Loading...
HomeMy WebLinkAboutFire Sprinkler Report 7/27/2009 \ .. 24 Hour Service · Commercial · Industrial · Residential 7fJ/4t 96u ~ 1004 7th Avenue North · P.O. Box 680 Brandon, SD 57005 Business: (605) 582-2400 Fax: (605) 582-7360 @ ~ A..~9..t. I( .j. \ INSPECTION CONTRACT# DATE OF INSPECTION 7- :; ?- 09 INSPECTION FREQUENCY _MONTHLY :5 " ....., ../.. .~ , QUARTERLY C -::-. ,,~ ( ~ANNUALL Y _OTHER ALARM/MONITORING COMPANY PANEL# Yes N.A.+ No. 1. General a. Is the building occupied? "- b. Are all systems in service? y c. Is occupancy completely sprinkled? )( d. Are all new additions and building changes properly protected? x e. Is all stock or storage property below sprinkler piping? \I f. Was property free of fires since last inspection? (Explain any fire on Page 2) ~ g. In areas protected by wet system, does the building apprear to be properly heated in all areas, including blind attics, perimeter areas and are all exterior openings protected against entrance of cold air? ..J. 2. Control Valves (See Section 11) a. Wet sprinkler control valves open? "'>i.. b. Standpipe control valve open? )( c. Dry system control valve open? )(. d. Anti-freeze control valve open? "- e. Special system control valve open? ~ f. Are all control valves in good condition and locked open or supervised? 'oj g. Are all control valves accessible? '"A. 3. Water Suoolies (See Section 12) a. Was a water flow test made? )l 4. Tanks Pumos. Fire Deol. Connections a. Are fire pumps, gravity tanks, reservoirs and pressure tanks in good condition and properly maintained? "/. b. Are fire department connections in satisfactory condition, couplings free, caps in place and check valves tight? X 5. Wet Svstems a. Have anti-freeze systems been tested and left in satisfactory condition? 'I. b. Are alarm valves, water flow indicators and tamper switches in satisfactory condition? V. 6. Drv Svstems a. Is system in service on inspection? X b. Does dry pipe valve appear free of damage? X c. Are the trim valves in the appropriate position? / d. Is the alarm test valve closed? .( e. Is the air compressor operational? I( f. Is the oil level on the air compressor normal? -.( g. Is any condensation drained off the air compressor? " I" . /"JIIl --":."1 r h. Are the high/low pressure switches operational? ;(.. i. Is the air maintenance device operational? ';l j. Were the low points property drained? X k. Are the quick opening devices in service? " I. Is the dry pipe valve trip test satisfactory? y. m . Is the dry pipe valve and supply protected from freezing? "'- 7. Soecial Svstems (See Section 10) a. Were valves tested as required? 'l( b. Kitchen Hood? Heads cleaned or replaced? y 8. Alarms a. Water motor and gong tesls8tisfactory? . .P > . -. X b. Electric alarm test satisfactory? X c. Supervisory alarm service test satisfactory? )( 9. Sorinklers Pioino a. Are all sprinklers in good condition, not obstructed, and appear free of corrosion or loading? ')( b. Are all sprinklers less than 50 years old? )( c. Is the piping, drain valves, check valves, hangers, pressure gauges, open sprinklers, strainers satisfactory? X d. Are all sprinklers of proper temperature rating? "- 10. Special Systems: @ Type Make and Model? Condition? 11. Control Valves INo? I Tvpe? Ooen Secured Closed Sions Condition Yes No Yes No Yes No Yes No t\ l Pump Control Valves Sectional Control Valves ""~ ,..( 1-00 I t.,<"" S c. n,-., r ~ - ..... J System Control Valves WATER FLOW TEST 12. Water Flow Test? (If none made, Why?) ITest pine Located Size Pressure Flow Pressure ITest Pice Located Size Pressure Flow Pressure Test Pioe Before Pressure After Test Pice Before Pressure After ;(:".. -;:"".," ,., ..... r/l..,lq" . "-. . -. . ,. ,'. 10 " ,. ,) J .. )02 c /,. ol..r. ("~ " I) /" 0 -f ..' a I t. o:,~ fA t" (. ) JUC.JI-o. VI S 13, ) /<?( 15, Recent changes in building occupancy or fire protection equipmenl. 16. Adjustments or corrections made. 17. Desirable Improvements.