Loading...
HomeMy WebLinkAbout9A - Water Tower Bids CITY COUNCIL AGENDA REPORT .1rINNESO't~ MEETING DATE: AGENDA # PREPARED BY: REVIEWED BY: AGENDA ITEM: November 18th, 2002 9A Makenzie McCormick, Public Works Coordinator Bud Osmundson, Public Works Director CONSIDER APPROVAL OF A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR RECONDITIONING OF TWO CITY WATER TOWERS, CITY PROJECT NO. 03 - 01. DISCUSSION: HISTORY As part of our preventative maintenance plan and due to the deterioration of the two City water towers, staff requested KLM Engineering, Inc. to perform a complete inspection of both towers in 2000. The inspection of both towers showed significant problems with the interior and exterior coatings or paint. Consequently, the consultant recommends reconditioning of both towers as soon as possible. At the October 215\ 2002 meeting, the City Council authorized the preparation of plans and specifications and the hiring of KLM Engineering, Inc., for the reconditioning of the two City water towers, Crest Avenue Tower and the Tower Street Tower, totaling $99,025.00. The purpose of this agenda item is to consider approving the plans and specifications and authorizing the advertisement for bids for the reconditioning of the two City water towers. CURRENT CIRCUMSTANCES The repair of the two towers has been identified in the Capital Improvement Plan for the last two years. Due to questionable water production status in 2001 and 2002, staff has not wanted to take a tower out of service for the identified repairs. With Well 6 on line and Well 7 to be completed soon, staff feels that the City should have adequate water production capabilities to move forward with the repairs. ISSUES: If authorized to move forward, staff would set the bid date for December 18t\ 2002. After receiving bids, staff would return to the City Council on January 6th, 2003 to award the bids and authorize the execution of contract(s). The estimated reconditioning construction cost is approximately $532,000 for the Crest Tower, and $503,000 for the Tower Street Tower. The funding is identified in the CIP and will come from the Trunk Utility Fund. We hope to receive lower bid prices by combining the reconditioninl! of both towers due to the economies of scale. Ma1l1tenance Center 17073 Adelmann 51. 5.E., Prior lake, Minnesota 55372 / Ph. (952) 440-9675 / Fax (952) 440-9678 AN EQUAL OPPORTIJNITY EMPLOYER T' T -r FISCAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: REVIEWED BY: In bidding, the City will retain the flexibility to hire two separate contractors and to time the work to minimize the impact upon our water users. The funding is to be drawn from the Trunk Utility Fund. The reconditioning of the Tower Street Tower would be completed by summer of 2003, and the Crest Avenue Tower is scheduled to be complete by the end of 2003. The proposed schedule is aggressive, but KLM Engineering, Inc. has recommended the City open bids in December to give the best opportunity for competitive bid prices. The fiscal impact of the project is discussed above. The alternatives are as follows: 1. A motion to approve a resolution approving the plans and specifications and authorizing advertisement for bids for the reconditioning of the two City water towers, City Project No. 03-01. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason. ative number 1. RESOLUTION 02-xx RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE ADVERTISEMENT FOR BIDS FOR THE RECONDITIONING OF THE TWO CITY WATER TOWERS, CITY PROJECT NO. 03 -01 WHEREAS, WHEREAS, WHEREAS, WHEREAS, MOTION BY: SECOND BY: It is proposed to recondition both the Crest Avenue Tower and the Tower Street Tower in 2003, and; The Adopted Capital Improvement Program for 2003-2007 has designated this project for the years 2003, 2004, and 2006, but report findings show that repairs are needed as soon as possible, and; By doing the repairs to both towers in the same year, the City could see significant savings, and; The City Council authorized the preparation of plans and specifications and the hiring of KLM Engineering, Inc. to do this work at its October 21st, 2002 regular meeting. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that: 1. The recitals set forth above are incorporated herein. 2. The City Council approves the plans and specifications for the reconditioning of the two City water towers, City Project No. 03-01, and authorizes the advertisement for bids to be received on December 18, 2002. Passed this 18th day of November 2002. { Seal} YES NO Haugen Haugen Vacant Vacant Petersen Petersen Zieska Zieska LeMair LeMair Frank Boyles, City Manager 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (952) 447-4230 / Fax (952) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ,