Loading...
HomeMy WebLinkAbout9D - Knob Hill 5th Addn. . .. MEETING DATE: AGENDA #: PREPARED BY: REVIEWED BY: AGENDA ITEM: DISCUSSION: CITY COUNCIL AGENDA REPORT MARCH 20, 2000 9D JANE KANSIER, PLANNING COORDINATOR DONALD R. RYE, PLANNING DIRECTOR z/ CONSIDER APPROVAL OF RESOLUTION oo-Yi. APPROVING THE FINAL PLAT AND DEVELOPMENT CONTRACT FOR KNOB HILL 5TH ADDITION History: On August 1, 1994, the City Council approved Resolution 94-46 approving the preliminary plat for Knob Hill. The preliminary plat consisted of96 acres to be developed with 173 single family lots. In 1997, an additional 17 acres, with 27 lots, was added to the development. The total Knob Hill development consists of 113 acres to be developed with 200 lots. The final plat to be known as Knob Hill 5th Addition is the fifth and final phase of this development. It consists of21.64 acres to be subdivided into 40 lots for single family homes (see attached graphic), The plat does not include any parkland, since the dedication requirements were satisfied by previous plats. The plat also does not include any outlots for future development. It does extend Carriage Hills Parkway to the end of this development. Current Circumstances: The principal requirements for final plat approval include a signed Development Contract with surety for the installation of utilities and streets and the satisfactory completion of all preliminary plat conditions. Staff has reviewed the final plat and finds it to be in substantial compliance with the approved preliminary plat. All of the conditions placed on the preliminary plat have been satisfied. The final plat is subject to six conditions which will be satisfied prior to the release of the final plat documents. The Issues: The development contract specifies the required improvements for this plat. Sanitary sewer and watermain trunk area charges, lateral water and sewer charges, and collector street fees are outlined in the contract. 1626(9~~r~0~ar~V)(\)l~~~~~~i4~11f1~~,OMinnesota 55372-1714 / Ph. (612) 447-4230 / Faxl(tff~h 447-4245 AN EQUAL OPPORTUNITY EMPLOYER . FISCAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: REVIEWED BY: Conclusion: A signed copy of the development contract is attached to this report. Staffwill be available to discuss the details of this contract with the Council. Budget Impact: Approval ofthis final plat will allow construction of new dwellings) which will contribute to the City's tax base. The required development fees are deposited into the appropriate City accounts. The City Council has three alternatives: 1. Adopt Resolution OO-XX, approving the final plat and Development Contract for Knob Hill 5th Addition 2. Deny Resolution oo-xx. 3. Defer this item and provide staff with specific direction. A motion and second to adopt Resolution OO-XX approving the final plat and Development Contract for Knob Hill 5th Addition and authorizing the Mayor and City Manager to sign the Development Contract. 1:\00files\00subdiv\finalpl\knob5th\finalcc,doc Page 2 RESOLUTION OO-XX RESOLUTION OF THE PRIOR LAKE CITY COUNCIL APPROVING THE FINAL PLAT OF"KNOB HILL 5TH ADDITION" AND DEVELOPMENT CONTRACT AND SETTING FORTH CONDITIONS TO BE MET PRIOR TO RELEASE OF THE FINAL PLAT. MOTION BY: SECOND BY: WHEREAS: the City Council held a hearing on and approved the preliminary plat known as Knob Hill, subject to conditions identified by Resolution 94-46, on August 1, 1994; and WHEREAS: the City Council has found that the final plat of "Knob Hill 5th Addition" is in substantial compliance with the approved preliminary plat; and WHEREAS: The City Council has approved the final plat of "Knob Hill 5th Addition". NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PRIOR LAKE, MINNESOTA, that it should and hereby does require the following conditions to be met, prior to release of, and recording of said plat: 1. A current title opinion or commitment of title insurance be submitted acceptable to the City Attorney. 2. Payment of all fees prior to release of the final plat mylars. 3. Reductions of the entire final plat be submitted, to the following scales: 1" = 800'; 1" = 200'; and one reduction at no scale which fits onto an 81/2" x 11" sheet of paper. 4. Four mylar sets of the final plat with all required signatures be submitted. 5. The developer provide financial security, acceptable to the City Engineer prior to release of the final plat mylars. 6. The final plat and all pertinent documents must be filed with Scott County within 60 days from the date of final plat approval. Failure to record the documents by May 20, 2000, will render the final plat null and void. Passed and adopted this 20th day of March, 2000. YES NO Mader Mader Ericson Ericson Gundlach Gundlach Petersen Petersen Schenck Schenck Frank Boyles, City Manager {Seal} 11;'\ClOOles.\OOiijhd~\finaloll.knobs.th~O~cc.dQc k M' .Page 1- oZ\JU-Ea!::!leuee"l-\Ve,~.c.,YnOrLa e, mnesota55372-1714 / Ph. (612)447-4230 / t-ax(b12) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER . -------r--------.------...~...----. Location Map I ! I ('411- l!li II,l lln i I ~ I '-i I; ;l iI' ,.i .Ii u' 'II q tis If -'I fl' 1 B I If~ Hi '15 ..9 .-1 I II, _ 'i1 I li- II:':! I . 11- f 1"1 iil "II I , u 1 r I' I, I 1 i 'Ii I I I III . t.! 1 I ., J 11 ~ I Hq it'l JI~ I ~ , I ! I J qu ij ! It ~ .II ~ l' I 1 ~I , ~ .j, d~1 1'1 f! ,.1! pi .' , la lH III r!! Hi r I r . , ill ,to .p "-I H. s; 5 'If hi rr ,:1 I I tff ';.\H IJ . ~ it -:J n " ~f P .. ~~ <I l~ .;;1 ;r I f I I I I I I . I J I ! I i I - B : I q. }' ! ~ I } i ~= I f ~ i r..I!.. I ~ ~'i t - }I Uf1i i i r i I i i I ~ i l! ! Ii! ~ I I _ i : "t If;11 I J t I ~ ~ ! I 1 I I I ~.. 1 I I l 0 I j ~ I i I i ~ I., i IIi t r I I ,. U rH l':j I": ~] r I I [ ( I 1 J ~ h .1 t~~1 \ I i I ~ ; J i\ [\ - t~ \ 1 i If I I[ tl \ 1 I. i l I ! . I l J ~ f i lMJ (fl) lMl co = ~ ~ r7:"J ~~~:=Y " , ~ t5 n en -i 0 ~ .... . z ~ 8 .ARR'_Gf ~_ 8 ii~l3 PK'."'. ~8 8 8 8 EXHIBIT A ;, ~5 QJ I A :; R [ S ..---- ,- ~! {. j~ ). C) C) =1 ~~ I I , :~ ,8 , ____..___J ,"00 .........}:)VIl;ll;lVO 8 ~ 1Ii_,UN.U JtI'"34't.t1... 1UI1 "I." 8 U'IU' OlS"60\~ z .lz,C;a.9D-V S.... !ll'l is:;: .. ,.ff- _ __ .!,!,.oo_ - -, 'F;:~~~~ I :.......q) '0. "l; .~, :~ ~_ 18 , I L__ - Nflr34;.!'C - ""1;_1 ~___.!..~Cl2..__ ..P.., , I , I ;e' 1;= ~i N It: : .,.. : L_ _ MU.lIf~.'- __J I ....00 ., - I~ : i ! Ii SI VI ~ 115f :;: I Jl~ J ) -- ~;~ \~ ~8 "" HUt- dj CJ1 P!!! ~~ ~O t:;jto t:;j ~~ O~ ~ 609,06 saS"53'2'.W i ~I II. f'l ti. 1 II 'n~ llil ,fi fll J ~f "ill 00. ~l [l " !H rf a~- .i~ I '0 ~Jli I';)! If hi il l~ !}l ~~- Ii '.~ Ii[ i~ Ip P ~g f.J ul , It~t II! . i ~O~ i - t jh I I!. H!I .f r .1 II i r-----rn---i , 0 ' ~ I "'.:~~ .::-~ I '0 ' '~;. ".~,. I 2 I L ij _u..-.... : a~ ~ In-n-lJF",!;=1'~'~ Ri j; ,: ..~~ " ..~ ;~r\t-: I~ ~ I ':;'. i':; I ~ I .!~ I :: L___n LJ , I ~. Ii , ~ , >- L _L ~~ r I - - fOl~ , Ill" oc: IE! i!~ c Y.' L.. I I I I DEVELOPMENT CONTRACT KNOB HILL 5TH ADDITION PROJECT #36-00 AGREEMENT dated March 20, 2000, by and between the CITY OF PRIOR LAKE, a Minnesota municipal corporation ("City"), and Gold Nugget Development (the "Developer"). 1. REQUEST FOR PLAT APPROVAL. The Developer has asked the City to approve a Plat for Knob Hill 5th Addition (referred to in this Contract as the "Plat"). The land is legally described as: Outlot A, Knob Hill 4th Addition 2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the Plat on condition that the Developer enter into this Contract, furnish the security required by it, and record the Plat with the County Recorder or Registrar of Titles within 60 days after the City Council approves the fmal Plat. 3. RIGHT TO PROCEED. Within the Plat or land to be platted, the Developer may not construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings I: \OOfiles\OOsubdi v\finalpl\knob5th\dvcntrct.doc 1 03/13/00 . until all the following conditions have been satisfied: 1) this Contract has been fully executed by both parties, 2) the necessary security, development fees and insurance have been received by the City, and 3) the City Engineer or Designee has issued a letter that all conditions have been satisfied and that the Developer may proceed. The foregoing restriction on the Developer's "Right To Proceed" does not apply to grading or other approvals set forth in Resolution No. 94-46, dated August 1, 1994, approving the Preliminary Plat for Knob Hill. 4. PHASED DEVELOPMENT. If the Plat is a phase of a multiphased preliminary Plat, the City may refuse to approve fmal Plats of subsequent phases if the Developer has breached this Contract or the Resolution approving the Final Plat and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Fees and charges collected by the City in connection with infrastructure and public improvements are not being imposed on outlots, if any, in the Plat that are designated in an approved preliminary Plat for future subdivision into lots and blocks. Such charge's will be calculated and imposed when the outlots are subdivided into lots and blocks. 5. PRELIMINARY PLAT STATUS. If the Plat is a phase of a multiphased preliminary Plat, the Developer shall submit a Staging Plan for City Council approval which may allow the Developer more than one (1) year to subdivide the property into lots and blocks. 6. DEVELOPMENT PLANS. The Plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract, but are incorporated by reference and made a part of this Contract as if fully set forth herein. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A -- Final Plat Dated February 1, 2000 (Prepared by Pioneer Engineering) 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 2 03/13/00 '-~-'-""---.'~--r---""'-' .-.-.--.....-.... . _. ------ Plan B -- Final Grading, Development, and Erosion Control Planes). The soil erosion plan must also be approved by the Prior Lake/Spring Lake Watershed District. Dated March 2, 2000 (Prepared by Pioneer Engineering) Plan C -- Landscaping Plan Dated February 14, 2000 (Prepared by Pioneer Engineering) Plan D -- One set of Plans and Specifications for Developer Improvements Dated March 2, 2000 (Prepared by Pioneer Engineering Plan E -- Street Lighting Plan Dated March 3, 2000 (Prepared by Pioneer Engineering) 7. DEVELOPER IMPROVEMENTS. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Sewer D. Streets E. Concrete Curb and Gutter F. Street Lights G. Site Grading and Ponding H. Underground Utilities I. Setting of Iron Monuments J. Sidewalks and Trails K Landscaping The improvements shall be installed in accordance with the City subdivision ordinance; City standard specifications for utilities and street construction; the City's Public Works Design Manual and any other applicable City ordinances, all of which are incorporated herein by reference. The Developer shall submit plans and specifications which have been prepared by a Minnesota registered professional civil I: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 3 03/13/00 engineer to the City for approval by the City Engineer. The Developer shall obtain all necessary permits from the Metropolitan Council and other agencies before proceeding with construction. The Developer, its contractors and subcontractors, shall follow all instructions received from the City's authorized personnel. The Developer or his engineer shall schedule a preconstruction meeting with all parties concerned, including the City staff, to review the program for the construction work. Before the security for the completion of utilities is released, iron monuments must be installed in accordance with Minn. Stat. ~ 505.02. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 8. CONSTRUCTION OBSERVATION. a. The City's authorized personnel shall inspect the DEVELOPER IMPROVEMENTS in accordance with the Public Works Design Manual. Inspection services by the City shall include: 1. Inspection of required improvements which include grading, sanitary sewer, watermain, storm sewer/ponding and street system. 2. Documentation of construction work and all testing of improvements. 3. As-built location dimensions for sanitary sewer, watermain and storm sewer facilities. 9. DEVELOPER SERVICES. The Developer shall be responsible for providing all other construction services including, but not limited to: a. Construction surveying b. As-built drawings of grading plans. 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 4 03/13/00 . -.--------_. c. As-built drawings showing location, dimensions and elevations of all utility improvements, including but not limited to top nut of hydrants, manhole rims, manhole inverts. (Tie dimensions to sewer and water services from City staff or City consultants.) d. Project Testing: The Developer is responsible through its testing company, at the Developer's cost, to provide testing to certify that Developer Improvements were completed in compliance with the approved [mal plans and specifications. The personnel performing the testing shall be certified by the Minnesota Department of Transportation. The City Engineer may require additional testing if in his opinion adequate testing is not being performed. The cost of additional testing is to be paid by the Developer. e. Lot corners and monuments 10. BOULEVARD AND AREA RESTORATION. The Developer shall seed or lay cultured sod in all boulevards within 30 days of the completion of street related improvements and restore all other areas disturbed by the development grading operation in accordance with the approved erosion control plan. Upon request of the City Engineer, the Developer shall remove the silt fences after turf establishment. 11. SUBDIVISION MONUMENTS. The Developer shall install all subdivision monumentation within one year from the date of recording the plat, or the monumentation shall be installed on a per lot basis at the time the building permit for the subject lot is issued, whichever occurs first. At the end of the one year period from recording of the Plat, the Developer shall submit to the City Engineer written verification by a registered land surveyor that the required monuments have been installed throughout the plat. 1: \00files\OOsubdiv\finalpl\knob5th\d vcntrct,doc 5 03/13/00 12. OCCUPANCY. A permanent Certificate of Occupancy shall not be issued for any building in the plat until water and sanitary sewer improvements have been installed and the streets have been completed and the first lift of bituminous has. been placed and said improvements have been inspected and determined by the City to be available for use. 13. TIME OF PERFORMANCE. The Developer shall install all. required public improvements by July 31, 2000, with the exception of the final wear course of asphalt on streets. The fmal wear course on streets shall be installed the first summer after the base layer of asphalt has been in place for one freeze thaw cycle. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be in writing and conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 14. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a non-revocable license to enter the Plat to perform all work and inspections deemed appropriate by the City in conjunction with Plat development. 15. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall be implemented by the Developer and inspected and approved by the City. The City may impose additional erosion control requirements if, in the City Engineer's opinion they are necessary to meet erosion control objectives at no cost to the City. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. All seeded areas shall be mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule or supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of any 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 03/13/00 6 --- 1 proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down the letter of credit to pay any costs. No development, utility or street construction will be allowed unless the Plat is in full compliance with the erosion control requirements. 16. CLEAN UP. The Developer shall daily clean dirt and debris from streets that has resulted from construction work by the Developer or its agents. Prior to any construction in the Plat, the Developer shall identify in writing a responsible party for erosion control, street cleaning, and street sweeping. 17. GRADING PLAN. The Plat shall be graded in accordance with the approved grading, development and erosion control planes), Plan "B". The plan shall conform to City of Prior Lake Public Works Design Manual. Before the City releases the security, the Developer shall provide the City with an "as built" grading plan and a certification by a registered land surveyor or engineer that all ponds, swales, and ditches have been constructed on public easements or land owned by the City. The "as built" plan shall include field verified elevations of the following: a) cross sections of ponds, b) location and elevations along all swales and ditches, and c) lot corners and house pads. The City may withhold issuance of building permits until the approved certified grading plan is on file with the City and all erosion control measures are in place as determined by the City Engineer. 18. OWNERSHIP OF IMPROVEMENTS. Upon completion of the Developer Improvements required by this Contract and fmal written acceptance by the City Engineer, the improvements lying within public easements shall become City property without further notice or action. 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct. doc 7 03/13/00 19. CITY ADMINISTRATION. The Developer shall pay a fee for City administration. City administration will include all activities necessary to implement this Developer's Contract. These activities include, but are not limited to, preparation of the Development Contract, consultation with Developer and its engineer on the status of or problems regarding the project, project monitoring during the warranty period, processing of requests for reduction in security, and City legal expenses. Fees for this service shall be six percent (6 %) of the estimated construction cost as detailed in Exhibit E, less oversizing costs outlined in Exhibit D, Section A, assuming normal construction and project scheduling. The provisions of this paragraph are subject to adjustment pursuant to Paragraph 40 of this Development Contract. 20. CITY CONSTRUCTION OBSERVATION. The Developer shall pay six percent (6%) of the estimated construction cost, less oversizing costs outlined in Exhibit D, Section A, for construction observation performed by the City's authorized personnel. Construction observation shall include, but is not limited to, part or full-time inspection of proposed grading, public utilities and street construction. The provisions of this paragraph are subject to adjustment pursuant to Paragraph 40 of this Development Contract. 21. STORMWATER MANAGEMENT FEE. The Developer shall pay a storm stormwater management fee of $42,994.00 prior to the City signing the [mal Plat. The amount was calculated as follows: 13.52 acres at $3,180.00 per acre. 22. SANITARY SEWER AND WATERMAIN TRUNK AREA CHARGES. A Sanitary sewer and watermain trunk area charge of $47,320.00 shall be paid by the Developer for sanitary sewer and watermain trunk improvements prior to the City signing the fmal Plat. The amount was calculated as follows: 13.52 acres at $3500.00 per acre. 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 8 03/13/00 ...--._-_.~_._--_.....~---~....~------_.- 23. COLLECTOR STREET FEE. This Development Contract requires the Developer to pay a collector street fee of $20,280.00 for collector street improvements prior to the City signing the final Plat. The amount was calculated as follows: 13.52 acres at $1500.00 per acre. 24. PARK AND TRAIL DEDICATION. Dedication requirements were determined as part of the preliminary plat and have been satisfied by earlier phases of this development. No additional dedication is required. 25. STREET SIGNS. AND STREET LIGHTS AND OPERATIONAL COSTS. Before the City signs the fmal Plat, the Developer shall pay to the City $400.00 for installation of traffic control signs and street signs. The Developer shall be fmancially responsible for the installation of street identification signs and non-mechanical and non-electrical traffic control signs. Street signs will be in conformance with the names as indicated on the Plat and pursuant to City standards. The actual number and location of signs to be installed shall be determined by the City and actual installation. shall be performed by City authorized personnel. The Developer is responsible for the installation of the street lighting. The Developer shall pay the full capital cost of every light to be installed; this includes poles, fixtures, underground wiring, and all appurtenant work. The street light plan must be acceptable to the City Engineer and in accordance with Exhibit F. 26. LANDSCAPING (Single-Familv Residential). Each residential lot in the Plat must have at least two (2) front yard trees as required in the Subdivision provisions of the City Code. The Developer or lot purchaser shall plant the two (2) front yard trees on every lot in the Plat which does not already meet this requirement at the time of the building permit. The trees shall be planted according to the requirements for subdivision trees as set forth in the Subdivision provisions of the City Code. The Developer or lot purchaser shall sod the front yard, boulevard, and side yards to the rear of every I: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct. doc 9 03/13/00 structure on every lot prior to the issuance of the final occupancy permit. If this section is to be satisfied by existing trees, a tree protection security may also be required. Upon satisfactory completion of the landscaping, the escrow funds, without interest, less any draw made by the City, shall be returned to the person who deposited the funds with the City. If the required landscaping is not installed the City is granted a license to enter upon a lot and install the landscaping using the escrowed funds deposited by the builder at the time the building permit was issued. 27. TREE PRESERVATION AND REPLACEMENT. There is no tree replacement required on this plat. 28. SECURITY. To guarantee compliance with the terms of this Contract, payment of real estate taxes including interest and penalties, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with an Irrevocable Letter of Credit in an amount equal to 125 % of the estimated Developer Improvement Costs. The Irrevocable Letter of Credit shall be in the form attached hereto, from a bank ("Security") for $643,924.00, plus a cash fee of $172,810.00 for City Development Fees. The amount of the Security was calculated as follows: DEVELOPER IMPROVEMENTS COSTS: Sanitary Sewer $ 101,668.24 $ 91,568.15 $ 102,304.50 $ 219,598.54 $ 0.00 $ 0.00 Watermain Storm Sewer Streets/Sidewalks/Trails Landscaping Tree Preservation and Replacement 1:\OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 10 03/13/00 - T Erosion Control $ 0.00 ESTIMATED DEVELOPER IMPROVEMENTS SUBTOTAL $ 515,139.43 X 1.25 TOTAL FOR IRREVOCABLE LETTER OF CREDIT AMOUNT $ 643,924.00 CITY DEVELOPMENT FEES: City Administration Fee (6%) (19) $ 30,908.00 City Construction Observation (6 %) (20) $ 30,908.00 Storm Water Management Fee (21) $ 42,994.00 Sanitary Sewer and Watermain Trunk Area Charges (22) $ 47,320.00 Collector Street Fees (23) $ 20,280.00 Park Dedication Fee (if in lieu of land) (24) $ 0.00 Street and Traffic Control Signs (25) $ 400.00 TOTAL CITY DEVELOPMENT FEES $ 172,810.00 This breakdown is for historical reference; it is not a restriction on the use of the Security. The bank shall be subject to the approval of the City Manager. The Security shall be for a term ending December 31, 2001. Individual Security instruments may be for shorter terms provided they are replaced at least sixty (60) days prior to their expiration. The City may draw down the Security, without notice, for any violation of the terms of this Contract or if the Security is allowed to lapse prior to the end of the required term. If the required Developer Improvements are not completed at least thirty (30) days prior to the expiration of the Security, the City may also draw it down. If the Security is drawn down, the proceeds shall be used to cure the default. 1:\OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 11 03/13/00 29. REDUCTION OF SECURITY. Upon receipt of proof satisfactory to the City that work has been completed and financial obl~gations to the City have been satisfied, with City approval the Security may be reduced from time to time by seventy-five percent (75 %) of the financial obligations .. that have been satisfied. Twenty-five percent (25 %) of the Security shall be retained until all improvements have been completed, all fmancial obligations to the City satisfied, and the required "as- built" grading plans and information have been received by the City. The City Public Works Design Manual outlines the procedures for Security reductions. 30. WARRANTY. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The warranty period for streets is one year. The warranty period for underground utilities is two years. The warranty period on streets shall commence after the fmal wear course has been installed and accepted by the City and the warranty period on underground utilities shall commence following their completion and acceptance by the City. The Developer shall post maintenance bonds to secure the warranties. All trees shall be warranted to be alive, of good quality, and disease free for twelve (12) months after planting. Any replacements shall be warranted for twelve (12) months from the time of planting. The City shall retain twenty-five percent (25 %) of the Security posted by the Developer until the Developer Improvements are accepted by the City Engineer and the bonds are furnished to the City. The security retainage may be used to pay for warranty work. The City standard specifications for utilities and street construction identify the procedures for fmal acceptance of streets and utilities. 31. REDUCTION OF SECURITY TO FIVE PERCENT (5%). The Security guaranteeing. satisfactory performance of the Developer Improvements can be reduced to 5 % of the original cost of the construction costs as set forth in Paragraph 28 by the City Engineer in writing and by providing the 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 12 03/13/00 - .----.---r----------- City a performance bond or a warranty bond from the Developer or its contractors in an amount equal to the construction costs which shall be in force for two (2) years for streets and one (1) year for utilities (the "Warranty Period") following acceptance of all required improvements and shall guarantee satisfactory performance of such improvements. All punch list items must be completed before a reduction in Security will be considered. The Warranty Period for a particular Developer Improvement shall commence on the date the City Engineer issues written acceptance of the Developer Improvement. The City Engineer may establish a lost of the individual Developer Improvements that the Developer will install as part of the Plat. The City Engineer may accept one or more individual Developer Improvements prior to the completion of all Developer Improvements. The City Engineer shall determine whether particular Developer Improvements are so integral to one another so as not to make it feasible or practical for the City to accept one Developer Improvement prior to the completion of other related Developer Improvements. The five percent (5 %) Security shall not be released until the Developer provides the City Engineer with a certificate from the Developer's land surveyor stating that all irons have been set following site grading and utility and street construction. 32. OVERSIZING. City and Developer agree that the Developer Improvements should be oversized for the benefit of future development.. Oversizing is the construction of a Developer Improvement to City specifications that exceeds those that would otherwise be required of the Developer. Oversizing improvements include, but are not limited to, sanitary sewer, water, grading, and road improvements. City and Developer agree that the cost of system oversizing to be reimbursed to the Developer is $47,539.00 based upon a cost estimate as determined by both quotes received from 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 13 03/13/00 the Developer's subcontractor and the City Engineer using the City's Assessment Policy based on a [mal engineering design. The calculation for oversizing is attached as Exhibit D. If the City Engineer determines additional work as the result of oversizing is required, the City shall reimburse the Developer for the costs associated with this work. 33. CLAIMS. A. City Authorized to Commence Interpleader Action. In the event that the City receives claims from labor, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment from the City, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the Security in an amount up to 125 % of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees pursuant to this Contract. B. Prompt Payment to Subcontractors Required. The Developer shall pay any subcontractor within ten (10) days of the Developer's receipt of payment by the City for undisputed services provided by the subcontractor. If the Developer fails within that time to pay the subcontractor any undisputed amount for which the Developer has received payment by the City, the Developer shall pay interest to the subcontractor on the unpaid amount at the rate of 11/2 percent (1.5%) per month or any part of a month. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. For an unpaid balance of less than $100, the Developer shall pay the actual interest penalty due to the subcontractor. A subcontractor who prevails in a civil action to collect interest 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 14 03/13/00 - ._.------.---._-_._--_._.~-- penalties from the Developer shall be awarded its costs and disbursement, including attorney's fees. incurred in bringing the action. (See Minn. Stat. ~471.425, Subd. 4a.) 34. SPECIAL PROVISIONS. The following special provisions shall apply to Plat development: A. Implementation of the conditions listed in the Resolution approving the final plat. B. The Developer is required to submit the final Plat in electronic format. The electronic format shall be compatible with the City's software (Auto CAD Release 13). C. The provisions of Minn. Stat. ~462.358 are incorporated herein as if fully set forth. If any of the provisions, criteria, performance standards or the like in this Development contract or in any City Ordinance applicable to this Development Contract are more stringent than those set forth in Minn. Stat. ~462.358, the more stringent provision, criteria, performance standard or the like shall apply. 35. RESPONSIBILITY FOR COSTS. A. Once the City Engineer approves the construction costs or estimates for the developer Improvements, except those that are subject to oversizing as described in Paragraph 32 of this Development Contract, there will not be any reimbursement to the City by the Developer or to the Developer by the City for City Administration or Construction Observation Fees. The Developer shall not be responsible for paying City Administration or Construction Observation Fees on the construction costs or estimates associated with oversizing. B. The Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 15 03/13/00 C. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt Plat development and construction until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18 %) per year. 36. DEVELOPER'S DEFAULT. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City, is first given notice of the work in default, not less than 48 hours in advance. This Contract is a license for the City to act, and it shall not be necessary for the City , to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part against all or any portion of the property within the Plat. The Developer hereby waives any and all procedural or substantive objections to any special assessment levied to pay the cost to remedy a Developer default, including but not limited to hearing requirements and any claim that the assessment exceeds the benefit to the Property. 37. INDEMNIFICATION. Developer shall indemnify, defend, and hold the City, its Council, agents, employees, attorneys and representatives harmless against and in respect of any and all claims, demands, actions, suits, proceedings, liens, losses, costs, expenses, obligations, liabilities, damages, recoveries, and deficiencies, including interest, penalties, and attorneys' fees, that the City incurs or suffers, which arise out of, result from or relate to this Development Contract. The responsibility to indemnify and hold the City harmless from claims arising out of or resulting from the actions or inactions of the City, its Council, agents, employees, attorneys and representatives does not extend to any willful or intentional misconduct on the part of any of these individuals. 1:\OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 16 03/13/00 - -------)"""-.--.----- 38. MISCELLANEOUS. A. The Developer represents to the City that the Plat complies with all county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the Plat does not comply, the City may, at its option, refuse to allow construction or development work in the Plat until the Developer does comply. Upon the City's demand, the Developer shall cease work until there is compliance. B. Developer shall be responsible for all street maintenance until final written acceptance by the City of the Developer Improvements . Warning signs and detour signs, if determined " to be necessary by the City Engineer, shall be placed when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If and when streets become impassable, such streets shall be barricaded and closed. For the purpose of this subparagraph, "street maintenance" does not include snow plowing or normal sweeping. C. Third parties shall have no recourse against the City under this Cop.tract. D. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including those sold to third parties, and shall be grounds for the City to order all work on the Plat to cease. E. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. F. Grading, curbing, and one lift of bituminous shall be installed and accepted on all public streets prior to issuance of any certificates of occupancy, except for model purposes only, a 1:\OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 17 03/13/00 maximum of ten percent (10%) of the totallots in the active phase of the subdivision may be issued building permits prior to utility and street construction. All such lots must be readily accessible for inspection by way of a two wheel drive vehicle, but in no case shall the distance exceed 300 feet of an existing roadway. If certificates of occupancy are issued prior to the completion and acceptance of Developer Improvements, the Developer assumes all liability and costs resulting in delays in completion of Developer Improvements and damage to Developer Improvements caused by the City, Developer, its contractors, subcontractors, materialmen, employees, agents, or third parties. No sewer and water connection permits may be issued and no permanent certificates of occupancy may be issued until the streets needed for access have been paved with a bituminous surface and the Developer Improvements including utilities are accepted by the City Engineer. G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. This Contract shall run with the land. The Developer, at his/her sole expense, shall record this Contract against the title to the property within ten (10) days of the City Council's approval of the Contract. The Developer shall provide the City with a recorded copy of the Contract. The Developer covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the property being fmal platted and/or has obtained consents to this Contract, in the form attached hereto, from all parties who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 18 03/13/00 . 'r I. Developer, at its sole cost and expense; shall take out and maintain or cause to be taken out and maintained, until the expiration of the warranty period(s) on the Developer Improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $1,000,000 for one person and $2,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the Plat. The certificate shall provide that the City must be given thirty (30) days advance written notice of the cancellation of the insurance. J. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. The Developer may not assign this Contract without the prior written approval of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire Plat, or any part of it. 39. AMENDMENTS. Developer hereby acknowledges that the City is working with the Developer Community through a series of "Developer Workshops" to standardize its Development Contract. If the City Council approves a standardized Development Contract, and the terms, provisions 1:\OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 19 03/13/00 or conditions thereof differ materially from the terms, provision or conditions herein, City agrees it will amend this Development Contract, if requested by the Developer, to be consistent with the provisions and the approved standardized Development Contract referenced herein. If a standardized Development Contract provides for fees that differ from those set forth in this Development Contract, the fees in this Development Contract will be amended to be consistent with the fees established in a stand,ardized contract. Not withstanding the foregoing, no amendment to this Development Contract shall be made unless both parties agree in writing to the amendment. 40. NOTICES. Required Notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail ~t. the following address: Gold Nugget Development, 8857 Zealand Avenue North, Brooklyn park, MN 55455. Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by certified mail in care of the City Manager at the following address: City of Prior Lake, 16200 Eagle Creek Avenue, Prior Lake, Minnesota 55372-1714. Concurrent with providing Notice to the City, Notice(s) shall be served upon the City Attorney Suesan Lea Pace, Esq. at Halleland Lewis Nilan Sipkins & Johnson, Pillsbury Center South, 220 South Sixth Street, Suite 600, Minneapolis, Minnesota, 55402-4501. 41. INTERPRETATION. This Development Contract shall be interpreted in accordance with and governed by the laws of the State of Minnesota. The words herein and hereof and words of similar import, without reference to any particular section or subdivision, refer to this Contract as a whole rather than to any particular section or subdivision hereof. Titles in this Contract are inserted for convenience of reference only and shall be disregarded in constructing or interpreting any of its provisions. 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 20 03/13/00 . 1213/14/2121121121 14:31 NOUAK-FLECK, INCINC. ~ 4474245 NO.819 .[;11212 42. Jl[JUSDICTION. This Contract shalt be gov~rned by the laws of the State of Minnesota. CITY OF PRIOR LAKE (SEAL) By: Wesley M. Mader', Mayor , } By: Frank: Boyles, City Manager RevieweQ! for Form and Execution: By: Suesan Lea Pace City Attorney DEVELOPER: BY:~ Its: ..' .. . By: Its: STATE OF MlNNESOT A ) ( S8. COUNTY OF scon ) The foregoing instrument was acknowledged berore me this _ day of , 2000, by Wesley M. Mader, Mayor, and by Frank Boyles, City Manager, of the City of Prior Lake, 2. Minnesota municipal corporation, on behalf of the' corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC l:\OOfiles\OOsubdiv\final,pl\knobSth\clvcntrd.doc 21 03113/00 03/14/2000 14:31 NOURK-FLECK, INCINC. ~ 4474245 NO.B19 [;103 STATE OF MINNESOTA ) ( 55. COUNTY OF~ ) The foregoing instrument was acknowledged before m,e this ~ day. of M A ~'H , 20J12., by ~ 1) 1\J~\l1T-1!.. '"fVlJ... !;ea.&17't-IUj fJ-f:. 60lD rJ 066ET 1:EVfU)P1\AaJ~ }tJt.. ~. rrl - ~ Q.a ~ /J J-OR.., ~" J-1. NOTARY PUBLIC . DRAFfED BY: Campbell. Knutson, Scott & Fuchs, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan) Minnesota 55121 (612) 452-5000 SLP:'kgm 1~"""h"""~''I.oVHU' r.tI"'. .---_. -~.........- - --- .- CANDICE l., TAAuTMAN-' '!orARY PUBLlCoMINJJEStlT4 N40I\J.OtlU~ L4V CCl~MISSION UPlRIS 141QlXl$ .~ ~VNtt~"V'..--I"N~~v.""'vvN. :: I :\OOfil~\OOs1.1bdiv\finalpl\knobSth\rtvcntrct .doc 22 03/13/00 .----,----.----..--..-....-..---- FEE OWNER CONSENT TO DEVELOPMENT CONTRACT , fee owners of all or part of the subject property, the development of which.is governed by the foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by them. Dated this day of ,19_ STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this _ day of 19_, by NOTARY PUBLIC DRAFTED BY: Campbell, Knutson, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 (612) 452-5000 SLP:kgm I: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct. doc 23 03/13/00 . MORTGAGEE CONSENT TO DEVELOPMENT CONTRACT , which holds a mortgage on the subject property, the development of which_ is governed by the foregoing Development Contract, agrees that the Development Contract shall remain in full force and effect even if it forecloses on its mortgage. Dated this _ day of ,19_ STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this _ day of 19_____, by NOTARY PUBLIC DRAFTED BY: Campbell, Knutson, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 (612) 452-5000 SLP:kgm 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 24 03/13/00 CONTRACT PURCHASER CONSENT TO DEVELOPMENT CONTRACT , which/who has a contract purchaser's interest in all or part of the~ubject property, the development of which is governed by the. foregoing Development Contract, hereby affIrms and consents to the provisions thereof and agrees to be bound by the provisions as the same may apply to that portion of the subject property in '. which there is a contract purchaser's interest. Dated this _ day of ,19_ STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this _ day of 19_, by NOTARY PUBLIC DRAFTED BY: Campbell, Knutson, P.A. 317 Eagandale OffIce Center 1380 Corporate Center Curve Eagan, Minnesota 55121 (612) 452-5000 SLP:kgm I: \OOfiles\OOsubdi v\finalpl\knob5th\dvcntrct.doc 25 03/13/00 . 1'4 I- t! II ti'l t Ji !l!i 1;;1 I}, (;i ! Ii il% In }t, t~1 J, II "&} %1' I i 1. H~ H" II~ l!~ Cl Ih 'il · II !H Sj I I~ ;tlIJ I ,1 ~'11\ I' ~~.\ 1 I Hi ! i g! t I 'i' if J Uq I' II ip i ~ P .1 ! I , I ! . . I j ~ f i I ! PI( n ht[ > ;~ . lh ! B hi! ~ ii hi' · .. " { , fi I! ~ II ~ ~ 1'1 . i1 t I I l " I ,II [ 1Ii I '1' t f: I I Ii" , ril IH HI Hi 'j! 1'1 H. .fi- lfl hi fl ,!l I II ,h .11 \ i ~ ,I fl III , - n I I }- t I J' }~ I } I { IS} I ,~ fl I I 11 !lfl~ 1 ~ ~ I ! : ~ i ~ \ i I. ~ I j i ~ t I f I ~ I [S: I I' ! ! ( .! 1 I tl ~. I j ~ \ i I : I II' , I 11'.1 1 t ir q ~U I ~ i J 1\ f \ i \.r I I I I I J I 1 1 I J I I I j I I i . r I I ! l q~ Pq II' i I 1 I I , I ! . \ ~ 8 =~ 8- 8 ii;l~ ~ ,..< PK'.\7, ~8 ~ 8 I .1 r II -,~~ I I 5~r'i i\ f'~ \ I' \ J I ! J i ,..---- J c~..... j \' ~\ ""',-' \'~, \ ~ - - - - :'~~:::::~~... --t_t. --'T. " ,: /~' 1""" "".... I 1 I I I I I- I~ I I I I I EXHIBIT A J. eRe 5 :: ?; <3 QJ ~~ ). C) CJ ::j <5 ::~ N 3::>VI~~VO 8 ~ ..~'42. ,....)1&1.1) ...~'~"L UJ." 4\.)' ft-___.l'l.Ol!..__l .f:~..4. I -, ~;~,,~~ i_ I I~ eJ 18 ~ : L__ - h.r~f.J"r -"1;J ..$___.L~0ii.__...P, . I : I ~: I~ ~ N I- I oJ>. I ~- JOO.......'- __J I" r - '''00 --I Iii 11 t..l ~llsr I ~ I db "I~ I __J .,) nDCI1500 L_ ~400L - '_ CJ1 lfi~ ~~ E;g ~t:s ~t-i Ot:-t ~ zr6\' 06'USOl-ll z ''Z~L.tO-V ~_ ..' . ~~ 11:. J "t; .~, 1;; 'c:'" i~ '8 ~ " . "1 i . ~ d~ 1 I~ fO[ 1 1 is 1,. r" n l!i) I iilz tJl I ~ n rill _L~ ~ III rl- - "'~ TT 1 go IJ I l~ -1 ,if t~ fll \(l J ~l ~!If O' ~~ll.IHr If lr- a-i i~ J;a lil I ~ 1I1~-:: P :!; Ii i i~ !n Iii aX I Iii l rI !~ - li"~ I<l il-~ i :---ur-----: . I '" . I . - ~ I ~'. '.- I Uil a: "-",. Vi ':-",. :I~ ~p '~----'!&-"R~"'-l~~ .r. ir ' · ri il '1 ~7c' . ~~ !(,,, 1 lD 'I-~ '::: I I lit ~ . ).' PI../: I i\' ",..J I ::: L_____ ~ -- ~ 8 ~ EXHIBIT "B" SAMPLE IRREVOCABLE LETTER OF CREDIT No. Date: TO: City of Prior Lake 16200 Eagle Creek Avenue Prior Lake"Minnesota 55372-1715 Dear Sir or Madam: We hereby issue, for the account of Irrevocable Letter of Credit in the amount of $ sight on the undersigned bank. (Name of Developer) and in your favor, our , available to you by your draft drawn o.n The draft must: a) Bear the clause, "Drawn under Letter of Credit No. 19_, of (Name of Bank) n; , dated b) Be signed by the Mayor or City Manager of the City of Prior Lake. c) Be presented for payment at November 30, 19_ (Address of Bank) , on or before 4:00 p.m. on This Letter of Credit shall automatically renew for successive one-year terms unless,' at least forty-five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Prior Lake City Manager that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows: Prior Lake City Manager, Prior Lake City Hall, 16200 Eagle Creek Avenue, Prior Lake, Minnesota 55372-1714, and is actually received by the City Manager at least forty-five (45) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 400. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation. BY: Its I: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 27 03/13/00 EXHIBIT "C" CERTIFICATE OF INSURANCE PROJECT: CERTIFICATE HOLDER: City of Prior Lake 16200 Eagle Cree~ Avenue Prior Lake, Minnesota 55372-1714 INSURED: ADDITIONAL INSURED: City of Prior Lake AGENT: WORKERS' COMPENSATION: Policy No. Effective Date: Expiration Date: Insurance Company: COVERAGE - Workers' Compensation, Statutory. GENERAL LIABILITY: Policy No. Effective Date: Expiration Date: Insurance Company: ( ) Claims Made ( ) Occurrence LIMITS: [Minimum] Bodily Injury and Death: $500,000 for one person $1,000,000 for each occurrence Property Damage: $200,000 for each occurrence -OR- Combination Single Limit Policy $1,000,000 or more COVERAGE PROVIDED: 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 28 03/13/00 -,- Operations of Contractor: YES Operations of Sub-Contractor (Contingent): YES Does Personal Injury Include Claims Related to Employment? YES Completed Operations/Products: YES Contractual Liability (Broad Form): YES Governmental Immunity is Waived: YES Property Damage Liability Includes: Damage Due to Blasting YES Damage Due to Collapse YES Damage Due to Underground Facilities YES Broad Form Property Damage YES AUTOMOBILE LIABILITY: Policy No. Effective Date: Expiration Date: Insurance Company: (X) Any Auto LIMITS: [Minimum] Bodily Injury: $500,000 each person $1,000,000 each occurrence Property Damage: $500,000 each occurrence -OR- Combined Single Limit Policy: $1,000,000 each occurrence ARE ANY DEDUCTIBLES APPLICABLE TO BODILY INJURY OR PROPERTY DAMAGE ON ANY OF THE ABOVE COVERAGES: If so, list: Amount: $ [Not to exceed $1,000.00] SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL MAIL THIRTY (30) DAYS WRITTEN NOTICE TO THE PARTIES TO WHOM THIS CERTIFICATE IS ISSUED. Dated at On BY: Authorized Insurance Representative 1: \OOfiles\OOsubdi v\finalpl\knob5th\dvcntrct. doc 29 03/13/00 EXHIBIT "0" TO DEVELOPMENT CONTRACT (Oversizing Calculations for Developer Improvements) A. OVERSIZING Carriage Hills Parkway Oversizing: Oversizing costs include additional quantities for upgrading from a typical 32-foot wide residential street to a 38-foot wide collector street with center medians.. Estimated oversizing quantities: I Description Class 5 aggregate base Bit. Base (Type 31) Bit. Wear (Type 41 A) Tack coat B618 curb and gutter Concrete sidewalk & median Bituminous Trail Pedestrian Ramps Keep Left sign No Parking sign Left turn lane sign Peds! bikes sign 4" white solid line Left turn arrow Sod (in median) TOTAL OVERSIZING Quantity I 1684.7 472.8 976.2 147 1223 1275 625 4 5 4 5 1 300 5 370 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 30 03/13/00 Unit sy sy sy gal LF SF SY Each Each Each Each Each LF Each SY Unit Price I Amount I $6.20 $10,445.14 $3.65 $5,905.53 $2.49 $2,430.74 $1.85 $271.95 $6.20 $7,582.60 $2.50 $3,187.50 $17.00 $10,625.00 $250.00 $1,000.00 $250.00 $1,250.00 $250.00 $1,000.00 $250.00 $1,250.00 $250.00 $250.00 $2.00 $600.00 $200.00 $1,000.00 $2.00 $740.00 $47,538.46 . .--...---......--r--.---...-..... --..-..........--.. EXIDBIT "E" TO DEVELOPMENT CONTRACT ESTIMATED CONSTRUCTION COSTS SUMMARY: Knob Hill 5th Addition: $408,586.54 Carriage Hills Parkway: $154,091.35 Subtotal $562,677.89* Oversizing Costs ($47,538.46) TOTAL $515,139.43 *See attached detailed engineers estimate. 1:\OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 31 03/13/00 F~9-n3~OO 05:03P Pioneer Engineering 1 P.02 EXHIBITE PROJ KNOB HILL 5TH ADDITION PRO~ 14347 DATE 02102100 BY KJM COST ESTIMATE SUMMARY EST. UNIT ITEM QTY.. UNIT DESCRIPTION PRICE AMOUNT 1 SANITARY SEWER 101,668.24 2 WA TERMAIN 91,568.15 3 STORM SEWER 72.601.90 4 STREETS 142,748.25 TOTAL . $408,586.54 fl rn@.. @ O~:7 @ ~~~. lJ I. II H I FEB I 4 mJ JW: :.~ . --,.---------------..------ F~.p-03'~OO 05:03P P;oneer Eng;neer;ng 1 EXHIBIT E P.03 PROJ KNOB HILL 5TH ADDITION PROJ1l 14347 DA TE 02102/00 BY KJM COST ESTIMATE SANITARY SEWER EST. UNIT ITEM QTY. UNIT DESCRIPTION PRICE AMOUNT 1 533 LF. 8" PVC SDR 3510'.12' DEPTH W/SAND BEDDING 14.65 7,808.45 2 89 L.F. 8" PVC SDR 3512'.14' DEPTH W/SAND BEDDING 15.75 1,401.75 3 44 L.F. 8" PVC SDR 26 10'.12' DEPTH W/SAND BEDDING 15.50 682;00 4 101 L.F. 8" PVC SDR 2612'.14' DEPTH W/SAND BEDDING 16.60 1,676.60 5 99 L.F. 8" PVC SDR 2614'.16' DEPTH W/SAND BEDDING 17.95 1.777.05 6 127 L.F. 8" PVC SDR 2616'.18' DEPTH W/SAND BEDDING 19.85 2,520.95 7 506 L.F. 8" PVC SDR 26 18'.20' DEPTH W/SAND BEDDING 22.45 11,359.70 8 266 L.F. 8" PVC SDR 26 20'.22' DEPTH W/SAND BEDDING 26.35 7,009.10 9 118 L.F. 8" PVC SDR 26 22'.24' DEPTH W/SAND BEDDING 32.85 3.876.30 10 21 L.F. 8" PVC SDR 26 24'-26' DEPTH W/SAND BEDDING 39.35 826.35 11 20 L.F. 8" DIP CL 5210'.12' DEPTH W/SAND BEDDING 23.30 466.00 12 11 L.F. 8" DIP CL 5212'-14' DEPTH W/SAND BEDDING 24.40 268.40 13 19 L.F. 8" DIP CL 5214'.16' DEPTH W/SAND BEDDING 25.80 490.20 14 10 L.F. 8" DIP CL 5216'.18' DEPTH W/SAND BEDDING 27.65 276.50 15 16 L.F. 8" DIP CL 52 18'.20' DEPTH W/SAND BEDDING 30.25 484.00 16 19 L.F. 8" DIP CL 52 20'.22' DEPTH W/SAND BEDDING 35.00 665.00 17 18 L.F. 8" DIP CL 52 22'-24' DEPTH W/SAND BEDDING 40.00 720.00 18 27 L.F. 8" DIP CL 52 24'.26' DEPTH W/SAND BEDDING 45.00 1,215.00 ~n AI: It:: 8ft DIP CL 52 25'-28' DEPTH \^J/SAt'-JD BEDD!NG 50.00 2,250.00 ,,, "?..J L.-.J. 20 42 L.F. 8" DIP CL 52 28'.30' DEPTH W/SAND BEDDING 60.00 2,520.00 21 94 L.F. 8" DIP CL 52 30'.32' DEPTH W/SAND BEDDING 70.00 6,580.00 22 11 EA. 48" SANITARY MANHOLES 0'-10' DEPTH 1,415.00 15.565.00 23 78.89 V.F. 48" SANITARY MANHOLE BUILD IN EXCESS OF 1( 78.00 6,153.42 24 3 EA. OUTSIDE VERTICAL DROP CONNECTION 0-5' 1.570.00 4,710.00 25 15.37 V.F. OUTSIDE VERT. DROP CONN. IN EXCESS OF 5' 96.00 1.475.52 26 40 EA 8"x4" PVC SERVICES WYES 30.00 1,200.00 27 1668 L.F. 4" PVC SDR 26 SERVICE PIPE 7.65 12.760.20 28 107.5 L.F. 4" PVC SDR 26 SERVICE RISERS 18.10 1,945.75 29 17 V.F. 4" DIP CL 52 SERVICE RISER 20.00 340.00 30 1 L.S. SEWER TEST 1,155.00 1.155.00 31 100 TON 1 1/2" ROCK FOR GRANULAR PIPE BEDDING 11.75 1.175.00 32 1 E.A: CONNECT INTO EXISTING 315.00 315.00 TOTAL $101,668.24 r------:::=:-~ :-i r::::'i :-....... ! i:-~, ~/~. j'.5 Q\\i/j;:::l 1.1......... i; r.. ., i ~ ~/ L.:-: \~. L~ ~ ~: W(\ FEB I 4 ~ Wi. U \1L I~ Feb-03.-00 05:04P '.' P;oneer Eng;neer;ng . EXHIBIT E 1 P.04 PROJ KNOB HILL 5TH ADDITION PROJiI 14347 DATE 02/02/00 BY KJM COST ESTIMATE WA TERMAIN EST. UNIT. ITEM QTY. UNIT DESCRIPTION PRICE AMOUNT 1 81 L.F. 6" DIP CL 52 15.30 1.239.30 2 2646 L.F. 8" DIP CL 52 18.15 48.024.90 3 8 EA HYDRANT WI GATE VALVE 2,005.00 16,040.00 4 2545 LBS. 0./. FITTINGS 1.75 4,453.75 5 40 EA 1" CORPORATION STOP 20.00 800.00 6 40 EA. 1" CURB STOP AND BOX 55.00 2,200.00 7 1712 L.F. 1" COPPER SERVICE PIPE TYPE K 8.35 14,295.20 8 5 EA. 8" GATE VALVE & BOX 600.00 3,000.00 9 1 L.S. WATER TEST 1,260.00 1,260.00 10 .1 E.A. CONNECT INTO EXISTING 255.00 255.00 TOTAL $91,568.15 r- . ~Dn7@rR' ;~ .-=11_ (~'~ \1/ ..... ",.' ::r\hS0~ ~ 5 1\';; i! lll~ II I:: ilVJ1 I;t \1' I \ : ~ \ i: iP \; FJ::'1::b' I 4 ?fjrn : ;;, IU~l ~". . "'I ~;)' . ----..--..-.....-...--..-..--.-.--...-.. Fe..,'?-03.~-OO 05: 04P Pioneer Engineering EXHIBIT E 1 P.os .) PROJ KNOB HILL 5TH ADDITION PROJ"# 14347 DATE 02102100 BY KJM COST ESTIMATE STORM SEWER EST. UNIT ITEM aTY. UNIT DESCRIPTION PRICE AMOUNT 1 852 L.F. 12" RCP CL5 20.15 17.167.80 2 518 L.F. 15" RCP CL5 23.70 12,276.60 3 20 L.F. 21" RCP CL 4 25.45 509.00 4 518 L.F. 24" RCP CL 3 30.00 15,540.00 5 2 EA. 12" RCP APRON 600.00 1.200.00 6 1 EA. 21" RCP APRON WfTRASHGUARD 1,000.00 1,000.00 7 9 C.Y. RIP RAP Cl 3 WI FILTER 65.00 585.00 8 2 V.F. 48" DIA. MANHOLE 1,140.00 2,280.00 9 8 EA. 48" OrA. CBMH 1.220.00 9,760.00 10 1 EA. 80" DIA. CBMH 1,850.00 1.850.00 11 6.56 V.F. 48" MH BUILD IN EXCESS OF 10' 100.00 656.00 12 2.35 V.F. 60" MH BUILD IN EXCESS OF 10' 150 352.50 13 4 EA. 24"x36" CA TCHBASIN 885.00 3,540.00 14 2 EA. 27" DIA.CATCHBASIN 630.00 1.260.00 15 15 EA. EROSION CONTROL FOR CATCH BASINS 75.00 1.125.00 16 1 EA. BAFFLED WEIR 1,500.00 1.500.00 17 4 EA. CONNECT TO EXISTING 500.00 2,000.00 TOTAL $72,601.90 hlRl r2 (2 f3 0 \'./7 r=,:::J f:'..." H [J lE: .:;::;' L:::. \:J ..:::J., I, 'i 'I,. '\ i I' I " I; I d ~ I i 1\ '/, ":1 II,! ~. 1.1 " !;. I, ii~!. ftD . !..:. 700" "; i \' . , 'I ' .' ; J...! I ~/ \' F"et<t.?-93t-OO 05:04P Pioneer Engineering . EXHIBIT E 1 P.06 PROJ KNOB HILL5TH ADDITION PROJlI 14347 DA TE 02102100 BY KJM COST ESTIMATE STREETS EST. UNIT ITEM QTY. UNIT DESCRIPTION PRICE AMOUNT 1 7600 S.Y. SUBGRADE PREPARATION 0.51 3,876.00 2 7600 S.Y. 12" CL. 5 AGGREGATE BASE 6.20 47,120.00 3 6400 S.Y. 2.5" BIT. BASE 3.65 23,360.00 4 6400 S.Y. 1 1/2" BIT. WEAR 2.49 15,936.00 5 500 GAL. TACK COAT 1.85 925.00 6 3320 L.F. SURMOUNTABLE CONCRETE CURB AND GUTTER 6.20 20,584.00 7 230 L.F. B618 CONCRETE CURB AND GUTTER 8.65 1.989.50 8 12 EA. ADJUST CATCH BASIN CASTING 50.00 600.00 9 10 EA. ADJUST MANHOLE CASTING 200.00 2,000.00 10 109 S.F. SAWCUT BITUMINOUS 3.15 343.35 11 109 L.F. MILL BITUMINOUS 2.60 283.40 12 500 C.Y. SUBGRADE EXCAVATION 6.30 3,150.00 13 500 S.Y. GEOTEXTILE FABRIC 1.55 775.00 14 500 TON Cl. 5 AGGREGATE(FOR SUBGRADE EX. BACKFilL) 10.50 5.250.00 15 1 L.S. BACKFILL CURB/RESHAPE BLVD 3,210.00 3,210;00 16 '6 AC. TURF ESTABLISHMENT 1,050.00 6,300.00 17 1578 S.Y. SOD (2 ROLLS BEHIND CURB) 2.00 3,156.00 18 170 S.Y. ACROSS ROAD (4"CL 5 AGG. BASE & BIT. WEAR 41A 17.00 2,890.00 I 191 4 EA. PERMANt::N I tsAt<t<iCADt:s 250 1,000.00 - TOTAL $142,748.25 [jN~ <S [g D\w[g,~:i III ~!. r'-~ I 11 .~.v.^ ';. . ;!h\ r~.~ 1 - . . i: ~ \ \ n ~ ~ \ 1'_ L~--...- \ . T EXHIBIT E .' . PROJ liliOB-f:1fLL 5TH .Mml noN PROJ#I 14347 DATE 02/02/00 BY KJM ?.1~~'Ac1!- tfllL-;' 'Vllf4--w/1 Y --- COST ESTIMATE SUMMARY EST. UNIT ITEM QTY. UNIT DESCRIPTION PRICE . AMOUNT 1 STORM SEWER 29,702.60 2 STREET CONSTRUCTION 124.388.75 TOTAL $154,091.35 '. "J " ....,.~-..__.,... . " Ii k\. t1Ui fEB'7am iii, Ill'.' J~il EXHIBIT E PROJ CARRIAGE HILLS PARKWAY PRO.ffl 20022 DATE 02111/00 BY KJM COST ESTIMATE STORM SEWER EST. . , UNIT ITEM OTY. UNIT DESCRIPTION PRICE AMOUNT 1 133 L.F. 12" RCP CL5 20.15 2,679.95 2 52 L.F. 15" RCP CL5 23.70 . 1.232.40 3 99 L.F. 18" RCP CL5 24.50 2,425.50 4 245 L.F. 21" RCP CL 4 25.45 6,235.25 5 66 L.F. 24" RCP CL 3 30.00 1.980.00 6 1 EA. 24"x36" CATCHBASIN 885.00 885.00 7 6 EA. 48" DIA. CBMH 1,220.00 7,320.00 8 21.63 V.F. 48" DIA. CBMH IN EXCESS OF 10' 150.00 3,244.50 9 7 EA. EROSION CONTROL FOR CATCH BASINS 100.00 700.00 10 3 EA. CONNECT TO EXISTING 1.00~ 3.000.00 TOTAL $29,702.60 ..:.;::~.u:~j\. .. _.,;---~'.::~":'.. ~,_::.:..... -- Hi .,:; FEB 11 _ \\ . " " (. .~ \j L--.---- i.._..._.__---...... - T EXHIBIT E PKOJ CARRIAGE HILLS PARKWAY PROJ~ 200022 DATE 02111/00 BY KJM COST ESTIMATE STREETS EST. " UNIT ITEM QTY. UNIT DESCRIPTION PRICE AMOUNT 1 6039 S.Y. SUBGRADE PREPARATION 0.51 3,079.89 2 5122 S.Y. 12" CL. 5 AGGREGATE BASE 6.20 31,756.40 3 3904 S.Y. 3" BIT. BASE 2331 (TYPE 31B) 4.25 16,592.00 4 3904 S.Y. 1 1/2" BIT. WEAR 2331 (TYPE 41A) 2.49 9,720.96 5 300 GAL. TACK COAT 1.85 555.00 6 2810 L.F. B618 CONCRETE CURB AND GUTTER 6.20 17,422.00 7 160 L.F. 3' CONCRETE VALLEY GUTTER 9.00 1,440.00 8 40 L.F. SAWCUT BITUMINOUS 2.00 80.00 9 40 L.F. MILL BITUMINOUS 2.00 80.00 10 4715 S.F. 4" CONCRETE SIDEWALK & MEDIAN 2.50 11,937.50 11 625 S.Y. 2 ~" BITUMINOUS WALK W/4" CL. 5 BASE 17.00 10,625.00 12 8 EA. PEDESTRIAN RAMP 250.00 2,000.00 13 4 EA. ADJUST GATE VALVE BOX 150.00 600.00 14 7 EA. ADJUST CATCH BASIN CASTING 100.00 700.00 15 2 EA. ADJUST MANHOLE CASTING 200.00 400.00 16 1 L.S. BACKFILL CURB/RESHAPE BLVD 5,000.00 5,000.00 17 1825 S.Y. SOD 2.00 3,650.00 18 4 E.A. STOP SIGN 250.00 1,000.00 19 5 EA KEEP LEFT SIGN 250.00 1,250.00 20 4 E.A. NO PARKING SIGN 2cn nn 1,000.00 -.JV.VV 21 5 E.A. LEFT TURN LANE SIGN 250.00 1,250.00 22 1 E.A. PEDS KEEP LEFT, BIKES KEEP RIGHT SIGN 250.00 250.00 23 300 L.F. 4" SOLID WHITE LINE (TURNING LANE) 2.00 600.00 24 60 L.F. 16" SOLID WHITE STOP LINE 10.00 600.00 25 4 EA ZEBRA CROSSWALK (PAVEMENT MARKING' 200.00 800.00 26 5 E.A. LEFT TURN ARROW (PAVEMENT MARKING) 200.00 ' 1,000.00 27 4 EA. PERMANENT BARRICADES 250.00 1,000.00 TOTAL ';X', ..... $124,388.75 r.:.~1 .~ r? n W~ 1'---::l ''''''''I;::.fC: .., \\ r.::. , , , ~ . !."'! \::::7 t..S U l__: ;\ \ J,j:=~---- I :::. (~ a'O I 7 'lItMl . ~: reo .6RJU ~". . 'j 't! L-_______..Jt ~...__.._----,---.-_._._._...._--.. ....-~... EXlllBIT "F" TO DEVELOPMENT CONTRACT RESIDENTIAL STREET LIGHTING POLICY BACKGROUND The City intends that this street lighting policy promote the safe travel of city streets in a manner both fair and affordable to the City and its residents. Residential street lighting promotes pedestrian and traffic safety to the extent that the City shall approve street lighting where warranted by such concerns. Lighting requests shall come either by recommendation of the City Engineer or by resident petition. The capital costs of residential street lighting shall be the responsibility of those residents, or any portion of those residents, determined to be affected by the light. NEW SUBDIVISIONS: All lighting plans require approval by the City and the utility responsible for street light operation and maintenance. In new subdivisions street lights shall be placed at intersections, every 300 feet between intersections where intersections are more than 600 feet apart, and at the ends of cul-de-sacs where the distance from said end to the intersection of the cul-de-sac with the street is greater than 300 feet. Within their developments, developers shall also install lights to City standards at the intersections of residential streets with collector streets. The developer shall pay the full capital cost of every light to be installed; this includes poles, fixtures, underground wiring, and all appurtenant work. The developer shall pay operatIon and maintenance for the light system until the City accepts the project, at which time the billing shall be transferred to the City. 100 or 150 watt high pressure sodium lights in traditional or cobra-head style (as approved by the City and the utility) shall be the standard for new subdivisions. Where a portion of the development is already lit, new lights shall match in style and wattage those already in place. Where a developer wishes to install more lights than warranted by City policy, the monthly operation and maintenance costs of the additional lights shall be borne by the residents of the development through their homeowner's association or similar organization. Where a developer wishes to install non-standard lights, not available through the servicing power company, the City will pay operation costs equivalent to a standard street light. Maintenance of non-standard street lights at City cost will require a signed agreement between the City, Developer, and power company that provides for power company maintenance of the non-standard lights at a cost to the City equal to or less than that of a standard fixture. EXISTING SUBDIVISIONS: Where traffic safety clearly warrants, a street light may be placed upon the recommendation of the City Engineer's office. The basis of such warrants shall be a minimum Average Daily Traffic of 2000 vehicles or a layout such that, in the City Engineer's estimation, significant improvement in safety might be obtained by the placement of a street light. Since the benefit of such installations extends to the City as a whole, these will be done at City expense. When residents request additional lighting for their neighborhoods, they must do so by petition - signed by 60% of the neighbors affected by the proposed light. The affected area shall be 100 linear feet on either side of the proposed light, on both sides of the street. The placement of the proposed light shall be specified in the petition. Petitioners shall approach the City prior to circulating their petition to obtain direction as to where street lights are warranted for their neighborhoods. Lights shall be approved only as they meet the following warrants for existing subdivisions: intersections, between intersections at intervals of 300 feet where the distance between intersections is greater than 600 feet, and at the ends of cul-de-sacs where the distance from said end to the intersection of the cul-de-sac with the street is greater than 300 feet. If approved, each street light shall be purchased by the affected residents. Payment shall be made prior to the installation of the light and shall include the cost of poles, fixtures, underground wiring, and all appurtenant work. The method of payment shall be as directed by the City Finance Departnient. The City shall assume operation and maintenance costs for a light from the time it is energized by the utility. In existing developments new lights shall match in style and wattage those already in place. If no lights be currently in place, then 100 or 150 watt high pressure sodium lights in cobra-head or traditional style shall be the standard. 1: \OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct .doc 40 03/13/00 . -..-.-..-.-......----.....-- EXlllBIT "G" TO DEVELOPMENT CONTRACT CONDITIONS OF PLAT APPROVAL 1. A current title opinion or commitment of title insurance be submitted acceptable to the City Attorney. 2. Payment of all fees prior to release of the final plat mylars. 3. Reductions of the entire final plat be submitted, to the following scales: 1" = 800'; 1" = 200'; and one reduction at no scale which fits onto an 81/2" x 11" sheet of paper. 4. Four mylar sets of the final plat with all required signatures be submitted. 5. The developer provide financial security, acceptable to the City Engineer prior to release of the final plat mylars. 6. The final plat and all pertinent documents must be filed with Scott County within 60 days from the date of final plat approval. Failure to record the documents by May 20, 2000, will render the final plat null and void. 1:\OOfiles\OOsubdiv\finalpl\knob5th\dvcntrct.doc 41 03/13/00