Loading...
HomeMy WebLinkAboutReport of Inspection 6/18/2009 c.v_.~~ Setting The Standard... St. Paul, Minnesota ::>::>11/ (651) 558-3300 . (800) 229-6263 Fax: (651) 558-3310 SHEET 1 of 2 - Use sel'Hate sheet for each building inspected MINNESOTA LICENSE NO. COOS REPORT TO I.-'d+!~ Ln\'~,'S jV1o,,,iesSor"1 STREET "" '7 '} (:> "i)c,!\'" c \ c~ 5;-. CITY & ST A 1J. ? I .~ \) r L:\ \<~. . /1<1 '" AGREEMENT AND REPORT OF INSPECTION #INSPECTION J I 7 {" CJ 0 BUILDING OR LOCATION INSPECTOR DATE Sa. >-vi e p.c. oJ I t-k.. f..t ('1 tr i 8 - 09 Owner hires Viking Automatic Sprinkler Company to conduct an inspection of the fire suppression system at the above location or building, and prepare a written report of that inspection for an agreed upon fee. As part of this agreement, owner agrees to terms and conditions on rear of form and will complete the Owner's Section of this document. Owner's Section (To be answered by Owner or Occupant) A. Explain any occupancy hazard changes since the previous inspection: h b""'l e B. Describe fire protection modifications made since last inspection: ,...., 0""1 f" C. Describe any fires since last inspection: jA ClAP D. When was the system piping last checked for stoppage, corrosion or foreign material? -:r-I.d "lIe; I! ,-,) I C'1 '1 c:, E. When was the dry-piping system last checked for proper pitch? () .) P, () b Ie WI S F. Are dry valve,adequate;y protected/rom freezing? ~ JZ..6. Signatur;-y,;:z <ii.';"...... ........~" Title 'Ct.c.-/ Date Inspector's Section (All responses reference current inspection) N/A = NOT APPLICABLE 1 General a. Is the building occupied? ~ Yes 0 No b. Are all systems in service? AYes 0 No c. Does there appear to be a minimum of 18 in. (457 mm) clearance between the top of the storage and the sprinkler deflectors? XYes 0 No d. Does the valve hose on the sprinkler system(s) appear to be satisfactory? 0 Yes 0 No )I{P N/ A 2 Control Valves (See Item 15) a. Do sprinkler system control valves appear to be in the appropriate open or closed position? ~ Yes 0 No b. Are control valves in the open position locked, sealed or equipped with a tamper sWitch?XYes 0 No 3 Water Supplies (See Item 16) a. Was a water flow test of main drain made at the sprinkler riser(s)? )F:tes 0 No 4 Tanks, Pumps, Fire Department Connections a. Are fire pumps, gravity tanks, reservoirs and pressure tanks in good condition and properly maintained? 0 Yes 0 No.)<N/ A b. Are fire department connections in satisfactory condition, couplings free, caps in place, and check valves tight? )(Yes 0 No 0 N/ A Are they accessible and visible?)(J Yes 0 No 0 N/ A 5 Wet Systems a. Are cold weather valves (0.5. & Y.) in the appropriate open or closed position? 0 Yes 0 No )4N/ A b. Have antifreeze system solutions been tested? 0 Yes 0 No ~N/ A c. Were the antifreeze test results satisfactory? 0 Yes 0 No )5-N/ A d. In areas protected by wet system(s), does the building appear to be properly heated in all areas, including blind attics and perimeter areas where accessible? 0 Yes 0 No )(N/ A Do all exterior openings appear to be protected against freezing?~.Yes 0 No 0 N/ A 6 Dry System (See Items 11 to 13) a. Are dry valves (s) in service?)!!lYes 0 No 0 N/ A b. Are the air pressures and priming water levels in accordance with the manufacture's instructions~ Yes 0 No 0 N/ A c. Has the operation of the air or nitrogen supplies been tested?)Cl' Yes 0 No 0 N/ A Are they in service~ Yes 0 No 0 N/ A d. Were all know low points drained during this inspection?~ Yes 0 No 0 N/ A e. Did quick-opening devices operate satisfactorily? 0 Yes 0 No )(N/ A f. Did the dry valve(s) trip properly during the trip pressure test? ~ Yes 0 No 0 Nj A g. Did the heating equipment in the dry-pipe valve room(s) operate at time of inspection? )l.{Yes 0 No 0 N/ A 7 Special Systems (See Item 14) a. Did the deluge or pre-action valves operate properly during testing? 0 Yes 0 No XN/ A b. Did the heat-responsive devices operate properly during testing? 0 Yes 0 No AN/A c. Did supervisory devices operate during testing? 0 Yes 0 No ~.N/ A 8 Alarms a. Did water motor(s) and gong(s) test satisfactorily? 0 Yes 0 No tt.N/ A b. Did electric alarm(s) test satisfactory?)l Yes 0 No 0 N/ A c. Did supervisory alarm service test satisfactory? 0 Yes 0 No )l! Nj A 9 Sprinklers a. Do visible sprinklers appear to be free from corrosion, loading or obstruction to spray discharge? ;X Y es 0 No b. Are sprinklers less than 50 years old? (Older sprinklers require sample testing))rJ. Yes 0 No c. Are quick response and residential sprinklers less than 20 years old? (Older sprinklers require sample testing) 0 Yes 0 No )(1 N / A d. Is stock of spare sprinklers available?}( Yes 0 No e. Does the exterior condition of sprinkler system appear to be satisfactory?)(l Yes 0 No f. Do visible sprinklers appear to be of proper temperature rating for their locations? )l Yes 0 No 10 Explain any "No" answers and comments: c;,io-n~h1"',p. b..,Q \~ n~"'n. L_ ia .......0. ". ..e. INI Gii AUTOMATIC SPRINKLER CO. Setting The Standard... St. Paul, Minnesota 55117 (651) 558-3300 . (800) 229-6263 Fax: (651) 558-3310 SHEET 2 of 2 - Uf,e separate sheet for each system inspected System No. or Description if multiple " b systems ::l /.1 Inspection Report No. :;l. \ 7bvO 11 Date dry-pipe valve trip tested (control valve partially open) 12 Date dry-pipe valve trip tested (control valve fully open) 13 Date quick-opening device tested ;.;IA 6 . I '8- 0 q (See Trip Test Table which follows) ., _ I - 0 P, (See Trip Test Table which follows) (See Trip Test Table which follows) DRY PIPE OPERATING TEST DRY VALVE TRIP TEST TABLE ann MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. "... .....,\: rIA \ AF.\Qc\5 :J...otc;-fl?, - - - Time to Trip Water Air Trip Point Time Water Reached Alarm Operated Thm Test Pipe Pressure Pressure Air Pressure Test Outlet Properly MIN. SEe. PSI PSI PSI MIN. SEe. YES NO Without // / 7Z 35 J2- /'" /'" ,,/ Q.o.o With Q.o.o 14 Date deluge or preaction valve tested (See Trip Test Table which follows) TRIP TEST TABLE ;J/A Operation D PNEUMATIC o ELECTRIC D HYDRAULIC Piping Supervised DYES o NO IDetecling Media Supervised DYES D NO Does valve operate from the manual trip and/ or remote control stations DYES D NO Is there an accessible facility in each circuit for testing DYES D NO IMethod of Testing Circuits Does each circuit operate Does each circuit Maximum time to MAKE MODEL supervision loss alarm operate valve release operate release YES I NO YES 1 NO YES I NO I I I DELUGE & PREACTION VALVES 15 See Control Valve Maintenance Table CONTROL VALVE MAINTENANCE TABLE Explain Abnormal Control Valves Number Type Open Secured Closed Signs Condition City Control Valves Bypass Valves Tank Control Valves Pump Control Valves Sectional Control Valves 1- LJ '" osr; -( - - - System Control Valves f - 7 'Iz. R. ~r= - - - Other Control Valves Kitchen Control Valves 16 Water Flow Test at Sprinkler Riser Water Su 1 Source: Tank Last Water Flow Test This Water Flow Test Test Pipe Location Size of Test Pi e Static Pressure i) Pum Residual (Flow) Pressure Z. 'Z..... .. '! ' 17 Explain any "No" answers and comments: 18 A justments or corrections ma e uring this inspection: 19 Ie improvements are recommen 'e Signature: ^ SSVf I Date: (0 - , H - 0'1 (Rev. 2/8/06)