HomeMy WebLinkAboutFire Sprinkler Report 3/17/2009 Contact & Phone: ~.~: --;.. ~ WITH SUNTIDE 651-603-0321 Was owner repres:nt~d p~ to inspection? Representative's Name: ~ Rep present during inspection? 0 Yes ~NO Were all rooms available for inspection? 0 Yes f2r.. No As-built drawings available? 0 Yes ~o ,~~G LB~ SOUTH LAKE VILLAGE - Property Name: Property Address: 16731 HIGHWAY 13 SOUTH PRIOR LAKE, MN 55372 1(C1:l1~I:lI:J~'''''''''I:lI~.I~I;(.I:ll''''UI.I~ Date of installation: Location of V~lve Assy: .,;;l- No. of Systems: FIRE SPRINKLER SYSTEM INSPECTION & TEST REPORT Inspection Date: : h tJ. Inspection #: 2606 Bill To: BEALMAKZ~:-mERS LLC Bill To Address: cIa SUNTIDE COMMERCIAL REALTY 2550 UNIVERSITY AVENUE WEST#416-S SAINT PAUL, MN 551 ~~ / ~'" Co....ct" q4t6? ~ves 0 No &1 Ves 0 No Aves 0 No Rep's Name: Last inspection report available? Zone map available? No. of Wet: No. of Dry: No. of Preaction: No. of Other: I NSP ECTI ONS ~v~tem components have been Inspected;)$ follows "'~:~I~I~.::I:""\.""':I\..",.I~"'Ull.'(.I~ Gauges (Dry, Preaction, Deluge) Waterflow Devices Valve Supervisory Devices Supervisory Signal Devices (Except Valve) Supervisory Switches Gauges (Wet System) Hydraulic Nameplate Hanger/Seismic Bracing (Exposed Only) Pipe & Fittings (Exposed Only) Sprinklers Spare Sprinklers Fire Department Connection Control Valves Alarm Valves Check Valves Pre-Action/Deluge Dry Pipe Valves Valves - Other Pressure Reducing & Relief Backflow Prevention Assemblies .....I...I~il.Jr.I:.:::."...I.~I::.:.....~..a~ll.I~I.:I:.il........' Control Valves Pressure Regulating Devices Piping Hose Connections Cabinet Hose Hose Storage Device Hose Nozzle ~ves ",,1. _ No N/A Other ~ .1I:tIIUIllr.fll:t::.:.II:'I.i._r.lll,ill.,.""I':I:.a..I".,LI Hose Houses Hose Hydrants (Dry Barrel & Wall) Monitor Nozzles Hydrants (Wet Barrel) Mainline Strainers Piping (Exposed) Piping (Underground) ''Il.,~::: J Waterflow Devites SUPERVISORY DEVICES ,,!"I:-,e-,S~~~rvl~ory Devices Water Motor Gong: Vane Type: ___~___I No. present~ No. Present: .... Did the Alarm Sound? Pressure Switch Type: -- Do all waterflow devices operate properly? No. Present: ~--Type:-- Do all supervisory devices o~era~e properly? Supervisory Signal Devices .~'~I~l".il.':L'" Main Orain Test Static: st? PSI Antifreeze Solution Specific Gravity at 60. F: ~;'\i:..lIl.I:', .~ ~"=-'~'~I:';""'I..A:_-;''''Ii;.:JII.t..I~C.~-=,,,~'""=-!L..dI.I~'I:'.""."".'I"U~ ... 1" 'I'~:'..:'I:':" ~..;.~~\;...:..:n;,~,~",t. .:1:.;,....l....I.~I:.a=-o;l...;ltI.I...~j.I::.a~1II Residual: '1D PSI to kD _~_D Freezing Point: . "F Adjustment needed? 0 0 .... ,,!.I';':..':Il.~:o.4 'C'I:=.IUI"f"~~~""~I~=I.IL..AI..I.l:I;"w.o:""'"..I;.....:w'l;"WII.1 .l:i...I I~ ~IIII.I" ,.u';'=<":I:r::"I"'I~~".=W:''':'';''',J.'''''''''~.''.l.J'''I.I:I''=-;''';I.'1:.a......I..a. ~ Control valves left opened and system placed back In service NOTES ~0 A~~ t& . =-. A^_.p ~-ID'510~/OG/I()~I'~ /CJ~ (()711(? /f'l/..lo /Yfr1 if ~ _ ~~/D7 // _/~ ~~~~i;;Z~ - ~ '1 ~9:. G'~~'~ 'M~~i~~~~" 'Ed;na~M~5~95itJ!~~ or-~4-~ -.-' REQUIRED PERIODIC INSPECTIONS (Check all that apply) .'J:""I:tlI.n'J~.I~..,:.;r.II'l~ NFPA 25 (2002) "An investigation of piping and branch line conditions shall be conducted every 5 years by opening a flushing connection at the end of one main ,and by removing a sprinkler toward the end of one branch line for the purpose of investigating for the presence of foreign organic and inorganic material." (Stated in NFPA 2S, 2002 Chapter 13.2.1) Has the owner been informed of the obstruction investigation requirement? Has an obstruction investigation been performed? Is obstruction investigation required with this inspection? oj o Date last obstruction investigation was perform;d:U \. If yes, owner's authorization: /Vr{ Inspections to be completed every 3 years D Water Storage Tank Inspections to be completed every 5 years D Alarm Valves 1)l Obstruction Inspection (1 Inspection/system) 1KL Check Valves (Interior) D Preaction/Deluge Valves (Interior) D Dry Pipe Valves (Interior) Tests to be completed every 3 years D Dry Pipe Valves (Full Flow Trip Test) D Quick-Opening Devices Tests to be completed every 5 years D Pressure Reducing and Relief Valves o Hose Connection Pressure Reducing Valves D Hose Rack Assembly Pressure Reducing Valves o Fire Hose o Standpipe & Hose System Hydrostatic Test D Standpipe & Hose System Flow Tests Q Water Sto ge Tanks Level Indicators ~ Gauges o Sprinklers - xtra HI h Temperature o Sprinklers - Corrosive Environment Tests to be completed every 10 years D Sprinklers - Fast Response o Sprinklers in service over 50 years TERMS AND CONDITIONS 1. Definitions . Nlnspection" is a visual exa.mination of a system or portion thereof to verify that it appears to be undamaged and in operational condition. "Test'" is a procedure used to determine the status of a system as intended by conducting periodic physical checks on water-based fire protection systems such as waterflow tests, fire p,ump tests, alarm tests, and trip tests of dry pipe, preaction, or deluge valves. These tests follow up on the original acceptance tests at intervals specified by NFPA 25. 'Maintenance" is work periormed to keep fire system equipment operable or to make repairs. "Owner" is the owner of the property or the occupant, management firm, or managing individual that has received authority from the owner for the inspection, testing, and mainte. nance Of the fire protection system. "NFPA 25" is the Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems (2002 edition) published by the National Fire Protection Association. "Authority Having Jurisdiction" is an organization, office, or individual responsible for enforcin~ the reguirements of NFPA 25 or for approving procedures, "Deficiency" is a condition where a system component appears to be damaged, not in operating condition, or the application is not within its designed limits or application. "Work" is the inspections, tests, and maintenance as reqUired by NFPA 25 and as limited by the scope of the contract. 2. Work Gilbert Mechanical Contractors, Inc. shall inspect and test the fire sprinkler system for the building in accordance with these terms and conditions. The inspection and tests shall be performed by qualified inspectors meeting any and all requirements of the applicable Authorities Having Jurisdiction. The Owner shall provide access to all areas of building containing system equipment and components requiring inspection under the scope of this inspection. The Owner shall provide a safe working environment and to the best ofthe Owner's knowledge, no unsafe materials or conditions exist. The Owner agrees to provide all MSDS sheets upon Gilbert Mechanical Contractors, lnc, request. 3. Scope (al Gilbert Mechanical Contractors, Inc. shall inspect and test the fire sprinkler system(s) in accordance with the applicable requirements as contained in the 2002 edition of NFPA 25. AI applicable tests and inspections will be periormed on an annual basis. (b) The following inspections and tests are excluded from the scope of this inspection and test: (il Inspections: (ii) Tests: Periodic (5 Yearllnspections Periodic (5 Year) Tests Fire sprinklers, pipe, fittings, hanger, and bracing in concealed spaces Sample testing for aged fire sprinklers such as above suspended ceilings Backflow device performance testIs) except for forward flow test ~~~i~~h~kv~lves (iii) ~~i~~~~~~C~r preventative actions including re airs, adjustments, or modifications to System check and alarm valves (internal) correct deficiencies unless specifically include~in the scope of contract. Building areas for adequate heat Records The Owner shall provide access to original system commissioning documents including maintenance manuals, material test certificates, certified fire ,pump curves, and as-built draw- ings. The Owner further agrees to provide any and all copies of inspections and tests periormed on the fire sprinkler system post commissioning within the guidelines of NFPA Z5. If these documents and recards are not available, the Owner shall hold Gilbert Mechanical Contractors, Inc. harmless for all exclusions, omissions, and damage to the system that may result from the lack of information contained within such documents. The Owner acknowledges that these inspections and tests are not intended to reveal design or installation deficiencies. The inspections and tests are to verify that the system appears to be in operating condition and system components appear to be undamaged. Corrective Action The Owner is solely responsible for the correction action required to correct deficiencies identified by the inspections and tests periormed under the scope of this inspection. The Owner further acknowledges that the inspection and tests are limited to the condition of the system found at the time of the work and Gilbert Mechanical Contractors, Inc. is not responsible for the condition of the system at any time subsequent to the date of the work. - . In addition, certain comments and recommendations made as a result of the inspections and tests may transcend the scope of NFPA 25. Such observations are made without knowl- edge ofwh~n the potential deviation occurred and what codes, standards, or jurisdictional amendments or variances were in affect at time of said deviation. Such e)(ceptions are only a record of observations of potential deviations from current codes and standards and are in no way an implication that any other system components or areas of coveragp. are in or -- - - out-otcompliance-,.-- -- - - - - - - - -------- -------~.------~--- ----__ - .. __ __ _________________.__ ~____ .____ ______ 5~ -1i;~'i)",;,~~';1~n:_T~~r.;:,~~,f~~~:~r; this. ag':;e;;ent. Payment IS due thirty (30) days t,:;;-m th~ date of the invoice. Inspections ma be s<;bject ~ inflationary cost increases. . This agreement s~aYI remain In effect for a period of (1) year and shall automatically continue from year to year thereafter unless thirty Y30) days prior to the termination of any yearly period, either party gives wntten notice to other party of Its Intent to terminate or renegotiate the terms and conditions set forth herein, liability Release and Indemnity The Owner hereby releases Gilbert Mechanical Contractors, Inc. and its affiliates, and their directors, officers, employees and a,gents, from ail claims, liabilities and damages which arise or result directly or mdlrectly, from the Owner's negligence, error or omission and the Owner agrees to defend, indemnify and hold harmless GIlbert Mechanical Contractors, Inc. and its affiliates, and their directors, officers, employees and agents, from and against any and all claims, losses or damages to persons or property resulting indIrectly or directly from the Owner's conduct or omission. lImitation of Liability The Owner agrees that Gilbert Mechanical Contractors, Inc.'s liability for any claims, losses or damages resulting directiy or indirectly from Gilbert Mechanical Contractors, Inc.'s "er- formance of this agreement, including any negligence, error or omission on the part of Gilbert Mechanical Contractors, Inc., shall be limited to the amount of fees received by Gilbert Mechanical Contractors, Inc. under thiS agreement. Waivers No waiver of any provision of this Agreement shall be effective, except pursuant to a written instrument signed by the party waiving compliance, and any such waiver shall be effective only in the specific instance and for the specific purpose statea in such writing. , 10. Subrogation The Owner hereby releases discharges and agrees to hold Gilbert Mechanical Contractors, Inc. and its affiliates harmless from any and all claims liabilities, damages, losses or expenses arising from or caused by any hazard covered by insurance resulting from or related to this inspection. whether said claim is made bV Gilbert Mechanical Contractors, Inc., his agent or insurance company or by any other parties claiming under or through the Owner. The Owner agrees to indemnify Gilbert Mechanical Contractors, Inc. against, defend and hold Gilbert Mechanical Contractorst Inc. harmless from any claims for subrogation which may be brought against Gilbert MechanIcal Contractors, Inc. by any Insurer or Insurance company or Its agents or assigns, incluaing payment of all damages, expenses, costs and attorneys fees. S. 4. 7. g. 9. Gilbert Mechanical Contractors, Inc., 4451 W 76th Street, Edina, MN 55435 (952) 835-3810 Page 2 of 2