November 16, 1995
Mr. John Breitbach
c/o Prior Lake State Bank
16677 Duluth Avenue South
Prior Lake, Minnesota 55372
RE: Letter of Credit for Landscape and Irrigation Improvements for American Glass
and Mirror/Metro Cabinets
Dear Mr. Breitbach:
I am writing at the request of Guy Selinske to clarify for you the City of Prior Lake's
requirements for a letter of credit for the above-named improvements. The City requires
a letter of credit in the amount of 125% of the estimated cost of the landscape and
irrigation improvements. The requirement is spelled out at Section 6. 1 O(K)(4) of the
Zoning Ordinance, a copy of which is attached for your information. You may note that
the letter of credit is due for posting with the City at the time of issuance of the building
permit. All developers in the City are apprised of this requirement early in the review
process, just as the contractor for this project was in this case.
I hope this provides the clarification you require for issuance of the letter of credit.
Please call if you have questions.
,. ..
;~Z~~
--.-.: ~-
R. Michael Leek
Associate Planner
cc. American Glass/Metro Cabinets File
Gary Staber, Building Official
16200 mIW~HJ:~ve. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 4h7-4245
AN EQUAL OPPORTUNITY EMPLOYER
'C
,
r ~
: -
f-
l. :
L
[:
I"
l
..
""-
I..
I
I
~
6.11
or other debris and other horticulturally appropriate maintenance methods for the
specific type of plant community.
J. Performance Guarantee:
1.
All plants shall be guaranteed by the developer for one year after total project
acceptance.
2.
The irrigation system shall be guaranteed for one year concurrent with the plant
guarantee. This will assure one winter season with a fall shut down and spring
start-up.
The developer shall notify the City prior to total project acceptance, for City 3
concurrence on the acceptability of the complete landscape and irrigation system
installation. The City shall issue a letter accepting the landscape and irrigation
system installation and therein fixing the date for guarantee purposes.
3.
4.
The developer shall post a letter of credit with the City for the complete
landscape and irrigation system installation when the building permit is issued
(plants, irrigation, mulch and edgers). The letter of credit shall be held by the City
and used, if necessary, to effect satisfactory completion of the project in the event
of incomplete or failed work. The value of the letter of credit shall be 125% of the
estimated construction costs for plants, irrigation system, mulch and edgers.
Release of the letter of credit shall occur on the date that the City has reinstated ;."':
and accepted the landscape and irrigation system and notified developer in
writing of such acceptance. Such release date shall not be earlier than ten (10)
days prior to the expiration of the plant guarantee specified in paragraphs (J) 2
and (J) 3 above.
5.
K.
~:>
Submission Requirements:
1. Landscape plans must be drawn to scale, show all proposed plants, quantities
and sizes, seed/sod areas/limits, etc. The plan(s) must include the entire project
area. Include project' name, developer, Registered Landscape Architect or
landscape designer, architect, dates, existing site conditions (topography,
vegetation, ponding areas or water bodies, utilities, boundary data, walks, etc.),
proposed site conditions, (grading plan, tree preservation/protection plan, etc.),
site lighting, off site conditions approximately 100 feet beyond the site, and other
site conditions that would be expected to affect landscaping.
2. Calculations to evaluate compliance with the ordinance provisions including: area
in square footage and percentage in total area for building, parking lot (including
driveways), landscape areas and total area; and quantities of trees and shrubs
required and planted or preserved.
~:-..
... -
3. Supportive plans, details, written narrative notes, cross-sections or other
information as may be required by the Planning Staff that is reasonable and
necessary to demonstrate the design intent and general compliance with this
ordinance, including, but not limited to, items listed under Section (C) 2.
4. Fifteen copies of all plans shall be submitted.
SCREENING: (Ord. 95-05)
..........:-.-:-~"':-
A.
Screening shall be required in residential zones where any offstreet parking area
contains more than six (6) parking spaces and is within thirty (30) feet of an adjoining
residential lot line.
B.
Where any business or industrial use (structure, parking or storage) is adjacent to
property zoned or developed for residential use, that business or industry shall provide
screening along the boundary of the residential property. Screening shall also be
provided where a business or industry is across the street from a residential zone, but not
Section 6, Page 11
.".
EFH CO
1601 EAST HIGHWAY 13 #204
BURNSVILLE, MN 55337
(612) 890-6450
LETTER OF TRANSMITTAL
No. 00016
Project: METRO CABINETS
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVE S.E.
PRIOR LAKE, MN 55372
July 6, 1995
Attn: GARY STABER
RE: METRO CABINETS
AMERICAN GLASS & MIRROR
WATERFRONT BUSINESS PARK
X Attached
Separate Cover Via:
Shop Dwg
Letter
x Prints Plans
Change Order
Samples
Other:
Specifications
Copies Date Item Number
Description
1
2
IRRIGATION DRAWING
SURVEY OF PROPOSED PROPERTY
These above items are transmitted for your action as noted:
For Approval
X For Your Use
X As Requested
Bids Due:
For Review And Comment
Approved As Submitted
Approved As Noted
Returned After Loan
Returned
Resubmit
Submit
Return
For Corrections
Copies For Approval
Copy For Distribution
Copies Corrected Print
ANY QUESTIONS PLEASE CALL. THANKS.
Signed:
By:
Date:
Expedition (R)
CITY OF PRIOR LAKE
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372
FAX: 447-4245 -
TELEPHONE: (612) 447-4230
DATE:
TO:
FROM:
SUBJECT:
,vC8A99~5 TIME:
~ d~ FAX#:
Au:k1 ~~
I :2 g34 P. M
89Q - _-:5""4 7?J
MESSAGE:
Number of pages sent (including this page): ~
May 8, 1995
4
Mr. Mike Whalen, Project Manager
EFH Co.
160'1 East Highway 13
Burnsville, Minnesota 55337
RE: Metro Cabinets/American Glass and Mirror Site Plan Review
Dear Mr. Whalen:
The Development Review Committee completed its review of the plans you previously
submitted. The following, additional comments are were made in the course of that
review;
1.
Proposed grades around the back side of the building need to be shown
along with proposed grades or spot elevations towards the ditch and 6ll0ng
the ditch. -..a.....~ I ~ot'';:;!. ..eU-t'f'l,c.i: ~/'-,? ~~/~./f?lCAd .
The curb around the southeast entrance radius needs to be tipped out so
that water does not pond there. The grade is at 0.0% around the radius.
Per City Code 6-6-5:(C) all drainage ways or charmels shall be within
dedicated drainage easements. The east and west sides of the property
should have drainage swales provided within the proposed lOft. wide
drainage easements~o prevent drainage across adjacent lots.
Profiles must be shown for all utilities since they are larger than 4". These
profiles must include type of pipe, percentage of slope, invert elevation,
length of pipe, existing and proposed ground elevations.
Per Ordinance 6. 14H4, all parking areas and drives shall be constructed of
concrete, bituminous or similar durable surface free of dust. The
periphery of all parking areas and drives shall be constructed of "poured
in place" concrete. Two areas on the east and w~t..side of the building
appear to be in conflict with this requirement. cP4 --a..-t.t./''' t;J-l__ ,iflt/1'~
Per Ordinance 6.1 0H2, a~lla~ are~ and ~ainage swales shall be sodde~; . . _ _/
The landscape plan COnflIcts With this requIrement. ,,'Ut1.i-. ,drt.//!. ';N. ,.,':i4!... A"L.&a:~",-
Per Ordinance 6.1 OH4, all lawn and landscape areas shall have built-in
irrigation systems. The irrigation plan should be a part of the Landscape
Plan, and will be required at the time of building permit application. ~ -M..r"~~>?L.
2.
'"
.).
4.
5.
6.
7.
Metro Cabinets/American Glass
5/.Q.8/1995
16200 cagle Creek Ave,. Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTI.:NITY EYfPLOYER
8. The existing sidewalk will have to be removed for the construction of the
two driveways into the site. Pedestrian ramps will be required and shall be
shown the plans. ./~~<-,.
~ 9. The existing B618 concrete and gutter will have to be removed on the
north side of Cottonwood Lane for the construction of the 2 driveways.
Sawcutting of the existing bituminous will be require, and shall be shown
on the plans. A detail of the proposed driveway apron shall be shown.
The final lifts for all roadways in the Business Park have not been
_) installed, '/<- and the timing of that installation should be considered.
10. A total of24 trees would be the minimum required
(933.5 1.f. divided by 40 = 23.33, rounded up to 24). The plan is 14 trees
short.,-:?,~
11. The ordinance requires that 25% of the minimum required trees be either
coniferous or deciduous. No deciduous trees are shown. Nor does the
plan show 10% of the minimum required trees being of a larger size as
required (3.5" diameter for deciduous canopy and 8 feet high for
coniferous). ,.;,, ,t<t/>'
Parking Lot Planting:
14.
Landscape islands should replace the proposed painted "no parking" area
at the four comers of the parking lot. Per the Ordinance at least 225
square feet HM~
Additional plantlngs within the 10 foot side yards will help screen the
service drives and service door areas; none is shown on the plan. ~y
A minor adjustment to the location of the 2 spruce along Cottonwood/
Lane would be appropriate to insure a "clear view triangle" as the trees
mature.
12.
13.
Other General Comments:
15. A seed mix and installation technique should be shown on the plans. :'/~//L...::./--
16. Earth berming is not shown on the plans; if it is intended to provide
screening it should be shown. NA
17. The 14 additional required trees could be used in the parking islands, the
side yards adjacent to the drive lanes and around the building. With the
required size and tree mix diversity it could supplement the proposed
spruce along C.R. 21 in a more interesting, yet equally effective planting
arrangement.
18. Additional plant species diversity should be considered for some of the
additional shrub and tree plantings required.
/Cj) -~i~/:iC7j.,- -Z;Uv~ ".t:4t:::b-::.l~t/:ic..
/'
Metro Cabinets! American Glass
5/08/1995
2
05 02,'95
09:00
'6'612 93i 5822
WESTWOOD PRO SVS
!4J Oin 004
,. .
Westwood Professional Services, Inc.
'"
14160 W. Trunk Highway 5
Eden Prairie, Minnesota 55344
Phone: 612/937-5150
Fax: 6121937-5822
FACSIMILE TRANSMITTAL
DATE
TO
COMPANY
NUMBER
t~~
o..t ik- {'~--=.w~u
1:~ l -- ^--~
:I.__'"_"".___.".....,.~, . ~,.. ...,..........._._
~-~--------~
~ ~~~~~~~~...~J.,.~~~~.~~==
FROM
REGARDING
PROJECT NO
Number of Pages including this cover letter
~
Plo&l1$e call (612) 937-5150 if you do not receive aU pages or Olq)arienee difficult)' receiving thi$ tran(jmittBI
PURPOSE ~As you requested 0 For your appro\lal 0 Reply to sender
o For your information 0 As we discussed 0 Other (see remarks)
REMARKS
.~~~~~.-
:--
THE l}.'FORMA TION CO}.'! AINED IN TillS F AC5tMILE MESSAGii: IS LEG ALL Y PRNILEOED AND CO....'FIDtNTw.. lNFORMA nON
fNT8-UED SOLELY FOR TI-IE USE OF THE PERSONS OR ENTITIES NAMED ABOVE. IF YOU ARE NOT SUCH PERSONS OR
ENTmES. YOU ARE HEREBY NOTiFIED THAT ANY DiSTRIBUTION. DlSSEMfNATION OR REPRODUCTION OF Tl-US FACSiMiLE
MESSAGE IS smeTL Y PROHIBITED IF "OU HAVE RECEIVED THIS MESSAGE fN ERROR. PLEASE IMMEDLATEL Y C,-.LL US
COlLECT AT (612) 937-51 SO.
.:'''05/02/95
09:01
'ftS12 937 5822
WESTWOOD PRO SVS
III 002 /OO.!
.
WeSllMlod Proff4ssional Sarvitl3S. Inc.
'"
14180 Trun~ H...y 5
Eden Pr,;,'rte. MN 55344
612.93;.5150
MEMORANDUM
FAX 612.9:i7.5822
TO:
R. Michael Leek, City of Prior Lake
FROM:
Greg Kopischke
DATE:
May 1, 1995
SUBJECT:
Metro Cabinet! American Glass and Mirror
As per your request, WestWood has reviewed the Landscape Plan for the p'roposed Metro
Cabinerl American Glass & Mirror site on Cottonwood Lane/County Road" 21 as prepared by Finn-
McDaniais Architects dated March 29,1995. The review consists of quantification and observations
regarding the proposed landscape plan relative to the proposed site plan, site conditions and ordinance
standards.
A. Tree CakuIations
1. Required Trees
933.15 l.1'. perimeter -+- 40 - 23.33 minimum requirc:d trees
10,895 sq. ft. 7 1000 = 10.9 minimum required trees
Th~ larger of the two nwnbers would apply, so 24 trees would be the minimum required.
2. Trees Provided
Deciduous Canopy
Coniferous
Ornamental/Half
Totals
Shm!:n
o
2
.2
11
Equivalent Reoy.ired Trees
o
1
2
10
Since ornarn~ntal trees can substitute for canopy trees at a 2 for 1 ratio, the plan shows a total of
10 equivaknr trees. This is 14 crees short of the 24 required trees_
3. Plant Sizes
Thl:: propu$r.;d tree sizes are consistent with the minimum required standards. Ornamental tre~s
are I 3/4" diameter and coniferous trees are 6 feet high. No deciduous canopy trees are shown
(minimum 2 1/2" diameter).
The ordinan.::: requir.;;s that.l minimum 10% cfthe mi..."limurn required trees be oia larger size (3
l/2" dia. for deciduous canopy and 8 feet high for coniferous). This has not been provided.
-....-.. t'r......III...1 'i.,...c.... I"'''. ., 'l't 4t1l1u.' q~DO"U".... .......I~I
..
05/02/95
09:01
'5'612 9Ji 5822
WESl1VOOD PRO SVS
1ll00J/004
R. Michael Leek - City of Prior Lake
May I, 1995
Page 2
4. Tree Mix
The ordinance requires that a minimum 25% of the minimum required trees be either coniferous
or deciduous. This has not been satisfied since only 10% is provided (1 equivalent deciduous
tree vs. 10 total trees).
5. Existing Trees
"S"one are Showl1 on the plan. Some existing I:hinese ~lm and boxelder a.djacent to County Road
21 are not suitable for credit since they are short-lived species.
6. Plant Species
All plant material used is hardy for this region.
B. Parking Lot Planting
1. The: intcmai parking lot green space is insufficient to meet ordin.mce standards. The area.
involved is about 60' x 175'. The:: calculation.therefore is: (IO,SOOi: sq. it. . 6,000 sq. ft.) x 5% =
225 sq. ft. Required green space.
Tht: pla.i shows four painted Isla",ds at the ends ofrh.e parking bays. The two islands adjacent to
the building are 126:t sq. ft. (7' x 18') each while the two others towards Cottonwood Lane are
108: sq. it. (6' x 18') each. While 2 of the 4 areas would satisfy the minimum area required if
conv~rted to a cUrb~d planted area, it would be desirable if all four locations were converted to
llindscaped area. ro provide for better traffic delineation of the psrking lor and separ:ltion of drive
lanes from parking areas.
The ordinance notes that landscape islands :;hall be at least 5% of the paved parking area which
may require mort:: landscaped island area if deemed appropriate.
2. ni~ ::;hrub ",lid trc~ pla.L1tings adjac.ent '(0 Cuucn\Je'0ud La.ne '!.,1,'il1 provide t;ccd ~.:rt;;;tli~g :;f th;
parking ar-:<i ['vffi the :.>uut..~c:rly vil:w. Planting orthe end isla.nd.:; will hdjoJ :;,;cn::cni::.g from the
east or west approaches.
3. Additional f'l.::...ildng$ within the 10 foot side;: yards will help screen !h~ strv:,:,l:; drive.; and .iervic;
door areas. None is provided on this plan.
4. A minor concern would be a clear view triangle that may become screened as the 'CWo spruce
along Cottonwood Lane mature to full size. A minor location adjustment would be appropriate.
C. Grounds and Lawn
1. The plan notes all an::as to be soddt:d or seeded. A sodded strip is required betv-een pavee and
seeded areas.
2. A seed mix and installation technique is not noted on the plans.
J. The plan does not note use of an irrigation system.
.
,
05/02/95
'6'612 9Ji 5822
iii 00-1 /OO,L
09:02
WESTWOOD PRO SVS
R. Michael Leek - City of Prior Lake
May 1, 1995
Page 3
D. Genera) Comments
~ 1. The ~ntry planting area along Cottonwood Lane provides int",r.::st. AJditi0n;J.1 plantings (tr.;c; 4nd
shrub) within the to' sideyards shou.ld (;,ompliment the pla..jt~i1g.:; .she..,.... (...nd th,;: adjacent
plantings at Becker Arc:na Products if possible. especially regarding tree placement).
2. Earth berming is not shown on any plans. It should be shown if it is intended to provide
screening or supplement/complement proposed plantings.
"* 3. 1'11.:: spruce adjacent to Co::ll.lfIty Road 21 will provide some softening of the building mass and re....r
VIew.
4. TI.e 14 additional requirl:d tret:s could be used in the: parking island,,;, the siJe y;;.rds adjacent to
the .:irive lanes and 3Iound t.he building. Th.: required size and tree miA cli-.e,sity .:ould
$:.Ippleme:r:: the propcscd spruce along County Road 21 in a more in:cresti<1&. yet ~qu.:J.lly
effective, planting arrangement.
~ 5. Additional plant specie diversity should be considered for some of.he additional shrub and tree
plantings required.
IN7:'J:j}~O~~ICJ:j} ~NLO
To: Paul Boettcher, Engineering Department DRC Coordinator
From: Jeffrey T. Evens, Engineering Technician IV
Re: Metro Cabinets/American Glass and Mirror
Waterfront Passage Business Park (Site Plan Review)
Date: May 1, 1995
The following is a list of items that need to be addressed per my review of
above mentioned project:
1. Per item number (4) four on the Site Plan Application Checklist, profiles shall be
shown for all utilities larger than 4". The proposed utilities are both 6", so in turn
profiles are required. These profiles shall include type of pipe, percentage of slope,
invert elevation, length of pipe, existing and proposed ground elevations.
2. Per Zoning Ordinance 6.14H4, all parking areas and drives shall be constructed of
concrete, bituminous or a similar durable surface free of dust. The periphery of all
parking areas and drives shall be constructed with poured in place concrete curbing. A
curb detail in required. Two areas on the Development Plan appear to be in conflict
with this ordinance. They are located on the east and west sides of the building.
3. Per Zoning Ordinance 6.10Fl, landscape islands shall be installed on 5% of the paved
parking lot if the lot area is in excess of 6000 square feet. Depending on how the
actual paved parking lot is calculated, the square footage is between 7,800 & 12,450.
Concrete islands should replace the proposed painted areas on the four comers of the
proposed parking lot. It appears that the flow of traffic in and out of the parking lot
will have a tendency to cut across the comers. Landscaped islands would prevent this
from occurring.
4. Per Zoning Ordinance 6.1 OH2, all lawn areas and drainage swales shall be sodded.
The Landscape plan is in conflict with this ordinance.
5. Per Zoning Ordinance 6.10H4, all areas to be lawn and landscaped shall have built-in
irrigation system. An irrigation plan shall be required at the time of obtaining the
building permit. This plan should be part of the Landscape plan.
6. The existing sidewalk will have to be removed for the construction of the two
driveways into the site. Pedestrian ramps will be required and shall be shown on the
plans.
7. The existing B618 concrete and gutter will have to removed on the north side of
Cottonwood Lane for the construction of the two driveways. Saw cutting of the
existing bituminous will be required and shall be shown on the plans. A detail of the
proposed driveway apron shall be shown. It should be noted that the final lift of
bituminous wear course for all the roadways in the Waterfront Passage Business Park
have not been installed. The timing of the wear course installation should be
considered.
'i? t (1
Reviewed bY:-6"~~ ......
Engineering Department DRC Coordinator
PLAN REVIEW MEMO
Date:
To:
CC:
From:
Subject:
04/29/95
Engineering DRC Coordinator
Jeff Evens
LANI LEICHTY
Metro Cabinet Site Plan Review
The following are comments made during the review of the above mentioned plan:
1. Proposed grades around the back side of the building need to be shown
along with proposed grades or spot elevations towards the ditch and along
the ditch.
2. The curb around the southeast entrance radius needs to be tipped out so
that water does not pond there. The grade is at 0.0% around the radius.
3. Per City Code 6-6-5:(C) all drainage ways or channels shall be within
dedicated drainage easements. The east and west sides of the property
should have drainage swales provided within the proposed 10ft. wide
drainage easements to prevent drainage across adjacent lots.
04/29/95
1
E F H Co.
General Contractor
1601 EAST HIGHWAY 13
BURNSVILLE, MINNESOTA 55337
(612) 890-6450
FAX (612) 890-5476
April 14, 1995
Ms. Deb Garros
City of Prior Lake
16200 Eagle Creek Avenue
Prior Lake, MN 55372
Re: Metro Cabinets/American Glass and Mirror
Waterfront Passage Business Park
Prior Lake, MN
Dear Ms. Garros,
I am enclosing information for your review for the above project. I have submitted the
information from the list produced from our meeting last week.
1. Accurate certified survey with legal description. I have these on 2 separate sheets.
2. Site plan is attached.
3. Grading and drainage plan is attached.
4. Utility plan is attached.
5. Landscape plan is attached.
6. Signage plan is shown on elevations sheet.
7. The provisions for fire protection are shown on the Site Utilities plan. The fire lane is
the main entrance drive through the parking lot. There is no parking against the East,
West and North sides of the building.
8. Building plans are attached.
9. The trash enclosure is shown on the site plan and will be constructed out of similar
materials as the main structure.
10. The luminare plan will be submitted with the information for the building permit.
11. As per our discussion the written narrative is not required.
12. Attached is the signed application form.
13. Attached is the application fee.
As per our conversation with Bonnie Carlson, the City of Prior Lake will complete the
Administrative Land Division Application Form and furnish required information for that.
Please review the above information and let me know if the Development Review Committee
requires additional information on any issue. I look forward to working with the City of Prior
Lake. Thank you.
Project Manager
*****
DATE:
FILE NAME: SP
CHECKED BY:
SITE PLAN APPLICATION CHECKLIST FOR:
COMMERCIAL, INDUSTRIAL, INSTITUTIONAL,
PUBLIC, AND SEMI-PUBLIC DEVELOPMENTS
Property Owner:
Address: ~ I
Applicant: ~Fl-1 LD.
Address: ~1."O1 ~.J./I~l:!tJbr"" 1"2. ~'W4-
6c~L /3. LCJ9"
Dat I
~~/YUA/1 J
~- /7,- ~)~
Date
TEN (10) ASSEMBLED SETS (24" x 36'') OF EACH OF THE FOLLOWING:
1.) ACCURATE CERTIFIED SURVEY (showing existin.~ conditions on the site,
within 50' of the site, and the Legal Description).
2.) DETAILED SITE PLAN (based on current certified survey).
3.) GRADING AND DRAINAGE PLAN (including storm water runoff
calculations and a map produced by a Professional Engineer; erosion
control plans using MPCA's, Best Manag-ement Practices standards).
4.) UTILITY PLAN (including proposed sewer, watermain, storm sewer lines,
and profiles of the utilities larger than 4" in diameter, produced by a
Professional Engineer).
5.) LANDSCAPE PLAN (can be on combined sheets, produced by a Landscape
Architect).
6.) SIGN PLAN (can be on combined sheets).
16200 Eagle Creek Ave., Prior Lake. Minnesota 55372-1714 / Ph. (612) 4474230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
7.) FIRE PROTECTION PLAN (showing fire lanes, hydrants, post indicator
valves, and siamese connections which may be shown on the Site or
Utility Plan).
8.) BUILDING PLANS (exterior wall elevations and floor layout).
9.) TRASH ENCLOSURE (provisions can be on combined sheets).
10.) LUMINARE PLAN (of all outside and building exterior lighting which may
be on combined sheets).
11.) ONE LEGIBLE AND REPRODUCIBLE WRITTEN NARRATIVE (describing
the proposal and variances requested).
12.) A COMPLETE APPLICATION FORM SIGNED BY THE PROPERTY FEE
OWNER (S).
13.) APPLICATION FEE PER CURRENT CITY OF PRIOR LAKE FEE
SCHEDULE.
ADDITIONAL INFORMATION NEEDED IF IT APPLIES:
.
N/ft
14.) ONE ADDITIONAL SET OF PLANS REQUIRED IF THE PROPOSAL
ABUTS OR ACCESSES A COUNTY ROAD.
15.) ONE ADDITIONAL SET OF PLANS REQUIRED IF THE PROPOSAL
ABUTS OR ACCESSES A STATE HIGHWAY.
REQUIRED SUBl\fiTTALS FOR THE PLANNING COMMISSION WHICH
MAY BE SUBl\fiTTED AFTER THE DEVELOPMENT REVIEW
COMMITTEE'S APPROVAL:
1.)
2.)
t/~ 3.)
4.)
5.)
6.)
7.)
SITE PLAN
LANDSCAPE PLAN
BUILDING EXTERIOR ELEVATIONS
LUMINARE PLAN
WRITTEN NARRATIVE
15 COMPLETE SETS OF THE ABOVE DATA (1-5) IN SIZE 11" x 17" OR
LARGER, ASSEMBLED AND FOLDED TO 8.5" x 11."
ONE COMPLETE SET OF THE ABOVE DATA (1-4) IN SIZE 8.5" x 11",
CLEAR AND LEGIBLE TRANSPARENCIES.
THE FOLLOWING ITEMS WILL NEED TO BE SUBl\fiTTED IN ADDITION
TO THE ABOVE WHEN REQUESTING PUBLIC FINANCIAL ASSISTANCE:
8.) A SHORT NARRATIVE ON THE GROWTH EXPANSION NEEDS OF THE
BUSINESS.
9.) A SHORT NARRATIVE ON THE COMPANY'S MARKET AND TRENDS IN
THE INDUSTRY.
*****
10.) THREE (3) YEARS OF HISTORICAL DATA INCLUDING P&L
STATEMENT AND BALANCE SHEETS.
11.) CURRENT INTERIM FINANCIAL STATEMENT.
12.) PERFORMANCE FINANCIAL DATA FOR THE TWO (2) PREVIOUS
YEARS.
13.) ESTIMATED COSTS FOR THE PROPOSED BUILDING, EQUIPMENT,
MARKETING, AND WORKING CAPITAL NEEDS.
14.) TOTAL NUMBER OF JOBS CURRENTLY, AND THE PROJECTED JOBS
WITHIN TWO (2) YEARS.
15.) BUSINESS/MARKETING PLANS IF AVAILABLE.
ALL FINANCIAL DATA WILL BE TREATED IN A
PROPRIETARY AND CONFIDENTIAL MANNER, AND
WILL NOT BE RELEASED TO ANYONE WITHOUT YOUR
PRIOR APPROVAL.
f
Applications will be reviewed by the Development Review Committee. A member of
the Planning Staff will notify the Applicant as to any additional information or
modifications needed. Site Plans, which are non-residential, and have no variance
or other possible applications as' required, may be administratively approved. Site
Plans requiring a variance or other possible applications will automatically be
scheduled for a Planning Commission Public Hearing when it has been verified
that the application is complete. Items will be scheduled before the City
Council, by the City Manager, upon Planning Commission Recommendation.
SPA
Approved and adopted by the Prior Lake Development Review Committee on September 2, 1993.
~,
\
.\
\
\
;
r " . "~'..,.... ~~'~ . ~"",...' '----.~"':""'~ ---"':'~"""''''':'''J'I;,~..._~'iiI'''''~'''-,'' ".,~~~., ,,,...,..,...,...~,__,,,,,,,,,,,,,,,,"'''.''''',''f"' ',....,,~~ ,"l'~"'''--
~ . ' , ' . , . ' , ", , '.' ,'," ," ' " "'. " "" , ;, " '"
r'
DATE
~572 0
}{J q (
)
i
"
~
RECEIPT
'.
CITY 0 F
PRIOR LAKE
4629 DAKOTA STREET S.E., PRIOR LAKE. MN 55372
, ~ "'Ll
~~
Rece i ved of IltthV CCt ~UiUA~'<:' Av1/l~/};t'
GIUM-1 ~~?
whose address and/or legal descripti
the sum of 01#/ #'A IA~ 1'0]/42 dollars
for the purpose of 0m ~ ,..... -rt c:!)-Dt)
'ZZwIi0rA/-L ;;~ L~V(~d-~
I
$ )'00,1'1
Reference Invoice No.
{6tc, (/(~CL C(j/l/~it-
Receipt Clerk for the City of Prior Lake