HomeMy WebLinkAbout9A Resolution Accepting Bids for Street Overlay Project 11-013CITY COUNCIL AGENDA REPORT
MEETING DATE:
JUNE 6, 2011
AGENDA #:
9A
PREPARED BY:
JOE WIITA, STREET AND UTILITIES SUPERVISOR
PRESENTER:
JOE WIITA
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION ACCEPTING BIDS AND
AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE
CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE 2011
STREET OVERLAY PROJECT 11 -012
DISCUSSION: Introduction
The purpose of this agenda item is to accept the bids and authorize the
Mayor and City Manager to execute the City's Standardized Construction
Contract with Bituminous Roadways Inc. for the 2011 street overlays as
identified in the 2011 Street Department portion of the General Fund
Budget. Streets to be overlaid are in the Sand Point area.
History
Staff utilizes a pavement management system for rating the condition of
streets throughout the City. Staff then uses this system as a tool when
identifying areas for maintenance and repair. To be eligible for an overlay
the street must have concrete curb and gutter, storm sewer, and a sound
sub base. The City also includes maintenance resurfacing of existing
streets in the overlay project area that do not have concrete curb and gutter
and will not be reconstructed in the next ten years. These maintenance
activities include patching and resurfacing of road segments necessary to
keep the streets usable until they are reconstructed.
The following street overlays and maintenance resurfacings have been
identified by staff for construction in 2011:
Full length road overlay.
Route
Description
Cedarwood Street
Crest Ave to Meadow Ave
Cedarwood Trail
Crest Ave to Aspen Ave
Aspen Ave
Cedarwood Trail to County Rd 42
Amblewood Drive
Crest Ave to Aspen Ave
Cedarwood Ct.
Cedarwood Trail to End
Cedarwood Circle
Cedarwood Trail to End
Meadow Ave
County Rd 42 to End
Birchwood Ave
Aspen Ave to Shady Beach Trail
http: / /financel /teams /am /October4 2010 /June 6, 2011/2011 OVERLAY.doc
Route
Description
Shore Trail
Ferndale Ave to End
Ferndale Ave
Carriage Hill Rd. to Shore Trail
Shore Lane
Carriage Hill Rd. to Shore Trail
Pine Road
Shore Trail to End
Current Circumstances
Advertisement for bids were published in both the Prior Lake American and
Construction Bulletin with bids due and opened on May 17, 2011, at
11:00am. The City received nine (9) bids for this project, which are listed in
the chart below.
Company
Address
Total
Bituminous Roadways Inc.
Shakopee, Mn 55379
$165,953.00
McNamara Contracting
Rosemount, Mn 55068
$182,686.25
Chard Tiling
Belle Plaine, Mn 56011
$192,917.25
Prior Lake Blacktop, Inc.
Prior Lake, Mn 55372
$193,287.30
William Mueller & Sons
Hamburg, Mn 55339
$201,203.05
GMH Asphalt
Chaska, Mn 55318
$201,787.15
Northwest Asphalt
Shakopee, Mn 55379
$205,550.25
Hardrives, Inc.
Rogers, Mn 55374
$223,779.05
Aslakson Blacktop
Red Wing, Mn 55066
$240,432.95
Conclusion
Staff is recommending awarding the construction contract to the lowest
bidder, Bituminous Roadways Inc., in the amount of $165,953.00.
Bituminous Roadways has previously worked for the City of Prior Lake and
have completed these projects successfully.
ISSUES: Considering the price of petroleum and petroleum based products, we
believe that the low bid represents a good value to the Prior Lake taxpayer.
The City's estimate was $195,000 based on last year's project.
FINANCIAL Funds for this project will be drawn from the Street Department portion of
IMPACT: the general fund budget, of which $330,000 is identified for the City's street
maintenance programs (overlay, seal coat, crack seal and stripping).
ALTERNATIVES: 1. Approve a resolution accepting the bids and authorizing the Mayor and
City Manager to execute the City's Standardized Construction Contract
with Bituminous Roadways, Inc. for the 2011 Street Overlay Project 11-
012.
2. Table this item for a specific reason and provide staff with direction.
3. Direct staff not to proceed with the project.
RECOMMENDED Alternative # 1
MOTION:
RESOLUTION 11 -xxx
A RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE MAYOR AND CITY MANAGER TO
EXECUTE THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE 2011 STREET
OVERLAY PROJECT 11 -012
Motion By:
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
Second By:
The following streets have been identified by staff for construction in 2011:
Route
Description
Cedarwood Street
Crest Ave to Meadow Ave
Cedarwood Trail
Crest Ave to Aspen Ave
Aspen Ave
Cedarwood Trail to County Rd 42
Amblewood Drive
Crest Ave to Aspen Ave
Cedarwood Ct.
Cedarwood Trail to End
Cedarwood Circle
Cedarwood Trail to End
Meadow Ave
County Rd 42 to End
Birchwood Ave
Aspen Ave to Shady Beach Trail
Shore Trail
Ferndale Ave to End
Ferndale Ave
Carriage Hill Rd. to Shore Trail
Shore Lane
Carriage Hill Rd. to Shore Trail
Pine Road
Shore Trail to End
;and
The City of Prior Lake is committed to improving the streets within the City by providing
continued maintenance; and
Continued maintenance of City streets will reduce the need of costly reconstruction in the
near future; and
A total of nine (9) bids (provided in the chart below) were received for the identified
improvements, with the low bid from Bituminous Roadways Inc. at a cost of $165,953.00
;and
Company
Address
Total
Bituminous Roadways Inc.
Shakopee, Mn 55379
$165,953.00
McNamara Contracting
Rosemount, Mn 55068
$182,686.25
Chard Tiling
Belle Plaine, Mn 56011
$192,917.25
Prior Lake Blacktop, Inc.
Prior Lake, Mn 55372
$193,287.30
William Mueller & Sons
Hamburg, Mn 55339
$201,203.05
GMH Asphalt
Chaska, Mn 55318
$201,787.15
Northwest Asphalt
Shakopee, Mn 55379
$205,550.25
Hardrives, Inc.
Rogers, Mn 55374
$223,779.05
Aslakson Blacktop
Red Wing, Mn 55066
$240,432.95
CADocuments and Settings \cgreen \My Documents \SharePoint Drafts \overlay resolution.doc
WHEREAS, City staff recommends award of a contract to Bituminous Roadways Inc. as the lowest
responsible bidder for the 2011 Street Overlay Project 11 -012.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Manager are hereby authorized to execute the City's Standardized Construction
Contract for the identified street overlays with Bituminous Roadways Inc. for a cost not to exceed
$165,953.00.
3. Funding for this project shall be drawn from the Street Department portion of the General Fund Account
# 101- 43100 -412
PASSED AND ADOPTED THIS 6th DAY OF JUNE 2011.
YES NO
M ser
M ser
Erickson
Erickson
Hedberg
Hedber
Keeney
Keene
- Soukup
Souku
Frank Boyles, City Manager