HomeMy WebLinkAboutadded - well no 6 MEETING DATE: AGENDA # PREPARED BY: AGENDA ITEM: DISCUSSION: FISCAL IMP ACT: CITY COUNCIL AGENDA REPORT September 4, 2001 BUD OSMUNDSON, PUBLIC WORKS DIRECTOR CONSIDER APPROVAL OF CHANGE ORDER NO. 1 TO THE CONTRACT FOR THE CONSTRUCTION OF THE PUMPHOUSE FOR WELL NO.6, CITY PROJECT NO. 02-00 History At the June 4, 2001 regularly scheduled meeting, the City Council awarded a contract for the construction of the pumphouse for Well Number 6 to Municipal Builders, Incorporated (MBI). The purpose of this item is to consider a change order for a change in site conditions from the specifications. The specifications for the foundation for the pumphouse were based on soil borings, using generally accepted soil boring methods and procedures, which showed unsuitable soils to a depth of three to four feet. The actual location of the soil boring was about twenty feet from where the well was drilled and the pumphouse is being constructed. During the initial phases of the construction the contractor has found approximately eight to nine feet of unsuitable soils and higher groundwater than anticipated under the building site. With the building footprint only 30 ft. by 28 ft. it doesn't sound like it would be a very large change in conditions. However, because we have to go out at a 1: 1 grade under the footings, then back up at a 1: 1 grade to the building elevation, the excavation and required backfill become much larger. We have worked with MEI to keep the added costs due to the changes to the lowest possible amounts. The total cost for the added excavation and replacement with proper structural fill is $12,356. This includes using City forces and trucks to haul in approximately 140 tons of the rock needed at the bottom of the excavation. The additional work will add about one week to the contract. This was a totally unavoidable condition to the City and to the contractor. Whenever we deal with soils we are dealing with conditions that we cannot see and have to trust standard procedures. The building cannot be moved to a more advantageous location due to the well location. In our opinion, the added cost would be the same amount if we had known about it prior to bidding and the contractor had included it in his bid pnce. Budf(et Impact The original bid amount for the construction of the pump house and appurtenant equipment was $365,500. Change Order No.1 in the amount of $12,356 is 3.38 per cent of the original contracted amount. The Trunk fund is the source of the money and would absorb the added cost. ag'~000Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (952) 447-4230 / Fax (952) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ALTERNATIVES: RECOMMENDED MOTION: agenda co no. 1 The alternatives are as follows: 1. Approve Change Order No. 1 to the contract for the construction of the Pumphouse for Well No. 6 and appurtenant work to Municipal Builders, Incorporated in the amount of$12,356, and authorize the necessary signatures. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason. Staff recommends alternative number 1. If we wait any amount of time, the contractor would probably move off the site to another project and want extra funding for time lost at this location including re-mobilization. Plus, when the contractor could then come back to this site to complete the work is another question mark, which could totally change the date the pumphouse would be complete and the well on line. CHANGE ORDER CHANGE ORDER NO.1 TO: Municipal Builders Incorporated 17125 Roanoke St NW J\noka,~ 55304 DATE: September 4,2001 FOR: Project No. 02-00, Pumphouse for Well No.6 OWNER: City of Prior Lake You are hereby directed to make the following change to your contract dated June 4,2001. The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will increase the contract sum by: Twelve Thousand Three Hundred Fifty Six and No/100 Dollars ($12,356.00) Add the following: Item Description Unit Quantity Unit Price Amount 1. Change in Soil LS 1 $12,356.00 $ 12,356.00 Conditions Total Additions $ 12,356.00 Amount of Original Contract $ 365,500.00 Change Order No. 1 $ 12,356.00 Revised Contract Amount $ 377,856.00 Contract time is affected by this change by adding one week. APPROVALS: Approved: City of Prior Lake Owner Approved: Municipal Builders Incorporated By By Mayor Date Date By Title City Manager Date 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (952) 447-4230 / Fax (952) 447-4245 c:\ WINDOWS\ Temporary Internet Files\OLK4072\i.\ll1!l.&lLWe~~%NITY EMPLOYER