Loading...
HomeMy WebLinkAboutExcavating & Filling Permit I CITY OF PRIOR LAKE APPLICATION FOR EXCAVATING/FILLING PERMIT Permit No, ()iJ1-D/ Date ~ I , 5 I 0 I 447-4230 Applicant peL- ~~dIo-\ ~.'c-.e-> l,,~ ~:C.d/~~e.. Sc:1~ Property Owner: C~G~ n~ >+ I ,y'/ ;G ~ e..-' "'J., D", \ ~ ~ sE;; J p~,'ar LQ,u-r~ Contractor: I\J~J"* ~~ha. ~ Address: 1...>1 S~~~c.'" I.A) $Lu..~ i,tlN Consultant Engineer/S~r Dt-~ '-ro...~ Address: 9$2.\ W~st- 7~t'o. $+. . #f/lllj1t~~"SIMfIV ~Jt.lq Location of Property: --1 b zeo Ow. \ \6.'\''-\ 4.1 e. . Phone II C\52... 88~~sn Address: Address: Phone Legal Description: Will the excavation or filling be in a: Watercourse Purpose for the proposed excavating or filling: AJo Wetland AJ~ Estimated start date: -'PM Completion date: -:s- ~II\~ ZOO , What is the type of material to be removed or deposited: In what manner will the material be removed and/or deposited? 1IDO~Y What highway, street, or other public way will material for removal or depositation be hauled or carried? ~.w }J)lA.l...", What, if any, street, avenue, lane, alley, highway, right of way, thoroughfare or public ground will be obstructed? Ala Cb~~'MO^ IT SHALL BE THE RESPONSmlLITY AND THE BURDEN OF THE APPUCANT TO DEMONSTRATE TO THE SATlSFAcnON OF THE CITY ENGINEER FOR THE CITY OF PRIOR LAKE THAT THE PROPOSED EXCA V A TlON AND/OR FlLUNG COMPUES WITH THE OVERALL CITY OF PRIOR LAKE STORM WATER MANAGEMENT PLAN. SAID BURDEN SHALL INCLUDE THE FURNISHING OF A REPORT WITH SUPPORT. ING CALCULA nONS OF A REGISTERED PROFESSIONAL ENGINEER. Will proposed excavation or depositon affect the City of Prior Lake overall storm water management plan? Yes L No _ If yes,showproposedeffect. ~~ Vo.~~ c:lf~t-l~ ~tf-. SUBMISSION REQUIREMENTS: (A) Completed application form (B) Completed legal description (C) Map or plat of the proposed filling or excavating showing location and amount of material proposed to be removed of deposited, with a description of the area (D) The depth or heights to which such removal or deposition is proposed throughout the area and the proposed angle of all slopes to be shown on a 2' contour map at a scale of I" = SO' or larger: The proposed and origiriaJ conlOUn shall be shown in- cluding all propeny within 1 SO' of proposed excavation or deposition and shall be signed by an engineer or surveyor registered in the State of MiiUlelOta .eE) Erosion control plan (F) Affect on existing utilities (0) Protection of site by erection of suitable fence, guard or barricade (H) Application fee (I) Bond. letter of credit. or deposit of monies in a sum sufficient to pay the cost of restoring a site. The extra ordinary costs of repairing. highways. streets or other public way. along designated routes of travel and to pay such expenses as the City may i Il.cur by r~~op ,anything required to be done (1) Public liability insurance. Amount of bond G> Letterofcredit. \...J.;.-~~fmOney ~'insuranceprOVided ~ PermilfeeWa.1D SignalUteofapplicanl ~~ Date~ Permit deposit N IA. City Engineer______ ~ Date ~ Permit is valid if signed by City Engineer. ~\J'~~ \.U f-€€. .~ ?e-\M\+ f.ee $4'1.'2-5 5 2 39 . 4 S ~~e8.'IO :Y-o- ~ ~ ./...... ~.._-- ....~....'C~-,... . . . ",0" -.,"..,_.,.- ~ /1 .............../. .. r-:';; )/ DATE: February 15, 2001 TO: PCl Construction, Attn: TQf:id Ulrich FROM: Sue McDermott, City Engineer I RE: St. Michael's Education Center {Project #43-00)r The grading permit for the subject site is approved with the following conditions: 1. et to s nk by th 2. Place erosion control blanket on all 3: 1 slopes or greater, particularly at the northwest corner of the property. 3. Show silt fence behind the sidewalk along Pleasant Street on the grading plan. The Engineering Department will place the following conditions on the building permit: 4. Construct pedestrian ramps at each driveway location. A right of way permit will be required for this work. 5. Directional bore the gas line underneath Pleasant Street minimizing pavement removal/restoration. A right of way permit will be required for this work. G:\PROJECTS\2000\43stmike\grading permit conditions.DOC ST. MICHAEL'S GRADING CITY PROJECT 01-43 PRECONSTRUCTION MEETING Friday, February 16,2001 2:30 P.M. Please sign your name, address, phone and company name (if applicable) below. ADDRESS PHONE COMPANY NAME (if applicable) 1. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. G:\FORMSIPrecon