HomeMy WebLinkAbout10-059 Feasibility Study 2011 Street Reconstruction
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 10-059
A RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT
FOR THE 2011 RECONSTRUCTION IMPROVEMENT PROJECT
CITY PROJECT #11-011
Motion By: Millar
Second By: Hedberg
WHEREAS, It is necessary to determine the feasibility of undertaking the construction of
improvements to Boudin Street, Denese Street, Grayling Circle, Lois Avenue,
Natalie Road, Rutgers Road, Timothy Avenue and Watersedge Trail including
the construction of storm sewer, sanitary sewer and watermain repairs,
aggregate base, concrete curb and gutter, bituminous surfacing, street lights,
and appurtenant work; and
WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of
the improvements, pursuant to Minnesota Statutes, Chapter 429,
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. That the proposed improvements be referred to the City Engineer for study and that the City
Engineer is instructed to report to the Council with all convenient speed advising the Council
in a preliminary way as to whether the proposed improvements are necessary, cost-effective
and feasible and as to whether they should best be made as proposed or in connection with
other improvements, and the estimated costs for the improvements as recommended.
3. The City Engineer is directed to solicit quotes for surveying, televising, and soil borings for
the project.
PASSED AND ADOPTED THIS 21st DAY OF JUNE, 2010.
Mvser x Mvser
Erickson x Erickson
Hedbera x Hedberg
Keeney x Keeney
Millar x Millar
YES
NO
M\COUNCIL\Resolutions\201 0\1 0-059 Feasilibly Study 2011 Street Recol1struction.doc