Loading...
HomeMy WebLinkAbout03-105 RESOLUTION 03-105 A ORDERING PREPARATION OF FEASIBILITY RE FOR THE 2004 RECONSTRUCTION ~PROVEMENT PROJECT CITY PROJECT #04-11 Motion By: LEMAIR Second By: PETERSEN WHEREAS, it is proposed to constru improvements on Breezy Point, Stefan Circle, Bianca Circle, Adrian Circle, Red Oak Road, Rutledge Street and Lakeview Circle, including the construction of storm sE ~er, sanitary sewer and watermain repairs, aggregate base, concrete curb and gutter, )ituminous surfacing, street lights, and appurtenant work; and WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of the improvements, pursuant t~ Minnesota Statutes Chapter 429. NOW THEREFORE, BE IT RESOLVE BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA that: 1. The recitals set forth above are inc ~orated herein. 2. The proposed improvements are h .~reby referred to the City Engineer for study and she is instructed to report to the Council with all c{,nvenient speed advising the Council in a preliminary way as to whether the proposed improveme~ts are necessary, cost-effective and feasible, and as to whether they should best be made as prop< ,sed or in connection with other improvements, and the estimated costs for the improvements as reccmmended. PASSED AND ADOPTI iD THIS 16th DAY OF JUNE, 2003. YES ~10 Haugen X Haugen elomberg X Blomberg LeMair X LeMalr Petersen X Petersen Zieska X Zieska City Manager, City of Prior Lake 16200 Eagle Creek Ave. $.E.. Prior Lake /linnesota 55372-1714 / Ph. (952) 447-4230 / Fax (952) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER