Loading...
HomeMy WebLinkAboutHeating Permit 94-0356 t. Pink - File F PR/ �� '��"`��—__ 2. Green - City ��� �� � - E TYPE OF STRUCTURE 3. Yellow - Conuactor 9 � m 4629 Permit No. 9Y 3� �tRR MN 5$ --�— Single Family _'� Two-Family Multi-Family ` ,r i, Commercial Industrial Public Other ING APPLI 10 �/� ERMIT Date a�j �J �5- _ j �-�—_ Q � Z„� �OB VALUATION FEE $0 -$1,000 2°l0 of job value, min. $20.00 Site Address 1 $1,001 -$10,000 $20.00 for the first $1,000 plus $1.25 tor each additional Lot � Block 2. Addition $100.00 or fraction thereof to and including $10,000. Owner�s Name _ 1 �1 � �n �� \ $10,001 - $50,000 $132.50 for the first $10,000 plus $1.00 for each addi- Address 1��C� �M\ ��.Q�,E �rG tional $100.00 or fraction the�eof, to and including I $50,000. Heating Contractor ��� 1�Q� �tPS�c��, � t� ��b Address 3�� t.C� •`�,�,� ��J , g�,y�_)� �� �3'3� $50,001 and over $532.50 for the first $50,000 plus $7.50 for each addi- r tional $1,000 or fraction thereof. Telephone # ��— ��7 The price of your heating permit includes one rough-in and one final inspection. Furnace Make & Model TYPE OF SYSTEM Additional inspections will be billed at $25.00 each. Warm Air Plants Model Size Gravity House Heating Test Record must be submitted with building rzermit number before build- Mechanical C, OS `^^^��pancy wil4 be issued. Conn. Load Air Conditioning _ L ED DUE TO NS REQUIRED with number of supply and return openings listed Fuel Flue Size Vent. System + A CTI�ITy 8�3 o/O 1 Per opening. New structures or additions send floor plan with sup- Supply Openings HEATING OR P01 �tions shown. HEAT LOSS CALCULATIONS, PAYMENT AND Steam Return Openings Hot Water �Y BE MAILED TO THE CITY OF PRIOR LAKE, 4629 Dakota St. Radiation S.E. Prior Lake, nnN. 55372. Input Output Special Devices City Hall business hours are 8 a.m. - 4:30 p.m. Edr. Other Devices ALL WORK MUST BE {NSPECTED (ROUGH-IN AND FfNAL) - CALL CfTY HALL Cfm. � ,�t • 447-4230. TYPE OP WORK I hereby apply for mechanical systems permft and I acknowledge that the information Afteratwns Replacement New Construction �_, above is complete and accurate; that the work will be in conformance with the ordi- nances and codes of the city and with the state buildingtmechanical c:odes; that this form Repair Est. Comp. Date ��, � does not become a permit until signed by the BUILDING OFFICIAL; that the work will be in acxordance with the approved plan in the case of all work which requires review and Est. Cost $ � ���Q • O(� Building Permit # ---�� app I of plans. HEATING PERMIT FEE $ � � � e I���� STATE SURCHARGE $ .50 ApplicanYs S' ature Date TOTAL PERMIT FEES $ � � Receipt # ��02,�� / � r � ^ � Buifding icial's Signature Date