DISCUSSION:
HISTORY
The City uses the Five Year Capital Improvement Program
to plan its infrastructure improvements and the financing for
capital improvements. The proposed 2003 street
reconstruction program includes several street and utility
improvement projects. The purpose of this Agenda item is
to initiate the process for local improvements set forth in the
2003 portion of the 2003-2007 Capital Improvement
Program in accordance with Minnesota Statutes (M.S.),
Chapter 429.
This process applies to all projects that will be financed in
whole or part through special assessments or bond
proceeds. The first step in the process is for the Council to
order preparation of a Feasibility Report for the improvement
projects.
The Feasibility Report will address: reconstruction of 150th
Street (from TH 13 to Fairlawn Shores Trail) and street
reconstruction in the Mitchell Ponds Area: (Mitchell Circle,
Condon Street, Ridgemont Avenue, and Hope Street) (see
attached location map)(collectively "project").
CURRENT CIRCUMSTANCES
This Project is in the 2003 Capital Improvement Program.
Attached is a page from the C.I.P. which provides additional
information on the Project. The Project requires special
assessments and financing through bond proceeds,
162QQpk~gle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (952) 447-4230 / Fax (952) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
therefore requires the City to follow the requirements of M.S.
Chapter 429.
ISSUES
The City is required to assess a minimum of 20% of the cost
of a public improvement project completed through the
Chapter 429 process and financed through G.O. bonds. The
City will meet the minimum assessment requirement. The
Feasibility Report will determine the estimated costs of the
improvements and methods of financing. In the last few
years, City street construction projects have included one or
more streets which were financed by 100% special
assessment. This 2003 Project is expected to involve 40%
assessments for all benefited parcels except 3-5 lots at the
end of Hope Street.
The preparation of the Feasibility Report is only the first step
in the public improvement process. Following receipt of the
Feasibility Report, the Council can schedule a Public
Hearing to move forward. Following a Public Hearing, the
Council may consider authorizing the preparation of plans
and specifications. Once completed, the City Council would
be asked to approve the plans and specifications, and
authorize advertisement for bids and finally, award a
contract. The City is not committed to doing the projects at
any of the steps outlined above prior to awarding the
contract. The following schedule outlines an approach to
complete this 2003 Project:
Accept Feasibility Study/Call for Public Hearing 10/02
Hold Informational Meeting 10/02
Conduct Public Hearing! Accept Project/Order Plans 11/02
and Specifications
Hold Informational Meeting 2/02
Approve Plans and Specifications/Order 3/03
Advertisements for Bids
Open Bids 4/03
Accept Bids/Award Contract 5/03
Begin Construction 6/03
Authorize Amount to be Assessed/Schedule 8/03
Assessment Hearing for 9/00
Conduct Assessment Hearing/Adopt Assessment Roll 9/03
Complete Base Course of Bituminous 9/03
03CIPFEA
FISCAL IMPACT:
ALTERNATIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
REVIEWED BY:
03CIPFEA
Beyond the Engineering staff time required to prepare the
Feasibility Report and complete surveying, we will also
complete soil borings which are needed to determine the
estimated costs of the Project. This cost will be taken from
the Construction Fund.
There are three alternatives for the City Council to consider:
1. Approve a resolution ordering pre~aration of a Feasibility
Report for: Reconstruction of 150 h Street (from TH 13 to
Fairlawn Shores Trail) and street reconstruction in the
Mitchell Ponds Area (Mitchell Circle, Condon Street,
Ridgemont Avenue, and Hope Street)
2. Deny this item for a specific reason and provide staff with
direction.
3. Table this item until some date in the future.
A motion and second as part of the consent agenda to
approve a resolution ordering pre~aration of a Feasibility
Report for: Reconstruction of 150 h Street (from TH 13 to
Fairlawn Shores Trail) and street reconstruction in the
Mitchell Ponds Area (Mitchell Circle, Condon Street,
Ridgemont Avenue, and Hope Street)
L
/0
ORDERING PREPARATION OF FEASIBILITY REPORT
FOR THE 2003 RECONSTRUCTION IMPROVEMENT PROJECT
CITY PROJECT #03-11
MOTION BY:
JP
SECOND BY:
f16
WHEREAS, it is proposed to construct improvements on 150th Street (from TH 13 to Fairlawn
Shores Trail), Mitchell Circle, Condon Street, Hope Street, and Ridgemont
Avenue(from Condon Street to Rutledge Street SE), including the construction of
storm sewer, sanitary sewer and watermain repairs, aggregate base, concrete curb
and gutter, bituminous surfacing, street lights, and appurtenant work; and
WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA,
that the proposed improvements be referred to the City Engineer for study and that she is instructed
to report to the Council with all convenient speed advising the Council in a preliminary way as to
whether the proposed improvements are necessary, cost-effective and feasible and as to whether
they should best be made as proposed or in connection with other improvements, and the estimated
costs for the improvements as recommended.
Passed and adopted this 15th day of July, 2002.
YES
NO
HauQen \ HauQen
LeMair '\ LeMair
Gundlach \ Gundlach
Petersen \ Petersen
Zieska \ Zieska
I
Frank Boyles, City Manager
{Seal}
~R;uJ.Q Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (952) 447-4230 / Fax (952) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
2002 CAPITAL BUDGET
~-~ --
and 2003 - 2006 CAPITAL IMPROVEMENTS
I I I I I I
I. Description and Location: 1_ Department: Public Works I
I
Street Reconstruction of 150th Street: Project Title: 150th St./Mitchell Ponds Recon.
(from TH 13 to Fairlawn Shores Trail)
Street reconstruction in the Mitchell Ponds Area: Project Number:
(Mitchell Circle, Condon Street, Ridgemont Avenue Project Useful Life: 20 Years
And Hope Street) III. Needs Assessment: H
II. Purp9se: Priority Rating 1
To reconstruct 150th street to a 9 ton standard and IV. Cost/Benefit Impact Statement:
restore residential streets in Mitchell Ponds to a Improved streets will reduce maintenance for the
7-ton design. streets and for vehicles.
Project Financing: 2003 2004 2005 2006 2007
Property Tax
Project Levy 510,000
Special Assessments 340,000
Federal )/
State
County
City MSA Funds 250,000
Capital Park Fund
Fund Balance
Equipment Certificates
Grant/Contributions ;::>::
Other/(Trunk Reserve) 300,000
Total 1 ,400,000
I
Project Expenditures: 2003 2004 2005 2006 2007
Construction (New) 1,400,000
Renovation/Repairs
Land Acquisition
Buildin2;s and Plant I
Equipment
Vehicles ::
Other
Total I 1,400,000
CIP 32
N
W+E
J
s
Lower prtor LaKe
LcW8l'PrlorLake
<3
D
D
0-
~
o
o
",'6 CJ' DO!!,)
'"
o
~'" 0
.~.
o
.P"" 0 0 0
~
~n
I ~ ~DDCO:lrnl"'D~DnD D~<;JCO
?J [\ 0 [l OJ [j D
r7 n 17 r1 r":I n
D
Road wI Concrete
Curb & Gutter
PROJECT AREA MAP
EXHIBIT 1