HomeMy WebLinkAbout9D MFRA to Provide Construction StakingPLO
f.
U
4646 Dakota Street SE
Prior Lake. MN 55372
CITY COUNCIL AGENDA REPORT
MEETING DATE:
AGENDA M
PREPARED BY:
PRESENTED BY:
JUNE 6, 2011
9D
LARRY POPPLER, INTERIM CITY ENGINEER
LARRY POPPLER
AGENDA ITEM: CONSIDER APPROVAL OF TWO RESOLUTIONS: 1) ACCEPTING PRO-
POSALS AND AUTHORIZING MFRA TO PROVIDE CONSTRUCTION STAK-
ING AND 2) ACCEPTING PROPOSALS AND AUTHORIZING STORK TWIN
CITY TESTING TO PROVIDE CONSTRUCTION TESTING FOR 2011 COW
STRUCTION PROJECTS
DISCUSSION: Introduction
The purpose of this agenda item is to accept the proposals for professional
services related to construction staking and construction testing for the 2011
construction projects including, Boudins Phase I Improvement project #11 -011
and the 2011 Street Overlay Project.
Histo
Before you tonight is award of a contract for the Boudins Phase I Improvement
Project #11 -011 and the 2011 Street Overlay Project.
These projects include storm sewer, sanitary sewer, water main, concrete curb
and gutter, aggregate base, bituminous surfacing, and appurtenant work. The
improvements require construction staking and construction testing of new City
infrastructure.
Current Circumstances
Construction Staking
Staff has requested proposals from the four firms from our consultant pool for
surveying services. They include: Bolton and Menk Inc., WSB and Associates,
Probe Engineering, and MFRA. Each of these firms has a positive history of
construction staking for the City of Prior Lake. The bids received by these
firms are tabulated below:
MFRA
$18,300.00
Probe
$25,600.00
BMI
$32,250.00
WSB
$36,500.00
The proposals received were each analyzed and City Staff is recommending
that MFRA perform the 2011 construction staking for the City of Prior Lake.
MFRA recently performed the construction staking for Brooksville Hills Phase
11 Project, County Road 82, County Road 21, and County Road 12 projects. At
times, construction necessitates re- staking. Because the amount of re- staking
can not be determined, any re- staking will be performed at an hourly basis.
This could increase the cost to a total that exceeds the base price. Re- staking
typically accounts for an additional 15% of the base price.
Construction Testing
Staff has requested proposals from the three firms listed in the consultant pool
for geotechnical services. They include: American Engineering Testing, Stork
Twin City Testing, and Braun Intertec. Each of these firms has a positive his-
tory of construction testing in Prior Lake. The results are tabulated below:
The proposals received were each reviewed using an estimated construction
testing estimate. The number of tests actually performed could be less than
the estimate or could exceed the estimate. For the purposes of evaluation, the
consultant provided a unit price for each item listed in the estimated construc-
tion testing estimate. The results were analyzed and City Staff is recommend-
ing that Stork Twin City Testing be selected to perform the 2011 construction
testing for the City of Prior Lake. Stork Twin City Testing completed the pre-
liminary soil boring analysis for this project and was also the company used for
the 2009 improvement project. Since Stork Twin City Testing performed the
original soil boring and pavement section recommendation, it is recommended
that they be selected to help carry out their pavement recommendations. Be-
cause of the poor soils and saturated conditions, the Contractor needs to take
special precaution during the street reconstruction. Since the price is so close
between Braun and Stork, City Staff feels Stork's knowledge of the conditions
and pavement recommendations is of greater value than the cost difference.
Conclusion
With award of the Boudins project construction will begin soon. Staking and
testing will be needed for this project.
ISSUES: Construction staking must be done by or under the supervision of a regis-
tered land surveyor and thus qualifies as a professional service. The City of
Prior Lake is not equipped or licensed to perform construction staking and
testing for these projects.
FINANCIAL The staking and testing for this project will be funded through assessments
IMPACT: and tax levy. Staking and testing are necessary components of the indirect
cost computation for these projects.
ALTERNATIVES: 1. Approve a resolution accepting proposals and authorizing the Mayor and
City Manager to execute the City's Standardized Contract for Professional
Services with MFRA for 2011 construction staking (subject to approval of
agenda item 9B).
2. Approve a resolution accepting proposals and authorizing the Mayor and
City Manager to execute the City's Standardized Contract for Professional
Services with Stork Twin City Testing for 2011 construction testing services
(subject to approval of agenda item 9A and 9B).
3. Deny this item for a specific reason and provide Staff with direction.
4. Table this item until some date in the future.
RECOMMENDED Alternates 1 and 2.
MOTION:
a
Braun Intertec
$12,670.00
Stork Twin City Testing
$12,820.00
American Engineering
$21,362.00
Testin
The proposals received were each reviewed using an estimated construction
testing estimate. The number of tests actually performed could be less than
the estimate or could exceed the estimate. For the purposes of evaluation, the
consultant provided a unit price for each item listed in the estimated construc-
tion testing estimate. The results were analyzed and City Staff is recommend-
ing that Stork Twin City Testing be selected to perform the 2011 construction
testing for the City of Prior Lake. Stork Twin City Testing completed the pre-
liminary soil boring analysis for this project and was also the company used for
the 2009 improvement project. Since Stork Twin City Testing performed the
original soil boring and pavement section recommendation, it is recommended
that they be selected to help carry out their pavement recommendations. Be-
cause of the poor soils and saturated conditions, the Contractor needs to take
special precaution during the street reconstruction. Since the price is so close
between Braun and Stork, City Staff feels Stork's knowledge of the conditions
and pavement recommendations is of greater value than the cost difference.
Conclusion
With award of the Boudins project construction will begin soon. Staking and
testing will be needed for this project.
ISSUES: Construction staking must be done by or under the supervision of a regis-
tered land surveyor and thus qualifies as a professional service. The City of
Prior Lake is not equipped or licensed to perform construction staking and
testing for these projects.
FINANCIAL The staking and testing for this project will be funded through assessments
IMPACT: and tax levy. Staking and testing are necessary components of the indirect
cost computation for these projects.
ALTERNATIVES: 1. Approve a resolution accepting proposals and authorizing the Mayor and
City Manager to execute the City's Standardized Contract for Professional
Services with MFRA for 2011 construction staking (subject to approval of
agenda item 9B).
2. Approve a resolution accepting proposals and authorizing the Mayor and
City Manager to execute the City's Standardized Contract for Professional
Services with Stork Twin City Testing for 2011 construction testing services
(subject to approval of agenda item 9A and 9B).
3. Deny this item for a specific reason and provide Staff with direction.
4. Table this item until some date in the future.
RECOMMENDED Alternates 1 and 2.
MOTION:
PRIO
ti
U erg
11 �
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 11 -xxx
A RESOLUTION AUTHORIZING MFRA TO PROVIDE
CONSTRUCTION STAKING SERVICES FOR THE 2011 CONSTRUCTION PROJECT
Motion By:
Second By:
WHEREAS, Construction staking is necessary to properly install City infrastructure; and,
WHEREAS, Construction staking is needed for the following projects: 2011 Improvement Project #11-
011; and,
WHEREAS, The City does not have the in house expertise to complete these services; and,
WHEREAS, The City solicited and evaluated proposals from qualified firms to provide construction
staking for the 2011 Improvement Project.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. MFRA is hereby selected to provide Construction Staking Services for the 2011 construction project for
a base price in the amount of $18,300.00.
3. The Mayor and City Manager are authorized to execute the City's Standardized Professional Services
Agreement with MFRA on behalf of the City.
4. Funding for these engineering services will be drawn from the Construction Fund Account #501- 48371-
505.
5. Approval of this resolution is subject to approval of the agenda item 9B.
PASSED AND ADOPTED THIS 6th DAY OF JUNE 2011.
YES
NO
M ser
M ser
Erickson
Erickson
Hedberg
Hedber
Keeney
Keene
I - Soukup
Souku
Frank Boyles, City Manager
Lo, PR10
U ny
4646 Dakota Street SE
'�rNxsso��` Prior Lake, MN 55372
RESOLUTION 11 -xxx
A RESOLUTION AUTHORIZING STORK TWIN CITY TESTING TO PROVIDE
CONSTRUCTION TESTING SERVICES FOR THE 2011 CONSTRUCTION PROJECT
Motion By: Second By:
WHEREAS, Construction testing is a necessary service needed to properly install City infrastructure;
and,
WHEREAS, Construction testing is needed for the following projects: 2011 Improvement Project #11-
011 and the 2011 Overlay Project; and
WHEREAS, The City does not have the equipment or expertise to provide these services; and
WHEREAS, The City solicited and evaluated proposals from qualified firms to provide construction
testing for the 2011 Improvement Project.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. Stork Twin City Testing is hereby selected to provide Construction Testing Services for the 2009
construction project for a base price in the amount of $12,820.00 and the unit pricing rates shown in the
proposal and attached to the City's Standard Professional Services Contract.
3. The Mayor and City Manager are authorized to execute the City's Standard Professional Services
Agreement on behalf of the City.
4. Funding for these engineering services will be drawn from the Construction Fund Account #501- 48371-
505.
5. This resolution is void unless agenda item 9A and 9B are approved.
PASSED AND ADOPTED THIS 6th DAY OF JUNE 2011.
YES
NO
M ser
M ser
Erickson
Erickson
Hedber
— Hedberg
Keene
— Keeney
Soukup
Souku