Loading...
HomeMy WebLinkAbout10C - 2011 Water Quality Maintenance and Retrofit Project MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: 4646 Dakota Street SE Prior Lake. MN 55372 CITY COUNCIL AGENDA REPORT JUNE 7, 2010 10C ROSS BINTNER, WATER RESOUCES ENGINEER CONSIDER APPROVAL OF TWO RESOLUTIONS: 1) ACCEPTING PROPOSALS AND AUTHORIZING WSB TO PROVIDE SURVEYING AND WETLAND DELINEATION SERVICES; AND, 2) ACCEPTING PROPOSALS AND AUTHORIZING NTS TO PROVIDE TESTING SERVICES FOR THE 2011 WATER QUALITY MAINTENANCE AND RETROFIT PROJECT. Introduction The purpose of this agenda item is to accept the proposals for professional services related to design, construction surveying, wetland delineation and pond sediment testing for the 2011 Water Quality Maintenance and Retrofit Project #11-012. Historv The City of Prior Lake owns the majority of the stormwater conveyance and treatment system (ponds, swales, culverts) that provides flood protection and water quality treatment of rainwater runoff. To keep the system in good working order, and maintain the mandated average designed level of service; periodic maintenance must be undertaken. The city council recently approved such maintenance for 2009 which is presently underway. This agenda item is for work to be undertaken in 2011. The City of Prior Lake inspects its entire stormwater system on a 3-5 year rotating basis. The result of these inspections triggers minor maintenance work that is completed annually by City staff. Inspections also lead to large full pond dredging projects and efficiency and capacity retrofit which occur biennially (currently every odd year). Water quality maintenance and retrofit projects are prioritized and completed based on the following criteria: cost efficiency, current level of service, and rights of access. City staff solicited proposals for surveying and testing services needed to collect information to assist in the process of prioritizing these ponds, and creating maintenance cost estimates and plans. Current Circumstances The 2011 Water Quality Maintenance Project includes five water quality areas. These five areas show signs of underperforming their design level of service and are in need of repair or modification. In order to determine the parameters needed to prepare the plans and specifications for this project the City needs to complete survey/wetland delineation work and testing. The results of the surveying and testing will allow City Staff to produce maintenance plans and cost estimates for full maintenance to be completed from January 1, 2011 through October 31, 2011. R\CounCii201O Agenda Reports\06 07 1CJJOOGCJ7 IGENDA !\ccept Ouotes Survey arid Testing docx Surveying and Wetland Services Staff has requested proposals from the three firms from our consultant pool for surveying services. They include: Bolton and Menk Inc., WSB and Associates, and MFRA. Each of these firms has a positive history of construction staking and wetland delineation services for the City of Prior Lake. The bids received by these firms are tabulated below. Note that MFRA did not respond to the RFP: I Firm Name I MFRA I WSB I BMI , Base Price Nonresponsive $4,980.00 $10,700.00 The proposals received were analyzed and City staff is recommending that WSB perform the surveying and wetland delineation services for this project. WSB has performed the construction staking and wetland delineations for City utilities in the past. The quoted represent a "Base Bid" that was based on assumptions about the amount of ponds to be maintained. Final determination on the amount of survey work required will depend on the final design estimated costs and any contamination detected during testing. These factors will determine whether the City will complete maintenance on less than or more than five areas based on budget constraints. Soil Testing Services Staff has requested proposals from the three qualified testing firms. They include: NTS, Braun Intertec, and Pace Analytical. Each of these firms has the unique ability to provide the State-mandated soil tests: I Firm Name I NTS I Braun Intertec I Pace Analytical . Base Price $4,532.00 $5,225.00 $6,420.50 The proposals received were each analyzed and City staff is recommending NTS to perform the soil testing services for the 2011 Water Quality Maintenance and Retrofit project. NTS performed similar services for the 2009 pond maintenance project and met the timelines and testing requirements. Each firm provided a "Base Bid" based on assumptions of numbers of tests required. The testing protocol requires a varying level of effort based on the sample content and a predefined decision matrix. The actual cost will vary depending on the soil sample content. ISSUES: Surveying, wetland delineation, and soil chemical tests must be done by or under the supervision of a registered land surveyor, or certified testing laboratory and thus qualifies as a professional service. The City of Prior Lake is not equipped or licensed to perform surveying and testing for these projects. FINANCIAL IMPACT: The surveying and testing for this project will be funded through the City Water Quality utility, capital outlay budget item #49420-530. R\Council\2010 Agenda Reports\06 07 10,1001307 A.GE~~D," Accept Que,tes Survey and Test!ngdo~x 2 ALTERNATIVES: The alternatives are as follows: 1. Approve a resolution accepting proposals and authorizing the Mayor and City Manager to execute the City's Standardized Contract for Professional Services with WSB for Surveying and Wetland Delineation Services for the 2011 Water Quality Maintenance and Retrofit project. 2. Approve a resolution accepting proposals and authorizing the Mayor and City Manager to execute the City's Standardized Contract for Professional Services with NTS for Soil Testing Services for the 2011 Water Quality Maintenance and Retrofit project. 3. Table the Resolution for a specific reason. 4. Deny the Resolution. RECO.. MMEN.DED. A7t rnatives # 1 and #2 MOTION: Revit~ j~:' ,1 ~\ _"~'-_"_______ Frank BOYI.e , C. it ty1< Inager .J i R.\Council\2010 A.geilda Reports\O(j 07 10,100\)07 AGEr~DA Accepi OUI)ies SUrVSy and 3 4646 Dakota Street SE Prior Lake_ MN 55372 RESOLUTION 10-xxx A RESOLUTION AUTHORIZING WSB TO PROVIDE SURVEY, STAKING AND WETLAND DELINEATION SERVICES FOR THE 2011 MAINTENANCE AND RETROFIT PROJECT Motion By: WHEREAS, WHEREAS, WHEREAS, Second By: Design survey, wetland delineations and construction staking are necessary to properly design, install and maintain City infrastructure; and, Survey, staking and wetland delineation is needed for the following project: 2011 Water Quality Maintenance and Retrofit Project #11-012; and, The City does not have the in-house expertise to complete these services; and, The City solicited quotes from three firms and evaluated quotes from two firms qualified firms to provide surveying staking and wetland delineations services for the 2011 Water Quality Maintenance and Retrofit Project #11-012. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: WHEREAS, 1. The recitals set forth above are incorporated herein. 2. WSB is hereby selected to provide Surveying Services for the 2011 Water Quality Maintenance and Retrofit Project for a base price in the amount of $4,980.00. 3. The Mayor and City Manager are authorized to execute the City's Standardized Professional Services Agreement with WSB on behalf of the City. 4. Funding for these services will be drawn from the Water Quality Fund #49420-530. PASSED AND ADOPTED THIS 7th DAY OF JUNE 2010. I Myser I Erickson Hedber!l Keenev Millar YES NO Myser Erickson Hedberg Keeney Millar Frank Boyles, City Manager R\Counclt\2010 Agenda Reports\06 07 10\100607 RESOLUTION Accept Survey.docxR:\Council\20 1 0 Agenda Reports\06 0710\100607 RESOLUTION Accept Survey.docx 4646 Dakota Street SE Prior Lake. MN 55372 RESOLUTION 1 Q-xxx RESOLUTION AUTHORIZING NTS TO PROVIDE SOIL TESTING SERVICES FOR THE 2011 WATER QUALITY MAINTENANCE AND RETROFIT PROJECT Motion By: WHEREAS, WHEREAS, WHEREAS, Second By: The State requires soil testing of pond sediment prior to pond maintenance projects; and Soil testing is needed for the following projects: 2011 Water Quality Maintenance and Retrofit Project #11-012; and The City does not have the equipment J expertise or required licensure to provide these services; and The City solicited and evaluated quotes from three qualified firms to provide soil testing for the 2011 Water Quality Maintenance and Retrofit Project #11-012. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: WHEREAS, 1. The recitals set forth above are incorporated herein. 2. NTS is hereby selected to provide soil testing services for the 2011 Water Quality Maintenance and Retrofit Project for a base price in the amount of $4,532.00 and the unit pricing rates shown in the proposal and attached to the City's Standard Professional Services Contract will be applied. 3. The Mayor and City Manager are authorized to execute the City's Standard Professional Services Agreement on behalf of the City. 4. Funding for these services will be drawn from the Water Quality Fund #49420-530. PASSED AND ADOPTED THIS 7th DAY OF JUNE 2010. Myser Erickson Hedberg Keeney Millar YES NO Myser Erickson Hedberg Keenev Millar Frank Boyles, City Manager RICouncii\2010 Agenda Reports\06 07 10\100607 RESOLUTION Accept Testing.docxR:\Council\20JO Agenda Reports\06 07 10\100607 RESOLUTION Accept Testing .docx