CITY COUNCIL AGENDA REPORT
DATE:
AGENDA #:
PREPARED BY:
REVIEWED BY:
January 5, 2004
6C
Bud Osmundson, Director of Public Works
Frank Boyles, City Manager
AGENDA ITEM:
CONSIDER APPRO V AL OF A RESOLUTION AUTHORIZING THE
CITY MANAGER TO HIRE McCARTHY WELL COMPANY TO
PROVIDE LABOR AND MATERIALS FOR THE REPAIR OF WELL
NO.5
DISCUSSION:
The purpose of this item is to authorize McCarthy Well Company to provide
professional services to repair Well No.5. A copy of their quotation for the
repairs is attached.
ISSUES:
During the drought last summer and fall, staff noticed a decline in the
pumping capacity of Well No.5. We knew that part of the decline was due
to the plunge of the water level in the Jordan aquifer caused by the increased
pumping of other Jordan wells in the area. However, we noticed that Well 5
was not pumping the water expected at times that it should have pumped at a
higher rate. In the 2003/2004 off peak period Well 5 was scheduled for a
preventative maintenance column and pump removal and inspection in the 5
to 7 year rotation we have for all of our wells. In November we had
McCarthy Well Company pull the column of pipe from Well No. 5 for
inspection at a cost of $2,053. McCarthy was the low quote between two
companies that specialize in well and pump repair (Second quote from Keys
at $2,400.) McCarthy already provides periodic pump inspection services of
our wells and pumps.
McCarthy's inspection revealed numerous holes in the pipe column due to
excessive use and wear. This caused a loss in pressure in the pumping
system and therefore the loss of pumping capacity. Prior to the development
of Wells 6 & 7, the City was dependent on using Wells 3, 4, & 5 exclusively,
which was the main cause of the wear. The McCarthy proposal details
exactly the tasks involved in repairing the pipe column, and the routine
maintenance of the pump and motor. This includes total replacement of
some of the pipe column.
FINANCIAL IMP ACT: As previously stated, staff obtained two quotes for the initial work which
was to remove the well column and pump from the well, take the equipment
to their shop, inspect the equipment for damages, and provide a cost estimate
for the repairs. Once the equipment is in a shop it would be expensive and
www.citybfpriorlake.com
--"'X:IOSlrfOllllSllj1\'W31et-Sysrem\w e111<1'n\1l;genrl:rMcearthy-paymen, 1-:5"04 :Bee---
Phone 952.440,9675 / Fax 952.440.9678
ALTERNATIVES:
RECOMMENDED
MOTION:
ACTION REQUIRED:
REVIEWED BY:
impractical to bring all the equipment to other well service companies for
inspection and estimate of cost to repair.
McCarthy's quote for the work is estimated to be $15,966.65. The funding
for the proj ect will come from the Water Operating fund, since it addresses
the repair of existing water facilities. The cost is over the $15,000 threshold
that the City Manager is allowed to authorize without going to the City
Council for approval.
There are two altematives for the City Council to consider:
1. Approve a resolution which authorizes the City Manager to hire
McCarthy Well Company to provide labor and materials for the repair of
Well No.5 as described in the quotation.
2. Deny this item for a specific reason and provide staff with direction.
Staff recommends adoption of Altemative No.1.
A motion an~ a second [OPt the Resolntion stated above.
it ' Manager
X:\Osmundson\Water System\Well No. 5\Agenda McCarthy pa)~l1ent 1-5-04.DOC
2
..---,
/~.. !~IO
2 o""r::i~
u ~
Maintenance Center
17073 Adelmann Street S.E.
Prior Lake, Minnesota 55372
RESOLUTION 03-XX
A RESOLUTION AUTHORIZING THE CITY MANAGER TO HIRE
McCARTHY WELL COMPANY TO PROVIDE LABOR AND MATERIALS
FOR THE REPAIR OF WELL NO.5
MOTION BY:
SECOND BY:
WHEREAS,
Through a preventative maintenance program for the City's wells it has been
identified that Well No.5 is in need of significant repairs, and;
The City received a quotation for the repairs from McCarthy Well Company,
and;
The quotation is for $15,966.65 which is over the $15,000 threshold that the City
Manager is authorized to spend without authorization by the City Council.
WHEREAS,
WHEREAS,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA that:
1. The recitals set forth above are incorporated herein.
2. The City Manager is authorized to hire McCarthy Well Company to provide labor
and materials for the repair of Well No. 5 as described in their quotation estimated to be
$15,966.65.
3. The funding for the repairs is to be drawn from the Water Operating Fund.
Passed and adopted this 5th day of January 2004.
YES
NO
Blomberg Blomberg
Haugen Haugen
LeMair LeMair
Petersen Petersen
Zieska Zieska
{Seal}
City Manager
www.cityMpriorlake.com
------x:m~lffiifldS(Yij\Wlltet_Syslen1\We11'No~gemia-Mct:arthYl'aymemi"~"fj4:D0e--..-_._._-~----_..__._._.-....----._-,....__._--..__.,..-~-._--..---_.-
Phone 952.440.9675 / Fax 952.440.9678
--..--.,--,-,----.-....-..,.........--...--..-.-----.-..-.~-'--'" ...--..-......--...--...-----.,-........---.......--..-.-.----.-.'----r--.
,a\~~tegr~r~m~l' WfElLi ~~M1R~ll
MAIN OFFICE, SHOP, YARD & WAREHOUSE' 590 CITATION DRIVE' SHAKOPEE, MN 55379-1887
Jl'~
~ -,
.............?...: -..
...,
/
._.. "-.-, - -
.........../:, j-- C;-iJ':=,
Date: 12/29/03
WELL DRILLING, SEALING & DEVELOPMENT. 24 HOUR EMERGENCY SERVICE
LINE SHAFT & SUBMERSIBLE PUMPS FOR ANY APPLICATION
Phone: (952) 854-5333 or (888) 854-5333 · Fax: (952) 445-1950
Attn: Craig Eldred - Public Works Dept.
City of Prior Lake
17073 Adelmann Street SE
Prior Lake MN 55372
Re: Repairs to pump #5.
Company Representative: Tim McCarthy
Our Job#: 201526
Customer's PO#: Q..XJte#201312
"AKNOIDLEDGEMENT OF ORDER"
Contractor disclaims any implied or express warranties or oral representations that the work
will result in water production of a particular quality, quantity, or duration.
uescrlptlon
Per your instructions McCarthy Well Company will furnish the following labor and materials to repiar the deep
well pump and motor:
Dismantle and wash all motor parts; dip, bake and varnish the windings; recondition the stator, machine the
bearing housing; balance the rotor; replace 2 thrust bearings and 1 guide bearing; reassemble motor; change oil,
regrease, test, trim balance and paint the motor; remove, face and reassemble the top column flange; remove
packing bushing; machine, fit and install a new packing bushing; remove and replace the packing; replace the
column pipe and column couplings; machine, fit and install a new motor shaft; remove and replace the line shaft
bearings; furnish a new tail pipe; remove and replace the suction, discharge and series bowl bearings,
recondtion the bowl shaft; chemically clean the bowls, head, impellers and spiders; straighten and dial the line
shafts; dispose of the old materials; reassemble the pump; apply a rust preventative to the head and bowls and
load the pump for reinstallation in the well.
Shop floor labor, machinist and lathe time - $5,269.00.
Materials, outside services and freight - $9,647.65
Reinstall pump - $1,050.00.
Total - $15,966.65.
Payment terms: Net 10 days from date of invoice. Acceptance-Please sign and fax this
acknowledgement back to us at 952-445-1950. Mail the blue copy with an original signature
to us at the above address. If you have any questions please call me at 952/854-5333. This
acknowlegement of order does not include the services on quote #201312 and invoice #19459.
Thank You For Your Order!
THIS "CONTRACT", WILL BE GOVERNED BY THE TERMS & CONDITIONS PRINTED ON THE FACE &
REVERSE SIDE HEREOF.
I Certify That I Am Legally Authorized To Purchase Materials And/Or Labor To Be Furnished.
By
Title
Date
Title
President
Page 1 of 1
Your 24 Hour Full Service Well & Pump Company
~'4 Oede4t · ~t'4 L~ "UlateJt 'P~