HomeMy WebLinkAboutReport of Final Estimate .. 11 1 7 --0 L ~\"NESo~ ~ ~ ~ 9- ~ ~ ~ ~ ~ ~ ~J' ~- OF TR~~ OJ:tP1CE MEMORANDUM Minnesota Department of Transportation METROPOLITAN DIVISION--Waters Edge State Aid Office To: Ms. Julie Skallman State Aid Engineer Mailstop 500 Date: March 23, 2000 From: Sharon LeMay Finals Administrator Metro State Aid Subject: REPORT OF FINAL ESTIMATE SAP 201-105-06 CITY OF PRIOR LAKE Please process the attached Report of Final Estimate for the above referenced project. Final inspection was completed on March 22. 2000. The project is in substantial accordance with the approved plans. Final payment is recommended. Documentation is attached as follows: . Report of Final Estimate . Copy of Final Voucher . Final Cost Distribution Please note any changes made to the documentation submitted and forward to me for distribution to the local agency. 'W;,;.. ....,Greg IIkka, City of Prior Lake MnlDOT 3g734 revised April 29, 1999 REPORT OF P:\RTI.A.L / FINAL ESTIMATE Partial Final X (check one) 6f:- S.A.P. No. 201-105-06 G:nw..t::.fCity Prior Lake (Submit one report for each SAP number) Local Project ID # 97-02 Funding shown below is for this project number only. Costs of projects or agreements tied to this project shall not be included on this request. A separate Report of Partial/Final Estimate must be submitted for each project number For Final Estimate use only: Attach final Estimate. Include quantity, unit price, and extension split for each project. Date work completed: lJ/ 31 /~. Date final payment to contractor: .JW.JlV-2.2.. Account Type *(see types below) Urban (MSAS) STATE AID CONTRACT COSTS Total costs to date $ 206.127.06 $ $ Less: ineligible $ 8.745.00 $ $ Less: eligible - local funds used $ 0 $ $ Force account costs** $ 0 $ $ Subtotal contract costs $ 197.382.06 It $ $ OTHER SA ELIGIBLE COSTS Project Development (PE/CE; 25% MAX) $ 8.617.94 $ $ Right of Way $ 0 $ $ Other $ 0 $ $ (specifY) TOTAL FUNDS REQUESTED $ 206.000.00 $ $ Remarks: For County/City Use (optional) Total Funds requested Less: previous payments Balance due this payment $ 206.000.00 $ 204.482.47 $ 1.517.53 $ $ $ $ $ $ "Urban (MSAS), Regular (CSAH), Municipal (CSAH), Co. Turnback (CTB), Munic. Turnback (MTB), Town Bridge, Fund 29, State Park, SA Bonds ""Include work by agency forces, MnDOT forces, locally furnished materials, railroad force account work, or utility force account work I hereby certify that engineering costs requested above do not exceed actual costs. Wage rates paid on this contract were equal or exceeded the minimum hourly rates required for state funded projects per the MnDL&I. Materials used in the state-aid funded portions of this project were sampled and tested in accordance with the Mn/DOT Schedule of Materials Control. Inspection on the state-aid funded portions of this project were performed by personnel certified in accordance with state-aid directives. The work required by this contract was completed in accordance with, and pursuant to, the terms of this contract. APPROVED: ANLp4~ //1 rU/~ (/ ~/;yiJ Engineer , ~7.t1 fl7//IUJ1t/!~ .-- [I District' State Aid- Engineer ;I' DATE: :<.1- SE~ PC; SIGNED: DATE: ,) / ;),3/ CD I I q"1- - () 'L ~\"'NESO~ ~ ~ ):; g ~ ~ ~ J-; ~ g ~ ~- ')- Of: TR~~ OFFICE MEMORANDUM Minnesota Department of Transportation METROPOLITAN DIVISION--Waters Edge State Aid Office To: Mr. Pat Murphy State Aid Engineer Mails top 500 Date: September 1, 1998 From: Sharon LeMay Finals Administrator Metro State Aid Phone: 651-582-1609 Subject: REPORT OF STATE AID CONTRACT SAP 201-105-06 CITY OF PRIOR LAKE Please process the attached Report of State Aid Contract for the above referenced project. The plans for this project were approved on Julv 16.1997 and project was let on Auaust4.1997. . Documentation is attached as follows: · Report of State Aid Contract · Abstract of Bids NOTE: This report has been revised to reflect the cost of only state-aid eligible items shown on the approved plan. The following items were removed from this report because they do not appear on the plan: 4 inch Perf Pipe Drain; Subgrade Excavation; Topsoil Borrow; Geotextile Fabric; 3 inch Quarry Limestone; and Dust Control for Water. The total cost of these items is $21,854.50. In addition, some items have quantities that differ from the approved plan--these too have been removed from the request: 60 SF out of 360 SF of Concrete Crosswalk and 2500 LF out of 5000 LF of Striping. This amounts to a reduction of $1,502.00. Lastly, the plan shows all contractor testing as being non- participating. The total amount of the reduction for these items is $870.00. The grand total for all reductions is $24,226.50. Please note any changes made to documentation submitted and forward to me for distribution to Local Agency. ce: Greg IIkka. City of Prior Lake Mn/DOT 31072 (Rev. i 5) REPORT OF STATE AID CONTRACT S.A.P. 201-105-06. Fish Point Road (Submit one Report for each project number.) Other S.A.P.'s or S.P.'s tied to this project City of _Prior Lake N/A (For reference only) TO THE COMMISSIONER OF TRANSPORTATION: The City of Prior Lake has entered into a Contract with McNamara ContractinlI. Inc. of Rosemount. Minnesota. for the construction of the above mentioned project which was let on AUlIust 4. 1997. in the total amount of $239.471.20. Payment and Performance Bonds for the full amount of the contract have been provided by National Fire Insurance Comoanv of Hartford. with the aggregate liability of the bond(s) equal to twice the amount of the contract. A portion of this contract in the amount of $0.00 will be paid for with local funds. The remainder of the contract in the amount of S;2J.9. ~ qualifies for State Aid participation and funding is requested on the following basis: ~f 51 '2\{y. I D 'd-I 5) d. "-14 . 70 $ ~1.20 from Municioal $ $ $ $ URBAN (Cities over 5000) Acct. * RURAL from Acct. * MUNICIPAL (under 5000) OTHER from Acct. * from Acct. * OTHER from Acct. * R/W Acquisition costs will not be requested. Project Development/Engineering costs in the amount of $ 0.00 are hereby requested. * ** Regular, Municipal, State Aid Bond Account, CTB, MTB Fund 29 (Bridge grants); Town Bridge; State park Road; etc. I hereby certify that the wage rates on this contract equal or exceed the minimum hourly rates required for work on state funded construction projects as determined by the Minnesota Department of Labor and Industry. Remarks: DATED: .2,1 A-ud q r l I 19 qr 1$ SIGNED: ~tuM// _/11. ljh~~ . A'", J!fA En}:':"". / /Yl APPROVED: /1f:7l ~W(fJ" tell q~ ~ District State Aid Engineer 17 DATED: 91- 0'2- Mr. Bob Brown Metro Division State Aid Engineer Minnesota Department of Transportation 1500 West County Road B2 Roseville, MN 55113 Subj: S.A.P.201-105-06 FISH POINT ROAD, PRIOR LAKE, MINNESOTA Dear Mr. Brown: Please find enclosed a Report of State Aid Contract for the subject project. Also included is a tabulation of the bids received on the project. Please forward these to the appropriate member of your staff for processing. If you need additional information or documentation or have any questions please call me at 447- 9831. Thank-you. Sincerely, A~fP/~-- Greg lIkka, P .E. City Engineer CITY OF PRIOR LAKE 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 I Fax (612) 447-4245 AN EQUAL OPPORlUNITY EMPLOYER MnlDOT 31072 (Rev. 12/96) REPORT OF STATE AID CONTRACT, S.A.P. 201-105-06. Fish Point Road (Submit one Report for each project number.) N/A (For reference only) Other S.A.P.'s or S.P.'s tied to this project City of Prior Lake TO TtlE COMMISSIONER OF TRANSPORTATION: The City of Prior Lake has entered into a Contract with McNamara ContractinQ. Inc. of Rosemount. Minnesota. for the construction of the above mentioned project which was let on AUQust 4. 1997. in the total amount of $239.471.20. Payment and Performance Bonds for the full amount 'of the contract have been provided by National Fire InsUrance Comoanv of Hartford. with the aggregate liability ofthe bond(s) equal to twice the amount of the contract. A portion of this contract in the amount of $0.00 will be paid for with local funds. The remainder of the contract in the amount of $239.471.20 qualifies for State Aid participation and funding is requested on the following basis: URBAN (Cities over 5000) $ 239.471.20 from Municioal Acct. * RURAL $ from Acct. * MUNICIPAL (under 5000) $ from Acct. * OTHER $ from Acct. * OTHER $ from Acct. * R/W Acquisition costs will not be requested. Project Development/Engineering costs in the amount of$ 0.00 are hereby requested. * Regular, Municipal, State Aid Bond Account, CTB, MTB Fund 29 (Bridge grants); Town Bridge; State park Road; etc. ** ---------------------------------------------------------------------------------------------------------------------- I hereby certify that the wage rates on this contract equal or exceed the minimum hourly rates required for work on state funded construction projects as determined by the Minnesota Department of Labor and Industry. Remarks: DATED: 2/ ~J 191r SIGNED: ~Afy1l/1/J Ih, W~'-- . - 1/ & Engineer DAlbD: 19 APPROVED: District State Aid Engineer