Loading...
HomeMy WebLinkAbout5C - Repair of Maint. Center & Fire Station No. 1 Roofs MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: 4646 Dakota Street S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT DECEMBER 1, 2008 5C AL FRIEDGES, PARKS & FLEET MAINTENANCE SUPERVISOR CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING REPAIR OF MAINTENANCE FACILITY AND FIRE STATION #1 ROOFS Introduction The purpose of this agenda item is to seek City Council authorization to perform roof repairs on the Maintenance facility and Fire Station #1. Historv. The roofs on the Maintenance Facility (built in 1996), and Fire Station No. 1 (built in 1994), are leaking and in need of repair. Both facilities were constructed with flat roofs. The flat roof membranes and systems specified by the City had a 15-year expected life and, therefore, are nearing their life expectancy. Staff has limited knowledge of flat roof repairs; so to assure that the proper repairs were conducted, a consultant from Building Resource Group was retained to inspect, identify the right correction to the roof problem, and write specifications necessary to solicit bids. Specifications for the roof repairs were sent to three roofing companies with quotes received on 11/18/08. Current Circumstances The report prepared by Building Resource Group has identified that the roofs on the Maintenance Facility and Fire Station No.1 are in poor condition and will need to be replaced in approximately 2012. The repairs proposed in this agenda are interim repairs, but are needed to avoid interior and structural damage to the buildings and equipment within these facilities. Staff has limited experience with flat roofs. Building Resource Group offers field inspection to oversee the contractor performing the repairs. Field inspection services for the Maintenance Facility and Fire Station NO.1 would cost $900.00. Staff recommends the use of this service. A total of three quotes were received and are listed below. Vendor Maintenance Fire Station #1 Total Facility Bid Price Bid Price I Horizon Roofing, Inc. $7,944.00 $7,042.00 $14,986.00 Dalbec Roofing $8,593.00 $9,060.00 $17,653.00 Niemen Roofing, Inc. $11,250.00 $6,500.00 . $17,750.00 www.cityofpriorlake.com R:\Council\2008 Agenda Reports\12 01 OIDcoof rep~~ageJ1dancI.P.l( Phone '::IbZ.447.::I~UO / Fax 952.447.4245 ISSUES: FINANCIAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: ReVie(j t Frank BOYIV Staff recommends awarding the bid to Horizon Roofing, Inc. in an amount not to exceed $14,986.00. Additionally, staff recommends utilizing Building Resource Group for field inspection in an amount not to exceed $900.00. The staff has created a Facilities Management Team to inventory repair and replacement work needed to protect the public's investment in City buildings. The repair of the membrane roofs on the Maintenance Center and Fire Station No. 1 have thus far been identified as top priorities. (A complete list will be submitted for City Council consideration at a later date.) The staff is making insurance claims for the hail damages to these roofs. We expect to use the insurance proceeds to help finance roof replacements. Horizon Roofing, Inc. has experience in this sort of repair work. Funding for the repairs will be drawn from the Fire Station Repair and Maintenance Account (101-42200-401) and the Water Utility Fund Repair and Maintenance Fund (601-49400-401). The alternatives are as follows: 1. Approve a resolution accepting the bid from Horizon Roofing, Inc. and utilizing Building Resource Group for field inspection 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. Alternative #1. anager R:\Council\2008 Agenda Reports\12 01 08\roof repairs agenda.doc 2 A RESOLUTION AUTHORIZING REPAIR OF THE MAINTENANCE FACILITY AND FIRE STATION #1 ROOFS Motion By: Second By: WHEREAS, The City hired Building Resource Group to evaluate the condition of leaking roofs on the Maintenance Facility and Fire Station NO.1 and prepare specifications for soliciting quotes; and WHEREAS, The completed report identifies the roofs on the Maintenance Facility and Fire Station NO.1 to be in poor condition; and WHEREAS, Interim repairs are needed to avoid interior and structural damage; and WHEREAS, A total of three quotes were received based upon the Building Resource Group specifications and are listed below: Vendor Horizon Roofing, Inc. I Dalbec Roofing I Niemen Roofing, Inc. ; and Maintenance Facility I Fire Station No. 1 $7,944.00 $7,042.00 $8,593.00 $9,060.00 $11,250.00 $6,500.00 Total $14,986.00 $17,653.00 $17,750.00 I WHEREAS, Staff recommends accepting the quote from Horizon Roofing, Inc. in an amount not to exceed $14,986.00; and NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The quote from Horizon Roofing, Inc. is accepted and the city Manager is authorized to enter into a contract with Horizon Roofing, Inc. in an amount not to exceed $14,986.00. 3. Staff is authorized to contract with Building Resource Group to inspect the roofing repairs on behalf of the City in an amount not to exceed $900.00. 4. Funds for Fire Station No. 1 roof repair ($7,042) are to be drawn from account #101-42200-401, and funds for the Maintenance Facility roof repair ($7,994) are to be drawn from #601-49400-401. PASSED AND ADOPTED THIS 1ST DAY OF DECEMBER 2008. YES NO Haugen Erickson Hedberg LeMair I Millar . Hau~en Erickson Hedberg LeMair Millar Frank Boyles, City Manager R:\Counci1\2008 Agenda Reports\12 01 08lroofrepair reso.doc .ty f . 1 k www.clopnorae.com Phone 952.447.9800 / Fax 952.447.4245