February 26, 1997
Hessian, McKasy & Soderberg
Attention: Marc Kruger
4700 IDS Center
80 South 8th Street
Minneapolis, MN 55402
RE: Equipment Building at Crest Water Tower, Prior Lake, MN
Dear Mr. Kruger:
The City of Prior Lake has completed the site plan review for the Airtouch Cellular
Communications Equipment Building on the Crest Water Tower site. The site plan and
landscaping plan you submitted, dated "Received, February 26, 1997" is hereby approved
subject to the following conditions:
1. Airtouch Cellular is responsible for repairing any damage to the existing roadway
occurring as a result of construction;
You may now proceed with your lease agreement and your building permit application.
Questions about the lease must be directed to Ralph Teschner, City Finance Director. Any
questions aQout the building permit process or requirements must be directed to Gary
Staber, City Building Official.
If you have any additional questions, please contact me at 447-4230.
~IQ. ~~.A:..
U~~n~~~~ Kansier,l ~~-
Planning Coordinator
c: Ralph Teschner
Gary Staber
Greg IIkka
1:\97files\97sitepl\uswest\apprlet2.doc
16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372~1714 / Ph. (612) 447~4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
~ [l.?; r;:::::. re" n \\ 17
D 5 \27 L::~ 1..1 \~
r --_._~
LAW OFFICES 1
HESSIAN, ~;,,~S~,~ODERBERG ~~I F~2 5~97 _
Minneapolis . Saint Paul . Washington, D.C.
4700 IDS Center
80 South Eighth Street
Minneapolis, Minnesota 55402-2228
(612) 330-3000 Facsimile 371-0653
Marc L. Kruger
(612) 330-3060
February 24, 1997
Ms. Jane A. Kansier, AICP
Planning Coordinator
City of Prior Lake
16200 Eagle Creek Avenue S.E.
Prior Lake, Minnesota 55372-1714
Re: U S WEST NewVector Group, Inc. (AirTouch Cellular)
MINMYSTICLAKE
Dear Jane:
I have had the Site Plan (Sheet No. Zl) dated January 10, 1997 revised to show a twelve
(12) foot wide paved driveway running around the base of the water tower, and to show how
that driveway connects to the parking area for the property to be leased to AirTouch. However,
as you can see, such driveway has been marked "Provided by others" because it is the intent of
AirTouch to begin its construction at this location after Sprint, and so (as you have explained)
Sprint will be the party responsible for the installation of this driveway.
As required, I enclose three (3) copies of this plan. I understand that you will mark one
of this copies as "Approved" and return the same to me. Please contact me immediately if the
plan enclosed requires any further modification.
Sincerely,
Marc L. Kruger
A~f i.
Enclosure
cc: Mr. Kent Sticha (w/o enclosures)
Ms. Suesan Lea Pace (w/o enclosures)
127752-1 0530200-008500
eo II j 11 ~ 0 0 j
HE~~IAN HKAn ~~DERBER~
~UI~/n 10:01 r.~~l/~~l
LAW OFFICES
HESSIAN, McKASY & SODERBERG
I'MOI'll81lIOl'W. AlIlIcXIATIOM
Minneapolis . Saint Paul . Washington, D.C.
4700 IDS Center
80 South Eighth Street
Minneapolis, Minnes018. 55402-2228
(6l2) 330-3000 Facsimile 371-0653
TELECOPlER TRANSMISSION RECORD
Sent To:
Jane Kansier
Ralph Teschner
447-4245
Telec:opicr:
Re:
U S WEST
NewVedol" Gl"OI,lP,
Inc. - Water Tower
Antennae Agreement
By:
Marc L. Kruger
Direct
Telephone:
Date:
(612) 330-3060
Febroary 18, 1997
Original will not be mailed.
Tilt! i/'l.fomlll1:ion cofltmned in rl1is telecopier transmission is confidential communication and is intended for tile IlJ'e
of tile. individual 07 entity namt!d above. If tile r<!oder of this message is not tile intended recipient, or tile
employee or agefU responsible to dl'lil1e:r ;/ to the in/lmrJed reopiefl/, YOIl. are. here/I)' IWrifl.l!d cluu fillY disl1ibutiOll
or copying of tllis commu.nication Lf stricrly prolribired. If you. have received rhis facsimile by mistake, please
i.,,/1f1.ediately notifJ us b)' telepllane, and 1"l!t/l1"ll all tile docltments received to us at the above address.
No. OF PAGES, lNe,LUDING THIS SHEET:
DOCUMENTS TRANSMITTED:
COMMENT:
2
REVISED SITE PLAN.
FOR YOUR REVIEW AND APPROVAL. NOTE
ALSO THE .l1AfIlDWRlTTEN ADDiTION; WE
ANT1CfPATE THAT OaR FACJ.LlTY WILL BE
CONSTRUCTED AFTER SPRINT'S, SO THE "llING
ROAD,j WILL BE IlPRovIDED BY OTHERS"
(SPRINT).
127377.1 QS3()2(X).OO8S00
8unde Land 8ur"eyina. .n<<:.
PRINCIPALS
EDW"'RD H. SUNDE, R.L.S., PRESIDENT
JOHN K. BARNES, R.L.S., SR. VICE PRES.
MARK S. HANSON, R.L.S., SR. VICE PRES.
SCOTT J. SOUKUP, R.L.S., VICE PRES.
9001 E. Bloomington Freeway
Bloomington, MN 55420
(612) 881-2455
FAX 612/888-9526
January 24, 1997
PROFESSIONAL SERVICES
LAND SURVEYING
LAND TITLE SURVEYS
CONSTRUCTION SURVEYING
C.....D. SERVICES
U.S. WEST NEW VECTOR GROUP, INC.
MINMYSTICLAKE
Prior Lake, MN
PROPOSED INGRESS AND EGRESS EASEMENT DESCRIPTION
A 15.00 foot easement over and across that part of Outlots A and B, SAND POINTE 3RD ADDITION,
according to the recorded plat thereof, Scott County, Minnesota. The centerline of said easement is
described as commencing at the southwest corner of said Outlot A, thence on an assumed bearing of
North 82 degrees 58 minutes 36 seconds East, along the south line of said Outlot A, a distance of 127.95
feet; thence easterly a distance of 109.39 feet, along a tangential curve, concave to the northwest, having
a radius of 855.49 feet and a central angle of 7 degrees 19 minutes 34 seconds, along said south line of
Outlots A and B to the point of beginning of the centerline to be described; thence North 8 degrees 33
minutes 10 seconds West a distance of 147.26 feet; thence North 33 degrees 23 minutes 03 seconds West
a distance of 45.01 feet; thence on a bearing of West a distance of 39.90 feet and said centerline there
terminating. The sidelines of said easement are to be prolonged or shortened to terminate at said south
line of Outlot B.
PROPOSED LEASE PARCEL DESCRIPTION
That part of Outlot A, SAND POINTE 3RD ADDITION, according to the recorded plat thereof, Scott
County, Minnesota, described as commencing at the southwest corner of said Outlot A; thence on an
assumed bearing of North 82 degrees 58 minutes 36 seconds East, along the south line of said Outlot A, a
distance of 127.95 feet; thence easterly a distance of 109.39 feet, along a tangential curve concave to the
northwest, having a radius of 855.49 feet and a central angle of 7 degrees 19 minutes 34 seconds, along
said south line of Outlot A and the south line of Outlot B; said SAND POINTE 3RD ADDITION; thence
North 8 degrees 33 minutes 10 seconds West a distance of 147.26 feet; thence North 33 degrees 23
minutes 03 seconds West a distance of 45.01 feet; thence on a bearing of West a distance of 39.90 feet;
thence on a bearing of North a distance of 7.50 feet to the point of beginning of the parcel to be
described; thence continuing on a bearing of North a distance of20.00 feet; thence on a bearing of East a
distance of32.00 feet; thence on a bearing of South a distance of 20.00 feet; thence on a bearing of West
a distance of 32.00 feet to the point of beginning.
OVERALL PROPERTY DESCRIPTION
(Per Certificate of Title No. 15512)
c;.,.
-
". ~.
~ -
...,
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVENUE SE, PRIOR LAKE, MN 55372
Date: February 12, 1997
Number of pages including cover sheet: 2
To: Marc Kruger
Hessian McKasy & Soderberg
4700 IDS Center
80 South 8th Street
MinneaDolis, MN 55402
Phone: 330-3060
Fax phone: 371-0653
CC:
From:
lane Kansier ()/\V J
\
Planning Coordirl: tor
City of Prior Lake
16200 Eagle Creek Avenue SE
Prior Lake. MN 55372
(612) 447-4230
(612) 447-4245
Phone:
Fax phone:
REMARKS:
o Urgent
181 For your review 0 Reply ASAP
o Please comment
Attached is a copy of the Sprint site plan showing the road around the tower. The Airtouch Cellular site
plan must also show this road, and how the site will attach to it. If you have any questions, please contact
me at 447-4230.
-
'\ ~ ~
/0 ~ I
~
<t, \
"-
{ "'-
'\ "-
I "-
'-
--
"-
"
-
--
-
-
- -
-
-
--
996
--
"
"
~~---
'\ - .9
, ~s
\ "
_J,..--- \
\ '\.
~ "-
:l;O'
\ '\.
" "'-, '
"
"-...
~
~
\';
"
\:.
'/ "-
/ "- "
\
\
\
",\
\\
\\
~
EDGE 81\. .
\ ENTRANCE
--...
/
\
\
~ <:
OIST\NG CONC.::.cu"RB . ._ \ .. . -.----:::::- - 4
_ ...c...:;::.:.; _-:::.,,.,. .... .. _. - ~ - ------ - r;;;;;;
~A SA
~_.l-
.... -.' .'
C[DARWOOO
5TR[[T
'~
\'
, /
't
February 12, 1997
Hessian, McKasy & Soderberg
Attention: Marc Kruger
4700 IDS Center
80 South 8th Street
Minneapolis, MN 55402
RE: Equipment Building at Crest Water Tower, Prior Lake, MN
Dear Mr. Kruger:
The City of Prior Lake has completed the site plan review for the Airtouch Cellular
Communications Equipment Building on the Crest Water Tower site. As I mentioned in our
telephone conversation today, the site plan and landscaping plan you submitted, dated
"Received, February 5, 1997" is in general compliance with City requirements; however, this
site plan must show the road around the water tower. Once you have submitted a revised
site plan showing this road, we can approve the site plan with the following conditions:
1. The road around the water tower must have a 4" aggregate base and a 2" bituminous
surface on a 12' width (see attached cross section).
2. Airtouch Cellular is responsible for repairing any damage to the existing roadway
occurring as a result of construction.
Once the site plan is approved, you may proceed with your lease agreement and your
building permit application. Questions about the lease must be directed to Ralph Teschner,
City Finance Director. Any questions about the building permit process or requirements
must be directed to Gary Staber, City Building Official.
If you have any additional questions, please contact me at 447-4230.
Sincerely,
(J.~
~ Kansier, Alep
Planning Coordinator
c: Ralph Teschner
Gary Staber
Greg IIkka
1:\97files\97sitepl\uswest\apprlet.doc
16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
INTEROFFICE MEMO
FROM:
DATE:
Greg IIkka
Gary Staber
Jane Kansier, Planning COOrdinato~
February 5, 1997
TO:
RE:
Communications Equipment Building (US
West)
Attached are the revised plans for the US West Communications building located
at the Crest Water Tower site. As you know, the recent amendment to the
Zoning Ordinance requires site plan approval by the City Engineer, the Building
Official and the Planning Director for these buildings.
I have scheduled the review of the plans for Wednesday, February 12, 1997, at
2:00 PM. Please let me know if you have any questions.
I :\97files\97 sitepl\uswest\revmemo.doc
LAW OFFICES ~rn@rn OW@ ~
HESSIAN, MCKASY & SODERBERG ) ': I 'I
\ f1J 51197 I~
PROFESSIONAL ASSOCIATION
Minneapolis Saint Paul Washington, D.C.
4700 IDS Center
80 South Eighth Street
Minneapolis, Minnesota 55402-2228
(612) 330-3000 Facsimile 371-0653
Marc L. Kruger
(612) 330-3060
February 4, 1997
BY MESSENGER
Ms. Jane A. Kansier, AICP
Planning Coordinator
City of Prior Lake
16200 Eagle Creek Avenue S.E.
Prior Lake, Minnesota 55372-1714
Re: U S WEST NewVector Group, Inc. (AirTouch Cellular)
MINMYSTICLAKE
Dear Ms. Kansier:
I have been asked by my partner, Jay Littlejohn, to follow up with you concerning the
additional plan requirements for the proposed equipment building for this facility which are set
forth in fax to Jay dated January 17, 1997 and your letter to Jay dated January 21, 1997.
The original Site Plan (Sheet No. ZI) dated January 10, 1997 has been revised to show
(i) a separation between the eastern edge of the roof of the equipment building on the U S
WEST lease site and the western boundary of the Sprint lease site of twenty (20) feet, five and
one-half (5-1/2) inches, (ii) that the roof overhang of the equipment building falls within the
boundaries of the U S WEST lease site, and (iii) a fifteen (15) foot wide paved driveway running
to the western boundary line of the U S WEST lease site.
In addition, the landscaping plan described in your January 17, 1997 fax has been
prepared (Sheet No. Ll), which shows (i) the trees (evergreens and ash) surrounding the existing
equipment building on the site, (ii) the proposed locations for the Colorado spruce and amur
maples to be planted as a part of the U S WEST development, (iii) a materials list for those
plantings and details for the planting of those trees, and (iv) a partial topography for the entire
water tower site, which demonstrates that the floor level for the U S WEST equipment building
is approximately three (3) feet above, and more than forty (40) feet to the South of, the storm
water detention pond along the northern portion of the water tower property.
Ms. Jane A. Kansier, AICP
City of Prior Lake
February 4, 1997
Page 2
However, these plans do not show the driveway to the U S WEST lease site extending
around the base of the water tower, as mentioned at item 2 of your January 21, 1997 letter. It
is our understanding that Sprint has already agreed, as a part of its obligations under its lease
with the City, to pave the area surrounding the water tower, and so it should not be necessary
for U S WEST to provide for the same on its plans.
As required, I enclose three (3) copies of each of these plans. This submittal should
permit the City to complete its site plan review process, and so be in a position (upon approval
of the zoning text amendment) to prepare for execution the Water Tower Antennae Agreement
with U S WEST. In connection with that preparation, I also enclose (i) a copy of the Survey
of the water tower property prepared by Sunde Land Surveying Inc. (last revised January 24,
1997) containing legal descriptions for that property, for the proposed U S WEST lease site, and
for the proposed easement for ingress and egress to that lease site from Cedarwood Street, (ii)
a sheet also prepared by that surveyor and dated January 24, 1997 with those same legal
descriptions, and (iii) a copy of the form of Exhibit D to Water Tower Antennae Agreement
which has been completed with the materials to be used for the U S WEST equipment building.
Please contact me immediately if the plans enclosed require any further modification, or
if there is additional information required for the preparation of the Water Tower Antennae
Agreement.
Sincerel y ,
~~ K~er 1(1'
Enclosures
cc: Mr. Kent Sticha (w/o enclosures)
Mr. Ralph Teschner (w/o enclosures)
Ms. Suesan Lea Pace (w/o enclosures)
126059-1 0530200-008500
January 21, 1997
.
Jaymes Littlejohn
Hessian, McKasy & Soderberg
4700 IDS Center
80 South 8th Street
Minneapolis, MN 55402
RE: Communications Equipment Building at Crest Water Tower, Prior Lake
Dear Jay:
The Building Department, Engineering Department and the Planning Department have completed the
site plan review for the proposed US West equipment building at the above site. The following
changes/additions must be made before we will approve this site plan:
1. The site plan must include topographic information and existing landscaping. We are especially
interested in the location of the proposed building to the top of the slope of the stormwater
detention pond on the he north side of this property, adjacent to Highway 42.
2. The area to your lease site must be paved. You must also pave any parking area on your lease
site, adjacent to the building. In addition, the driveway to your site must be extended around the
water tower.
3. The overhang of your building must be completely on your lease area.
4. As I mentioned in the FAX I sent you on January 17, 1997, you must also submit a landscaping
plan. The Engineering staff has also noted that no landscaping rock may be used on the site, due
to vandalism problems we have experienced in the past.
Please submit at least three (3) copies of the revised plans to me. Once I have received therevisions,
I will schedule another review meeting.
Thank you for your attention to this matter. If you have any questions, please contact me at 447-4230.
~sincereIY'O, ~
ane A. Kansier, AICP
lanning Coordinator
c: Greg IIkka, City Engineer
Gary Staber, Building Official
Ralph Teschner, Finance Director
1:\97files\97sitepl\uswest\0121Iet.doc
16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
Jane Kansier
From:
To:
Date Sent:
When:
Subject:
Jane Kansier
Gary Staber; Judy Pint; Greg IIkka
Friday, January 17,1997 12:57PM
Tue, Jan 21, 1997, 1 0:30AM - 11 :OOAM
Communications Equipment Buildings
US West and Sprint are looking for approval on the site plans they have submitted for the equipment
shelters at the Crest Water Tower site. I am scheduling this meeting in the hopes we can get this done. I
distributed the site plans to you on January 15th. If this is not a convenient time, please let me know so
we can reschedule. Thanks.
Page 1
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVENUE SE, PRIOR LAKE, MN 55372
To: )aymes Littleiohn
Hessian McKasv & Soderberg
4700 IDS Center
80 South 8th Street
Minneaoolis. MN 55402
Phone: 330-3003
Fax phone: 371-0653
CC:
Date: January 17, 1997
Number of pages including cover sheet: 3
From: lane Kansier
Planninsz Coordinator
City of Prior Lake
16200 Easzle Creek Avenue SE
Prior Lake. MN 55372
Phone: (612) 447.4230
Fax phone: (612) 447-4245
o Please comment
REMARKS:
o Urgent
~ For your review 0 Reply ASAP
I have completed a preliminary review of your plan. Before we can proceed, the following changes or
additions are necessary:
1. The lease area you show appears to be too close to the Sprint area. There must be a 20' separation
between the buildings; it appears your lease area is 10' from the Sprint building.
2. A landscaping plan is required. As you prepare this landscaping plan, please keep in mind the following
points:
. The purpose of the landscaping is to screen the building from the road and the adjacent residential
area. It is not necessary to screen it from the water tower or other equipment buildings.
. For screening purposes, coniferous trees work best, although some combination of coniferous and
deciduous trees may be appropriate and attractive.
. Coniferous trees must be at least 6' high; deciduous trees must have at least a 2 1/2" caliper.
The Engineering and Building Departments have not yet completed their reviews. I will forward any
comments they have as soon as possible. Please let me know if you have additional questions.
1
~
~
-
.~
~
j
~
~
\-
2
~
<+
VJ
~
r::::
Q
~
~
C)
--.I
o
lL.J
-.I
>-
I-..
es
~
2:
qj ....
.(:;:... 0
.....1::: ~
....l(j c:
01il..... 0
~215 .!!
'" ......t;::
~1000.~
lIl~1:Ic:
~~ .0
oltl.....
0'10..... .!2
.~ ~ g Q,
-01:;,'11
......0 :S
c: s:::
:8o~o
-_..... t3 "f.J
~~lIlO'l
0( ....0 .10
a:i 1:1
~ '11~
~ '0.10 ~
tU~: tJ
......::3...;:"
.10 0 ~ t:i.
&~:s~
~~~o
c: lIl.1;;
~'O'I1~
.'b:S~
ltl~c:'I1
'o.(:;O~
~t:......s
:;, 0.1;;
Oc:o~
.... '11 Q, c:
0,(:;00
..... \...
'tc:OQj
ti 0..... E
Q, :... 0
..........1::0
0.10 '11.....
:50(;;(1)
Q,00
~o~~
!;; .........
........:;,::J
000
50'1l1llll0
:e.s Q) ~ "0
~ ~ g.... ~
0( 'o.~.... t:
'11.... 0.10
~ ltl :...~
I<j L' -
"4ialS\
_'11~.........
~.!;;t::lIlt:
c: - 0 '11 ::.
'o~0;t8
Q..'I1.....:S
~~gJ:;,::::
C:lil"~O
~{l:tt<X
~ 0'1 g ~ .S
......~ 'I11Q~
go:s~~
- - (,,)
<5:E'O~~
~:1
~
'11
ii:
<=
a
i:::
~
~
~
C)
--.I
d
lL.J
-.I
~
V)
~
~
Q.
~
V)
LS
--.I
i..:5
:...10:.....
~O.....'O
1ii~~Q.
~~<5 ~
..... ....
.~~~~
_0101
.'6.... 0'1
t: 0.10
:8ltiqjr!
~.....~8
,,0 \,)
'l(:;:;to
~<5.(:; t:i.
I<j~:;~
~ ~ ~.~
.1;;.... CI) E:
&O:Sal
'11 ....
-g~8!1l
ti.(:;..... ~
(I) 't .S :S
a:ioo~i.;
C:Q,t:~
'O'Iloo,g
:;:;:s 0 \....E
::. .... '11
Oc: ElIl
....o~oo
0..... al U ~
.....s 1iI.... '11
l:::Oti~:Q
...Q,qj'llb
Q, 0.(:;.(:; 1Il
..... ......owCl)
o.....~::.~
:S01ll~t:i
~O'IqjQ)""
S:::'S u.(:; 0
tiC:~""'~
a .~:S '0 ~
;;::~ l::"'~
"ti . CD ai
l:iI ~,>f:......t-
O(,S()~C::
.~ Q-U;t~
o ~'lllil:SO
~ ,g~~::::
.!bslllO
Q) .S II \....... (l)U
:S O~OQ)
Q.. t:~c:
'0 ~ 0'1 'Il '-
't ~.~:S~~
ti lil,Q......:u
Q, O(.~ o~ ~
o ~.........
:S 'O~Q)60
::;::.......1;)....,1:)
~ <5'O~~6
\...
OQ)
'II 0
.A::le
0.....
01 ..... .!!!
1:10 O'I~
5...: a.1;; 0
UIII~:;'.....
2:~.t'~1II
~c:~
- 0""
~{3i:iu
t:'ll 0'1
~O:!ilQ).s;
:;~h~2
.S III t.(:; .A::l ti>
Eo~"" qj.s:
o Q)." U c:
~ 01 .A::l:"( i.s
qj . 0'1
lIl~ 0 :S'II
lb-............ .a
tl.S: 'Il.!O ......
5.E:!:::&to
{l~Vjlll~""
\'\j III oo's
Q;) 'II 00
lI)~.!!!o .Q,
:s~~-g'll
:;, ti'tQ': 11.... :S
~{l~~~2
tl~~~g....
o ti'l1
5i.(:;'II\........~
.(:;....-l'l1l1l
.....~'ll;::;:'60
;;;: 0 0
~ :S.s 00
.....~....~.(:;to)
ol;)O'll't....
:;:;'110'1.(:;00
:;,.A::l t:....;;;: CD
o 0( 't;:.S 0'1 (,,)
:tl ......s: ~ c: !::;
...... 0 ir .......t ~
~:;:;.A::l 0 ~.!!!
....oc5....0.A::l~
0..... 0
:tl 'II
~.6.....q; g:s
E lIl.~~ CIl::.
8 '0 Q,1Q :S ~
..... Q)1Q,;,;-.....
III '11.(:;" CIl ...,
Cb.S....., Q).s....:
~-0....-.::~1lI
:fi.(:;.....O~CD~
Cj........IlII<).A::l
c:~Q)u,,'I1Q)
t:~6-uls
III '11 ........ 5i :;,
:S:Sco.!!! 0.(:;<5t
.1:1 ....
..... .... II)
og-"ou..~
O'I'e ~ 1iI ~ ~ "
'!O:;'OOOl~O'I
g ~ II) I.iJ '6 0 .S:
'IlOOO'loO.S
E t: .r::: II) 0
E ...: ti i::........,.....
l/)..... 0 1Il'~ c:
8~~~~'O8
~
:!il
b
III
~
~
o
~
QI
:S
~
e
g
~
~
\...
~
o
III
Cll
1Il
o
e-
:;,
Q,
l:l
~
2'i.;
~~
5::::
.E
III 1Il
~o
\...
O'I~
.S: ~
\....;;:
.Eli:
.....~
&i
E'!!!
CIl.(:;
~.~
QI.(:;
.....~
0....
.EO
04>
0.10
11)1::
-~
oi
U
.(:;
~CI)
!t:S
lii~
:S~
~~
~~
III
U
5iQl
.(:;.1;;
.....-
..~
tal
0~:S
..... :::l
~~ 0
liJ~lIl
1Il~ 'Il
1:I....:S
500
~'Il"'"
III U .
~6~
,....~~
1Il '6 \...
'Il 0
.....0
:;, III
.10 'ti ~
E~ E
I<) ...:
lO{;l1ll
~a-l!!
'IlUIQ
5.~~
II) "
~I<)~
_0_
-t)....
.c:~o
....:;,1lI
5.C: U
lilE6
'Il .....
\,)~:5
I::
Qj III 0
:S'Il
'Il....
'. 5. I/)
· 'Il~
.0( ~
.....I")~
.S I<) c: ti>
&.(:; 8.s
.....Q).....
0:;'1Il0
....~o'!:;
~ - E
~ggJ~..:
-l!!Qj..... Q)
'Il.(:;:;' ~~
\.........s 'Il
~,;,;-E::S~
0'l11<)~0
.A::l-l!!"'l :;,
~ C:I:r
~ 1Il 0<11
~~3lltl"
....10 5......~
.....C\f'll.Q~
O....~.....
0'1 0 ~ cl 0'1
~ CD..... .S
.", U '-' :tl .1::
c: s:::.(:;.- 0
.S ti..... ~.....
0'1..... :;, -, t:
~~~'O8
~
----.
w
w
I
N
VlLf'l
()C"-l
zl
-0
3:0
<((X)
0:::1
o~
----
o
O:::-1Z
0-10
u<(-
wu!::
O:::w6
oZ:2
ZOW
<( 0
W
Vlt-O:::
z;=:o
QVlZ
~O:::O
uWi=
OI<(
-1~~
00U
.-J X
W .W
-w
lL.-!>-
mz
:2(7i<(r--.
~VlOo:t
lL.ot-(X)
0.. 'V
W o:::W
o:::wo.....
<(0:::_
Wo::: .
zIo..O
3:3: Z
o
Oowt-
Iwf-W
Vl-U~
~<(~
Vlo:::t-t-
wwZ
->0>-
!:: um
:=!o
t-.-JWz
:::>'=!mo
..lL. i=
w t-<(
t-oVlu
OZ:::>o
Z<(:2-1
~.
//'\ \
// \
// \
\
\ \
\
"f~\~ \
-1:1:1 \ ~
""\~
0",,\
~\ \
\
\
\
\
//
///
//
//
///
//
//
//
,./
,./
//
(
en
:....\
r-
~ ~ -:::;
f>L ~ "" itO
.C::
~ ~ ~ ~
, Cl ~~
, , ~(;) ~. ~ ~~\
t:
I ~(;) ~
, NcQ
I o 01 a: ] ...~
~
(I) ~ 0
1
--- ~
,
I
I
I
oI~~ /
,/
~~
iJ'J,6
'l.o'J
c}oJ
.... ~
~1l~
"'l: ~IO
a
l:JlCl. d
oS ,,<:
-(/I
~ 28
~ ....IC:~
bt~'"
,!>.'!>
~.
m
.-s....
~i
~~
_1.4.i
,-<.
I-
Z
<5
0..
~~Va 0)\
i~ / i< ; \ ,~
~_ / ~~~ \'8
/1 : ~\"""
'!! <0 \
.. co
~t 5\ \
__-~_J
,/
,/
~
~~? 0
/ ~ /
e?'
~
~
~
"(
-..I
~
a::
Q.
/
orn'ZZ := 1
fWfZ9 := ~
..tl,f1fog, := ~
~
~. .
<C'-tO
z,,1{)
5..,foi
o::.:ot.f'l
O~~
O~N
uo 0
~I')
~~cn
:I: W
o.wO Z
~O~I')O
0~G(()~
~~g~~
:S:
~
l&..
o
W
(f)
a)
!;(
LL LL
<l '0..
::::>0
o::>u...
(/) .0
Q..
"": ~
'<t -
goO
c.D~1
NZ
.-OZ
NO
L51-i=
o:::zS::?
<(wO
o:::(/)
wo:::-
1-::::>0:::
UiO~
~!
Jl
~ J"~
VJ]~
~ -\- j
Ol~fa
Q.. :3
VJ ~ a
~I-
~ zt::J
~g:
- I-(/)
ZO
~o
00
>-3:
I~
1-0-1
::::>w(/)
zu~
0<(
~ZO'l
I-<(LO
..wo
::,.::::::>O'l
o:::zO'l
<(w
~>z
<l:0
II-i=
O(/)<(
zwGj
WO:::-I
mow
INTEROFFICE MEMO
TO:
Don Rye
Greg IIkka
Gary Staber
Jane Kansier, Planning COOrdlnato,(~
January 15, 1997
FROM:
DATE:
. RE:
Communications Equipment Buildings
We have received two requests for communications equipment buildings at the
Crest Water Tower site. As you know, the recent amendment to the Zoning
Ordinance requires site plan approval by the City Engineer, the Building Official
and the Planning Director for these buildings.
Attached are the site plans. I am hoping we can review these plans tomorrow,
sometime during the DRC meeting. Please let me know if you have any
questions.
I:\drc\distmemo\commemo.doc
. _.__....-."-_.~-.---
, ~. -, r--.., ,
........ ! I'>
'j 1 \1
! i ii
.j t l
L\ W OFFlCES
HESSIAN, McKAsy & SODERBERG
PROFESSIONAL ASSOCIATION
Minneapolis . St. Paul . Washington, D.C.
\. i
uL
JAN t 5 1991
i '~
4700 IDS Center, 80 South Eighth Street
Minneapolis, Minnesota 55402
(612) 330-3000 Facsimile 371-0653
. '. t .1 ..r
J \.~/ ~
..J
Federal Identification
# 41-1751152
Jaymes D. Littlejohn
(612) 330-3003
January 14, 1997
Via Messenger
Ms. Jane Kansier
City of Prior Lake
16200 Eagle Creek Ave. S.E.
Prior Lake, MN 55372-1714
Re: Site Plan Review - Cellular Antenna Site
Water Tower at 5580 Cedarwood Street
Dear Ms. Kansier:
Thank you for taking the time to speak with me before and after the city council meeting
on January 6, 1997 and for speaking with me on the telephone today about this site. As you
requested, I have enclosed three (3) copies of the site plans and elevations for the proposed
cellular installation on one of your city's water towers.
As staff requested, we have moved the proposed location of the equipment shelter so that
it is 30 feet from the base of the water tower. I understand that, when my client discussed this
installation with city staff months ago, staff requested that our proposed building be constructed
with an exterior that matches the existing building that AT&T Wireless has at the site. This will
be done, and the elevations on this drawing bear that out. Finally, you asked that the site plan
contain contours of sufficient detail so that you could assess whether the ditch or swail to the
north of the building would be affected by the new location. As you can see, the elevation of
the base of the building will be approximately 998 ft. above mean sea level, and the ground
elevation rises above that level to the north of the proposed location.
I understand that staff can now conduct an internal site plan review of the proposal.
When the site is approved, and assuming that the city adopts the zoning text amendment that has
been proposed, we can complete the lease. We hope that site plan review can be completed in
the near future so that I can provide the legal description, building description, approved site
Ms. Jane Kansier
January 14, 1997
Page 2
plan and elevations, the legal name of our client (D S WEST NewVector Group, Inc.) and other
materials necessary so that the city attorney can prepare a lease that is ready to be signed
immediately after passage of the zoning text amendment. Working drawings for the site can
then be submitted for approval, and we can begin paying rent and building the site.
Because my client first approached your city in August of last year with its request to
lease this space, we are eager to bring this matter to a close. Therefore, if you need further
information so that this can be completed, please let me know.
If you would like to discuss this further, please contact me at your convenience.
Sincerely,
, HESSIAN, McKASY & SODERBERG, P.A.
.... /'l)
" /'~~~ --==
Jaymes D. Littlejohn
JDLI
enclosures
cc: Mr. Ralph Teschner (w/o enclosures)
Ms. Susan Lea Pace (w/o enclosures)
Mr. Kent Sticha (w/o enclosures)
124008-1 0530200-008500
City of Prior Lake
Prior Lake, MN
Ph. (612)
EXHIBIT D
to
WATER TOWER ANTENNAE AGREE.MENT
(Equipment Shelter)
Fax (612)
Quantity: -L
Description:
Structure:
43517
~ctural Steel Skid NONE
Floor. VINYL TILE & 3/4" SUBFLOOR ON CONCRETE
Walls. ARCHITECWRAL PANELING
CeiIin.2. ARCHITECWRAL PANELING
Roof. CEDAR SHAKES ON HIP ROOF -'SEE ATTACHED
Exterior. EMBOSSED FACE BRICK IN CONCRETE - SEE ATTACHED
/
w
u
~
a:: W
:::> ~
en co
~_w
o ~
~ C!)
:?; W
:::> a::
~- g
!D <r
=
=
N
..
'.
.;
~-
N
:"
~
..
.
"
",
.~,
"
..
,",
..
.:.
z
o
1==0
dO-'
w-;
Cf)=
co
Cf);;;
Cf)..
W
O....J
c:<r
'O~
B~I~nlij~o~
J I r KUAU
)022'OQ"E
HE~~IAN HKAn ~ijDERBER~
I'JU. 4L \ 14UTn
321.00
ijUI~/~1 10:01 P.ijijUijij~
~ I .)
Will - - -- - -... - - ---. - - -.......- "'7" - - - - - - --. - --,
32' X 20' LEASE PARCEL
SEE ENLARGED PLAN, 2/Z1
PROPOSED 12' X 24'
EQUIPMENT BUILDING
EXISTING WATER TOWER
,
Lf1
c
-
12' BITUMINOUS DR~ -
(FYW- ~ O~J '\
..P~.,..
- ---
_ ... ~-992-
7 95 -- - ----
12. . _ _.. -- - - - '\011
- - Si~B'36"W b;:: \9020
- CEOARWOOO
~--
~s'J.~~~-.
-;::. ~
~...
--
o
l-nTr-F