Loading...
HomeMy WebLinkAbout5H - Purchase of Materials for Repair of Pike Lake Park & Garage Roofs MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: ISSUES: FINANCIAL IMPACT: CITY COUNCIL AGENDA REPORT NOVEMBER 17,2008 5H AL FRIEDGES, PARKS & FLEET MAINTENANCE SUPERVISOR CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING THE PURCHASE OF MATERIALS FOR REPAIR OF PIKE LAKE PARK HOUSE AND GARAGE ROOFS Introduction The purpose of this agenda is to seek authorization for the funding necessary to repair the roofs on the house and garage at Pike Lake Park (formally the Pavlish property). Historv At the September 4,2007, City Council meeting, Council approved an agreement with the Trust for Public Land for the purchase of 30 acres; formally the Pavlish Property, to be known as Pike Lake Park, Included in the purchase of the property were the existing dwellings. The existing dwellings are in relatively good condition and have been secured by staff for future use as a storage garage and four season park facility. Current Circumstances Staff has determined that both the house and garage roofs are in immediate need of repair. The existing shingles are deteriorated to the point that the roofs could start leaking, resulting in damage to the under layment and building interiors. If a new roof is not installed on the house and garage soon, structural damage is certain to occur. The Parks Maintenance Division staff can perform the labor to remove the existing shingles and install new 30 year architectural shingles. The following is the cost to replace the roofs on the house and garage: I 35 square of 30 year architectural shingles 100 L.F, of hip and ridge shingles 530 L. F. of ice and water paper 35 square of felt 450 L.F, of D-edge 10 roof vents I 4 plumbing stacks I 10 4x8 ass plywood I 3 boxes 1 X coil nails I Disposal fee I I I $3,570.001 $160.00 I $640.00 I $324.00 $270.00 $110.00 $24.00 $96,00 $120.00 $350.00 $5,664.00 $368. 16 $6,032.16 I Subtotal Tax Total www.cityofpriorlake.com R:\Council\2008 Agenda Reports\11 17 O~~eO}~~.~~rlYage.!ilta9f9rt44 7 .4245 I Staff labor - 40 hours x 30.00 I Grand Total $1,200.00 I $7,232.16 I Funding for the repair of these roofs was not identified in the 2008 Budget. $275,000 was budgeted in the General Fund for contingencies; and after this expenditure, the balance of unspent contingency funds will be $178,968. ALTERNATIVES: The alternatives are as follows: 1. Authorize City staff to repair the roofs on the house and garage at Pike Lake Park for an amount not to exceed $6,032.16 for materials. 2. Table this agenda item for a specific reason. 3, Deny this agenda item for a specific reason and provide staff with direction. RECOMMENDED MOTION: Alternative #1. ReVief!J /J Frank BOY'7 "',,"ager R:\Council\2008 Agenda Reports\11 17 08\repair roofs at pike lake park agenda. doc A RESOLUTION AUTHORIZING THE PURCHASE OF MATERIALS FOR THE REPAIR OF THE PIKE LAKE HOUSE AND GARAGE ROOFS Motion By: Second By: WHEREAS, The City has previously determined that the existing house and garage at Pike Lake Park should be preserved for future use; and WHEREAS, Staff has determined that both the house and garage roofs are in immediate need of repair at Pike Lake Park; and WHEREAS, If the roofs are not repaired, structural damage can occur; and WHEREAS, The Parks Maintenance Division staff can perform the labor necessary to repair the roofs; and NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2, All materials for the repair shall be purchased for a total price not to exceed $6,032.16. 3. Funds are to be drawn from account # 101-49999-000. PASSED AND ADOPTED THIS 17TH DAY OF NOVEMBER 2008. YES NO Hau~en Erickson I Hedberg I LeMair I Millar Haugen Erickson Hedberg LeMair Millar Frank Boyles, City Manager R:\Council\2008 Agenda Reports\11 17 08\repair roofs at pike lake park re~o.doc www.cityotpriorlake.com Phone 952.447.9800 / Fax 952.447.4245