Loading...
HomeMy WebLinkAbout98-84A RESOLUTION APPROVING A LONG TERM ACCESS AND DEVELOPMENT PLAN FOR TRUNK HIGHWAY 13, AS AMENDED FOR FRANKLIN TRAIL INTERSECTIONS. MOTION BY: MADER SECOND BY: KEDROWSKI WHEREAS, the City has worked with MnDOT, Scott County, and the City of Savage to prepare a Long Term Access and Development Plan for State Highway 13, and WHEREAS, public informational meetings were held in 1996, and WHEREAS, an approved Long Term Access and Development Plan enhances the potential for MnDOT participation in funding proposed improvements to State Highway 13, and WHEREAS, approval of the Long Term Access and Development Plan will help the City, its businesses and residents plan for the future. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, the Long Term Access and Development Plan prepared by MnDOT and the State Highway 13 Task Force and as shown on Exhibit A (attached), is hereby approved. BE IT FURTHER RESOLVED, the City shall plan for a trail to be added along the entire length of Highway 13. 1620..~9~ Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER Passed and adopted this 6th day of July, 1998. {Seal} YES Mader X Kedrowski X Petersen X Schenck X Wuellner NO Mader Kedrowski Petersen Schenck ~rank Bo~ ~' City Ma~ City of Pri'~r Lake P~ES9885.DOC Stays As Is Full Signalized Intersection Port Rlcnora Connection ol Candy Cove Trail on the south side of T H 13 will be closed. Prlodty C Includes commitment by City to move the connection of Ridgemount Ave. and Main St. further from T.H. 13 Stays As is Full Signalized Intersection Priodty A Signalizing intersection is dependant on connection of County Rd. 23 with Five Hawks Ave Pdefity C Priority A Acces~ Intersection D~sign Not Ye~ Determined Stays As is Full Signalized Intersection Stays As is Full Signalized Intersection It is anticipated that the city 'Ring Road" in this area would be completed before intersection changes are made here. Prfodty C I I I I I &., % l I I I I I I Scale I mile Port SAVAGE 1990 POP. Priority A construction maybe done prior to the northbouml lane. Stays As is Full Signalized Intersection Priority B Priodty c Note: Cost participation by the city or the property owner would be required for the northbound Highway 13 to Westbound business driveway opening and turn lane to be constructed. Nolee All street connections to T H 13 that are not highlighted will be limited to 'fight rum in and fight turn out: m ~ m m m Potential new roads, general Iccationo ConstrucPon Tune Table Pdodtlee Priority A: t-3 yeem Priority B: 4-10 years Pdefity C: 10-30 years Note: Tim timetable for rviodty B and C projects, will be dependeet on local development, traffic vclume growth, accident patteme, and avallatge funding. Future accident patterns may result in the need to alter the degree o! acceee shown on this plan, at individual locations Stays As is Full Signalized Intersection Port Rlcl~ora Cannection o! Candy Cove Trail on the south side of T H 13 will be closed, Priorily C Includes commitment by City to move the connection of RIdgernount Ave. and Main St. !mlher !rom T.H. 13 Stays As is Full Signalized Intersection Priodty A Signalizing intersection Is dependent on connection of County Rd. 23 with Five Hawks Ave Priority C Priority A Intersection Design Not Yet Determined Stays As Is Full Signalized Intersection c[oA~io00 $1. It is anticipated that the city 'Ring Road" in this area would be completed before intersection changes ara made here. Prbdty C TRAILER % I I I I I I I Scale 1 mile ~ SAVAGE 1990 POP. McCoU Priority A conatruction mm/oe done prior to the Stays As is Full Signalized Intersection Pdodty B Priority c Note: Cost participation by the city or the property owner would be required for the northbound Highway 13 to Westbound business driveway opening and turn lane to be constructed. Notes NI street connactiona tot H 13 that are not highlighted will be limited to 'right turn in and right turn out.' m m .. m m Polenital new roads, general locations Construction Time Tab~ Priodbe8 Priority A: 1-3 yeem Priority B: 4-10 yearn Priority C: 10-30 years Note: The timetable for pdmtty B and C projects, will be dependent on IocaJ development, traffic volume growth, accident patterns, and available funding. Future accident patterns may rMuit in the need