Loading...
HomeMy WebLinkAboutReport of Inspection "V. ..t. .. ca AUTOMAnc SPRINKLER CO. Setting The Standard... St. Paul, Minnesota 55117 (651) 558-3300 . (800) 229-6263 Fax: (651) 558-3310 SHEET 1 012 - Use separale sheet for each building inspecled MINNESOTA LICENSE NO. COOS AGREEMENT AND REPORT OF INSPECTION #INSPECTION ~ ,"":.. ~: ~.;;".. i..1 -1 .' ...' REPORT TO STREET CITY & STATE 5~. th" i.,.!, i L;, i i [O.....<t.r .. 1..),-,,, i~,./t; ~ l,'\ (_) {,C, .1< BUILDING OR LOCATION INSPECTOR DATE ill:.. L, . \ (, l,ti iI\ ( 7.' ":> -()~I Owner hires Viking Automatic Sprinkler Company to conduct an inspection of the fire suppression system at the above location or building, and prepare a written report of that inspection for an agreed upon fee. As part of this agreement, owner agrees to terms and conditions on rear of form and will complete the Owner's Section of this document Owner's Section (To be answered by Owner or Occupant) A. Explain any occupancy hazard changes since the previous inspection: B. Describe fire protection modifications made since last inspection: C Describe any fires since last inspection: f' D. When was the system piping last checked for stoppage, corrosion or foreign materia!? E. When was the dry-piping system last checked for proper pitch? '.- 1'. Are dry valves adequately protected from freezing? Signature Title Date Inspector's Section (All responses reference current inspection) N/A = NOT APPLICABLE 1 General a_ Is the building occupied? l{Yes 0 No h Are all systems in service? dYes 0 No c. Does there appear to be a minimum of 18 in. (457 mm) clearance between the top of the storage and the sprinkler deflectors? Ifill Yes No d. Does the valve hose on the sprinkler system(s) appear to be satisfactory? 0 Yes 0 No ...rN/ A 2 Control Valves (See Item 15) a. Do sprinkler system control valves appear to be in the appropriate open or closed position? .dYes 0 No h Are control valves in the open position locked, sealed or equipped with a tamper switch? Od"Yes 0 No 3 Water Supplies (See Item 16) ~-'---'~- a. Was a water flow test of main drain made at the sprinkler riser(s)? ;t(Yes 0 No 4 Tanks, Pumps, Fire Department Connections a. Are fire pumps, gravity tanks, reservoirs and pressure tanks in good condition and properly maintained? 0 Yes 0 No p''N/ A b. Are fire department connections in satisfactory condition, couplings free, caps in place, and check valves tight? )iff'Yes 0 No u Nj A Are they accessible and visible? .)'l'Yes 0 No 0 N/ A 5 Wet Systems a. Are cold weather valves (0.5. & Y.) in the appropriate open or closed position? 0 Yes 0 No ~N/ A b. Have antifreeze system solutions been tested? 0 Yes 0 No'l'f'N/ A c. Were the antifreeze test results satisfactory? [) Yes 0 No t"fNj A d. In areas protected by wet system(s), does the building appear to be properly heated in all areas, including blind attics and perimeter areas where accessible? .J!i'Yes 0 No 0 N/ A Do all exterior openings appear to be protected against freezing? ,.,dYes [J No 0 N/ A 6 DIY System (See Items 11 to 13) 'ii'''-.4.re dry valves (s) in service? eYes 0 No 0 N/ A b. AI:e~ir pressures and priming water levels in accordance with the manufacture's instructions? 0 Yes 0 No 0 N/ A c. Has the ~tion of the air or nitrogen supplies been tested? 0 Yes 0 No 0 N/ A Are they in service? 0 Yes 0 No 0 N/ A d. Were all know"'~oints drained during tllis inspection? 0 Yes 0 No 0 N/ A e. Did quick-opening d~(;:es operate satisfactorily? 0 Yes 0 No 0 N/ A f. Did the dry valve(s) h'ip properly during the trip pressure test? 0 Yes 0 No 0 N/ A g. Did the heating equipment in the dry-pipe valve room(s) operate at time of inspection? 0 Yes 0 No 0 N/ A 7 '-Sp~ial Systems (See Item 14) a. ~e deluge or pre-action valves operate properly during testing? 0 Yes 0 No 0 N/ A b. Did th~onsive devices operate properly during testing? 0 Yes 0 No 0 N/ A c. Did supervisory ~vices operate during testing? 0 Yes 0 No 0 N/ A 8 Alamls a. Did water motor(s) and gong(s) test satisfactorily? 0 Yes 0 No p1<J/ A b. Did electric alarm(s) test satisfactory? J'f"Yes 0 No 0 N/ A c. Did supervisory alarm service test satisfactory? ,Ff'Yes 0 No 0 N/ A 9 Sprinklers a. Do visible sprinklers appear to be free from corrosion, loading or obstruction to spray discharge? 0 Yes .I'f'No b. Are sprinklers less than 50 years old? (Older sprinklers require sample testing) /J- Yes 0 No c. Are quick response and residential sprinklers less than 20 years old? (Older sprinklers require sample testing)_..l'iYes 0 No 0 Nj A d. Is stock of spare sprinklers available? p Yes 0 No e_ Does the exterior condition of sprinkler system appear to be satisfactory? (;INes 0 No f. Do visible sprinklers appear to be of proper temperature rating for their locations? ,..I,rYes 0 No 10 Explain any "No" answers and comments: Signature: \ \ Date: t' "-"t ".~I"'~ AUTOMATIC SPRINKLER CO. Setting The Standard... 1301 L'Orient Sh'eet St. Paul, Minnesota 55117 (651) 558-3300 . (800) 229-6263 Fax: (651) 558-3310 SHEET 2 of 2 - Use separate sheet for each system inspected System No. or Description if multiple systems Inspection Report No_ ?i $ S"\~I 11 12 13 Time to Trip Thru Test Pipe '-'-..l4,pDEL ----...... Water ---.."",,-- Air Pressure P~!lW.r.\L (See Trip Test Table which follows) (See Trip Test Table which follows) (See Trip Test Table which follows) TRIP TEST TABLE Q_O.D. SERIAL NO. MAKE MODEL SERIAL NO_ Date dry-pipe valve h'ip tested (control valve partially open) Date dIy-pipe valve trip tested (control valve fully open) Date guick-(jp~:UJ:1g device tested ........,"-.. DRY VAt:'\o'E........_., MAKE DRY PIPE OPERATING TEST Trip Point Air Pressure Time Water Reached Test Outlet Alarm Operated Properly MIN. SEe. PSI PSI -........, PSI '". ......." MIN. SEe. YES NO Without Q.O_D With QDD '... 14 Date deluge or preaction valve tested DELUGE & PREACTION V ALVES -:J NO 'J NO MAKE fv1aXlnlUlll tinl€ to operate releasc' ........._____YES YES I NO 15 See Control Valve Maintenance Table "'-", CONTROL VALVE MAINTENANCE TABLE 'Y' " Secured i ,J r-,.. I ' Closed Signs Explain Abnormal Condition Control Valves Citv Control Valves Bypass Valves Tank Control Valves Pump Control Valves Sectional Control Valves System Control Valves Other Control Valves Kitchen Control Valves 16 Water Flow Tes;jat,rFrinkler Rts~r f<;\ r-. WaterSupplySoUrCE:.h< 'f\!'u".~u-!)L City py^io/ i.v.~.k-, Number Type Open L\ ,-.... -1-..'-...,......... , Tank (/> Date Test Pipe Location (l{4,.....-, Ili'~'-'" , Size of Test Pipe Sta tic Pressure Pump (15 Residual (Flow) Pressure Last Water Flow Test This Water Flow Test ~ It, :._.-!~ ~-:< , ! :c i~: '~? ~'1"', 7' ,:;. G:.:>"\ j -.,"( :;; 'f -, ,~, 17 Explain any "No" answers and comments: 18 Adjustments or corrections made during this inspection: 19 Although these comments are not the result of an engineering review, the following desirable improvements are recommended: Signature: \0"",t/ c.-:j. j Date: "'",' (Rev. 2/8/06) .----) /f"'....""'/' l ,.__'" I~ING AUTOMATIC SPRINKLER CO. 1301 L'ORIENT STREET ST. PAUL, MINNESOTA 55117 (651) 558-3300 . (800)-229-6263 FAX: (651) 558-3310 J.:.-i Report of Inspection Additional Comments I \, (.... .,;; ( :,-t , --~ .-