HomeMy WebLinkAboutBuilding Permit 11-0307 DATE TIME
CITY OF PRIOR LAKE /
INSPECTION NOTICE SCHEDULED J� J �//
ADDRESS 313 Q Ocja , 'PT
OWNER C NTR.
PHONE NO. PERMIT NO. j ( - 307
❑ FOOTING ❑ PLUMBING RI ❑ EX/GRAD /FILLING
❑ FOUNDATION ❑ MECH RI ❑ COMPLAINT
❑ FRAMING ❑ WATER HOOKUP ❑ FIREPLACE RI
,Ar INSULATION ❑ SEWER HOOKUP ❑ FIREPLACE FINAL
FINAL ❑ PLUMBING FINAL ❑ GASLINE AIR TST
❑ SITE INSPECTION ❑ MECH FINAL ❑
COMMENTS: lit r -C91 r -
_ i / fite--0
WIMWAIIIL
IIII
/Un 4-- WORK SATISFACTORY PROCEED
❑ CORRECT ACTION AND PROCEED
❑ CORRECT WORK, CALL FOR REINSPECTION BEFORE COVERING
Inspector: Owner /Contr:
�5
CALL 0 FOR THE NEXT INSPECTION 24 HOURS IN ADVANCE.
CODE REQUIREMENTS ARE FOR YOUR PERSONAL HEALTH & SAFETY!
INSNOTI
ti o � PR 44, �
CITY OF PRIOR LAKE BUILDING PERMIT, Date Recd
TEMPORARY CERTIFICATE OF ZONING COMPLIANCE
AND UTILITY CONNECTION PERMIT
r
'� E SOS
I. White File PERMIT NO. X 3
2. Pink City
3. Yellow Applicant
(Please type or print and sign at bottom)
ADDRESS ZONING trice use)
3173 Shoo Cove__ T+ 1•1 W
LEGAL DESCRIPTION (office use only)
LOT BLOCK ADDITION PID
(Name) 0.0 \ L.-01 ciK (Phone) —114 "7— 759
(Address)
BUILDER (Company Name) £F— (o � r[ i 1ci (Phone) 5 $ '') ZCO
(Contact Naamee) 'SG 11l jl f ' (Phone) 6f, 2 " 2 - 1 Z�
(Address) L/ 5 iQ,66 4,je_ ' FlO / lJG('�N l 55vs/
TYPE OF WORK ❑ New Construction ['Deck ❑Porch *e- Roofing ❑Re- Siding ❑Lower Level Finish El Fireplace
❑Addition ['Alteration ❑Utility Connection
CODE: ❑I.R.C. ❑I•B.C• ❑ Misc:
Type of Construction: I H III IV V A B pp� ' i 2
Occupancy Group: A B E F HI MR S U PROJECT COST /VALUE $ r 0 .
Division: 1 2 3 4 5 (excluding land)
I hereby certify that I have furnished information on this application which is to the best of my knowledge true and correct. I also certify that 1 am the owner or authorized agent for the
above- mentioned • .. • t..,'on will conform to all existing state and local laws and will proceed in accordance with submitted plans. I am aware that the building
oke this permit for Ns .":•`t•••_t,:gby agree that the city official or a designee may enter upon the property to perform needed inspections.
X
•ol ( i 4D2 L I zsil
Signature Contractor's License No ate
Permit Valuation Park Support Fee # $
Permit Fee $ SAC # $
Plan Check Fee $ Water Meter Size 5/8"; 1 ";
State Surcharge $ Pressure Reducer $
Penalty $ Sewer /Water Connection Fee # $
Plumbing Permit Fee $ Water Tower Fee # $
Mechanical Permit Fee $ Builder's Deposit $
Sewer & Water Permit Fee $ Other $
Gas Fireplace Permit Fee $ TOTAL DUE $ 7 c 7 f
This Application Becomes Your Building Permit When Approved Paid 7 1 7 r - Rec No. 6 Z-b
Date el_ 27 if By
Building Official Date
This is to certify that the request in the above application and accompanying documents is in accordance with the City Zoning Ordinance and may proceed as requested. This document
when signed by the City Planner constitutes a temporary Certificate of Zoning compliance and allows construction to commence. Before occupancy, a Certificate of Occupancy must be
issued.
Planning Director Date Special Conditions, if any
24 hour notice for all inspections (952) 447 -9850, fax (952) 447 -4245
4646 Dakota Street S.E., Prior Lake, Minnesota 55372