Loading...
HomeMy WebLinkAboutLegal ,) JI ill 1fqf//l r.I.~.I,An R 2 8 -':i,-'n f. .,;,)0 ~~~~ ~ ~ ); 9- )> '< ~ ~ ~ 0: ~~ i' ')- OF ,.t:\~~ OFFICE MEMORANIWM-:~=:,-,--. Mlnnesota Department of Transportation METROPOLITAN DlVlSlON--Waters Edge state Aid Office Date: March 23, 2000 To: Ms. Julie Skallman state Aid Engineer Mai\stop 500 From: Sharon LeMay Fina\s Administrator Metro State Aid subject: REPORT OF FINAL ESTIMATE SAP 201-114-03 and 201-114-02 CITY OF PRIOR LAKE please process the attached Report of Final Estimate for the above referenced project. Final inspection was completed on ~arch 22. 2000.. The project is in substantial accordance with the approved plans. Final payment is recommended. Documentation is attached as follows: . Report of Fina\ Estimate . Copy of Fina\ Voucher . Fina\ Cost Distribution . R/W Documentation (on fi\e with SAP 201-106-03) NOTE: Right of Way for this project and project SAP 201-106-03 was handled together because it involved the same property owner. Please note any changes made to the documentation submitted and forward to me for distribution to the local agency. ." Greg 1\kka, City of Prior Lake --...----...-- _ I ____u--- .J H. JI.. (.f- MnlDOT 30734 revised April 29, 1999 REPORT OF 1!AR'!'!.\b-1 FINAL ESTIMATE Partial Finall (check one) S.A.P. No. 201-114-03 ColIDty/City Prior Lake (Submit one report for each SAP number) Local Project ID # 97-17 Funding shown below is for this project number only. Costs of projects or agreements tied to this project shall not be included on this request. A separate Report of Partial/Final Estimate must be submitted for each project number For Final Estimate use onlY:. Attach Final Estimate. Include quantity, unit price, and extension split for each project. Date work completed: ill 31 I~. Date final payment to contractor: ..J11 ~..22.. Account Type *(see types below) Urban (MSAS) STATE AID CONTRACT COSTS. Total costs to date $ 349.458.01 - $ Less: ineligible $ not split out $ Less: eligible - local funds used $ not split out $ Force account costs** $ 0 $ Subtotal contract costs $ 127.000.00 $ OTHER SA ELIGIBLE COSTS Project Development (PE/CE; 25% MAX) $ 0 $ Right of Way $ o this S.A.P. $ Other $ 0 $ (specify) TOTAL FUNDS REQUESTED $ 127.000.00 $ $ $ $ $ $ $ $ $ $ Remarks: See S.A.P. 201-114-02 for ri;zht-of-wav costs. Not reauesting full state aid eligible amount., For Countv/Citv Use (optional) Total Funds requested Less: previous payments Balance due this payment $ 127.000.00 $ 120.650.00 $ 6.350.00 $ $ $ $ $ $ *Urban (MSAS), Regular (CSAH). Municipal (CSAH), Co. Turnback (CTB). Munic. Turnback (MTB), Town Bridge, Fund 29, State Park, SA Bonds **lnclude work by agency forces, MnDOT forces, locally furnished materials, railroad force account work, or utility force account work I hereby certify that engineering costs requested above do not exceed actual costs. Wage rates paid on this contract were equal or exceeded the minimum hourly rates required for state funded projects per the MnDL&I. Materials used in the state-aid funded portions of this project were sampled and tested in accordance with the Mn/DOT Schedule of Materials Control. Inspection on the state-aid funded portions of this project were performed by personnel certified in accordance with state-aid directives. The work required by this contract was completed in accordance with, and pursuant to, the terms of this contract. APPROVED: 4~vt~ f!l. (U4~~ j ~itYEngineerj fi'~ JhWU,^ ))l , ,Ii DistricfState Aid Engineer r j DATE: Z-'(- SFP 11 SIGNED: DATE: ~I ,D / Of) -! I l' .. ..:1. Jl, .ILl ]1 CAMPBELL KNUTSON ~ 1- ,-11' Professional Association Attorneys at Law January 22, 1999 Joel J. Jamnik Andrea McDowell Poehler MaTthew K. Brokl* John F. Kelly Matthew J. Foli Marguerite M. McCarron Thomas J. Campbell Roger N. Knutson Thomas M. ScoTt EllioTt B. Knetsch Suesan Lea Pace (651) 452-5000 Fax (651) 452-5550 * Also licensed in Wisconsin ;,. ".;~ t"':lll:"""Y".:ali V:r:~;""ri_. '1 ~or- JAN 2 5 1999 Mr. Greg Ilkka Director of Public Works City of Prior Lake 16200 Eagle Creek Avenue SE Prior Lake, MN 55372-1714 Re: Holy Cross Lutheran Church vs. City of Prior Lake Dear Greg: Enclosed please find Judge Stacey's decision in the above matter in which he upholds our proposed reassessment of the property in the amount of $79,382.50. Please call if you have any questions. Best regards, CAMPBELL KNUTSON Professional Association 'L \ Thbmas M. 'Scott By: h II> '"/ (', TMS:cjh Enclosure cc: Mr. Ralph Teschner Suite 317 . Eagandale Office Center . 1380 Corporate Center Curve · Eagan, MN 55121 ,.1 JL, ... '1 STATE OF MINNESOTA DISTRICT COURT COUNTY OF SCOTT FIRST JUDICIAL DISTRICT , File No. 97-20534 Holy Cross Luthercln Church, Appellant, FiLED' JI\N 2 0 1999 A SCOTT COUNl't' COUR1S FINDINGS OF FACT, CONCLUSIONS OF LAW, ORDER FOR JUDGMENT AND JUDGMENT v. City of Prior Lake, Respondent. The above-entitled matter came before the Honorable Rex D. Stacey, Judge of District Court, on December 9, 1998, at the Scott County Courthouse, Shakopee, Minnesota. Christopher E Morris appeared for Appellant. Thomas M. Scott appeared for Respondent. Based upon the proceedings, this Court makes the following: FINDINGS OF FACT 1. Appellant Church sits on a 6.3 acre parcel with 565 feet of frontage along Pike Lake Trail in the Cityof Prior Lake. 2. On November 3, 1997, the Prior Lake City Council approved a resolution adopting Project 97-17 which transformed Pike Lake Trail from a gravel road to a minor collector street with curb, gutter, storm sewer and sidewalks and extended municipal water service to Appe\\ant's property. 3. Based upon front footage, the City originally assessed the Church $85,484.50 for the street, $14,509.20 for water and $11,007.50 for trunk water for a total .___________..~_____'__ II J JI. JI.~ ]:' I assessment of $111,001.20 but later approved two change orders which reduced the street assessment to $64,873.20, the water assessment to $14,509.20, and eliminated the trunk water assessment leaving a total assessment of $79,382.50. 4. In 1993, the City agreed to extend sewer service to Appellant's property at a cost to the City in the amount of $48,892.70; Appellant was charged $19,600.00 for this "sanitary sewer lateral" together with an $8,648.75 sanitary sewer trunk charge, a $46,030.72 storm water management fee and a $4,403.00 street collector fee. 5. Appraiser Jason L. Messner testified on behalf of the City that the value of the subject property was $170,000.00 before the addition of public utilities and street improvements and $327,00.00 after for a difference, or special benefit, of $157,000.00; Messner's analysis of the "after" value of his comparables included storm water management fees paid by purchasers and he deducted the fees paid by the Church in 1993, or $74,279.00 ($19,600.00 sanitary sewer lateral fee, $8,648.75 sanitary sewer trunk fee and $46,030.72 storm water management fee), in arriving at the "net" special benefit of approximately $83,000.00. 6. Appraiser Frank J. Wicker testified on behalf of the Church that the value of the subject property was $88,000.00 before ands $188,000.00 after the addition of public utilities and street improvements for a special benefit of $100,000.00; Wicker's "after" value analysis did not include the cost of street upgrades, sanitary sewer, water or storm sewer charges. Based upon the foregoing Findings of Fact, the Court now makes the following: CONCLUSIONS OF LAW 1. The City's assessment is presumed to be proper and the burden is on the 2 ~ .1 JI. lI.. ".") 1 Church to show the assessment is excessive. 2. The special benefit to the property equals or exceeds the City's proposed reassessment for Project 97-17 in the amount of $79,382.50 ($64.873.20 street and $14,509.20 water assessments). Based upon the foregoing Conclusions of Law, the Court makes the following: ORDER The City is directed to reassess the subject property pursuant to Minn. Stat. Sec. 429.071, subd. 2, in the amount of $79,382.50. LET JUDGMENT BE ENTERED ACCORDINGLY. Dated: January 14. 1999 BY THE COURT: r-f0 ~ Rex D. Stacey Judge of District Court -....... ~ 3 . v ~:.....+_:""... C'+............. A:....I Crt./'T;noor /1 r~ / Certificate No. 00036038 CERTIFICATE OF INSURANCE ISSUE DATE <MMIDD/YY) 04/01/98 PRODUCER COBB STRECKER DUNPHY & ZIMMERMANN, INC. 150 SO. 5th ST.,SUITE 2000 MINNEAPOLIS, MN 55402 This certificate is issued as a matter of information only and confors no rights upon the certificate holder. This certificate does not amend, extend or alter the coverage afforded by the policies listed below. COMPANIES AFFORDING COVERAGE COMPANY LtlltR A TRANSCONTINENTAL INSURANCE CO. COMPANY LtlltR B INSURED MCNAMARA CONTRACTING, INC. 5oo1160TH STREET WEST COMPANY LtlltR C TRANSPORTATION INSURANCE C~~ TRANSPORTATION INSURANC~ ., ~~ . ~it., VALLEY FORGE INSURANCE COMPJ {9JW .. COMPANY LtllJ:lR D ROSEMOUNT MN 55068 COMPANY LEITER E COVERAGES This is to certify that policies of insurance listed below have been issued to the insured named above for the policy period indicated. Notwithstanding any requirement, term or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions, and conditions of such policies. Limits shown may have been reduced by paid claims. CO Type of Insurance LTR A GENERAL LIABILITY Policy Number Policy Effective Policy Expiration Date (mmldd/VV) Date (mm1dd/yy) LiabilitY Limits [X] Commercial General Liability [ ] Claims Made [ X ] Occurrence [ ] Owner's & Contractor's Proto CI21134264 [ ] 03/01198 03/01199 General Aggregate Pf(Xlucts-Comp/Ups Azgre~ate Personal & Advertlsmg Iniurv Each Occurrence !'ire Damage (Anv One Fire) Medical Expense (Anv One Person) $1,000,000.00 $1,000,,000.00 $500.000.00 $500.000.00 $.00 $.00 B AUTOMOBILE LIABILITY [ X ] Any Auto [ X ] All Owned Autos (priv Pass.) [ X ] AIl Owned Autos(Other) [ X ] Hired Autos [ X] Non-Owned Autos C121134278 [ ] Garage Liability [ ] CSL 03/01198 03/01/99 Bodily Injury .Per Person Bodily Injury Per Accident Property Dllma~e $1.000.000.00 $.00 $.00 C EXCESS LIAB!Lli { [ X] Umbrella Form CI21134295 [ ] Other Than UmbreIla ForrtJ. 03/01198 03/01199 $00 Each A.ggregate Occurrence $5,000,000.00 $5,000,000.00 D WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY WCC168516047 03/01198 03/01199 StatutorY I $100,000.00 (Each ACCIdent) $500,000.00 (Disease Policy Limit) $100,000.00 (Disease Each Employee) E OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLESIRESTRICTIONJ/SPECIAL ITEMS 1997 STREET & UTILITY CONSTRUCTION OF PROJECT 97-02; FISH POINT ROAD, PROJECT 95-07 MUSHTOWN ROAD PROJECT 97-17 PIKE LAKE TRAIL ADDITIONAL INSUREDS: CITY OF PRIOR LAKE (OWNER) AND THE PROJECT ENGINEER CERTIFICATE HOlDER CITY OF PRIOR LAKE 16200 EAGLE CREEK AVENUE SE PRIOR LAKE MN 55372 CANCEU,AT10N Should"Aiiy Of The Above Described Policies Be CanceIled Before The Expiration Date Thereof, The Issuing Company WiII Mail 30 Days Written Notice To The Certificate HOC)d r Named To The Left. ""'" - AUTH~~Ivt . . -/ ....... "'1m J H Jt! Jan 08 99 1:>:41 r'lu.vv.J , .-- TEL: r 4/-/7 RECEIVED JAN 1 1 1999 CITY OF PRIOR LAKE J.......-l999 14.27 ""'"""" co<rRACTIHO INC. 61"-,",,,594. lVlll ~l"U::'':)V.J.n. LI~pC11 UU~U\. Ul 1,~V~1\U~ Withholding Affidavit for Contractors This oHicJavlt muJl b. opprovttd by th,.1JJnflemto DepClflment 01 Rev.nu. boFl>,..,h. staI8 of MlnnfJsoIo or OilY of itl Jubdlvl510ns eon make 1;(101 payment '0 con/roelOfS. P.02/07 IC-134 "~I.1)1>> QI' prill' c:/...t1t. 1111, 'AA1l1te ~ lIloilins1ob,l I9r rvtlIrtt'og "" <<Jfftple/efllonn. k----------------~ . t; ,c. "",~a Contracting, I"". I ~~~-S940 L.'.j 'AcId.... -\ TolaI tOftload olftClunt 0'.1 I 5001 160th Str.eet ~est 1 S &fl olj'f./~ t::-t I CIIf !\Cle ZIp Cvdo . 1 ""'o~' \lal dIIe _:'; \... ~~''::: ~~ ~~~o~ ...:~~ _ _ _ _./ .s. jjf U,1.;oJ . JoN"".ada ",lIhho\dl"g to- 10 AU"'"' 1525665 t./QnWyeot "C1I~ be;oft 09/91 ~/yatJI"'C1tk ,filled 01/98 , . .::.~ Pro~ Rumt-r "0\_" IocaIIon :'.:- 'I, 97 -02,95-07,97 -17 FISIIl'OIllI BD, MUSlfl'OIlN BD, PINL U\1lE TR '1".11 'roJIIC' l)Ilr". ' Mdt... Oly ~~!E:~ erN OF PRIOR lAKE 16200 EAGLE CREl!K AVE 5[" PRIOR LAKE .:l'f.~ Did'you ...... . " '. II -,It 01\ "'i, p.o\Odf Ili Y.. 0 No 11,,0, ~ cIId tie wadr.' . : '.~:t! 5_ Zlp_ ' ~ . 55312 . -TJ} ~ .~ ii, .:U:~11 ., =,/"IlIJ ;",'>1..~) .~:~;f!l~ . "'....j ; 01 ....#." . \0'" ........ .'l.:\;.":~i ':;'!;.'1'~'" ...:::~: . ..:~ -', :!.,~. . .- :.;..:.~;:~ _,' ...i-1 '1 ".:J . ,.~ ,... ';':.' .: :J;~l ::'?Q':'i> '.. ....,M ..~~ ".,:.~;..~ '.~;)"~ ':,5~{f -ill Ch.~1c tho bOlt ,ltal deKrlbO$ your Irwolvtmenl 1/1 1/1f' pro/ect and I,It In all InformallOn reqU85/fJd, o 501- canmlCtor o subeentNdor No". 01 conlroclor who hl,ed you Ad<<en l!lII Pri- _....<10.-11 YO' .obc...",,,,.,J 00' ""y...ll< .. thl. ...,.d. aU 01 1"'" "be"""""" ..... 111, oil'" """ IC.134 allid..... aod """o"om ""'hod by lbe D.po""'''' 01 Rovon.. boIo<o YO' ,an 11Io YO" alllol.,tI. F., ooch ..""",.._ yo. had. ftU In Ib, 1.lo"""Uo, below and 0""" a copy 01 "",h ..b<o._.....iRod 1e-13.1. II yoo .need mot. .paoo, attach Q 'cparoto .heel. b"".'\ D"". .A.. IJ: ~ OwnttJ.QI&J, _B"ROWN &CRlS INC 19740 KENRICK AVE UKMlLE}~ 55044 ARlO CON51'RucnON 0:) BOX 446 MADISON LAKE }tfl 56063 JIREK SOD 'F~ INC 20245 BlAINE AVE FAlUilLIfJ.1.V'Li ~ '55024 RosrI roNSTRUcrION OJ PO BOX 243 'UJ<EVILl..! MN 55044 PRECISION PAVEME1ll' M\RKING INC 14280 JAMFS ~1) ROODS. t-N 55414 - .:.t~ ' o!odaN ..' .. ",.",..... ,...... (lIIod . .. ... ....,. ... oM .._.. .. boo 01 "" ........... oM ..... J......o .. ......-.. ...., r._. ..- ......_,_ -.. . 'f, _, "".... dMil... .- .......... · ........ --~,_. ........-' ..6:' ,,"d to ,,"'/ '".... ... ", _ ., ",.... CO'!/n:>CIaI", otld 10 /fIo conlroat"" agenq. c~.~ c.... hi 9 u . .. ,. '" '" .-- . of R..,. ~, ing DivIsion, Moll $101I0" 6610,51. Pall MN 551~tO tJ~.4< ~~Jt certlflcGle of Compll.....e JAR 0 8 1999 ' .1. ,......'--r". .1 JI 1I.. ( ':ONSTRUCTlON PAYMENT VOUCHE"p " Estimate Voucher No. FINAL For Period Ending: January 11, 1999 Date: January 11, 1999 Project Number: 97-17 Class of Work: Pike Lake Trail Street Improvements For: ptv of Prior Lake. To: McNamara Contracting, Inc. 5001 160th Street Rosemont, MN 55068 A. Original Contract Amount $ 403,396.00 B. Total Additions $ 18,554.00 C. Total Deductions $ 78,142.00 D. Total Funds Encumbered $ 343,808.00 E. Total Value of Work Certified to Date $ 349,458.01 F. Less Retained Percentage 0 % $ 0.00 G. Less Total Previous Payments $ 325,034. 19 H. Approved for Payment, This Report $ 24,423.81 1. Total Payments Including This Voucher $ 349,458.01 J. Balance Carried Forward $ -5,650.01 APPROVALS Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 100 % completed as of, December 31 , 1998, I hereby recommend payment of this voucher. Project Engineer Approval: /'f~ It1 - ~ U' V This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Date: M< 4/.." I; Va. em .J...~d'(;/vtC . .z/7//qq Signed By: ~~ /l,..-l~ Contractor: Title: Esr/-,'n....~ ..- CITY OF PRIOR LAKE 1l~ ~J)~~ V<n1cherCheck~ Appro~ for paym~ J(~~ Authorized Representative Date: --1.. "Z-S '1 '1 I G:\Projects\1997\ 17pikeso\payest.xls Date: /4..r, Irq 56/- t../ S 36 S - 5 Q I --.-.............---r-.. . ,J JlL, Jill Professional Association Attorneys at Law ~1- -rr F'YI CAMPBELL KNUT~ON Thomas J. Campbell Roger N. Knutson Thomas M. Scott Elliott B. Knetsch Sues an Lea Pace (651) 452-5000 Fax (651) 452-5550 Joel J. Jamnik Andrea McDowell Poehler Matthew K. Brokl * John F. Kelly Matthew J, Foli Marguerite M. McCarron * Also licensed in Wisconsin December 23, 1998 Mr. Christopher E. Morris O'Neill, Traxler, Zard, Neisen & Morris, Ltd. 222 East Main Street P. o. Box 105 New Prague, Minnesota 56071 Re: Holy Cross Lutheran Church vs. City of Prior Lake Court File No. 97-20534 Dear Mr. Morris: Enclosed herewith and served upon you by United States mail please find Respondent's Post-Trial Brief and proposed Findings of Fact, Conclusions of Law, Order for Judgment and Judgment in the above-entitled matter. Best regards, CAMPBELL KNUTSON Professional Association T~~SM: s~ A ,\ By: TMS:cjh Enclosure ~~i.~iJV- DEe 2 8 1998 Suite 317 . Eagandale Office Center . 1380 Corporate Center Curve · Eagan, MN 55121 .1 JI. Jill 11/(-=(' 0A-Y ~..~ 10-; s 6 CrA;.? ~c} 0-~~~ I'-Ak. 6 ~W' ---- December 21, 1998 Mr. Frank Boyles City Manager City of Prior Lake Dear Mr. Boyles, This letter is to inform you that Holy Cross Lutheran Church objects to the proposed amount of the re-assessment for City Project 1I>J7 - 17, Pike Lake Trail, on the grounds that the proposed assessment exceeds the increase in market vaiue occasioned by the improvement. Since the original assessment is being adjudicated by District Court, this hearing is of no consequence. inc el\\fJv'^\<-____ J ck Hunter Pr sident Holy Cross Lutheran Church CC: Mr. Chris Morris ".&, .u. ,011.. .,. I STATE OF MINNESOTA DISTRICT COURT COUNTY OF SCOTT FIRST JUDICIAL DISTRICT CASE TYPE: 14-0ther Civil Court File No. 97-20534 Holy Cross Lutheran Church, Appellant, RESPONDENT'S POST-TRIAL BRIEF. vs. City of Prior Lake, a municipal corporation, Respondent. Th'!'KODUCTION The City submits this post-trial brief in support of an order upholding the City's assessment of Appellant's property in the amount of $79,382.50. A proposed order is also enclosed. STATEMENT OF FACTS, 1. On November 3, 1997, the Prior Lake City Council approved Resolution 97-97 adopting assessments for Project 97-17 Pike Lake Trail Improvements. (Ex. 4, Tab 28) 2. Appellant's property was initially assessed as follows: Street Water Trunk Water $ 85,484.50 $ 14,509.20 $ 11.007.50 TOTAL $111,001.20 68188 ~ r 3. Subsequent to the original November 3, 1997 assessment, the City Council in 1998 approved two change orders which reduced the total Pike Lake Trial project costs from $520,709.80 to $423,657.00. (Ex. 4, Tab 18 and Ex. 5) 4. The reduced contract amount results in the following reassessment of Appellant's property in accordance with the City's assessment policy: Street Water $64,873.20 $14.509.20 TOTAL $79,382.50 (Ex. 5) 5. Project 97-17 transformed Pike Lake Trail from a gravel road to a 9-ton, minor collector, paved urban street with curb and gutter, storm sewer and sidewalks. (Ex. 4, Tab 3) 6. Project 97-17 also extended municipal water service tothe Church property. (Ex. 4, Tab 3) 7. The 6.3 acre Church property has 565 feet of frontage along Pike Lake Trail. It is being assessed on a front footage basis for the street and water improvements. (Ex. 5) 8. In 1993, Appellant decided to construct its church building prior to the general extension of sewer and water to its immediate area. The City entered into an agreement with the Church, whereby the City extended sewer to service the Church property. (Ex. 7) 9. The City paid a contractor $48,892.70 in 1993 for the Church sanitary sewer extension. (Ex. 8) The Church was charged $19,600.00 for this sanitary sewer lateral. (Ex. 7) 68188 -2- _ .. "'1m r I" 10. Appellant also paid the required $8,648.75 sanitary sewer trunk charge, $46,030.72 storm water management fee and $4,403.00 street collector fee when the property was developed with the Church building and related improvements in 1993. (Ex. 7) 11. Appraiser Jason L. Messner testified on behalf of the City. Appraiser Frank J. Wicker testified for the Church. Both appraisers utilized a so-called "land- only" approach to determining the before and after value of the property. 12. Appraiser Messner testified that the Land Value of the Property in the before situation without any public utilities or street improvements was $170,000.00. The After Value with urban street and all public utilities was $327,000.00, with a difference in value or special benefit of $157,000.00. Appraiser Messner included in his After Value of his comparable properties the storm water management fee paid by purchasers, and, to be consistent, deducted the amount paid by the Church in 1993 for this development cost. After deducting the $74,279.00 ($19,600.00, sanitary sewer lateral; $8,648.75, sanitary sewer trunk and $48,892.70), Messner testified to a remaining special benefit of $83,000.00. 13. Appraiser Wicker testified to a Before Value of $88,000.00 ($14,000/acre) and an After Value of $188,000.00 ($30,000/acre), with a special benefit of $100,000.00. Wicker admitted that his "After Value" of $30,000.00 an acre did not include the cost of street upgrades, sanitary sewer, water or stvuu sewer charges. None of the improvements which the Church property has after this project were included in the $30,000.00 per acre comparable sales valuation. 68188 -3- ~, " r 14. Appraiser Messner arrived at a per acre "After Value" of $52,000.00 per acre by utilizing comparable properties which included in the purchase price the cost of the improvements which the Church now has as a result of this project and the storm water management fee paid by the Church in 1993. ARGUMENT I. BOTH M'.tN\ISERS SUPPORT A SPECIAL BENEFIT ItlAT EXCEEDS TJ:lli $79,382.50 ASSESSMENT The City is authorized to assess the cost of an improvement project to abutting property to the extent that the project causes the property to increase in market value. There is a presumption that the assessment is proper. Minn. Stat. 429.051; Buettner v. Citv of St. Cloud, 227 N.W.2d 199 (Minn. 1979). The property owners have the burden of proving the assessments are excessive. Villa2:e of Edina v. Joseoh, 119 N.W.2d 809, 817 (Minn. 1962). In Schumacher v. Citv of Excelsior, 427 N.W.2d 235, 238 (Minn. 1988), explained "usually, if property receives better municipal service and amenities, it is worth more. It is on the basis of this common experience that the law confers prima facie validity to a city's determination of assessable benefit. " The Church paid the $46,030.72 storm water management fee in 1993 when the City provided sanitary sewer to the property and the church was constructed. Appraiser Messner added this development cost paid by all developing properties to arrive at his $52,000.00 per acre After Value. He then gives the Church the full deduction for this fee, along with the sanitary sewer fees, which were paid in 1993, 68188 -4- ,.. 111 1m , T r I., arriving at a special benefit for the Pike Lake Trail project in the amount of $83,000.00. Appraiser Wicker, on the other hand, flat out admits that his $30,000.00 per acre After Value, does not reflect the fact that all utilities are installed and paid for in the Church "After" situation. In spite of the fact that his After Value does not reflect the payment of any such development costs, he deducts all of the development costs paid by the Church in 1993. Wicker's $30,000.00 per acre reflects the value of property that has all utilities available, but not yet installed and paid for. It represents the per acre price a buyer pays who is additionallv assuming all the development costs which the Church has in place as a result of this improvement. The one truly comparable sale that Wicker reported but discarded as being an "out-lying" sale is his Comparable Number Four, which has an adjusted price per acre of $57,050.00 (Ex. 2, p. 60). This comparable, unlike his other five comparables which have an adjusted per acre sale price of between $16,000.00 and $44,000.00, reflects all utilities installed and paid as part of the purchase price. Its $57,050.00 per acre value is in line with Appraiser Messner's $52,000.00 per acre After Value of the Church property. Even utilizing this defective analysis, Wicker's appraisal shows a special benefit of $100,000.00 resulting from the provision of street, sanitary sewer and water utilities. The City is assessing $79,382.50. The Church paid $19,600.00 for its lateral sanitary sewer charge in 1993. Subtracting the $19,600.00 sanitary sewer charge paid in 1993 from the special benefit of $100,000.00, the resulting $80,400.00 68188 -5- r ." still exceeds the amount now being assessed for the street and water improvements which gives the church property full municipal services. II. l.tlli 1993 CHARGES FOR TRUNK SANITARY SEWER AND STORM W ATE.K FEES SHOULD NOT BE CONSIDERED IN DETERMINING SPECIAL BENEf41T Appraiser Wicker testified that the special benefit to the Church property resulting from the street improvement and extension of sanitary sewer and water totaled $100,000.00. In 1993, the Church paid $19,600.00 for the lateral sanitary sewer charge. It is now being assessed $79,382.50 for street and water. As stated above, the other charges paid by the Church in 1993 are as follows: Sanitary Sewer Trunk 6.29 acres ($1,375/acre) $ 8,648.75 Storm Water Management Fee 6.29 acres ($. 168/square foot) 43,560 square ft./acre $46,030.72 N either of these charges should be considered in determining the special benefit relating to the provision of municipal services to the Church property. The sanitary sewer trunk charge relates to an area-wide system cost for providing trunk sewer lines. It does not relate to the specific costs of extending the lateral sewer line to specifically service the Church property. It was collected pursuant to Minn. Stat. 444.075, subd. 3, which does not require the showing of any special benefit to the property. Cr9wn Cork & Seal Co.. Inc. v. City of Lakeville. 313 N.W.2d 196, 201 (Minn. 1981). 68188 -6- ::t II IDI 1 r Specifically, Minn. Stat. 444.075, subd. la. defines systems covered by the statute to be (1) waterworks, (ii) seWage systems, and (iii) storm sewer systems. Minn. Stat. 444.075, subd. 3 states: To pay for the construction, reconstruction, repair, enlargement, improvement, or other obtainment and the maintenance, operation and use of the facilities, the governing body of a municipality or county may impose just and equitable charges for the use and for the availability of the facilities and for connections with them and make contracts for the charges as provided in this section. The storm sewer area charge relates to the infrastructure costs that cities incur in dealing with surface water drainage and treatment resulting from run-off. It does not have anything to do with the street, sanitary sewer and water improvements which Appraiser Wicker addresses in his before and after valuations. This is a fee also authorized by Minn. Stat. 444.075 that does not require a showing of special benefit. Crown Cork & Seal Co.. Inc, 313 N.W.2d at 201. CONCLUSIONS The assessment is presumed valid. Appellant has the burden of proof. The City carefully applied its written assessment policy. The City Assessment Review Committee reviewed the proposed assessment. (Ex. 4, Tab 26, p. 3) The Council specifically considered the special benefit when it adopted the assessment, and made a specific finding that each parcel was benefited by the proposed improvement by at least the amount of the assessment. (Ex. 4, Tab 26, p. 3; Tab 27) The appraisal testimony fully supports the revised assessment amount of $79,382.50. Appellants have not met their burden of proof. Appellant's appraiser admits that his comparable "After" Sales do not have street, sewer and water 68188 -7- T STATE OF MINNESOTA DISTRICT COURT COUNTY OF SCOTT FIRST JUDICIAL DISTRICT .CASE TYPE: 14-0ther Civil Court File No. 97-20534 Holy Cross Lutheran Church, Appellant, vs. FINDINGS OF FACT. CONCLUSIONS OF LAW. ORDER FOR JUDGMENT AND JUDGMENT City of Prior Lake, a municipal corporation, Respondent. The above matter came on for trial before the undersigned at the Courthouse in Shakopee, Minnesota on December 9, 1998. Appearing for Appellant was Christopher E. Morris, O'Neill, Traxler, Zard, Neisen & Morris, Ltd., Law Building, 222 East Main Street, P.O. Box 105, New Prague, Minnesota 56071. Appearing for Respondent was Thomas M. Scott, Campbell Knutson, Professional Association, Suite 317, 1380 Corporate Center Curve, Eagan, Minnesota 55121. Based upon all the evidence, and having carefully considered the arguments of council, the Court makes the following: FINDINGS OF FACT 1. On November 3, 1997, the Prior Lake City.Council approved Resolution 97 -97 adopting assessments for Project 97-17 Pike Lake Trail Improvements. 2. Appellant's property was initially assessed as follows: 68199 1 If Inl r TOTAL $ 85,484.50 $ 14,509.20 $ 11.007.50 $111,001.20 Street Water Trunk Water 3. Subsequent to the original November 3, 1997 assessment, the City Council in 1998 approved two change orders which reduced the total Pike Lake Trial project costs from $520,709.80 to $423,657.00. 4. The reduced contract amount results in the following reassessment of Appellant's property in accordance with the City's assessment policy: Street Water $64,873.20 $14.509.20 TOTAL $79,382.50 5. Project 97-17 transformed Pike Lake Trail from a gravel road to a 9-ton, minor collector, paved urban street with curb and gutter, storm sewer and sidewalks. 6. Project 97-17 also extended municipal water service to the Church property. 7. The 6.3 acre Church property has 565 feet of frontage along Pike Lake Trail. It is being assessed on a front footage basis for the street and water improvements. 8. In 1993, Holy Trinity decided to construct its church building prior to the general extension of sewer and water to its immediate area. The City entered into an agreement with the Church, whereby the City extended sewer to service the Church property . 9. The City paid a contractor $48,892.70 in 1993 for the Church sanitary 68199 -2- 1 II 111I r sewer extension. The Church was charged $19,600.00 for this sanitary sewer lateral. 10. Holy Trinity also paid the required $8,648.75 sanitary sewer trunk charge, $46,030.72 storm water management fee and $4,403.00 street collector fee when the property was developed with the Church building and related improvements in 1993. 11. Appraiser Jason L. Messner testified on behalf of the City. Appraiser Prank J. Wicker testified for the Church. Both appraisers utilized a so-called "land- only" approach to determining the before and after value of the property. 12. Appraiser Messner testified that the Land Value of the Property in the before situation without any public utilities or street improvements was $170,000.00. The After Value with urban street and all public utilities was $327,000.00, with a difference in value or special benefit of $157,000.00. Appraiser Messner included in his After Value of his comparable properties the storm water management fee paid by purchasers, and, to be consistent, deducted the amount paid by the Church in 1993 for this development cost. After deducting the $74,279.00 ($19,600.00, sanitary sewer lateral; $8,648.75, sanitary sewer trunk and $48,892.70), Messner testified to a remaining special benefit of $83,000.00. 13. Appraiser Wicker testified to a Before Value of $88,000.00 ($14,000/acre) and an After Value of $188,000.00 ($30,000/acre), with a special benefit of $100,000.00. Wicker admitted that his "After Value" of $30,000.00 an acre did not include the cost of street upgrades, sanitary sewer, water or storm sewer charges. N one of the improvements which the Church property has after this project were included in the $30,000.00 per acre comparable sales valuation. 68199 -3- 1 UI 111I 14. Appraiser Messner arrived at a per acre "After Value" of $52,000.00 per acre by utilizing comparable properties which inCluded in the purchase price the cost of the improvements which the Church now has as a result of this project and the storm water management fee paid by the Church in 1993. CONCLUSIONS OF LAW 1. The special benefit to the property exceeds the City's proposed reassessment of the subject property for Project 97-17 Pike Lake Trail Improvement in the amount of $79,382.50 (street - $64,873.20 plus water - $14,509.20). 2. The City is directed to reassess the subject property pursuant to Minn. Stat. 429.071, subd. 2 in the amount of $79,382.50. LET JUDGMENT BE ENTERED IMMEDIATELY, WITHOUT ANY STAY. Dated: BY THE COURT: Honorable Rex D. Stacey Judge of District Court . 68199 -4- . II IIiI TIT 1 1- I CONSTRUCTION PAYMENT VOUCHE. Estimate Voucher No. 5 For Period Ending: October 6, 1998 Date: October 13, 1998 Project Number: 97-17 Class of Work: Pike Lake Trail Street Improvements For: Citv of Prior Lake To: McNamara Contracting, Inc. 5001 160th Street Rosemont, MN 55068 A. Original Contract Amount $ 403,396.00 B. Total Additions $ 0.00 C. Total Deductions $ 78,142.00 D. Total Funds Encumbered $ 325,254.00 E. Total Value of Work Certified to Date $ 342,141.26 F. Less Retained Percentage 5 % $ 17,107.06 G. Less Total Previous Payments $ 306,666.90 H. Approved for Payment, This Report $ 18,367.30 I. Total Payments Including This Voucher $ 325,034.20 J. Balance Carried Forward $ 219.80 APPROVALS Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 99 % completed as of, October 13 , 1998, I hereby recommend payment of this voucher. ~;J!I 1d/~ ~ I (I This is to certify that to the best of my knowledge, information, and belief, the quantittes and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Project Engineer Approval: Contractor: /l-A<.4)t).m~ r.tJnf.mcf..') ::J:i,(... Signed By: Date: / {) - ? D- Q'3 Title: r7~-:J h?/5;1/l , , ~ CITY OF PRIOR LAKE Approve;tjbr Pa~ent~ A~~~' Authorized Representative ~w ~cf)~-tt Voucher Checked By Date: !D!J3!98 Date: 10),3/9f'.- G:\Projects\l997\ 17pikeso\payest.xls 56/- 48300 - 56 I .....1 1111 .J H JI.. Jan 08 99 16:20 No.008 P.U4 6123225944 P.04~~v. I l:. L : t1:NAMffiA CO-lTRflCT It.jG 1 He. JAN-08-1999 15: 10 J ' tlEC-1~.19te 1520' MCNAMARA CCM'RACTlNG INC. lVll1'\ll"r.;:,UJ../\ U~.fJW'LU1~W U! J.\t::vt:1t~~ Withholding Affidavit for Contracto'rs TAlt "H,,*,';', mil" &. opprav.J by u.. MI",,",,1tJ D&po,',nwn' 0' l.w.nu. b~fo,.lh, j I/o'. 01 Mnl1eso/tl or cmy 0/'" jLJ~dM~'o"J c:on mo~' (rn,,' P"YIJI'''' tr:J con'rac'or!. 612322594q P,02/~ - IC.l34 'II.... ~ " ,.,r/l' cJtQ(~. nIl ~ bt ro" ,"""ng'l1W fw flr.JlJl/"II.. Clllllp""rllorm. ',' rc.;;;;;;;:;;,. - - - - - - - -- - - - - - "'\ Po;t'- phe"l .t-; I JIlEK SOD 'AiM, INC I lCDs,1 ,Yen). ~ .,. I A.,,,,,,, I -r.;r___~ ..... I 2014.5 BWNli: AVE I . ~ 32,1.48.20 fj.. '011. *11 lie elli, I "vnllll!I dll' to::~.: \... .!~W.L~ _ _ _ ~ _ _ >>~_ _ _,..I $ 1.607.41 I A4L0....ra "'''..'11'.. I.. r.I IU/llb., 2~~~ 09/97 M-n"'1VIIf "",It '""Id 07/98 '~"~" ~ rto".lllul'IIttf "'~"d Iocol!,)" . ::97~49.5.0~..27-17 l!'ISli PO~'T RD, WSHI.M RD. PINE lAKE 1'R J't, frelnl -II ...lIdru. C!J ~ ! CITY OF PllWR lAKE 16200 F.AOU: ClEEK AVE SE PRIOR l';KE ': ;1I~ Dldrou"-_p/..."'lrllllllllajlfo!MI' t1VIl 0.... 1I11t....ho~..~) . ..I.-,., . .~..t Ji" 1~5jh , .~~'i, aedc /he b.. IbDt Je.s~,'/;,,, yrllJ/ Invo/V8ffl'1I11n tb, pro/ea. anti ~n '" 0" InformaMolI rlqlltN .d. "i~ CJ SDle eontn;n:tar , . :.i:~ ~ Sube_tredar , ~ ~I "1_, .. atl\lftl,.., .11. ..,... )/... , '~~~:1 ~. CON'l1&.tllt<<; I ~~ H_ ." ,,;:'1 160th ST-~- RO;~ ~ SS06a ..,.: .t"': ". '. . ~i J'":~.: . ..- : ..' . , .. :..~ , . 1-: ...r~ .... (: ~,~,!J . "';':.: .' h ,.~ .. ;;i ."-:-; ", ...... ,.~ o Prim. _ntrador-If yell lubcol\lrM'ad au, till)' work on '1\11 plojacf, all or your Jubt on/rOetor' mu.t nI. th,tr own IC-' 3A aFfldbvlu Q"d hellO Ihom cerllll.d by th., Oepofhnent of R.",,"u, ~'~f' YDlI ear hr. your affidavit. For each JubconlraO/Dr yow had, ". 'n tnlllnformlltioll bll.,~ arid attach Q copy of eath ,ubcPI\" :IdOl" ~trll~.d Ie., 34. If }IOU need /I1Of' Ipol:8. aJlQch Q 5lllpafOl. .heel. IIhI"'d...cp, A4iw.' Own.I'JOtfrur . . ... . r'. . ~. .,(,; ',l.t. .' ,.!J '.: ",'", I .,.1 Certiflcat. of C:ompUan~e IOled on ..corda pf th. Mln"'''OIO Oeporlm_n' of R.verlllO, / etr6#Y Ihat Is,. cOIIlracfor ~o hOI': " cI thiJ ...,ft~{,ote haJ MAlI,d Qtf the ,equ/r."'tnls 6f MlllOhola 6tQlu'u .290. 92 "lid 190.91 conc.mln9 Ihe wr'''''alclln: ~\'MJnn..alD Inc:o",. lax 'I'D'" Iwwog.. paldao employtlft5 relatIng 10 COl\lrac' ..rricn wilh ,It. ,'al. of MJ""hO/" o'ldlor III IUtJdivl,Io".. ~'IIJI'"'O".7l'~ [)~ Po_ .JAtLO ~ 1q~q '\ .. rJ.. "0110 I~, .. lilts} .""IM...'..,.w......... 'Ilk,. "'_ -Inll.. ",.MI"'I~l .; .. - .... .U ~ONSTRUCTION PAYMENT VOU(;nE~ Estimate Voucher No, 4 For Period Ending: June 15, 1998 Date: June 25, 1998 Project Number: 97-17 Class of Work: Pike Lake Trail Street Improvements For: Citv of Prior Lake To: McNamara Contracting, Inc, 5001 160th Street Rosemont, MN 55068 A, Original Contract Amount $ 403,396.00 B, Total Additions $ 0.00 C. Total Deductions $ 78,142.00 D, Total Funds Encumbered $ 325,254,00 E, Total Value of Work Certified to Date $ 322,807,26 F, Less Retained Percentage 5 % $ 16,140.36 G. Less Total Previous Payments $ 226,498.39 H. Approved for Payment, This Report $ 80,168,50 I. Total Payments Including This Voucher $ 306,666.90 J. Balance Carried Forward $ 18,587,10 APPROVALS Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 95 % completed as of, June 15 , 1998, I hereby recommend payment of this voucher, Project Engineer Appmval: ~~. ~ This is to certify that to the best of my knowledge, information, and belief, the quantitle's and values of work certified herein is a fair approximate estimate for the period covered by this voucher, Contractor: (V1ti)fA no..su. C{)P,.~-Ilc"JJt.l., Signed By: 0 ~ Jt...~ ~ ' fI Date: ~ - ~l..9 - 6t~ Title: ES+t~ lL -+""1\.11. J CITY OF PRIOR LAKE ~~~ ._~ Authorized Representative "'- :);MSI,t,,-y-d Mcn~ -'- .........- I V oucher Checked By -- ~ I:J.~ / q 8 Date: Date: , /~/'fe- 50( - liB 30 S-501 r --"'..~._-_._--~. PROJECT: FISH POINT ROAD SAP 201-105-06 PIKE LAKE ROAD SAP 201-114-03 MUSHTOWN ROAD OWNER: CITY OF PRIOR LAKE, MINNESOTA OPENING DATE: AUGUST 4,1997 ENGINEER: HOWARD R. GREEN COMPANY DATE JUNE 15, 1998 =l_isa.~~g! PA Y ESTIMA TE NUMBER 4 ~ I I SCHEDULE 1.0 FISH POINT ROAD (STREET) 1 MOBILIZATION LS 1 $ 4,000,00 0,00 $ 2 COMMON EXCAVATION CY 1105 $ 5,00 0,00 $ 3 SUBGRADE EXCAVATION CY 500 $ 6,50 0,00 $ 4 TOPSOIL BORROW CY 1066 $ 7,00 1000,00 $ 5 SUBGRADE PREPARATION RDSTA 12 $ 125,00 0,00 $ 6 GEOTEXTILE FABRIC TYPE V SY 1500 $ 1,00 0,00 $ 7 AGGREGATE BASE, CLASS 5 TON 3850 $ 7,25 397,16 $ 8 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 $ 7,25 0,00 $ 9 TYPE 41A, 2 1/2" BITUMINOUS PATHWAY TON 300 $ 42,00 179,00 $ 10 TYPE 41A, WEAR COURSE MIXTURE TON 700 $ 24,50 614,28 $ 11 TYPE 31B, BASE COURSE MIXTURE TON 1410 $ 21,00 0,00 $ 12 BITUMINOUS MATERIAL FOR TACK COAT GAL 220 $ 1,50 200,00 $ 13 ADJUST GATE VALVE EA 4 $ 100,00 4,00 $ 14 ADJUST FRAME AND RING CASTING EA 8 $ 165,00 8,00 $ 15 4" CONCRETE WALK SF 5786 $ 1,70 5671,00 $ 16 CONCRETE CROSSWALK SPECIAL SF 360 $ 4,20 308,00 $ 17 CONCRETE CURB & GUTTER, B618 LF 4600 $ 6,20 0,00 $ 18 CONCRETE PEDESTRIAN RAMP EA 8 $ 190,00 8,00 $ 19 CONCRETE TRIANGULAR VALLEY GUTTER SF 150 $ 5,25 0,00 $ 20 CONCRETE VALLEY GUTTER LF 75 $ 15,50 0,00 $ 21 PERMANENT BARRICADE EA 2 $ 325,00 0,00 $ 22 PAVEMENT STRIPING, 4" EQUIV, WIDTH LF 5000 $ 0,50 3237,00 $ 23 FURNISH & INSTALL SIGN PANELS, TYPE C SF 102 $ 23,00 0,00 $ 24 BALE CHECK EA 30 $ 15,00 0,00 $ 25 SILT FENCE, HEAVY DUTY LF 525 $ 2,50 0,00 $ 26 CATCH BASIN SEDIMENT BARRIER EA 17 $ 125,00 0,00 $ 27 DUST CONTROL WATER MGAL 60 $ 15,00 0,00 $ Pay Estimate 4 Page 1 7,000,00 2,879.41 7,518,00 15,049,86 300,00 400,00 1,320,00 9,640,70 1,293,60 1,520,00 1,618,50 I , <:11-4 .. .. r to 1,00 $ 4,000,00 1105,00 $ 5,525,00 0,00 $ 1000,00 $ 7,000,00 12,00 $ 1,500,00 0,00 $ 3409,85 $ 24,721.41 0,00 $ 179,00 $ 7,518,00 614,28 $ 15,049,86 1009.49 $ 21,199,29 225,00 $ 337,50 4,00 $ 400,00 8,00 $ 1,320,00 5671,00 $ 9,640,70 308,00 $ 1,293,60 4541,00 $ 28,154,20 8,00 $ 1,520,00 66,00 $ 346,50 47,50 $ 736,25 2,00 $ 650,00 5143,00 $ 2,571,50 102,00 $ 2,346,00 0,00 $ 607,00 $ 1,517,50 0,00 $ - ._-". ...-. 0,00 $ PAYESTXLS a_E_aes 28 SEED MIXTURE 500 AC 1,1 $ 1,000,00 0,28 $ 280,00 0,53 $ 530,00 29 SODDING, LAWN & BOULEVARD SY 2350 $ 2,00 5085,00 $ 10,170,00 5085,00 $ 10,170,00 30 WOOD FIBER BLANKET TYPE REGULAR SY 1825 $ 1,00 80,00 $ 80,00 1298,00 $ 1,298,00 31 TRAFFIC CONTROL LS 1 $ 1,500,00 0,00 $ - 1,00 $ 1,500,00 32 SUBGRADE DENSITY TEST, INPLACE EA 2 $ 55,00 0,00 $ - 2,00 $ 110,00 33 CLASS 5 GRADATION TEST EA 2 $ 55,00 0,00 $ - 2,00 $ 110,00 34 CLASS 5 PROCTOR TEST EA 1 $ 100,00 0,00 $ - 1,00 $ 100,00 35 CLASS 5 DENSITY TEST, INPLACE EA 3 $ 55,00 0,00 $ - 3,00 $ 165,00 36 CONCRETE TESTING EA 9 $ 75,00 2,00 $ 150,00 6,00 $ 450,00 37 BITUMINOUS AIR VOID TEST EA 6 $ 100,00 2,00 $ 200,00 4,00 $ 400,00 38 BITUMINOUS CORE DENSITY TEST EA 6 $ 25,00 0,00 $ - 2,00 $ 50,00 T SCHEDULE 1,0 FISH POINT ROAD (STREET) - TOTAL SCHEDULE 2,0 FISH POINT ROAD (STORM SEWER) 1 12" RC PIPE SEWER DESIGN 3006 CLASS V LF 2 15" RC PIPE SEWER DESIGN 3006 CLASS V LF 3 18" RC PIPE SEWER DESIGN 3006 CLASS III LF 4 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 5 CONNECT TO EXISTING MANHOLE EA 6 CONNECT TO EXISTING PIPE EA 7 CONST DRAINAGE STRUCTURE, DESIGN 48-4020 EA 8 CONST DRAINAGE STRUCTURE, DESIGN SPECIAL EA 9 SUBGRADE PROCTOR EA 10 SUBGRADE DENSITY - INPLACE EA T SCHEDULE 2,0 FISH POINT ROAD (STORM SEWER) - TOTAL SCHEDULE 3,0 PIKE LAKE TRAIL (STREET) 1 MOBILIZATION LS 2 CLEARING AC 3 GRUBBING AC 4 CLEARING EA 5 GRUBBING EA 6 SALVAGE AND REINSTALL CMP LF 7 REMOVE BITUMINOUS SURFACE SY 8 COMMON EXCAVATION CY 9 SUBGRADE EXCAVATION CY Pay Estimate 4 480 $ 870 $ 70 $ 200 $ 1 $ 1 $ 9 $ 9 $ 1 $ 8 $ 1 $ 0,9 $ 0,9 $ 28 $ 28 $ 30 $ 280 $ 4960 $ 500 $ 23,75 25,25 27,00 10,00 500,00 475,00 1,050,00 825,00 85,00 40,00 3,000,00 2,500,00 1,250,00 150,00 110,00 15,00 3,00 3,50 5,00 Page 2 ... = ~ $ 59,420,07 $ 152,230,31 0,00 $ - 448,00 $ 10,640,00 0,00 $ - 867,00 $ 21,891,75 0,00 $ - 74,00 $ 1,998,00 0,00 $ - 0,00 $ 0,00 $ - 1,00 $ 500,00 0,00 $ 1,00 $ 475,00 0,00 $ - 9,00 $ 9,450,00 0,00 $ 9,00 $ 7.425,00 0,00 $ - 1,00 $ 85,00 0,00 $ - 5,00 $ 200,00 $ - $ 52,664,75 0,00 $ 1,00 $ 3,000,00 0,00 $ 1,60 $ 4,000,00 0,00 $ - 1,60 $ 2,000,00 0,00 $ - 28,00 $ 4,200,00 0,00 $ - 28,00 $ 3,080,00 0,00 $ - 10,00 $ 150,00 0,00 $ 60,00 $ 180,00 0,00 $ - 4960,00 $ 17.360,00 0,00 $ - 1074,00 $ 5.370,00 PAYESrXLS 10 SALVAGE TOPSOIL RESPREAD 11 MODIFIED SELECT GRANULAR BORROW 12 GEOTEXTILE FABRIC TYPE V 13 AGGREGATE BASE, CLASS 5 14 3" MINUS 100% CRUSHED QUARRY LIMESTONE 15 3" BITUMINOUS DRIVEWAY RESTORATION 16 TYPE 41A, WEARING COURSE MIXTURE 17 TYPE 31B, BASE COURSE MIXTURE 18 BIT, MATERIAL FOR TACK COAT 19 MODULAR BLOCK RETAINING WALL 20 ADUST FRAME AND RING CASTING 21 4" CONCRETE WALK 22 CONCRETE CURB AND GUTTER. DESIGN B618 23 CONCRETE DRIVEWAY PAVEMENT 24 CONCRETE PEDESTRIAN RAMP 25 TRAFFIC BARRIER DESIGN A8307 26 FURNISH & INSTALL SIGN PANELS, TYPE C 27 SILT FENCE, HEAVY DUTY 28 CATCH BASIN SEDIMENT BARRIER 29 WOOD FIBER BLANKET 30 SEED MIXTURE 500 31 SODDING, LAWN & BOULEVARD 32 DUST CONTROL WATER 33 PAVEMENT STRIPING, 4" EQUIV, WIDTH 34 TRAFFIC CONTROL 35 CLASS 5 GRADATION TEST 36 CLASS 5 PROCTOR TEST 37 CLASS 5 DENSITY-INPLACE 38 CONCRETE TESTING 39 BITUMINOUS AIR VOIDS 40 BITUMINOUS CORE DENSITY 41 SUBGRADE DENSITY-INPLACE T SCHEDULE 3,0 PIKE LAKE TRAIL (STREET) - TOTAL SCHEDULE 4.0 PIKE LAKE TRAIL (TRUNK STORM SEWER) 1 4" PERFORATED THERMOPLASTIC PIPE DRAIN 2 RANDOM RIP RAP CLASS III Pay Estimate 4 CY CY SY TON TON SY TON TON GAL SF EA SF LF SY EA LF SF LF EA SY AC SY MGAL LF LS EA EA EA EA EA EA EA LF CY 1080 $ 1920 $ 1500 $ 4075 $ 930 $ 85 $ 550 $ 900 $ 230 $ 6000 $ 3 $ 6400 $ 2700 $ 30 $ 2 $ 570 $ 103 $ 1200 $ 13 $ 50 $ 1 $ 1600 $ 35 $ 6225 $ 1 $ 2 $ 1 $ 3 $ 4 $ 6 $ 6 $ 4 $ 360 $ 8,5 $ Page 3 2,50 7,00 1,00 7,25 7,75 42,00 25,00 22,00 1,50 14,30 160,00 1,75 6,30 28,00 190,00 13,00 23,00 2,75 125,00 3,00 500,00 2,00 20,00 0.45 55,00 55,00 100,00 55,00 75,00 100,00 25,00 55,00 9,50 53,00 845,00 $ 0,00 $ 0,00 $ 1078,15 $ 0,00 $ 160,00 $ 0,00 $ 678,01 $ 45,00 $ 386,00 $ 4,00 $ 4910,00 $ 2660,00 $ 49,10 $ 5,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 2,00 $ 0,00 $ 1,00 $ 4,00 $ 2,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 2,112,50 7,816,59 6,720,00 14,916,22 67,50 5,519,80 640,00 8,592,50 16,758,00 1,374,80 950,00 110,00 55,00 300,00 200,00 $ 66,132,91 i ~a5_ 845,00 $ 2350.40 $ 0,00 $ 4312,06 $ 2142,66 $ 160,00 $ 0,00 $ 678,01 $ 45,00 $ 386,00 $ 4,00 $ 4910,00 $ 2660,00 $ 49,10 $ 5,00 $ 0,00 $ 0,00 $ 1923,00 $ 13,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 1,00 $ 2,00 $ 0,00 $ 1,00 $ 4,00 $ 2,00 $ 0,00 $ 2,00 $ 350,00 $ 8,50 $ .. 2,112,50 16,452,80 31,262,44 16,605,62 6,720,00 14,916,22 67,50 5,519,80 640,00 8,592,50 16,758,00 1,374,80 950,00 ,--; 5,288,25 1,625,00 55,00 110,00 55,00 300,00 200,00 110,00 $ 169,055.42 3,325,00 450,50 PAYESrXLS i_iil5EEE- 3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 48-4020 EA 2 $ 1,050,00 0,00 $ - 3,00 $ 3.150,00 4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 60-4020 EA 3 $ 1,490,00 0,00 $ - 3,00 $ 4,470,00 5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 84-4020 (SUMP) EA 1 $ 2,400,00 0,00 $ - 1,00 $ 2,400,00 6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN SPECIAL EA 8 $ 825,00 0,00 $ - 7,00 $ 5,775,00 7 CONNECT TO EXISTING STORM SEWER MANHOLE EA 1 $ 475,00 0,00 $ - 1,00 $ 475,00 8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF 127 $ 23,00 0,00 $ - 108,00 $ 2,484,00 9 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 292 $ 24,30 0,00 $ - 293,00 $ 7,119,90 10 18" RC PIPE SEWER, DESIGN 3006 CLASS III LF 552 $ 26,30 0,00 $ - 555,00 $ 14,596,50 11 21"RCPIPESEWER,DESIGN3006CLASSIII LF 122 $ 28,50 19,20 $ 547,20 41,20 $ 1,174,20 12 24" RC PIPE SEWER, DESIGN 3006 CLASS III LF 255 $ 30,30 0,00 $ - 255,00 $ 7,726,50 13 27" RC PIPE SEWER, DESIGN 3006 CLASS III LF 184 $ 36,60 0,00 $ - 184,00 $ 6,734.40 14 36" RC PIPE SEWER, DESIGN 3006 CLASS III LF 150 $ 50,50 0,00 $ - 152,00 $ 7,676,00 15 36" RC PIPE APRON EA 1 $ 1,250,00 0,00 $ - 1,00 $ 1,250,00 16 SUBGRADE PROCTOR EA 1 $ 80,00 0,00 $ - 0,00 $ 17 SUBGRADE DENSITY _ INPLACE EA 8 $ 38,00 0,00 $ - 0,00 $ 18 PIPE FOUNDATION MATERIAL CY 50 $ 13,70 46,70 $ 639,79 46,70 $ 639,79 T SCHEDULE 4,0 PIKE LAKE TRAIL (STORM SEWER) - TOTAL SCHEDULE 5,0 PIKE LAKE TRAIL (WATERMAIN) 1 CONNECT TO EXISTING WATERMAIN 2 HYDRANT WITH 6" VALVE 3 6" GATE VALVE 4 8"GATEVALVE 5 10" GATE VALVE 6 12" BUTTERFLY VALVE 7 6" DIP WATERMAIN, CLASS 52 8 8" DIP WATERMAIN, CLASS 52 9 10" DIP WATERMAIN, CLASS 52 10 12" DIP WATERMAIN, CLASS 50 11 FITTINGS 12 SUBGRADE PROCTOR 13 SUBGRADE DENSITY -INPLACE 14 PIPE FOUNDATION MATERIAL EA EA EA EA EA EA LF LF LF LF LBS EA EA CY T SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN) - TOTAL Pay Estimate 4 $ 2 $ 480,00 0,00 $ 5 $ 1,750,00 0,00 $ 1 $ 455,00 0,00 $ 1 $ 600,00 1,00 $ 1 $ 840,00 0,00 $ 2 $ 775,00 0,00 $ 163 $ 16,50 0,00 $ 48 $ 19,20 0,00 $ 773 $ 21,80 0,00 $ 553 $ 23,30 0,00 $ 3150 $ 1,55 0,00 $ 1 $ 80,00 0,00 $ 10 $ 40,00 0,00 $ 50 $ 14,00 50,00 $ $ Page 4 1,186,99 600,00 700,00 1,300,00 ~--i $ 69,446,79 2,00 $ 960,00 5,00 $ 8,750,00 1,00 $ 455,00 2,00 $ 1,200,00 1,00 $ 840,00 2,00 $ 1,550,00 141,00 $ 2,326,50 48,00 $ 921,60 794,00 $ 17,309,20 555,00 $ 12,931,50 3235,00 $ 5,014,25 1,00 $ 80,00 4,00 $ 160,00 50,00 $ 700,00 $ 53,198,05 PAYESTXLS E_-=ii=~~ SCHEDULE 6,0 PIKE LAKE TRAIL (SANITARY SEWER) 8" PVC SEWER SDR 35 (10-12') DEEP 4" PVC PIPE SEWER 8"X4" PVC WVE CONNECT TO EXISTING SANITARY SEWER MANHOLE 48" DIAMETER SANITARY MANHOLE SUBGRADE PROCTOR SUBGRADE DENSITY - INPLACE PIPE FOUNDATION MATERIAL 1 2 3 4 5 6 7 8 LF LF EA EA EA EA EA CY 427 $ 40 $ 1 $ 3 $ 2 $ 1 $ 2 $ 50 $ 16,00 8,80 29,00 500,00 1,425,00 80,00 40,00 14,00 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 50,00 $ T SCHEDULE 6,0 PIKE LAKE TRAIL (SANITARY SEWER) - TOTAL $ SCHEDULE 7,0 MUSHTOWN ROAD (STREET) 1 MOBILIZATION LS 1 $ 3,500,00 0,00 $ 2 CLEARING AC 1 $ 3,000,00 0,00 $ 3 GRUBBING AC 1 $ 1,750,00 0,00 $ 4 CLEARING EA 1 $ 400,00 0,00 $ 5 GRUBBING EA 1 $ 250,00 0,00 $ 6 COMMON EXCAVATION CY 9037 $ 2,50 0,00 $ 7 SUBGRADE EXCAVATION CY 650 $ 4,25 0,00 $ 8 SALVAGE TOPSOIL AND RESPREAD CY 2775 $ 1,75 2364,00 $ 9 GEOTEXTILE FABRIC TYPE V SY 1950 $ 1,00 0,00 $ 10 MODIFIED SELECT GRANULAR BORROW CY 3530 $ 8,00 0,00 $ 11 AGGREGATE BASE, CLASS 5 TON 3425 $ 7,25 0,00 $ 12 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 1210 $ 7,75 0,00 $ 13 TYPE 41A, WEAR COURSE MIXTURE TON 650 $ 25,00 0,00 $ 14 TYPE 31B, BASE COURSE MIXTURE TON 1025 $ 21,00 0,00 $ 15 BITUMINOUS MATERIAL FOR TACK COAT GAL 340 $ 1,50 25,00 $ 16 TYPE 41A, 2 112" BITUMINOUS PATHWAY TON 150 $ 42,00 150,00 $ 17 BITUMINOUS DRIVEWAY SY 45 $ 9,00 0,00 $ 18 ADJUST HYDRANT EA 2 $ 225,00 0,00 $ 19 ADJUST FRAME AND RING CASTING EA 1 $ 250,00 0,00 $ 20 CONCRETE CURB & GUTTER, B618 LF 4630 $ 6,15 0,00 $ 21 CONCRETE VALLEY GUTTER SF 500 $ 4,20 0,00 $ 22 SILT FENCE, HEAVY DUTY LF 1100 $ 2,75 0,00 $ 23 BALE CHECK EA 30 $ 15,00 0,00 $ 24 CATCH BASIN SEDIMENT BARRIER EA 11 $ 125,00 0,00 $ 25 SODDING, LAWN & BOULEVARD SY 10300 $ 2,00 2430,00 $ Pay Estimate 4 Page 5 700,00 700,00 4,137,00 37,50 6,300,00 4,860,00 653,00 $ 40,00 $ 1,00 $ 3,00 $ 2,00 $ 1,00 $ 2,00 $ 50,00 $ 10,448,00 352,00 29,00 1,500,00 2,850,00 80,00 80,00 700,00 .,---,-j $ 16,039,00 0,75 $ 2,625,00 1,00 $ 3,000,00 1,00 $ 1,750,00 1,00 $ 400,00 1,00 $ 250,00 7000,00 $ 17,500,00 650,00 $ 2,762,50 2364,00 $ 4,137,00 0,00 $ 2169,57 $ 17,356,56 3617,11 $ 26,224,05 3580,87 $ 27,751,74 0,00 $ 1032,59 $ 21,684,39 25,00 $ 37,50 150,00 $ 6,300,00 45,00 $ 405,00 0,00 $ 0,00 $ 4608,00 $ 28,339,20 182.40 $ 766,08 2176,00 $ 5,984,00 0,00 $ 9,00 $ 1,125,00 2430,00 $ 4,860,00 PAYESTXLS 26 SEEDING MIXTURE 500 AC 1,6 $ 1,000,00 1,23 $ 1,230,00 1,23 $ 1,230,00 27 SEEDING MIXTURE 250 AC 0,4 $ 1,000,00 0,00 $ - 0,00 $ 28 WOOD FIBER BLANKET SY 1600 $ 1,75 640,00 $ 1,120,00 640,00 $ 29 DUST CONTROL WATER MGAL 60 $ 10,00 0,00 $ - 0,00 $ 30 TRAFFIC CONTROL LS 1 $ 55,00 0,00 $ 1,00 $ 31 SUBGRADE DENSITY TEST, INPLACE EA 4 $ 55,00 0,00 $ 4,00 $ 32 CLASS 5 GRADATION TEST EA 2 $ 100,00 0,00 $ - 2,00 $ 33 CLASS 5 PROCTOR TEST EA 1 $ 55,00 0,00 $ - 1,00 $ 34 CLASS 5 DENSITY TEST, INPLACE EA 4 $ 75,00 0,00 $ - 4,00 $ 35 CONCRETE TESTING EA 5 $ 100,00 0,00 $ - 0,00 $ 36 BITUMINOUS AIR VOID TEST EA 5 $ 50,00 0,00 $ - 5,00 $ 37 BITUMINOUS CORE DENSITY TEST EA 5 $ 25,00 0,00 $ - 5,00 $ OJ '3 T SCHEDULE 7.0 MUSHTOWN ROAD (STREET) - TOTAL SCHEDULE 8,0 MUSHTOWN ROAD (STORM SEWER) 1 12" RCP CLASS V LF 2 15" RCP CLASS V LF 3 18" RCP CLASS III LF 4 24" RCP CLASS III LF 5 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 6 STORM MANHOLE 48" DIA EA 7 STORM MANHOLE 48" DIA WITH 3' SUMP EA 8 STORM MANHOLE 60" DIA WITH 3' SUMP EA 9 CATCH BASIN EA 10 18" RCP APRON EA 11 24" RCP APRON EA 12 RIPRAP CLASS III TON 13 SUBGRADE PROCTOR EA 14 SUBGRADE DENSITY - INPLACE EA 15 PIPE FOUNDATION MATERIAL CY T SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) - TOTAL CHANGE ORDER NO.1 PIKE LAKE TRAIL 1 COMMON EXCAVATION CY 2 SILT FENCE LF 3 CLEARING AC Pay Estimate 4 293 $ 28 $ 159 $ 44 $ 1670 $ 2 $ 1 $ 1 $ 7 $ 1 $ 1 $ 15 $ 1 $ 5 $ 100 $ 1000 $ 600 $ 0,23 $ 23,60 25,00 26,80 30,80 9,50 1,000,00 1,200,00 1,850,00 840,00 590,00 775,00 55,00 80,00 40,00 14,00 3,50 2,75 2,500,00 Page 6 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ $ 1000,00 $ 600,00 $ 0,23 $ 17,684,50 3,500,00 1,650,00 575,00 1,120,00 55,00 220,00 200,00 55,00 300,00 ~~ 250,00 125,00 $ 176,813,02 230,00 $ 5,428,00 28,00 $ 700,00 149,00 $ 3,993,20 38,00 $ 1,170.40 1500,00 $ 14,250,00 2,00 $ 2,000,00 1,00 $ 1,200,00 1,00 $ 1,850,00 7,00 $ 5,880,00 1,00 $ 590,00 1,00 $ 775,00 15,00 $ 825,00 1,00 $ 80,00 5,00 $ 200,00 0,00 $ $ 38,941,60 1000,00 $ 3,500,00 600,00 $ 1,650,00 0,23 $ 575,00 PAYESTXLS iiii ::::=:::::':'::mm::m::mlm:m:m:::m:m:m:t::m:::::::m:::t::m:::::m:m:tmmmmm:tm:mmt=:':::::m:m:m:m:::m=t::::::tm'tt:rr:::t=r::r::rr:::t:::rn:c::t:rr:ttt:n:rrrr::rr:t:::tt:r:tt:r:::m,:r:m=::ttmrr:l::mtmm:&Wrmm:m:mm,::m:m:::m:1igijj':m:m:m:::mtIIIHift:m:I::m:aI::::m:tIIjpf.ilifJ:::m:::t::: 4 GRUBBING AC 0,23 $ 1,250,00 0,23 $ 288,00 0,23 $ 288,00 5 RETAINING WALL SF 130 $ 23,00 130,00 $ 2,990,00 130,00 $ 2,990,00 6 COSTS INCURRED (WALL SUB) LS 1 $ 4,250,00 1,00 $ 4,250,00 1,00 $ 4,250,00 7 UTILITY SUB RE-MOB LS 1 $ 500,00 1,00 $ 500,00 1,00 $ 500,00 8 WATERMAIN MODIFICATIONS LS 1 $ 1,315,00 1,00 $ 1,315,00 1,00 $ 1,315,00 :: !:::l T CHANGE ORDER NO.1 PIKE LAKE TRAIL - TOTAL $ 15,068,00 $ 15,068,00 SCHEDULE 1,0 FISH POINT ROAD (STREET) $ 59,420,07 $ 152,230,31 c~ SCHEDULE 2,0 FISH POINT ROAD (STORM SEWER) $ - $ 52,664,75 SCHEDULE 3,0 PIKE LAKE TRAIL (STREET) $ 66,132,91 $ 169,055.42 SCHEDULE 4,0 PIKE LAKE TRAIL (TRUNK STORM SEWER) $ 1,186,99 $ 69,446,79 SCHEDULE 5,0 PIKE LAKE TRAIL (WATERMAIN) $ 1,300,00 $ 53,198,05 SCHEDULE 6,0 PIKE LAKE TRAIL (SANITARY SEWER) $ 700,00 $ 16,039,00 SCHEDULE 7,0 MUSHTOWN ROAD (STREET) $ 17,684,50 $ 176,813,02 SCHEDULE 8,0 MUSHTOWN ROAD (STORM SEWER) $ $ 38,941,60 CHANGE ORDER NO, 1 PIKE LAKE TRAIL (GRADING, STORM SEWER, STREET) $ 15,068,00 $ 15,068,00 TOTAL ESTIMATE THIS PERIOD $ 161,492,47 $ 743,456,94 AL TERNA TE 1,0 MUSHTOWN ROAD (STREET) 1 MOBILIZATION LS 1 $ 2,200,00 0,25 $ 550,00 1,00 $ 2,200,00 2 CLEARING AC 0,1 $ 3,000,00 0,00 $ 0,10 $ 300,00 3 GRUBBING AC 0,1 $ 2,000,00 0,00 $ - 0,10 $ 200,00 4 COMMON EXCAVATION CY 1000 $ 4,00 0,00 $ 700,00 $ 2,800,00 5 SUBGRADE EXCAVATION CY 125 $ 6,00 0,00 $ 125,00 $ 750,00 6 SALVAGE AND TOPSOIL RESPREAD CY 200 $ 3,50 0,00 $ - 0,00 $ 7 GEOTEXTILE FABRIC TYPE V CY 300 $ 1,00 0,00 $ - 0,00 $ 8 MODIFIED SELECT GRANULAR BORROW CY 680 $ 7,50 0,00 $ - 680,00 $ 5,100,00 9 AGGREGATE BASE, CLASS 5 TON 700 $ 8,00 0,00 $ 887,73 $ 7,101,84 10 3" MINUS 100% CRUSHED QUARRY LIMESTONE CY 100 $ 9,00 0,00 $ 654,82 $ 5,893,38 11 TYPE 41A, WEAR COURSE MIXTURE TON 130 $ 28,75 0,00 $ 0,00 $ 12 TYPE 31B, BASE COURSE MIXTURE TON 200 $ 25,00 0,00 $ 200,00 $ 5,000,00 13 BITUMINOUS MATERIAL FOR TACK COAT GAL 67 $ 2,00 0,00 $ 0,00 $ 14 TYPE 41A 21/2" BITUMINOUS PATH TON 45 $ 55,00 91,64 $ 5,040,20 91,64 $ 5,040,20 15 CONCRETE CURB & GUTTER, B618 LF 835 $ 7,35 0,00 $ - 835,00 $ 6,137,25 16 BALE CHECK EA 10 $ 20,00 0,00 $ - 0,00 $ 17 CATCH BASIN SEDIMENT BARRIER EA 4 $ 125,00 0,00 $ - 4,00 $ 500,00 Pay Estimate 4 Page 7 PAYESTXLS !!~iEe_~=-= 18 SILT FENCE, HEAVY DUTY 19 SODDING, LAWN & BOULEVARD 20 SEEDING MIXTURE 500 21 SEEDING MIXTURE 250 22 WOOD FIBER BLANKET 23 DUST CONTROL WATER 24 TRAFFIC CONTROL 25 SUBGRADE DENSITY TEST, INPLACE 26 CLASS 5 GRADATION TEST 27 CLASS 5 PROCTOR TEST 28 CLASS 5 DENSITY TEST, INPLACE 29 CONCRETE TESTING 30 BITUMINOUS AIR VOID TEST 31 BITUMINOUS CORE DENSITY TEST LF SY AC AC SY MGAL LS EA EA EA EA EA EA EA T ALTERNATE 1,0 MUSHTOWN ROAD (STREET) - TOTAL ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER) 1 12" RCP CLASS V 2 15" RCP CLASS V 3 18" RCP CLASS III 4 4" PERFORATED THERMOPLASTIC PIPE DRAIN 5 STORM MANHOLE 48" DIA 6 CATCH BASIN 7 SUBGRADEPROCTOR 8 SUBGRADE DENSITY - INPLACE 100 $ 320 $ 0,2 $ 0,2 $ 450 $ 15 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1,50 3,00 1,500,00 1,500,00 1,50 200,00 55,00 65,00 65,00 75,00 75,00 75,00 75,00 75,00 LF 12 $ 23,60 LF 38 $ 25,00 LF 148 $ 26,50 LF 150 $ 9,50 EA 1 $ 1,000,00 EA 3 $ 850,00 EA 1 $ 80,00 EA 4 $ 40,00 T AL TERNA TE 2,0 MUSHTOWN ROAD (STORM SEWER) - TOTAL ALTERNATE 3,0 PIKE LAKE TRAIL (STORM SEWER) 1 4" PERFORATED THERMPLASTIC PIPE DRAIN LF 2 RANDOM RIP RIP CLASS III CY 3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 48-4020 EA 4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 60-4020 EA 5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 72-4020 (SUMP) EA 6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN SPECIAL EA 7 CONNECT TO EXISTING STORM SEWER MANHOLE EA 8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF Pay Estimate 4 360 $ 8,5 $ 4 $ 1 $ 1 $ 8 $ 1 $ 127 $ Page 8 9,50 55,00 1,025,00 1,500,00 2,400,00 850,00 475,00 23,00 0,00 $ - 100,00 $ 0,00 $ - 0,00 $ 0,00 $ - 0,00 $ 0,00 $ - 0,00 $ 0,00 $ - 0,00 $ 0,00 $ - 0,00 $ 0,00 $ - 1,00 $ 0,00 $ - 1,00 $ 0,00 $ - 1,00 $ 0,00 $ - 1,00 $ 0,00 $ 1,00 $ 0,00 $ - 0,00 $ 0,00 $ - 0,00 $ 0,00 $ 0,00 $ $ 5,590,20 $ 0,00 $ - 12,00 $ 0,00 $ 28,00 $ 0,00 $ 148,00 $ 0,00 $ - 150,00 $ 0,00 $ 1,00 $ 0,00 $ - 3,00 $ 0,00 $ - 1,00 $ 0,00 $ 4,00 $ $ - $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ 0,00 $ - 0,00 $ 0,00 $ - 0,00 $ 0,00 $ 0,00 $ 0,00 $ - 0,00 $ 0,00 $ - 0,00 $ 150,00 55,00 65,00 65,00 75,00 75,00 41,507,67 283,20 700,00 3,922,00 1,425,00 1,000,00 2,550,00 80,00 160,00 10,120,20 PAYESrXLS J ___-:raJE 9 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 292 $ 24,50 0,00 $ - 0,00 $ 10 18" RC PIPE SEWER, DESIGN 3006 CLASS III LF 552 $ 26,30 0,00 $ - 0,00 $ 11 21" RC PIPE SEWER, DESIGN 3006 CLASS III LF 439 $ 28,50 0,00 $ - 0,00 $ 12 30" RC PIPE SEWER, DESIGN 3006 CLASS III LF 150 $ 41,00 0,00 $ - 0,00 $ 13 30" RC PIPE APRON EA 1 $ 950,00 0,00 $ - 0,00 $ 14 SUBGRADE PROCTOR EA 1 $ 80,00 0,00 $ - 0,00 $ 15 SUBGRADE DENSITY -INPLACE EA 8 $ 40,00 0,00 $ - 0,00 $ 16 PIPE FOUNDATION MATERIAL CY 50 $ 14,00 0,00 $ - 0,00 $ TOTAL $ 5,590,20 $ $ 41,507,67 $ 10,120,20 $ $ 51,627,87 T ALTERNATE 3,0 PIKE LAKE TRAIL (STORM SEWER)-TOTAL $ TOTAL ESTIMATE THIS PERIOD FOR ALTERNATES ALTERNATE 1,0 MUSHTOWN ROAD (STREET) ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER) ALTERNATE 3,0 PIKE LAKE TRAIL (STORM SEWER) $ $ $ 5,590,20 I HEREBY CERTIFY THAT THIS IS AN ACCURATE TABULATION OF THE BIDS RECEIVED FOR THE ABOVE MENTIONED PROJECT, Pay Estimate 4 Page 9 PAYEST.XLS TEL: Jan JAN-eS-1999 1SI0~"'M _ _.~~~~ C?_~~~~;~~!~~".~ MINNESOTA Depart:JMnt of R~vQXl~e Withholding Affidavit far Contrador5 "Ntb am~, InUllI ~ approv.J "Y 11.. Minn810N D.,xIrt"'.'" CJf ftwO"". befrmt rlt. flu18 cf MJIIIlatolrJ or tiny aF CIs 4uhdlv;IJoPIJ CDn 17101_ finot pcryrJlCltf ~ conlr,,~1c1rJ, 08 99 T 16:19 No.008 P.02 61~5944 P.02106 'et ......... e~_____ ~.IG."CI. %C-134 ,-. ~~ rJI' plitt _rly. Th" wi. II_ ywr ...iq ,."., for IfNrn'" ".. ct6fIpWcJ /omI, !tl~!:~ IC,~,~;;;';- - - - - - -..... - - - - - ~ DI,II;" "'- ~.. !: I BRam &: aus INC. I I I ,I' I' I :.~ I!J NlllrMl T-c ,.."... U1..", ~I: I. 19740 l<ENRICK AVE... ,.._' S 210,699.64 j, , I (;,Iy 4,CI~ lip eoda I AJIltUfl' -"I..", ~1~1i \..~___ MN ___ SSQ..~_...J S 10.~3~198 fN"~~m.1if> a "~b.' Me...../.,.. ".~ b'1lO" 09/97 MOIlIhIy_ WDoI. ....... 06/98 i":l~ ~'.'!Ct""~r ~ 'OC'Cl~on I.r~ . 97-0l, 95-07,97"'17 l'I511 roINT lID. MlJSIfllJJN iD. i;., '~OF.'PRIOR lAJQ; ..~oo l!:ACLE CRm( Avt. SE ;~i. ,'. tJ;,i,- ...;.._'lo,......r~.. Ihll,.-i..:lt .1!iv. UHa InD,.....~ ......l .. ~ .... : -; ~\~:: Ole'" H.. box ,hat J~"L.~ )OlIt jn~o/"ernt:.." kr lb.l'fOf-ct ow l' in allln~:",.."Ii.1I ~ : ~il;i 0 ..1. CClIRfrcrdg, .. c.,,>> f:~f.J~"~ ~~c;:=r..~~_ INC "'~.m C'UW'JAM WN'DACnNG ;;;$ sM1~60th. ST W ROSOOl.M' ~N 550GB I ~~.; :0,,' . . 1 ~.:~: .~.f 7TI 0 ,0.' _. !. ., :~. ~1 So 0" l! ',: . ,0:. l "~I f'~ f4 . ~. .,., .;'" i.~~ ~i)~~ ":\~:{t/; ~;"t~ l'~'~ll. ;.il'~"i .. 'I~. .:.. ..\, -.,. -....... :! it:r i :~~.. :,; 5,J:.; :.{~1 PINt ~ 'IR ~/ly PRl9!.~ .slolc: ZIp eerl. t1N 5~~?2 "rime ...fnIC........lf Yll!llll1bGontr~,Md aut tJn'l ~ an "'" ptol~. -I, ., )"", SlIbcon ,.. r~ "'"., fll. melr own IC-13. alfl~vI" QnJ ~~"'C1 '~ltm ..rlfA.J b, ,he C1Iparlmll1t of leftftq _I. you t4Pl flit your afflcfcMt. For eacJ. .ub~ntraclot you ~od, lill r" 'h, !nfonn.llon iI.low and utIQch a capy of tad. Jllbeonfrllldot', certlff.d IC134. If you n"d mgra 'f"'CIC, a".dt a a..paral. ,h..I. Iukwr.I'ID" ~~I .9-llerlOrtlc,r ,'" ,,- , ~",., vi """"-'an J #wweIiJl.J '"1111 ""- f."" II /rv9.nd ,-"I.", "......,.,'"J ._~ fIIId "'hI.IGfltAeIf.. ~_ D"f1O""'."'.' I...... '" ... ,.tfIlMl/Il"'/IIa"." rwI-'i", ID Ill'. ,-""Ie", trrQJIIt, -.trn. .."1,, oIIN,IonIl, ., 1'1. ",... ~, . , .", . .u!.c:o~,. ottd ."...,....: ,. ,. ... II I - . pn".. ..,,,....,. -<J ,./h. on"",*", '~ . . ., ' ~. ..~' . " rille g" . j PL2.l<;S, ~ I: I ,.. Jr- '1&f... . ?~ DIpt. "., Wllhh.lJ:n, DMlrQl'l, ~610.1'. ',.,l #.AN S514666~O Cerlificate of COlftpJi.nee Besect 011 raconU 0' ,he MlnnlJQro Pepctr!lnOnf 01 h"6/1u., I ~r111t ~ the lICInfrdclcr who hq-, .I;ncd ,hr. cer1i~CQte hg. ful"lled Cllllhtl ~uJ'.lft.,." af MI""I,gfa Slgtlol"" 290.92 ancl 290.91 hllt.'1I111g th. ""''''hoWI,,~ of Mi,,"__'CI 1111;01710 /all h.n WGS" ptJirl I. .",pIo,B'" reJofil'lSi '0 CO'llrocl urvlt." wHh ~. WIlt tl Mlnnesofll QnJ/or Iii .ubdlvl.,OIls. a.~""o/.._ ."..01 DrIIe /~ ~ JAN081999 " ... .- ,."., '_1'. ..... I '''''I' ./ I\JIA.. P.01 II III III1 J L · TEL.: Jan Q8 9~ 10..1.......-. J~1939 15'0'3 I ,~ Cll'ITRACTl"" IHC. 61,-.7.>';9<\4 p.0311!6 l'dU "'~ "'~ 1.1'10 1J~'p4U LlllCa.4. Vi ~v~llU~ Withholding Afflda..rit fOr Contractors \C-H4 1/J. ./IIJ""" _~, t.o opp""..l br ~. Mi.- Ilep<<hM'" 01 R-'" 1.010.. ".. ..... of M;n~~O or OilY of ill sl)bd;"i~iotlC ~(Jn II'oko fJtloI p"Y"'enf to c:Of\"bel~.. ',....Sf typt 0( I'M JtfI~r- Thll ,.!Illl, yo'" /lldIIJ"9laLellcr t'llhKn~ irt QefII,.w.J ~ , : rc;;;;:;:;;;;.-------------' D~ps.c- i: \ mO 0lI0.a.CIWN CO, .__ I lift' f/3?-:.YLLIt Ii'; I ~ I ...........- I: ,_ JlllI. /146. .'_ - -' }99.779.oo 1::: ''''' ........,... I - "".:- ~;; '- J!"D.J~.J.~.q _ _ ~ _.1~-_.J _$4.988.95 I fIl~ ~,"heloll"ll-ID """,bet . d/'f '?O~1JR!1 ~be(lOll 09/97 .-..J./rP' ....... omded 06/98 _.-- ..' ......"'ct """,,* \ r,.,l-d ~ , ':;.I,1..Q2. 95-07 · 97-17 ,FlSII 1'Onn:~.. MUS~ ~ u.lEJR . , --~.. CIoy- 'I, ',Cl'lY OF pnOll ~ 16100 i"AGY! C1ll'J'1lINE SE PlllOB. lAKE It'l 1 '. ;:;..,... .... ......... .......,";j;j,...1"" a... D'" .-........ ........, . -.... .. !~'!- - -.... fjp code 55372. , "~o/' , ..\~::;:~ . '!', .. . .- ',. .... ..~ . , '. j." . .:: '";' .00 ., '.0 ~~. :~ .~ ',~';4~1 ,::~1:. l.~':i :, ':i~'~ ,0 .' , " ' 00 " , " i . t~'.r : ',~\} , "'.'~ : .~ .<: ,., : ~ ~'::;i . .1,. ..:.~.. ( . '..':.~ .... C....k .... ....Ihol d....~ ro"' ;..0""",...,.,1.. P"'i"""" Jill. .. ;,Jo,moIIon "'I""""'. o s... ."........, U ~_~ IlC .160th S! U !lOS~ ttt .55068 .. __,.,' . o .- _cto,- U Y"" ..,.........1 .., 0"/....... on 1\>1. p,"\O<" oil 01 YO" ........- mod 610"". "'-' 1C-13A """'.~" ..d he'. tl>om ...'Rod I.v il>o llopGrlm'" 01 R-' be/oM,.. - No Y"'" aIfldodl. rof ..<I, ...........,., you had. 00 ;. ,.. ',I........ ....... ..d olla<h 0 "'f'i coI_~ ....--(. ..ot\1Iod 1C-13d. f,.. ,,~ ..,. Ip.~. attach <J aepGl'ote .h.... ...-._, ___ l1JOI'ro- - - - .__., w' . ....... .......-. - j':. 'I,:i . -e.." - ,_ ..... r,/. ,.'~''''~ ,1IoJ.. _............ -'-........ J Mf..............."""".-... -.. ,_H" ......., ,............. ....... .......'" '"""'" - -.... - .... -_... ... .... ..-..... "nt/ to Gf"/ ......A~''''" ,ff 011I 0, pflme c.. . .... . anit 10 IIIe CQft)lOCtlftIJ agerq. c~. . . . r~ . ..'.' ~ · ,.. . ': _ -rUI!'.1L;';'- .~,..; 'I' ~ t1wzJE'''" "".it .. MN 00.., of ~",,_"\14. WI 'hoIdln8 01.,.\01\. Mall S)dlIOII 64' O. Sr. tau', MH ~ ,..~ 10 De" CJ ,..IL: 9 t::. / certiBicate of compliance .. ....d.. __ 01'" ........- 0..._" '" ................ .... ... _.....IuD...... AU_IuD IooIl\I1od oil ... ........- '" ....'n.- SIoIv'P 190.91 ond 196.07 --... IM.....hoI&oo 01_ -. ... '- _ ..... .. .......... '.'."'" .. ~._....._..... .... _ ol......- ..u<<.. ,.w;.;.;.-. ......- eI....... ,," . · . - ~ t4(/.?J~ fh(k,~ 'JAN 0 BJ.99S. .,d. tolo. 3000'" _"""8' ,......-~_.-I-. . ~_ -s.............- ~. --.--'......... . -.'..r. TE' : 'JAN-08-1999 1511121'" l'O~AM~ CCl'ITRACTIl.jG Hole. MINNESOTA Department of Revenue ,~ Withholding Affidavit for Contractors This oHidavlt mil" be OpprOlleJ by the Mlnn.1Ofa D.parlment of ReYMUft Wore ,J.e JIoIe of Mlnnft.~c>'a of ony of III svoclivi,.lons con make hllul poym8TIt to confrOe/on. I .\ .1, "." CJ' Informallon I bqvl 111/.0 '/I 011 th's lorm " hie riM ~,.r.I' 10 '- J"." ., '"y IIt.wI.Jg' .nd bellJ. IlIII/IIorfn tit. O,pa"""/I' of ~".,,-ID <<M:JOSO " , IlIIn{orm""on re/olll'lfl b "',. pro/.cf. Indlllll", Mlld/lli cop'" fll ".If kItm, ID "" p/fllll con'-CIC/Or If 10m O.II&eOltIr=:: ond 10 OIt~Yr:1ot: If 10m ptlm. e."'..,,~r, onil to. tit, collt*II,'lI ""''''Y. c. .... alIKe . nil, D L..l Dal. f'("'J.'t.Qo.~ /~-/',9? Malh.. pt. 0 v........ Wilhholdl'9 01'11&101\, Mail SlQllon 6610, $" PUll I, MN~.sl~lC , .. Certificate of Complkanco Bcscd 01\ record. of tilts M1nn~oia Oeponment of Kevonue, I certify that !he conlroclor who hoe signed !hI, certiftea.. hQ3 fulflll.d aR th t'IIqulro/l'lenll of Mlnneoola Stalyto. 290.9'2 ond 290.97 concomlng \h. withholding of Minnesota Income lox from wagea paid 10 employee. telatlng to contract servlc:a, ""lIh the sIolD of MlnnollOla ood/VI 115 iubdlvI,lona. o.pG~.nto'71~ O~ ~JANO 8 1999 " .1 H. JL .. "il'"'" ..~ , .:,.., ;'ti' , '~ ..' ( S-'o Nv. -'000 I:M II", 1'1"1 ] an 0-8 99 16:21 No.008 P.05 61G.:lGG5944 P.0S/e6 ie .134 1'Ieot.1yfx << prl~I clearly, Thb wig be 'ftN' IIlG/IIlIg Iobt/lor twArmlng th. compltltlJ knn, rc;;,.:;-;;-,,..-----------:---, ~phone (I ~MflD;.t:' .J-: G,HI<bvLA~~~L~ ~ ,I l'f'Zrl &'I>'-~S"2. '3 ~ Tlllul CD,,1nIcI GllIOII'" I J p _ ~ "1..43 ,I $ I 2-f j q ,.t 0 I Cltf 51ara lip elld_ I Airo6UN ."11 due \..1~~---.l11.&'--~0l:lY--.) s "/9. Lr' MIMlla'" wltkholdlnlllr.l\ 10 numb'l ':J "3 -z, ~ ~ >~ Monlh/)'lOr ..o,k b~on /0 - ,-; MondllYoQr WOI\ ~nd.ci {p':' 98 'to(OCf locol"" Ptt>>leeI ftUlIlbet ~ t:t-t. 01. 'ff,o"1 '...leG! _'*' A.dd,.... _,_ c.1.. '* . Pnv /..g/u Dkf ~ { I., ,WOI1C Oft Ihl. proltdl 1~1-00 ~ t~f.k~J~"~~P' ~ YeI 0 Nil If II., .ad "'- wor\' sa- up n:. 11(,IU 5> '?? d Cheek tits bex thar da3CTlbes YOUf Involvsment In the proler:' t:Jnd lilltll all informa,ion requ....cI. o $QI. coftlfador ~ Sult<<ontradar Na/ftpjtJX#~ed JGI tOh~.e:;" ,f.cfd_I~J Ij,o-ft.r ~-r ~ rJ o Prime contractor-If you lubcontToc,.,d out any work an thla proloct, all of your JubcDntraclofl mull fil. their own IC 13-4 afftdClvil1 and hall. then'l eerllfled by Ihe Department of RlMInu. befe,. you can fll. your Clfflclo";lI. For eech '1.~._"lrQl;tur you had, flU In ,1\1' Information below and oltac:h Cl copy oJ _och 5ubc:on' . . ,'I c.rtlrr.d IC.134. IF you n..a more 'pac_, a"oah a aeporolll aheel. ' "'n... "0"" lldd",u o...-/OIIker ~{.. en~~ ~ ';)5"0" 'l w , -" .."".... _ ~,..., WI'" '~" . . .W"., ..... Vlt", ~II' ~k, .-__,_.._..,._.,~..___..,_"..__". ."..M" ~----.-----...---~---'--_._. ...&. ..H, <IIH 91- - l"r " " t ~\l'\NES014 ~ ~ l7 9- ~ E ~ g: ~ ~o ')- OF T~-p,.~ca OFFICE MEMORANDUM Minnesota Department of Transportation METROPOLITAN DIVISION--Waters Edge State Aid Office To: Mr. Pat Murphy State Aid Engineer Mails top 500 From: Sharon LeMay Finals Administrator Metro State Aid Date: September 1, 1998 Phone: 651-582-1609 Subject: REPORT OF STATE AID CONTRACT SAP 201.114-03 CITY OF PRIOR LAKE Please process the attached Report of State Aid Contract for the above referenced project. The plans for this project were approved on Julv 25,1997 and project was let on Auaust4.1997. . Documentation is attached as follows: . Report of State Aid Contract . Abstract of Bids NOTE: City is not applying for full state-aid eligible amount at this time due to low fund balance, Please note any changes made to documentation submitted and forward to me for distribution to Local Agency, QQ_ Greg IIkka, City of Prior lake R~~"'J~j SEP 3 \998 .... .., [ ASSESSMENT NOTICE CITY PROJECT #97-17, PIKE LAKE TRAIL DATE: December 21, 1998 TIME: 7:30 P,M. PLACE: Prior Lake Fire Station #1, 16776 Fish Point Road S.E. NATURE OF IMPROVEMENT: As described in enclosed Public Hearing Notice AREA TO BE ASSESSED: As described in enclosed Public Hearing Notice, TOTAL AMOUNT OF ASSESSMENT ROLL: $224,473.10 Holy Cross Lutheran Church P.O, Box 177 14085 Pike Lake Trail NE Prior Lake, MN 55372 If the City Council adopts these assessments at or after the assessment hearing you may pay the total amount of your Statement of Special Assessments within 30 days after the assessment hearing without interest. Partial prepayments of assessments will also be accepted, but only within the 30 days following the hearing date, Otherwise the total amount will be certified to the Scott county Auditor at Shakopee and an annual installment will appear on your tax statement. All prepayments must be submitted to the Finance Office of the City, The City also has adopted a deferred assessment ordinance whereby the City Council may defer the payment of special assessment for those individuals who are permanently disabled or have attained the age of 65 or older, Guideline criteria and applications are available at City Hall, Application must be made within 30 days following the adoption of the assessment roll by the City Council. If the entire assessment is not paid, then the assessment must be paid in annual installments with interest on the unpaid balance, The first installment shall be the annual principal plus interest calculated from the public hearing date to the end of this year plus the twelve months of the next year. STATEMENT OF SPECIAL ASSESSMENTS 1. Total Current Paving Assessment 2, Total Current Water Assessment 3, Total Deferred Paving Assessment 4. Total Deferred S&W Assessment 5, Frontage Assessed 6. Frontage Deferred 7, Acreage Assessed 8, Acreage Deferred 9. Deferred Classification 10. Paving Rate per Front Foot 11. Water Rate per Front Foot 12. Acreage Rate 13. Length of Assessment (years) 14, Interest Rate 15. Parcel No, 16. Legal Description $64.873.30 565' $114.82/FF 9 8% 25-926-003-0 Sec 26. Tl15. R22 8.23 AC N 640' ofW 560' ofNl/2 NE1I4 The proposed assessment roll is on file in the City Manager's office and any written or oral objections will be considered at the public hearing, No appeal may be taken as to the amount of any assessment unless a signed, written objection is filed with the City Manager prior to the hearing or presented to the presiding officer at the hearing. An appeal to district court may be made by serving notice upon the Mayor or City Manager within 30 days after adoption of the assessment roll and filing such notice with district court within 10 days after service upon the Mayor or City Manager, 162mft~~e Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER .J. JI J1j q ':1'-1 -1- CHANGE ORDER CITY OF PRIOR LAKE 16200 EAGLE CREEK AVENUE SE PRIOR LAKE, MN 55372 Rr=CEIVED SFP n 1 1998 en \' lJFPRIOR LAKE CHANGE ORDER NO.2. TO: McNamara Contracting, Inc. 5001160th Street West Rosemount, MN 55068-1304 DATE: June 1, 1998 FOR: Project No. 97-17, pike Lake Trail Grading, Stonn Sewer, and Street Improvements OWNER: You are hereby directed to make the following change to your contract dated Auqust 18. 1997.. The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will increase the contract sum by: City of Prior Lake T Jbree_Thousand-Four-Hundred-Eightv-SiX and No/IOO Dollars ($3.486.00) Add the following: I Unit LS LS 9uantity 1 1 Unit Price Amount $1,086.00 $ 1,086.00 $2,400.00 ~ $ 2,400.00 I. Item \ 1. 2. Descriotion 15% mark-up on wall Labor Total Addition~ =$ 3,486.00 , $ 953.641.85 Amount of Original Contract ~ </8.142.00> Change Order No. 1 <deduct> $ 3.486,00 Change Order No.2 $ 878.985.85 Revised Contract Amount Due to weather considerations, fInal completion of the bituminons wear course on Pike Lake Trail and Mushtown Road is ,hereby extended to July 31,1998. G:\PROJECTS\1997\I7PIKESO\C02.DOC If I, -- , , DATE: June 1, 1998 CHANGE ORDER NO.2 TO: McNamara Contracting, Inc. 5001 1 60th Street West Rosemount, MN 55068-1304 FOR: Project No. 97-17, Pike Lake Trail Grading, Storm Sewer and Street Improvements OWNER: City of Prior Lake Approved as to Form: /tUJ~il~tL~ CITY AITORNEY APPROVALS: Approved: City of Prior Lake Owner Approved: ,McNamara Contracting. Inc.. -- - '.~. ,~qll B~-f);u., Date 6(,1 (q0 Date By \,,~ "~":Yayor By ~tJ. << City M " q ~4 ~ Date. Title f!tm4ckt --I G:IPR.OJECI'S\I997\I7P1KESOIC02.DOC II II ~iI T T" ASSESSMENT RATE: ASSESSMENT CODE: INTEREST RATE: SPREAD: P ~ VMENT METHOD: I LEGAL DESCRIPTION & PARCEL NUMBER See, 26, TI15, R22 25 S 25 A of NE'l. NW'/. 25-926-006-0 Sec. 26, TI15, R22 8,23 N 640' of W 560' ofN'/, NE'l. 25-926-003-0 Sec. 26, TI15, R22 15 N 552' ofE 1183.7' ofNE'/. NW'/. 25-926-002-0 ~. 25, TI15, R22 2.5AC !'iO' ofN 435,60 of SE'l. NW'/. 25-926-00 1-1 DATE: DECEMBER 21, 1998 PROPOSED $114.82/FF PAVING PAVING - 92 8.0% PAVING - 9 YEARS EQUAL PRINCIPAL CURRENT FRONTAGE 565' 150' PROPERTY OWNER & ADDRESS DEFERRED FRONTAGE ISO' Herbert & Elaine Wensmann 1895 Plaza Drive Eagan, MN 55122 Holy Cross Lutheran Church P.O, Box 177 14085 NE Pike Lake Trail Herbert & Elaine Wensmann 1895 Plaza Drive Eagan, MN 55122 620' - 150' TOTALS $'~~~~AA\$t~1~c?M.!,tm/ SI53,569.5O . Credit reflects entire principal paid in 1997. o 320' Ed Vierling 14310 Pike Lake Trail Prior Lake, MN 55372 o ORIGINAL CURRENT PAVING ASSESSMENT AMOUNT (Code 92) $22,695,00 $85,484.50 $22,695,00 $22,695,00 REDUCED CURRENT PAVING ASSESSMENT AMOUNT (Code 92) $17,223.00 $64,873.30 $17,223,00 $17,223,00 SI16,542.30 REASROLLDOC 1998 PAYMENT CREDIT <$1,054.53> <$3,972,04> <$1,054.53> <$5,527.16>* REFUND NET CURRENT PAVING ASSESSMENT AMOUNT (Code 92) SI6,168.47 $60,901.26 $16,168,47 None ....S> ~ \ - ~ .1 JI ... Pike Lake Trail Assessment Determination I Project #97-17 - With Change Orders (Deduct) Step 1: Determine Construction Cost from bids, after Change Orders: Street: Storm Sewer: Sanitary Sewer: Watermain: 12./' I" $191,470,50 $69,431.60 $12,423,00 $52,564,90 $325,890,00 ($266,126.5'" $78,142,00 + $3,486,00) Note: Error in bid quantity for a $2,850 difference. This error is not reflected in the "Original Contract Amount" in the pay estimates to date. Step 2: Deduct from Street and Storm Sewer the following costs: Street + Storm Sewer: 1) Trunk Storm Sewer 2) 7 to 9 Ton 3) Sidewalks 1) Trunk Storm Sewer (Oversizing) 2) 7 to 9 Ton (Oversizing) 3) Sidewalks $9,098,70 (Bid PriCE!.s) $5,189,00 (Bid Prices) $11,580.00 (Bid Prices) $260,902,10 (=$191,470,50 + $69,431,60) ($9,098,70) ($5,189,00) ($11,580.00) $235,034.40 Step 3: Determine Project Costs (Construction + "Soft") add 30% Street + Storm Sewer: Sanitary Sewer: Watermain: Non-Assessable 1) Trunk Storm Sewer 2) 7 to 9 Ton 3) Sidewalks Total = $305,544.72 (1,3 x $235,034.40) $16,149,90 (1,3 x $12,423,00) $68,334,37 (1,3 x $52,564,90) $33,628.01 (1,3 x ($9,098,70 + $5,189,00 + $11,580,00)) $423,657.00 Step 4: Determine Front Footage Rate for each type of work: Project Cost Frontage F/F Rate Street + Storm Sewer: $305,544.72 2,661 $114,82 Sanitary Sewer: $16,149,90 2,096 $7,71 Watermain: $68,334,37 2,661 $25,68 Step 5: Determine Total Assessable Amounts: Assessabl City Assessable F/F Rate e Frontage Frontage Amount City Cost Street + Storm Sewer: $114.82 1,955 706 $224,473,10 $81,062,92 Sanitary Sewer: $7,71 1,390 706 $10,716,90 $5,443,26 Watermain: $25.68 2,105 556 $54,056.40 $14,278.08 Non-Assessable $33,628.01 , TOTALS $289,246.40 $134,412,27 T Assessable totals It t... Pike Lake Trail a- *StreeUStorm sewer cost $ 402,597,52 ~ Sanitary Sewer ($12A23,OO x 1,3) $ 16,149,90 Watermain ($52,564,90 x 1,3) $ 68,334,37 Sidewalk ($11,580,00 x 1 ,3) [MSA] $ 15,054,00 7-9 tons ($5,189.00 x 1,3) [MSA] $ ~ le14~,11' trunk storm ($9,098,70 x 1,3) ]TRUNK] $ 11,828,31 Project Assessable Assessable Project Assessments Cost Frontage Rate F/F frontage Amount City FF City Cost ... StreeUStorm Sewer $ 4Q2,597,52 2,6Q1 $151,30 1 ,955 $ 295,782,85 706 $ 106,814,67 Sanitary Sewer $ 16,149,90 2,096 $7,71 1,390 $ 10,710,10 706 $ 5,439,80 Watermain $ 68,334,37 2,661 $25,68 2,105 $ 54,056,31 556 $ 14,278,06 Non-assessable (SWKJ 7- 9 ton /TRUNK STM) $ 33,627,31 $ 33,627,31 9,0 T atals $ 520,709.10 $ 360,549,25 $ 160,159,85 Actual bid for street $ 266,126,50 Storm sewer bids $ 69,431,60 Trunk Storm se~er,deduct (LAlli \ ) $ (9,098,70) - 7-9Tondeduct1"bas=- $ (5,189,00) Sidewalk/Ped, r~mps bid total of bids 30% admin/bond/eng./insp/survey *Grand Total "" .. ~ <DIe Page 1 Cf1- )1- August 27, 1998 Mr. Bob Brown Metro Division State Aid Engineer Minnesota Department of Transportation 1500 West County Road B2 Roseville, MN 55113 · Subj: S,A.P, 201-114-03 PIKE LAKE TRAIL, PRIOR LAKE, MINNESOTA Dear Mr. Brown: Please find enclosed a Report of State Aid Contract for the subject project. Also included is a tabulation of the bids received on the project, Please forward these to the appropriate member of your staff for processing, If you need additional information or documentation or have any questions please call me at 447- 9831. Thank-you. Sincerely, k~ Greg ~a, P .E. City Engineer CITY OF PRIOR LAKE 16200 Eagle Creek Ave. S.E" Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER MnlDOT 31072 (Rev. 12/96) REPORT OF STATE AID CONTRACT S.A.P. 201-114-03, Pike Lake Trail (Submit one Report for each project number.) Other S.A.P.'s or S.P.'s tied to this project City of _ Prior Lake N/A (For reference only) TO THE COMMISSIONER OF TRANSPORTATION: The City of Prior Lake has entered into a Contract with McNamara Contracting. Inc, of Rosemount. Minnesota. for the construction of the above mentioned project which was let on AUl!Ust 4. 1997, in the total amount of$403.396.00. Payment and Performance Bonds for the full amount of the contract have been provided by National Fire Insurance COITmanv of Hartford. with the aggregate liability of the bond(s) equal to twice the amount of the contract. A portion of this contract in the amount of $276.396,00 will be paid for with local funds. The remainder of the contract in the amount of $127.000.00 qualifies for State Aid participation and funding is requested on the following basis: URBAN (Cities over 5000) $_ 127,000,00 from Municipal Acct. * RURAL $ from Acct. * MUNICIPAL (under 5000) $ from Acct. * OTHER $ from Acct. * OTHER $ from Acct. * RIW Acquisition costs will not be requested. Project DevelopmentJEngineering costs in the amount of $ 0,00 are hereby requested. * ** Regular, Municipal, State Aid Bond Account, CTB, MTB Fund 29 (Bridge grants); Town Bridge; State park Road; etc, I hereby certify that the wage rates on this contract equal or exceed the minimum hourly rates required for work on state funded construction projects as determined by the Minnesota Department of Labor and Industry, Remarks: DATED: '2-7 .4-vd- 19'1 g' SIGNED: ~~ J!1, .wt~ () qJfj Engineer DAI bV: 19 APPROVED: District State Aid Engineer ...&, ..1. ... MniT'OT 31072 (Rev. L S) ... REPORT OF STATE AID CONTRACT S.A.P. 201-114-03. Pike Lake Trail (Submit one Report for each project number,) Other S,A.P.'s or S,P,'s tied to this project City of Prior Lake N/A (For reference only) TO THE COMMISSIONER OF TRANSPORTATION: The City of Prior Lake has entered into a Contract with McNamara ContractinQ. Inc, of Rosemount. Minnesota" for the construction of the above mentioned project which was let on AUQust 4. 1997. in the total amount of $403.396.00, Payment and Performance Bonds for the full amount ofthe contract have been provided by National Fire Insurance Comoanv of Hartford. with the aggregate liability ofthe bond(s) equal to twice the amount of the contract. A portion of this contract in the amount of $276.396.00 will be paid for with local funds, The remainder of the contract in the amount of $127.008,00 qualifies for State Aid participation and funding is requested on the following basis90 (; ) ~ 3? , ~ ~ URBAN (Cities over 5000) $_127.000,00 from Municioal Acct.* RURAL $ from Acct, * MUNICIP AL (under 5000) $ from Acct. * OTHER $ from Acct. * OTHER $ from Acct. * R/W Acquisition costs will not be requested. Project DevelopmentlEngineering costs in the amount of $ 0,00 are hereby requested, * ** Regular, Municipal, State Aid Bond Account, CTB, MTB Fund 29 (Bridge grants); Town Bridge; State park Road; etc, ---------------------------------------------------------------------------------------------------------------------- I hereby certify that the wage rates on this contract equal or exceed the minimum hourly rates required for work on state funded construction projects as determined by the Minnesota Department of Labor and Industry, Remarks: IJ~ C'mYi'd r fJi) Cfipfy, ~~O ,,01'0.10 a~ af2- DATED: '27 A--tAd 191~ SIGNED: /~~ //1, r~v1- (/ <@Engineer J ~ 1 1ffi DATED: APPROVED: ~s_iP~ ~~- TEL: JAN-0B-1999 15:11 Jan q.8 99 t'O-lAI1ffiA ca-rrRACT I NG I NC . ,I ' 16:21 No.008 P.06 6123225944 P.06/06 """" JUN 22 '99B Mlnn..ote Department of Rovenua Withholding Affidavit for Contractors Ie-1M J:Ioy. 11 JOO Company naml! PRECISION PAVIiMENT MARKING INC Addr1la& 14280 JAMES ROAD City th.te Zip COde ROGERS MN 66474 Plene type or W'f'll'lt ot..rly Ilton. TI1le will b" your mallt'lp lab.1 for returnl"g tho oomp1e\Od fornl. Telephone rAMnbet to 12)629-11120 DId VOU /'t,v. .mCloy... wortc 011 tIlle proJecn1 If non., IlCIJTIln who dlddW'worlt:" - ".., , YES ThIll etfldavll MUtlt be apDfoved by the .JUM..ota D~r\nwnt or Reven"" bcrflM" the !hatD of MlnnlllQta or Iny 0' III BUlldlvl,'ona oll1lnalle flnll payment to oOnlrlC1N(I, MlnnMOta 10 numbftr 1888443 MonlJllvNI \'VGrit begllO Oct.97 Month',.ar work ended JUI'I-9B I Totll ConVlot lmot.Int: $4,740,00 Amount 1111 dUI: "'lIll1et number: Proltot location: ,",uleat ~r: Addrea Check the bolf thet dHorlbea your b\Volvernoht In th. praJecI and fill In "I Information roquell18d In Ihat aeftgory: - __0 '488.00 CP U7-02 FISH POINT AD/PRIOR LAKe CITY OF PRIOR LAKE 080le n... ...r 0!;IIIJcon\lWOlOf If you I,. I .vbGonltaotor, flU In the name e"d .ddrellt of the UUltreotor 1tIat hlled \'Ou: MCNAMARA CONTRACTING INCi BOOl lOOTH WEST. R05EMOUNT, MN 65Q69 Dprtrn ConlrMtor H you IlUbcotr1roctad out any work on rhl8 pr~jeet. all of vour lubeomrllc:torll mwt fae thllr own IC.\34 .ftld.,," end tUNII V.II L"'lIrtIllecl by ttlo D'Plnment at Revenue before YOII Olin fU. your .fTleI.vIt. Fft, eath cuboonttevtOl vou hid, fill In ~'" MIIltI. InfOrm.tlon billow, II'Id ntlOh I copy of each suI, .. '." oIVr'1 oertIflocf Ie. 134. IIf you n"lef MOtl 'PIUII, ..tech II c..,.,... she"t,) 8Ulinllll name Address Own.rlOffloer ................. 4o.' --- I._~- ".:_ I 1I-.1..1het.." ~"ammIon IIlIv01Ml1d In I\n thl& torm Iv true Ind oorn.... to tll. tlI&1 ot my kncrwltdltlt WId bell... 'authorlzl' the 0eper1ment of R~nue 10 d1lCllose pertlnenr Information rela"", to thla project, Including 'ending oopl81 ot fila form, to 1he prime conIr: 'lIIT1 . IUboo "" . ,Dr. erld ta firry .ubOomrDOtCll"I H J 1m I prIMe oontteoto" "lll '0 tho con'ractlng agenav. IItroto.. --I-- Title Olt., ....1 OFACE MANAGER 8/1 8/98. r oertifloatlon, mall original and one copy to; MlnnlttotQ Olilpartmont of Revenue, Bualn&G9 TrUll! Tax Seotlon Mall Stellon 6610, 81 Puul, MN 86148-6610 C.r1IfIoete of Compllanoe with MInn..ola 'noom. Tax Withholding Lew easr:d on rcoords 0' the Mlrlnoeotl Dup.nm.nt of nOVenvll, I wnlly that th. contfAtlt", wha ..,.. clghnod this Hrtllk:.w nu ful'lQ.d aN thl ,."url'fIlmtl Of Mlnne.at. Sttatutll& 290.92 end 290.87 cOllClefnlng the wlthtloldlng 0' Minneeot. inoom. till 'rom WIlQOI oeld 10 AmDlov.... r.l,mll to. ~ontr.ct ..NlOOI with the ct. " 0' MlrlneeotoO Ind/or Ih eulKllvllllonl, 1""1\1,. "I..,\llarIr..rr '''I ., ..... tA'V~ ~~v~ D\1te ~ ....... Na. IOOoIN TOT~ P.l2l6 I. III II!I ,.I JI. .II.. 1 '(1 ~Ir CHANGE ORDER CITY OF PRIOR LAKE 16200 EAGLE CREEK AVENUE SE PRIOR LAKE, MN 55372 CHANGE ORDER NO.1 TO: McNamara Contracting, Inc, 5001 160th Street West Rosemount, MN 55068-1304 DATE: April 20, 1998 FOR: Project No, 97-17, Pike Lake Trail Grading, Storm Sewer, and Street Improvements OWNER: City of Prior Lake You are hereby directed to make the following change to your contract dated Ammst 18. 1997, The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will decrease the contract sum by: Seventv-EiQht-Thousand-One-Hundred-Fortv-Two and No/lOO Dollars ($-78.142.00) Deduct the following: Item Description Unit Quantity Unit Price Amount 1. Retaining Wall S.F. 6,000 $14.30 $85,800.00 2. Guard Rail L.F. 570 $13.00 I $7.410.00 Total Deductions ! $93,210.00 Add the following: Item Description Unit' Quantity Unit Price Amount 1. Common Excavation C.Y. 1,000 $3,50 $ 3,500,00 2. Silt Fence L.F, 600 $2.75 $ 1,650,00 3. Clearing Acre 0.23 $2,500.00 $ 575.00 4. Grubbing Acre 0.23 $1,250.00 $ 288.00 5. Retaining Wall S.F. 130 $23.00 $ 2,990,00 6. Costs Incurred(wall Sub) L.S. 1 $4,250.00 $ 4,250,00 8. Utility Sub Re-Mob L.S. 1 $500.00 $ 500,00 9. Watermain Modifications L.S. 1 $1,315.00 $ 1,315,00 Total Additions $15,068.00 G:\PROJECTS\I997\17P1KES0\CO 1 ADOC ----~.~----~.__.---'- . 1 DATE: , April 20, 1998 CHANGE ORDER NO, 1 TO: McNamara Contracting, Inc. 500 I 160th Street West Rosemount, MN 55068-1304 FOR: Project No. 97-17, Pike Lake Trail Grading, Storm Sewer and Street Improvements OWNER: City of Prior Lake Amount of Original Contract $ 953.641.85 Change Order No, 1 <deduct> $ <$78.142.00> Revised Contract Amount $ 875.499,85 The Contract time for bituminous base course completion for Pike Lake Trail is hereby extended to June 30, 1998. Substantial completion and final wear course completion for Pike Lake Trail is hereby extended to July 15, 1998, Contract time for Mushtown Rd. and Fish Point Rd. are not affected by this change. Approved as to Form: CITY ATTORNEY APPROVALS: Approved: City of Prior Lake Owner Approved: McNamara Contracting:. Inc, By By By Date Title Date G:\PROJECTS\I991\17PIKESO\COI A,DOC . T ISSUE DATE (MMIDD/YYI Certificate No. 00036038 PRODUCER COBB STRECKER DUNPHY & ZIMMERMANN, lNC, 150 SO, 5th ST,.SUITE 2000 MINNEAPOLIS, MN 55402 CERTIFICATE OF INSURANCE 08/20/97 This certificate is issued as a matter of infonnation only and confers no rights upon the certificate holder, This certificate does not amend, extend or alter the coverage afforded by the policies listed below, COMPANIES AFFORDING COVERAGE COMPANY LEITER A TRANSCONTINENTAL INSURANCE CO. COMPANY LiB H~.R B INSURED MCNAMARA CONTRACTING, INC. 5001 160TH STREET WEST COMPANY LEITER C COMPANY LJ::\llJ::\R D TRANSCONTINENTAL INSURANCE CO, ~, ..,~ CONTINENTAL CASUALTY COMPANY ~ <' / T TRANSCONTINENTAL INSURANCE CO. (9~..> ROSEMOUNT MN 55068 COMPANY LEITER E COVERAGES This is to certify that policies of insurance listed below have been issued to the insured named above for the policy period indicated, Notwithstanding any requirement, term or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions, and conditions of such policies, Limits shown may have been reduced by paid claims, E~ Type of Insurance Policy Number Policy Effective . Policy Expiration Date (mm1dd/v'!l Date (mm1dd/vv) Liabilitv Limits A GENERAL LIABILITY General Aggregate Pire Damage (Any One Fire) Medical hxpense (Anv One Person'! $1.000,000,00 $1.000,000,00 $500 .000,00 $500,000.00 $,00 $,00 [ X ] Commercial General Liability [ ] Claims Made [ X ] Occurrence [ ] Owner's & Contractor's Proto 121134300 [ ] 03/01197 03/01198 l'rOOucts-Lomptups A!!~re~ate l'ersonal & Advertlsmg Iniurv hach Occurrence B AUTOMOBILE LlABILffY [ X ] Any Auto [X] All Owned Autos (priv Pass,) [ X ] All Owned Autos(Other) [ X ] Hired Autos [ X] Non-Owned Autos 121134278 [ ] Garage Liability [ ] CSL 03/01197 03/01198 Bodily Injury Per Person Bodily Injury Per Accident P,ul',,.~j lamilfp' $1.000.000.00 $,00 $,00 C EXCESS LIABILITY [ X] Umbrella Form 121134295 [ ] Other Than Umbrella Form 03/01197 03/01198 $.00 Each A.ggregate Occurrence $5,000,000,00 $5,000,000.00 StatutorY I ~luo,uou.uo (tiaCh ACCident) D WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY 168516047 03/01197 03/01198 $500,000,00 (Disease Policy Limit) $100,000,00 (Disease Each Employee) E OTHER UJ::\,:)\...luPTION OF OPERATIONS/LOCATIONS/VEHICLES/RESTRICTIONJ/SPECIAL ITEM... 1997 STREET & UTILITY CONSTRUCTION OF PROJECT 97-02; FISH POINT ROAD, PROJECT 95-07 MUSHTOWN ROAD PROJECT 97-17 PIKE LAKE TRAIL ADDITIONAL INSUREDS: CITY OF PRIOR LAKE (OWNER) AND THE PROJECT ENGINEER CITY OF PRIOR LAKE 16200 EAGLE CREEK AVENUE SE PRIOR LAKE MN 55372 ~AN~IDJ,.AJ~Qt' Should Any vf 1 De Above Described Policies Be Cancelled Before The Expiration Date Thereof, The Issuing Company Will Mail 30 Days Written Notice To The Certificate Holder Named To The Left, CERTIFICATE HOLDER AU;~ORIZED REPRESENTA:...TI~ ,,<J( Q...U..;-yr H ' ~(;VYO ..... ".&L. .... .~-' JAMPBELL KNU1 ~ON 91/\"1' Professional Association Attorneys at Law Thomas J, Campnell Roger N, Knutson Thomas M, Scott Elliott B, Knetseh Suesan Lea Pace (651) 452-5000 Fax (651) 452-5550 Joel J, Jamnik Andrea McDowell Poehler Matthew K, Brokl* John F, Kelly Matthew J, Foli Marguerite M, McCarron December 24, 1998 * Al.s() licensed in \'x'i.mm.sin Mr, Greg Ilkka Director of Public Works City of Prior Lake 16200 Eagle Creek Avenue SE Prior Lake, MN 55372-1714 Re: Holy Cross Lutheran Church vs, City of Prior Lake Dear Greg: Enclosed for your information is the Church's final written argument, The Judge has up to 90 days to make a decision, Best regards, 7///7 /// 1/ . i?1 By: Thomas M, Scott TMS:cjh Enclosure \' l.t DEe 2 ~ '~~6 Suite 317 . Eagandale Office Center · 1380 Corporate Center Curve · Eagan, MN 55121 ...a ~I. .u., DEt~23-98 WED 02:43 PM O#NEILL.TRAXLER & ZARD " 1 6127582599 P.03 IN DISTRICT COURT STATB OF MINNESOTA COUNTY OF SCOTT FIRST JUDICIAL DISTRICT ASSBSS~NT APPE~ --------------------------------~---------------------------------- Respondent. ) } ) ) ) APPELLANT'S FINAL ) ARGUMENT ) ) ) Court File No. 97-20534 ) ) ) Holy Cross Lutheran Church, Appellant, vs. city of Prior Lake, ------------------------------------------------------------------- The principal issue in this assessment appeal is whether the assessment to Appellant' s property exceeded the special benefit. Appellant contends the assessment exceeds the special benefit, and is therefore unlawful. Municipalities are authorized by statute to make local improvements and to assess properties benefitted by such improvements. Minn. stat. S429.021 and S429.051. For a special assessment to stand, it must meet the following guidelines: (I) the land must acquire a special benefit from the improvement; (2) the assessment must not exceed the benefit; and (3) the assessment must be uniform on the same class of property. Tri-St,~t~ I.~,t:ld Co. v. City of Shoreview" 290 N.w.2d 755, 777 (Minn. 1980). The benefits from an improvement are calculated on the market value of the land before and after the improvement. .Anderson v. Gitv of Bemid;~, 295 N.W.2d 555, 560 (Minn. 1980). If the assessment ia set higher than the special benefit conferred, it is a taking without compensation to the extent of the excess. Car1son-Lanq Realtv Co. v. Citv of Windo~, 240 N.w.2d 517.519 (Minn. 1978). When the issue presented is the claim that a special assessment exceeds the ~ ...&. .la, .11.. DEC~23-98 WED 02:44 PM O~NEILL,TRAXLER & ZARD , 1 6127582599 P.04 benefit from an improvement to the assessed property, the trial court must independently review the evidence relating to the value of the assessment rather than defer to the decision of the taxing authority. Tri-State at p. 778. A district court must order a reassessment if it finds that a reduction is appropriate. Buettner v. Citv of St. Clou~, 277 N.W.2d 199, 204-05 (Minn. 1979). An II independent finding of special benefit establishes a permissible assessment ceiling." Mi. at 205. Jack Hunter, President of Holy Cross Lutheran Church congregation, testified that in 1993 they purchased the subject parcel from the Minnesota South District of the Lutheran Church Missouri Synod for $43,482.00 with the purpose of constructing a church. He testified they paid $78,682.47 for the improvements to the property in 1993, in the form of sanitary sewer and trunk, street collector fee and stormwater management fee. The Church was unable to obtain a building permit until the improvements were made. Mr. Hunter testified that he received notice of the City's proposed assessments in 1997 and appeared at city Council meetings challenging the proposed assessment. After the assessment was adopted, he again met with city officials to attempt to resolve the matter. The response he received was that the City would let the Courts handle the matter from this point on. The property was a difficult parcel for development purposes. The original top of the hill was 45 feet above the road. The Church investigated two options for development. To regrade the property to make it fully usable would involve moving approximately 75,000 cubic yards of dirt at a cost in excess of $200,000.00. The other option, which was selected, involved removing 5 feet of dirt off the top of the site. A switchback driveway was created to climb the 40 feet at a cost ,,j JI .iJ., DEC~23-98 WED 02:45 PM O~NEILL,TRAXLER & ZARD 6127582599 p.e5 DEC~23-98 WED 02:45 PM O~NEILL,TRAXLER & ZARD -']:! 6127582599 P.1<l6 benefit from all utilities for the Church parcel, including the amounts paid in 1993 of $78,682.47 and the 1997 assessment of $111,001.20. Mr. Wicker concluded that the assessments exceeded the special benefit by $89,684.00. Mr. Wicker stated that the parcel was clearly over assessed and that the property did not receive a special benefit of $111,001.20 from the recent assessment of approximately $111,001.20. He stated that full utilities resulted in a benefit of $100,000.00 to the "'l'l.,.....~, _ r------ Full utilities will cost the Church approximately $189,000.00. This exceeded the benefit to the property by approximately $89,000.00. using Mr. wicker's analysis, the special benefit to the property from the improvements was approximately $22,000.00. The City will attempt to argue that this analysis is inappropriate because the improvements in 1993 were paid for by the Church and were not "assessed." This is an attempt to confuse the Court by using an apples to oranges analysis. They will claim because the improvements were not assessed in 1993, they cannot be factored in to a "before and after" valuation. This is a red herring issue. The issue under Chapter 429 is whether the assessment exceeds the special benefit. Both appraisers testified that it did, while they came up with different valuations. Both appraisers factored in the previous amounts paid for improvements. Appellant's appraisal found a "before" valuation of $88,000.00 and an "afterll valuation of $188,000.00, for all utilities. The property did not receive a special benefit from the improvements as assessed by the city. City Engineer Greg Illka testified that pursuant to statute and City procedures three basic criteria must be satisfied before a parcel can be validly assessed: (1) land must have received special benefit; I ..&, .11& , ,., ~J;:C'-23-98 WED 02: 46 PM 0" HE I LL, TRAXLER & ZARD 1 6127582599 P.C37 (2) amount of assessment must not exceed the special benefit; and (3) Mr. Illka testified that these the assessment must be un1torm. criteria were from the City's assessment policy manual. On cross examination, Mr. Illka agreed that the city did not make a specific determination prior to making the assessments that the amount of the assessment did not exceed the special benefit. He testified that they did not have an appraisal of the property "before" and "after". Mr. Illka testified that the general way a public improvement is assessed to the property owners is that they take the total project cost, look at the front footage of the parcels, and divide that to get the assessments. He testified that they generally just look at the costs and do not get an appraisal of the affected parcels to determine whether the improvement increases the property valueB to the levels of the assessment. He testified that the City tries to look at the costs of development and attempts to determine whether the improvement would increase the market value to the level of the assessment. On crOBB examination, Mr. Illka stated that the city council tries to make a determination as to whether the special benefit exceeds the amount of the assessment. In reality, the City council relies on the City Engineer's opinion. In Respondentia Exhibit 4, subsection 26, page 4, the city Manager asked whether in the City, Engineer's professional opinion, the special assessment benefit equals or exceeds the amount proposed in the assessment roll. Mr. Illka said the benefit did exceed or equal the amount proposed in the assessment roll in his professional opinion. At trial, Mr. Illka attempted to place the decision solely in the hands of the Council. During the public hearings on the improvements, council Members had concerns about the valuations. Council Member Schenck questioned .... I DEC~~3-98 WED 02:47 PM O~NEILL.TRAXLER & ZARD [ 6127582599 P.la8 how the City proposed to address the proof of the proposed valuation increase to the property. At that City Council meetins, November 3, 1997, Jack Hunter stated that in 1993 when they built the church they were told they had to request sewer whe(l applying for a building permit, or they would not ,get the building permit. He stated that Larry Anderson, former city Engineer, worked with the developer to try and have them pay all the costs of the access road. The Church did not believe they would be assessed again for any future improvements. In subpart 17 of Exhibit 4, page 4, several council Members expressed concern whether there would be any appeals of the pike Lake Trail project. There was concern at that time whether the assessments were consistent wi th the added value to the property. Mayor Andren indicated that the Pike Lake Trail had been an issue for 4 years and that at one time a developer was going to do townhomesi then it was changed to a business park. She said she was concerned about having an assessment hearing after the project was commenced, because they had not done it that way. Mr. Illka further testified that the City had recently reassessed the property to $79,382.00, as compared to the initial $111,000.00. He testified that this was a resul t of a retaining wall being removed from the project. Jason Messner, the City'S appraiser, testified that he conducted a "before and after" analysis of the parcel with utilities and came up with a special benefit of $83,000.00. He testified he factored in the previous assessments of approximately $78,000.00. He further testified that he was familiar with the appraisal previously done by Frank Wicker prior to performing his appraisal. One valuation area not addressed by either appraiser conc~rned the development costs for this parcel. The City'S appraiser valued the '. 1I1 1m 1 ..&, ..,..... DEC~23-98 WED 02:47. PM O~NEILL.TRAXL~R & ZARD T 6127582599 P.09 property at $327,000.OQ after utili~ies. If th~ property was ever to be developed for anything other than a church, single family housing for example, the developer would have to incur well over $200,000.00 in additional development costs. There would be additional costs to bring the utilities to each lot. This piece of property could not be developed with affordable lots. Ultimately, the property is not worth as much as other parcels of similar size and location. The Church bought a hill. This ca.nnot be compared to other flat or slightly rolling land with woods or ponds. This was not factored in by either appraiser. Both appraisers were too high if development costs were factored in. Given the costs of developing the land and the probable proceeds from sale of developed sites, the City's assessment cannot be supported. The present use of the land is not the controlling factor in determining whether the land has received benefit from the improvement. Rather, the test is whether the land could be used for purposes which would benefit from the improvement. polden v. Citv of EaaaoJ, 393 N.W.2d 526, 528 (Minn.Ct.App. 1986). The economic infeasibility of developing the property reduces the level of benefit from the improvement. The Church had a street before. The Church had water before. Does a paved street and city wa~er increase the value of the property by $111,000.00. Clearly this is not an accurate assessment. The City has recently proposed to reassess the parcel to a total assessment of $79,382.50. 'l'his is a change supposedly based on reduced costs of the project. However, once again there was no discussion as to property valuations. Appellant claims that the City reassessed the parcels in light of the appraisal they received. Mr. Messner testified that he started the appraisal several months ago and it took him time DEC~23-98 WED 02:48 PM O~NEILL,TRAXLER & ZARD T 6127582599 P.10 to finish: but gave the reason that it was simply not a high priority item. His report is dated November 11, 1998. The date of the notice of public hearing on reassessment for Pike Lake Trail project was dated December 4, 1998. Appellant contends that this is simply an attempt to avoid costs in this matter granted to the prevailing party. The City has admitted that the special benefit should now be reduced to $79,382.50. The initial assessment was $111,001.20. Appellant had to take this appeal as the costs of improvement exceeded the special benefit: As such, at the appropriate time, Appellant is entitled to their costs and disbursements in this matter. Another inequity in this case concerns the delay in receiving the City's appraisal. Appellant had their appraisal in December 1997. Appellant did not receive the City's appraisal until a few weeks before trial. Further inequity concerns the interest costs incurred by the Church for the assessment. They were assessed in November of 1997, and interest began accruing on the assessment at that time. The project was not completed until the middle of 1998. They were being charged interest on the full utilities, but they only had partial use until completed. The Church, to date, will have been charged with one year's interest ($10,291.19) on the full assessment, despite the fact that they did not benefit fully until the project was completed and that the assessment amount significantly exceeds the special benefit. In conclusion, Appellant's property had water prior to the 1997 improvements. Appellant's property had road access prior to the improvements. The improvements provided City water. The improvements provided a paved road. The total costs to the Appellant for these improvements was approximately $189,000.00. The Church was required to undergo the initial improvements in 1993 in order to obtain a building il II 1111 I DEC-23-98 WED e2:4~PM O~NEILL.TRAXLER & ZARD~, 6127582599 P. "11 permit to build their church. Whether they paid these costs by agreement or were assessed is irrelevant. If they did not pay them, the costs would have been assessed at a later date. Appellants had to construct a switchback driveway at a cost of $50,000.00 and shave 5 feet off the top of the hill to make the property usable. If the property were to be developed, for single family homes, which is consistent with development in the neighboring property, significant grading would have to be performed to make the parcel usable. These costs would have to be passed on to the lots and would be cost prohibitive to new buyers. The proposed assessment, and also the proposed reassessment, exceed the special benefit to the property. Appellant respectfully requests that the Court order the City to reassess the parcel with a , ceiling of $22,000.00, and recalculate the interest accrued to date in an equitable amount. DATED: This 23rd day of December, 1998. Ch Atty. ID '212209 O'NEILL, TRAXLER, ZARD, NEISEN & MORRIS, LTD. Attorneys for Appellant Law Building, 222 East Main P. O. Box 105 New Prague, Minnesota ,56071 Phone: 612-758-2568 il III 1111 r,'IEY ~1 -11- O'NEILL, TRAXLER, ZARD, NEISEN & MORRIS, Ltd. A1TORNEYS AT LAW LAW BUILDING 222 EAST MAIN STREET P. O. BOX 105 NEW PRAGUE, MINNESOTA 56071 ROBERT 0, O'NEILL STEVEN D, ZARD CHRISTOPHER A. NEISEN CHRISTOPHER E, MORRIS Phone: (612) 758-2568 Fax: (612) 758-2599 NORBERT B. TRAXLER Of Counsel February 16, 1998 Mr. Frank Boyles City Administrator City of Prior Lake 16200 Eagle Creek Avenue S.E. Prior Lake, Minnesota 55372 RE: Holy Cross Lutheran Church vs. City of Prior Lake Court File No. 1997-20534 Dear Mr. Boyles: Please find enclosed and Appellant's Informational referenced matter. served upon you by U. S . Mail the Statement Form regarding the above- LER, ZARD, IS, LTD. CEM/cln Enclosure cc: Jack Hunter f'l ~"'~'-""-~"._--"'--"~' FORM 111.02 INFORMATIONAL STATEMENT ~civil Matters--Non-Familv\ STATE OF MINNESOTA DISTRICT COURT COUNTY:_SCOTT JUDICIAL DISTRICT: FIRST CASE NO.: 1997-20534 CASE TYPE: Assessment Apneal Holv Cross Lutheran Church. Appellant, APPELLANT'S INFORMATIONAL STATEMENT FORM vs. City of Prior Lake. Respondent. 1. All parties (have) ~~~~~ ~~~ been served with process. 2. All parties {3~7~) (have not) joined in the filing of this form. 3. Brief description of the case: Annellant did not receive ~ snecial benefit in the amount assessed from Public ImDrovemen~ Pro;ect 197-17 which was adonted bv Resnondent on Rovember 3. 1997. and. therefore. Annellant should only be assessed for th~ amount of snecial benefit. 4. It is estimated that the discovery specified below can be completed within 4 months from the date of this form. (check all that apply, and supply estimates where indicated.) a. Factual Depositions No Yes X , estimated number 2 b. Medical Evaluations No Yes , estimated number c. Experts Subject to Discovery No Yes X , estimated number 2 5. Assignment as an expedited X standard complex case is requested. (If not standard case assignment, including brief statement setting forth the reasons for the request.) 6. The dates and deadlines specified below are suggested. a. 04/15/98 Deadline for joining additional parties, whether by amendment or third party practice. b. 04/15/98 Deadline for bringing non-dispositive motions. c. 05/01/98 Deadline for bringing dispositive motions. d. RIA Deadline for submitting to the Court. (specify issue) e. RIA Deadline for completing independent physical examination pursuant to Minn. R. civ. P. 35. f. 05/15/98 Date for formal discovery conference pursuant to Minn. R. civ. P. 26.06. g. 06/01/98 Date for pretrial conference pursuant to Minn. R. Civ. P. 16. h. 06/15/98 Date for scheduling conference. i. 06/01/98 Date for submission of a Joint Statement of the Case pursuant to Minn. Gen. R. Prac. 112. j. 06/30/98 Trial date. k. 06/01/98 Deadline for filing (proposed instructions), (verdicts), (findings of fact), (witness list), (exhibit list). 1. R/A Deadline for 7. Estimated trial time: 1 days than a day must be stated in hours). (specify) hours (estimates less """ 8. A jury trial is: (X) waived by consent of Appellant pursuant to R. civ. P. 38.02. (specify party) ( ) requested by (NOTE:Applicable fee must be enclosed.) (specify party) 9. a. MEETING: Counsel for the parties have not met N/A to discuss case management issues. (date) b. ADR PROCESS (check one): Counsel agree that ADR is appropriate and choose the following: Mediation Arbitration (non-binding) Arbitration (binding) Med-Arb Early Neutral Evaluation Moderated Settlement Conference Mini-Trial Summary Jury Trial Consensual Special Magistrate Impartial Fact-Finder Counsel agree that ADR is appropriate but request that the Court select the process. X Counsel states that ADR is NOT appropriate because: the case implicates the federal or state constitution. X other (explain with particularity)Parties should be able to neaotiate this matter without the aid of ADR. domestic violence has occurred between the parties. c. PROVIDER (check one): The parties have selected the followingADR neutral: The parties cannot agree on an ADR neutral and request the Court to appoint one The parties will select an ADR neutral on or before 10. st ny additional information which might be helpful to hen scheduling this matter. N/A. signed: Lawyer for Respondent signed: \ L Appellant Christopher E. Morris Atty.Reg.#: 212209 FIRM: O'NEILL. TRAXLER. ZARD. NEISEN & MORRIS. LTD. Address: Law Buildina. 222 East Main L P. O. Box 105 New Praaue. MN 56071 Phone: ,'612\ 758-2568 Date: Februarv 16. 1998 Atty.Reg.#: FIRM: Address: Phone: Date: . III 1111 -111 '1:r -/r December 30,1997 Mr. Tom Scott Campbell Knutson Scott Fuchs 1380 Corporate Center Curve 317 Eagandale Office Center Eagan, MN 55121 SUBJECT: HOLY CROSS lUTHERAN CHURCH APPEAL OF SPECIAL ASSESSMENT PIKE LAKE TRAil IMPROVEMENTS Dear Tom: I am forwarding a copy of the information given to me by representatives of Holy Cross Lutheran Church. They apparently had an appraisal done on the property. In 1993 the Church and the City entered into an agreement to extend the sanitary sewer to the Church. They discuss what they paid for the sanitary sewer improvement. I have included a copy of that agreement with this letter for your information. I assume that the next step is for the City to obtain its own appraisal of the property. Please advise if you wish me to take the lead on obtaining that, or if you will. If you have any questions my direct dial number is 447-9831. Sincerely, 1J:k~ Director of Public Works/City Engineer CITY OF PRIOR LAKE Enclosure 16200 Eagle Creek Ave. S.E" Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ~ ...&. ..a. .... l!1 Holy Cross Lutheran Church Special V.oter's Assembly December 22, 1997 Status report regarding Holy Cross' Appeal of Special Assessments. Frank J. Wicker Associates has completed it's Appraisal Report,"Street Improvements and Cost Benefit Analysis". Wicker appraised the property as vacant land, considering its highest and best use as residential since the parcel is adjacent to residences, with new residential developments occurring to the South qnd East of the parcel. The appraisal uses six comparable properties with limited utilities and six properties' with full utilities. Wicker's professional conclusion is the Holy Cross property is worth (as of December 5, 1997): Value before improvements Value after improvements Total benefit of improvements $ 88,060 $188.700 . $100,640 In 1994 we paid $78,682.47 for partial improvements. With an average escalation 5% per year, this would equal $92,900 when also brought to December 5, 1997. Therefore, Total economic benefit received from improvements $100,640 Previously paid $ 92.900 Remaining cost benefit for street improvement $ 7,740 . ,~ .... 1 -..., RE!.!.r1ALS WHEREAS, Holy Cross desires to construct a church building on its property in the City of Prior Lake, and WHEREAS, Holy Cros has requested that the City provide sewer service to its property line which will require extending sanitary sewer across County State Aid Highway 42 and along the length of property located on Pike Lake Trail, and W 1f..l1.;REAS, in order to extend said sewer line as requested by Holy Cross, the City requires reimbursement for certain construction costs and needs certain right-of-way easements for the City and Scott County NOW THEREFORE, in consideration of the mutual promises, convenants and agreements herein and in consideration of the City extending its sanitary sewer line to Holy Cross' property, the parties agree as follows: Page 1 ~. "''' II 1. 1 ~ Holy Cross .:snall pay City Four Thousand (~,vOO.OO) Dollars prior to the issuance of a building peU..L~t by the City to Holy Cross. 2. Holy Cross shall pay City Seventy-Four Thousand Six Hundr~d Eighty-Two And 47/100ths ($74,682.47) Dollars (the balance of the sanitary sewer extension construction costs and related fees) by July 19, 1993. In the event said balance is not received by the City by July 19, 1993, the City shall stop further building inspections and will.not issue a Certificate of Occupancy. 3. Holy Cross shall execute and deliver all necessary easements. required for the extension of the sanitary sewer project as prepared by the City and Scott County~ 4. The assumptions and understandings of the parties as set forth on Exhibit "A" attached hereto are incorporated herein and are part of this Agreement. 5. This Agreement may be amended by the parties hereto only by written instrument executed in accordance with same procedures -and formality followed for the execution of this Agreement: 6. This Agreement may be simultaneously executed in several counterparts, each of which shall be an original and all of which shall constitute one in the same instrument. 7. The terms and conditions hereof shall be binding upon and inure to the benefit of the representatives, successors, and assigns of the parties hereto. 8. This Agreement shall be executed by the City Manager and the Mayor of the City only when authorized by the City Council. IN VI rn'ffiSSWHEREOF, City and Holy Cross have caused this Agreement to be duly executed as of the day and year first above written. Page 2 1 '.Db T~; CITY COUNCn.. ON T~ 2/ DAY. OF .r'~'. I , . Ii ~~g,db.,;J~ FrankBors?~w ~er ~/Lyt' ~~. LYd1YAndi~n, Mayor , ! APP~VED AS TOi~ By ~ltw^ (1, \, \.l"'-U Glenn R. Kessel LOM:MEN, NELSON, COLE, & STAGEBERT, P.A. 80 South 8th Street, Suite 1800 ~eapolis,~ 55402 HOLY 9)088 LUTHE~ CHURCH By ~-'~,-~: (14 ch~les g, ~/ By (7 /.,../k-- Gary Tho J: pson; TruStee By'0~' David Busse, Trustee Page 3 - -. ....." T STATE OF MINNESOTA) ) . COUNTY OF SCOTT ) On the day of , 19 , before me, a Notary Public, within and for said County personally appeared Lydia Andren and Frank Boyles, to me personally known, being each by me duly sworn did say that they are the Mayor and City Manager, respectively, of the City of Prior Lake, a Minnesota municipal corporation, named in the foregoing . instrument; and that said instrument was signed on behalf fo the municipal corporation :by authority of its City,Counci1 and acknowledged said instrument to be the free act and deed of said municipal corporation. N atary Public STATE OF MINNESOTA) ) COUNTY OFSCO'fT ) On the /5~daY of ~ (){.m L .1993 before me, a Notary Public, within and for said County persriiliy appeared Charles Vig, Gary Thompson, and David Busse, to me personally known, being each by me duly sworn did say that they are Trustees of Holy Cross Lutheran Church, and that said instrument was signed on behalf of the Church of authority of its Board of Trustees and acknowledged said instrument to.be the free act and deed of said Church. AGREE.WRT MARY A. M1EROW ... JY7/1;1.A..f () 1YI.J.J/'v62-U'- !~'~".... NOTAR'f pUBlIC_MINNESOTA ,~ ~ (~ SCOTT COUNTY.r u. L. \. Yy;.~~:EJ;*8&()d.15, 1996 otary Public , __ ,__,.__\\t\t\\lt\\~" ~,\\., .,,\l . Page 4 ~ T --. 11 EXllltsIT A" HOLy CROSS LJJTHERAN CHURCl{ June 11, 1993 1. ,ASSIJ)\'Jt' J .ONS, A. Holy Cross will grant easements for street as prepared by Scott County and the City of Prior Lake -75 feet CSAH42 -75 feet Pike Lake Trail B. Frontage and area charges, based upon easements being provided. 2. City will extend sanitary sewer across CSAH 42 and extend the length of the ,p..v,perty along Pike Lake Trail and provide a sewer service stub to the }'..v~ line. The City understands that the church desires completion of the building by September I, 1993. The City will make reasonable efforts to have the sewer available at ,that time. In the event that the sewer is not available at that time, the City will not be liable for delays caused. 3. Sanitary sewer, watermain and paving ilU}'wvements will be adjacent to the property along CSAH 42 & Pike Lake Trail in the future. Assessments and/or charges will be based upon the rates and policies at that time. 4. The cUUI;......trates are as follows: Sewer Street Water $ 401F00t $ 401F00t $ 20IFoot Street Collector Trunk Sewer Trunk Water Stonn Water Management $ 700/ Acre $1,375/Acre $1,375/Acre $. 168/Square Foot 5. The amqunt owed to the City based upon providing ROW.is as follows: SANITARy'sEWER A. Sanitary Sewer Trunk 6.29 Acres ($1,375/Acre) = $ 8,648.75 B. Sanitary Sewer Lateral .. Page 1 ;-.. III 1m t' 490 Feet l~.oolFoot) ,"" = :j)19.600.00 SUB TOTAL $28,248.75 STREET COLLECTOR FEE 6.29 Acres ($700.00/Acre) STORM WATER MaNAGEMENT FEE = $ 4.403.00 6.29 Acres ($.168/Square Foot) 43.560 Square Feet/Acre = $46.030.72 $78.682.47 TOTAL = 6. To facilitate cash flow for the church in lieu of collecting the amount owed to the City up front, the church will pay $4,000.00 prior to issuance ofa building pennit and the balance by July 19. 1993. In the event that payment is ,not made by July 19. 1993, the City will stop further building inspections and will not issue a Certificate of Occupancy. 7. City Staff will present this for Council approval at the June 21. 1993 Council Meeting. The church will agree to this in writing prior to placing it on the Council Agenda. CHURC1.WRT Page 2 11 ~I 1m CONSTRUCTION PAYMENT VOUCHER Estimate Voucher No. 3 For Period Ending: November 30. 1997 Date: December 10, 1997 Project Number: 97-17 Class of Work: Pike Lake Trail Street Imorovments For: Citv of Prior Lake To: McNamara Contracting. Inc 5001 160th Street Rosemont ,MN 55068 A, Original Contract Amount B. Total Additions C, Total Deductions D, Total Funds Encumbered E. Total Value of Work Certified to Date F, Less Retained Percentage G. Less Total Previous Payments H. Approved for Payment, This Report I. Total Payments Including This Voucher J. Balance Carried Forward $ 403.396.00 $ 0 $ 0 $ 403.396,00 5 % $ 238.419.36 $ 11.920,97 $ 96.972,01 $ 129.526.38 $ 226.498.39 $ 176,897.61 APPROVALS Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 60 % completed as of, November 30 . 1997, I hereby recommend payment of this voucher, Project Engineer Approval: ~ ~ ~ --/Jl. ~ /17;7 ' This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher, Signed By: 9 ~ Yh A r!~ ( Contractor: Me,,'V OJ'f1AN.. w.rrl-+ (ttcl't'j :r;;.. L .. Date: 1':k-tD-o'l Title: CITY OF PRIOR LAKE -f ':fw Iv( c-Q~-f+ V oucher Check~<rBy . 1'2- /ID ('1' 50 ( - 4830 S - 50 ) Date: Approve~r Payme~ K~~ Authorized Representative Date: (;)...1 \ 0 ) C\ 1 VOUCH3,DOC -. CONSTRUCTION PAYMENT VOUCHER Estimate Voucher No. 2 Date: November 5. 1997 Class of Work: For Period Ending: October 31. 1997 Project Number: 97-17 Pike Lake Trail Street Imorovrnents For: Citv of Prior Lake A. Original Contract Amount B. Total Additions C. Total Deductions D, Total Funds Encumbered E. Total Value of Work Certified to Date F, Less Retained Percentage G, Less Total Previous Payments H, Approved for Payment, This Report I. Total Payments Including This Voucher J. Balance Carried Forward APPRQV ALS To: McNamara Contracting. Inc 5001 160th Street Rosemont ,MN 55068 $ 403.396,00 $ 0 $ 0 $ 403.396,00 5 % $ 102.075.80 $ 5,103,79 $ 16.022,94 $ 80.949,07 $ 96.972,01 $ 306.423,99 Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 25 % completed as of, October 31 . 1997, I hereby recommend payment of this voucher. Project Engineer Approva1:_ ~~~ This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor: (V1<AJ..~,"".... C...+r..~j"'i ':t.... S;gned By: ~ J11;;J;... Date: (l- lP - l1l Title: ~ CITY OF PRIOR LAKE ~!~ Voucher~~ejA!y Date: /1- 6,. 91 5"D\ - 462040 - 50 I VOUCH2,DOC I ~I IIII APprov~.orpa~~ r~.-( . Authorized Representative Date: II / (. I <t .., ,p~I1!lj),\1!lI!'i1!c\\%,wn!i'{X'i'i,"{nnwn:\l\!!Q"jI€Tm!frJI'lj:~i!,!1\~~!l1$~jpk~!i!~!l!'l'ji\\W{:{:W{W!0tKKiii'i;'i>i""ii' ASSESSMENT HEARING DATE: NOVEMBER 3, 1997 ASSESSMENT RATE: PROPOSED $151.30IFF PAVING, SINGLE FAMILY RESIDENTIAL ASSESSMENT RATE: PROPOSED $7.71IFF SAN. SEWER, SINGLE FAMILY RESIDENTIAL ASSESSMENT RATE: PROPOSED $25.68IFF WATERMAIN, SINGLE FAMILY RESIDENTIAL ASSESSMENT CODE: PAVING - 92 ASSESSMENT CODE: SEWER - 93 ' ASSESSMENT CODE: WATER - 93 INTEREST RATE: 8.0% SPREAD: PAVING - 10 YEARS SPREAD: SAN. SEWER - 20 YEARS SPREAD: W A TERMAIN - 20 YEARS INITIAL YEAR: 1998 ADDITIONAL INTEREST: 58 DAYS PAYMENT METHOD: EQUAL PRINCIPAL '1 . LEGAL DESCRIPTION & PARCEL NUMBER, PROPERTY OWNER & ADDRESS Herbert & Elaine Wensmann 3312 West 151st Street Rosemount, MN 55068 Holy Cross Lutheran Church P,O. Box 177 14085 NE Pike Lake Trail Herbert & Elaine Wensmann 3312 West 151st Street Rosemount, MN 55068 Ed Vierling 14310 Pike Lake Trail Prior Lake, MN 55372 Lot 8 Block 1 Maple Hills Addition TOTALS ASROLL.DOC PAVING SEWER WATER CURRENT ASSESSMENT ASSESSMENT ASSESSMENT FRONTAGE AMOUNT AMOUNT AMOUNT (Code 92) (Code 93) (Code 93) 770' $116.501.00 $5.936,70 $19.773,60 565' $85.484,50 $4.356.15 $14.509,20 470' $71.111.00 $3.623,70 $12,069,60 150' $22.695.00 $1.156.50 $3,852,00 150 $22.695,00 $1.156.50 $3.852,00 $318.486.5Q $16.229,55 $54.056.40. '::>'T~l ~~N J-1A-~~ - ISO' ISo' ) 5"0 -nO' 770f 770 410' 4-70' 470 5"fo!7 r 5foS- 13 <Jo \ S-O , " /955' ~IO S- . I LEO B. lc HElEN A. VlERuNC SO' >- ~ ~ cr < ~ (I) ~ x ILl ~ ILl ILl ~ (I) ~ < ir cr < o SSD O?O ?~ _ TD'fA-l- ~ 5elA~ 15"0' 770 ' 470 ' 0' ~\;\o~ ~~T ... lfJ ~ II ~ IL . 45' R.O,W. TO BEl '--l-t. ~ ..... - - ACQUIRED . f - ,.."..','..m....::p.. .............,_....,....:::t:"........,.. . ., .. no......... .. . _..........'......... ....,~.... \ .. , .. --...--.... ...-......-""'..':":..-.. . t........._-",...,..,...........m'~.......~ ~ """""" "Q"-<T-_, I SO · W",1l' ~ '-- 11 ~ . .um. AS PER KNOB H1U AOOIllON 0 ~e:~ EXlsn~,o.w.- o ~~ . . ~ \0\LLS f' '''TOI<A- COI<<u: ..J \ v: l~ \ ~ w\ I\JLt- \.; \ ~ ~ ;:>'~IC 15'0' 770' 410' 5"05' H~~ 15'0' 77D I 470' C:h c: ' t-'IK~ I AKr --RAil , 770 STR.Ee.T 770' {..JA. n=~ 770' ~GHE:R. 'l\ENSMANN REAlTY ED VlERUNC , 1$"0 S~ \>0' ~t=vi~ ISO'14.ATe.R PROPOSED RETAINING WAlLS ~\ \ "0 \ \..- \.-- 70fo....,>o:;. $"~. H 70 b ' S1JZ.ee.l 70h' 7eWf;~ ~ PROPOSED SANITARY SEWER \..,...,....::::::::.-.J STREET IUPROVEMENTS F-~':'~.~':-:.:':.:.:::::~ M .. ~ -1-.ll::a r""'ItP"'\,"""'.....__ _____ _ ____ "..., :3 ") ~ I ?f?' \t 'J t:I ..1 01J.flO " L ~6)'UrI e __ ti'f;'l H ~: j r )f " '9 \ 0 ~ ~ ..l H6 -t ~8 I o 31e/~ ~ >- si'4~ 01.~'ro I 09!;; lOSt" ...al$iJI It<;tthl 1S'0 /FJ \ ~o?\i- ob g..~'._". "." . , ' o',e" \, ,.7-V - Oor..i.,i c c.; () (Jr~ ~9\ O~I I:'L-- q .v, t a CJ ~ ) () ..,..........-" / 91~~~2 lONVl:18 AH10~OO ~I I AKI:: ....HAIL , 770 STR.66.T 770' 14ATlil< 770 ' ~GH~R. WENSUANN REAlTY ~NSUANN REAlTY I 47D $TRet::'-r 470' ~S~e.fZ. 470' NATe!Z. N V I~ o a::: ED V1ERUNG I >- 1$"'0 I S~ PROPOSED STORM 5EWERl ~ \s;b' 5t:vl~ PROPOSED RETAINING WALLS <t PROPOSED STREET I.z! 5 ISO' L4A~ SEClION UNE-r () /!, 45" R.O. W. TO BE - . . . , .'. 'I ACQUIRED - - - ~ -t ("I/' ~"::':'{.:'=.f""""""":'~"":"~""':'"""'t,:~~"".,:,,,'iID~~!~:::..'~'4$::"': _.~" - . Ic.....'lWI\~f'-- It ~ ' '.' ~E)(JSllNG'~5' R.O.W.' 'I, '-' 7V' rll;" EXISTl~.O.W. _ , D1CAlED RIGHT-OF-WAY 0 ~E:W. ~ \.1\\_\.-S C/~&-.' ,e':' t"',_~I) ~ PER KN08 ",,,oon... .. ~ \' \ ...,~ _ 7 J _ ,n..- I' 1 -c MITOKA CIRClE ~ LUlHERAN CHURCH , I .\ l~ S'l12.eer >105' FUTUREJ J\.-~ \. Yh. NA-TE~ 565' WATERMAIN I \-JII\'\ I , \ S~e~ 0' I o ~ \ \\\'--Y ~>o::. $"~ H ( '(/:O~': $1J2ee: 70 b ' ~e..Hf;~ ~ o 200 . ,. UTILITY AND & I Ht:t: I' IMPROVEMENTS PROPOSED SANITARY SEWER (THIS PROJECT) PIKE LAKE TRAL Assessable totals I I Pike Lake Trail $ 402,597 ~ $ 16,149~ $ 68,334,37 $ 15,054~ $ 6,745,00 $ 11,828,31 "Street/Storm sewer cost Sanitary Sewer ($12,423,00 x 1,3) Watermain ($52,564,90 x 1,3) Sidewalk ($11 ,580,00 x 1,3) 7-9 tons ($5,.1.89,00 x 1,3) trunk storm ($9,098,70 x 1,3) Cost Assessable frontage [MSA] [MSA] ]TRUN"l Project Assessments Project Frontage Rate F/F Assessable Amount City FF City Cost Non-assessable (SWKl7- 9 ton /TRUNK STM) 1,955 $ 295,782,85 706 $ 106,814,67 1,390 $ 10,710,10 7~_~,439,80 2,105 $ 54,056.31 556 $ 14,278,06 -",...,- $ 33,627,31 - -, -- $ 360,549,25 $ 160,159,85 t \ \ \ $ 402,597 ~ 2,661 $151,30 .-L- 16,1~~ 2,096 $7,71 $ 68,334,37 2,661 $25,68 ---- $ 33,627~ ,__ ----,- ----- ,- $ 520,709,10 --- $ 266,126.50 $ 69,431 ,60 $ .(9,098,70) $ (5,189~,....___ $ (11,580,00) $ 309,690,40 '. ~ $ 92,907,12 I --+- $ 402,597.52 \ - Street/storm Sewer Sanitary Sewer Watermain Totals ~ Actual bid for street ~ Storm sewer bids Trunk storm sewer deduct 7-9 Ton deduct 1" base Sidewalk/Ped, ramps bid total of bids 30% admin/bond/eng.linsp/survey "Grand Total .......t -; , Page 1 J)~$(;Rll'1'l()N: ASSESSMENT HEARING DATE: ASSESSMENT RATE: ASSESSMENT RATE: ASSESSMENT RATE: ASSESSMENT CODE: ASSESSMENT CODE: ASSESSMENT CODE: INTEREST RATE: SPREAD: SPREAD: SPREAD: INITlAL YEAR: ADDITlONAL INTEREST: PAYMENT METHOD: LEGAL DESCRIPTION & ~RCEL NUMBE~ Sec, 26, Tl15, R2W S 25 A of NEIl, NW/, 25-926-006-0 Sec, 26, Tl15, R22 8,23 N 640' ofW 560' ofNI/2 NEil, 25-926-003-0 ~ Sec, 26, '[115, R22 15 N 552' ofE 1183,7' ofNE'/, NW/, 25-926-002-0 Sec, 25, TI15, R22 2,5AC E 250' ofN 435,60 of SEll, NW/, 25-926-001-1 ~ Lot 8 Block 1 Maple Hill Addition 25-082-008-0 -=-=: -; ASROLL.DOC !!!tQJ)!!~'i!ftjilj;~~~i~Yii~~r!~g!'!Y!B~1'!"7 NOVEMBER 3,1997 PROPOSED $151.30/FF PAVING PROPOSED $7.71/FF SAN. SEWER PROPOSED $25,68/FF W A TERMAIN PAVING - 92 SEWER - 93 WATER-93 8.0% PAVING -10 YEARS SAN. SEWER - 20 YEARS W ATERMAIN - 20 YEARS 1998 58 DAYS EQUAL PRINCIPAL PROPERTY OWNER & ~DDRESS ~ & Elaine Wensmann 3312 West 151st Street Rosemount, MN 55068 Holy Cross Lutheran Church p,O. Box 177 14085 NE pike Lake Trail Herbert & Elaine Wensmann 3312 West 151st Street Rosemount, MN 55068 Ed Vierling 14310 pike Lake Trail Prior Lake, MN 55372 DaVid & Nancy Triebel 14264 Mitoka Circle NE prior Lake, MN 55372 TOTALS CURRENT r:B-ONTAGE 770' 565' 470' 150' 150' --.-- PAVING ASSESSMENT AMOUNT (C~2) ~116.501.00 SEWER ASSESSMENT AMOUNr (Code 93) ~85.484.50. $71.111.00 ~22.695,OO $295.791.50 1 ~5.936.7Q. Q $Ui23 ,70 $1.156,50 Q $~W6.90_ T WATER ASSESSMENT AMOUNt (Code 93) - ~.19,773,60 $14.509.20 ~12.069.60 $3.852,00 Q ~3.852,OO - $54.056.40 - LEGAL DESCRIPTION PROPERTY 0- & & ~RCELN11~ bPDRE~ - - MUSHTOWN - - ~ - - - - - - Lots 1, Block 2, Windstar Addition ~ Herbert & Elame Wens 25_911-044-1 3312 West 151st Street Roseroont, MN 55068 I- - ---= Brink Lan~ Lotsl-12, Block 3, Lot 4, Block 1, Woodridge Estates 3rd Addition 7765 East 175th Street Prior Lake, MN 55372 l - ,~ L ~ DESCRIPTION: ASSESSMENT HEARING DATE: ASSESSMENT RATE: ASSESSMENT CODE: INTEREST RATE: SpREAD: INITIAL YEAR: ADDITIONAL INTEREST: PAYMENT METHOD: Ii \ ASROLL,DOC ~. 1 PROJECT #95-07, MIlSIlTOWN RO,\D STREET IMPROVEMENT NOVEMBER 3, 1997 PROPOSED s67.50iFF P A- VING, SINGLE FA-MIL Y REsroENTlA.L PAVlNG-9,\ 8.0%- PAVING -10 YEARS 1998 58 DAYS EQUAL PRINCIPAL WNER l - . CURRENT fl3:0NT Mill --- PAVING ASSESSMENT ~UN1 ~code 94) roan - 150' =-- -~oj25.QQ $85.177,OQ _ J -TI!T~ I- ~~J - 1 - I .l.U. ill 10-30-57 4:56PM BANNIGAN & KtLL1~ -, SENT BY; Banni;gan & Kel1v. P.A.J ATTORNEYS AT LAW 1750 )lOIrI'H .....,..."..AI. UFB TOWEll 445 MlNNf"SOTA STIlBRT SAJNl" rAUL, MINNI!$Ul'A :55101 (f) 11) 22.4-3781 PAX (612) ZZ3-1019 10HN F. 1\J\I'lJrllOAN. J1l, PATRICK J. KELLY JA)IET M. VfIUlBSKI SO)lO l.D PAWctrrT STBl'lUiI'f PLLY O~tober 30, 1997 Sent Via Fax tJnd U.S. Mail Mr. Frank Boyles City Manager . Prior Lake 16200 Eagle Creek Ave. SE Prior Lake, MN 55372 RE: Public Improvement Project No. 97-17. Pike Lake Traillmpruvemenrs Dear Mr, Boyles: This is to advise you that the Firm of Bannigan & Kelly. P. A. has been retained by Edward Vierling, fee owner of record of !he property involved in the sbove-named pubtk project. Please accept this tetter as written objection to lbe proposed special assessment. My client is of lbe opinion that said property doeS not speciallY benefit in the amount of $33,710.00 (current assessment) and $47,420.00 (defen'ed as_) from sanitary sewer, water, street and storm sewer. trUllk. sewer and water fee, grading, sggregate base. concrete curl> and gutter, bituminous surfacing, and appurtenant work for the improvement of Pike Lake Trail, Please call me 80 that wc can disc.uss this matter, Thank. you for your coope,ration. Respectively submitted, BANNIGAN & KELLY. P,A. .:)~ 'i._)!_~~t'L- Stephen Kelly SK/rlk c: Mr, Edward Vierling (via. fax) q7,I7 l.Jl lli h'~' " : I ' _ '( ~. ,__' , I I I ~ ; I 'J'-..- ' LICENSE AGREEMENT ()~~ ~~ T THIS AGREEMENT is made and entered into this a'l day of October, 1997 by and between WENSMANN REALTY, INC" a Minnesota corporation ("Wensmann") and the CITY OF PRIOR LAKE, a Minnesota municipal corporation ("Prior Lake"). RECIT ALS: A. Wensmann owns certain real property m Scott County, Minnesota, legally described as follows ("Wensmann Parcel"): The Northeast Quarter of the Northwest Quarter (NEV4 of NWV4) of Section 26, Township 115, Range 22, Scott County, Minnesota. B. Prior Lake is presently in the process of improving a public street called Pike Lake Trail which lies adjacent to the Wensmann Parcel. C. The engineering, surveying, excavation, sloping, grading, installation and paving of Pike Lake Trail and installation of utilities, as planned by Prior Lake, will be facilitated by temporary use by Prior Lake and its contractors and subcontractors of that portion of the Wensmann Parcel necessary to properly grade and shape the land area to generally lower the elevation of a high area on the Wensmann Parcel and to use the soil materials taken therefrom to slope and build up improved Pike Lake Trail. D, The parties wish to accommodate each other and Wensmann has agreed to grant Prior Lake, its contractors and subcontractors an immediate temporary license for engineering, surveying, excavation, sloping, grading, installation and paving of Pike Lake Trail and installation of utilities, which may affect the Wensmann Parcel and to grade and shape the land area adjacent to the improved Pike Lake Trail. r --.- .I 11 JU I.. T NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows: 1. License. Wensmann hereby grants to Prior Lake, and its contractors and subcontractors, a temporary non-exclusive license for engineering, surveying, sloping, grading, installation and paving of Pike Lake Trail and installation of utilities over that portion ofthe Wensmann Parcel, to-wit: The Northeast Quarter of the Northwest Quarter (NEV4 ofNWt..4) of Section 26, Township 115, Range 22, Scott County, Minnesota, ("Wensmann Parcel") as is necessary to enable Prior Lake, its contractors and subcontractors to complete the improvement of Pike Lake Trail as planned and designed by Prior Lake. 2, Term. The License shall terminate upon the completion by Prior Lake of the improvements to Pike Lake Trail, but in no event later than December 31, 1997, unless otherwise extended in writing by the parties. 3. Indemnification,. Prior Lake hereby indemnifies and holds harmless Wensmann for any and all claims, liabilities, or damages arising out of or in any way related to the use by Prior Lake, its employees, contractors, subcontractors, agents and invitees of Prior Lake, including without limitation any mechanic lien claims filed by contractors or subcontractors providing materials or labor in connection with the improvement of said Wensmann Parcel. In the event of the filing of any mechanics liens against the Wensmann Parcel, Prior Lake shall immediately take all steps necessary to remove such lien, including the posting of a bond if required. Prior Lake further agrees to maintain general liability insurance, This paragraph in no way waives the City's tort liability limitations provided in Minnesota Statutes Ch. 466 et. seq. 4. Restoration. Prior Lake will leave the Wensmann Parcel in as good condition as currently exists and grade and shape the land in a workmanlike manner and take all steps reasonable upon completion of grading so as to minimize any erosion. s. Miscellaneou~, This license shall be governed by and construed in accordance with Minnesota law, It shall be binding upon the parties and their successors and aSSIgns, WENSMANN rTY, INe. BY~~- \ 'C('v\.-r~~ '.~ensIUann~ It~: PIC;~lJ"...~~ /~r 2 --~-----~- '..... I .l.JI lI.J r ST ATE OF MINNESOTA) ) ss. COUNTY OF DAKOTA) The foregoing instrumentXas acknowledged before me this 2. L day of October, 1997 b~~(~~ Wensmann, the Pre~~t ofWensmann Realty, Inc., a Minnesota corporation, on behalf of the corporation, la~~] NOtaryPUbliC~ A.IJ ~ STATE OF MINNESOTA) ) ss. COUNTY OF SCOTT ) The foregoing instrument was acknowledged before me this)1 day of October, 1997 by Frank Boyles, the City Manager for the City of Prior Lake, a municipal corporation, on behalf o the corporation, lCI\SlEMM.~ IIJVIffldd. DNlIIIACCUnY My CamftL EJIIIIISJII1. 31. 2000 ~/l. t/cbJ Notary Public 3 -------,..- l Jl. lli l)~ C9 C;r;~ I g <:r t~~- (!)~ ~s/ iC;'1] :,,,, .;1."0.,,\ NOnCE OF PUBLIC ASSESSMENT HEARING. PUBLIC IMPllOVB~t'(I' PROJECT #95-07' MUSltI'OWN ROAl) .' :AND ..... .... ",' .'. . PUBLlCIMPROVBMEN1P~omCT 97.l7jPlKELAKETRAlL '.' ' RBCONSTRUoTIONOOROVE- MENT PROJECT'" :" GR.AI>ING. STORM SEWER, AGGRBOATS'BA,SB, CONCREte' CURB ..... ".'.., ..': . ,. AND G:t]T;rER.Bm.rMINOUS ' SUiFACING,SANlTARY SBWER, WATER,MAW '.' .......~', ANI> APPURTENANTWdRK. IN. THB . CITY OF.PRIOR1.AKB.."SCOTl' CQUNTY.MINNEs.OrA ; Notice,ishete\))' given that the City Council of the City ofptior ~e,MUme" sota wUlmeetin-tbe .QoonCUc:bamberut FiteStation l'{o.M~1<<,~FisJ:\;r.$i~tRoad, ollMonday;the3rd()lNo,Vem~~; 1~97 at ? :30p.m, to consi.d~.,~dj)o"ibly ~opt, U1epro~se~ ~~~~~~.~(~~~~ll' ~ ofgr~ ." ,~\~~m,..,eV{~,~agp'i~te. :~e, eonae . ~'~dgq,...}li.1:unlbi6US'; sUrfacing,s . 'Jewe,rfl~",'llfid ''IlPurtbnant'. ot'1h.,tm:provo*ntbP th6followingl~treetS: . ' . " ,'. MUShl""YiN ROAD.- .: ,The area Proposed to b~~sesse~ is every lot, piece;'aild par~l~~efitingfrom . said improvement, whether abutting or not, within the following described areas: Part of the Northwest 114 of Section 11. To~ship 114 north. Range 22 west, Scott County I Minnesota, .' Specific 'propeity descripijons in- cludtdin ttie abovedesenbed area,butnot inclusive, are as follows::. ' . /, . Lot 1, Block 2; Wtndstar Addition , Woodridge 'E$tata~~r~Mdition .'.r~LAKE.~ > ,Tbe ar~ ptc!1lQ$e4 ~;~fl,.,sessedis every lot, piece. lIl1~p~lb~ne1itingfrom said iniptoYeJ1lent;,whetberabutting or not.,'Wi@.I1:tl11~foll~V{ingdestribed areas: '..' .,.Part()ft)1eN.OFt1lh.a1f~fNoitheast1'J 4 of ',Sec(i,9Ii 16:;' TO'Ii@l1lPl1S:northl "R~~'~Yr'est..SC(\~ COUIm';'Minn~6ta: ';<'The ~Ol'theaSt 114 of the Northwest If '4,01 ~...tI"";".c ",__".0:3-'. .... ~ j.H JI., c~ I;jJu ~~ 1G~ ) f! ~ ({)cJ;:-J,~ ;;;'>; I q 01 . __:~Y@l'~~ir ~~ ,:~c IMPlwvEMBNTPROmcr 9'J.l1, pIKE I..AKB'lltAlL . " =~~=N ,IMPROVE- ING. j) l~AM S'BWEll. . GATBBASB. CONCllBTE' Gv Ill:!.1\., BITUMINOUS ACING. SANITARY SEWEll. .' lGPUllTENANT WORK crl.'YGf PIUOR1..AKB. SCO'IT ~, MiNNBSOTA .... ;,~isbeteblgiven that'- ltl. PKi"l)ftheCityO. f. Pri<<L.~... ... .~ , . 'm__taaeao.ril . ,-. ~ No,l.1&1;l6~"''''' y .the.3t4....0..f. ..N... ....0'1....... ~'.' ...I~.".".'..". . to COIlS_..d~8Sib ...... .' I..' '.' . .' ......of.' ..... '~\~.Wer.. . . . ". . ., tb~~'" '.....a.S....,.BeweJ..-...., I.... . .~t~th$imprOvt~W>j WUlg~treets:/ . 'i. " ", . . stuV,iN ROAD ,', '. .....,.'. area ~"'.i."sed to. be. ass. ........ ..iI ,'.. .. pieQe;and~~fi.-- '. ..' vement, wbethClr &bu.. ... . . ' the foUowit18 clescribe4'-: ~ of the N ...iL".st 1/4 of ~ 1 ' 114 north. &an.eZ...... ,Minnfl$O'" .;. .~~ ....~~d. ...~.crlfti~ (","'.. , area. _ as 1o)loW$:' .p 1.tloqt 2. W~ AddI1iIIa . . ~3t4Addit*:; J,.A:.O~'. .' ....., . ...t..... ...........t.,'......t'.;.'..a.....'. ..Jo...bCDC."..' .==.....1...... .......... '. ..,101,' IDCl .'.1' " , .' ~,~eD'Ot,'=k aW . ." ,.~.......... fi,..........;.....'.~..........O..f.. ..~.......Mld.N<dl.........'=:...........'..........'.......~.O..f.,'....N..~.~....I..._.............:.. ." . 16.~Wft 11S . .'. ',.. '21~Scot\~; ,., ,'~ 'N~li4"'''~'' , ._~\26,~t15.' ". , .. '~....SCOl~' . ." . . ,..;l~o-"--- i.n .... . """""1"- ....~ ,in ~ b1ItlIt OW,.:..... <./.; t8,.... ~1'.' Maple 1Ji1l~... '" ,e .. led to~ of both ~ ..... S:~:80,' '. ' ,.~J .,- .'. ..' . ..'.... M8il~ .~'" . .'.. .~~;'.. U....... ..pbjectiOl1S will beeonsidered atthe publi<: ~,No appealmaybe taken as ~ the lIIlouutof any assessment unless asigned; written objection is filed with the City ,)4ana&~ ~or to the beGing or ~esentlld " the presiding offiCer at the beariJ.lg. An ~.to di$tri(:t ~ riJay.be ~ by .rong no~~ upon tb~ Mayor or ,City i........anager.wi:..thin.',~Qda.ys. ~.' ...114011...' .... .,~ .-_entroll aIld filing sucj ~thdi8trlct court Withip 10 cia,.' ,; ,.;'.~. '.upoOtheMayor<<Cityl'.... .... .'... ,1!be City also has '. a d ~. .'......!! ".J'i,'."""D.t".'.'!d'"~"=,,,, e.bY tllt.' ................'.. \ .' uncil__y~flllftb4;~entof : .:; .; tsunentsfortbose,iDdividu8ls;. :;' ntlydisabledorbave ,. i.. :.~of 6Sorl()}der. (luideline ,.' . . ' 'l ~1lS lie a~~~at,City i. \'. lications mus.tbe . ' ~IoUowingtbe~ftDe .-ntIOU by the CiI.1 I . ., ..,. ,-,.,....}. ""."C",",'.o,., ,.1&, ,.Jl, ... ( I, <........, October 15, 1997 RE: PUBLIC HEARING NOTICE ON ASSESSMENTS FOR STREET IMPROVEMENTS ON PIKE LAKE TRAILIPROJECT #97-17 Dear Property Owner: This letter is to notify you that your property is proposed to be assessed for the improvements of Pike Lake Trail. Please find enclosed an Assessment Hearing Notice for Public Improvement Project #97-17, This notice will be published in the October 18 and October 25, 1997 Prior Lake American and describes the notice of improvements and the area to be assessed. The Assessment Hearing is scheduled to be held on November 3, 1997. To provide 14 days notice on the assessments to the property owners, we have prepared the assessments based on the actual bid amount received for this project, The proposed front footage rates area as follows: Street Sanitary Sewer Water $151.30/FF $7,71/FF $25,68/FF If you have any questions, please call either Jeff Evens or myself at City Hall, 447-4230. Sincerely, )~ . fl1444- Greg n'U.a, P ,E. Public Works Director/City Engineer CITY OF PRIOR LAKE GI/aj 9717LET,DOC 16200 Eagle Creek Ave, S,E., Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ,I J1 ill 08/18/97 MON 14:36 FAX 612 452 5550 CAMPBELL ,LJ-o CJl-ll ~uu.. T \..../ Project: pike Lake Trail PID: 15-rns::J120 & 15-g}H:J:HJ Abstract Property CONSENT TO EASEMENT, PRIOR LAKE STATE BANK. organi;z.ed and existing under the laws of the State of MinneSota, which holds a mortgage on all or part of the property more particularly described in the foregoing Grant ofPennanont Easement. which mortgage is dated October 24. 1997, and recorded November 8, 1997 as Document No. 382435 with the office of the County :Recorder for Scott County, MinDesota, for good and valuable consideration, the receipt and suffICiency of which is hereby ackDoWledged, does hereby join in, consent, and is subject to the foregoing GIanI of PermaneDl EasemenL PRIOR LAKE STATE BANK STATE OF MINNESOTA) ) 5S. COUNTY OF SCOTT ) The foregoing instrument was ""knowledged _ before me this I ~ day of ~ .' 1997. by ,."., ~ -"OAC!' ___ and bYl~~ 1 .<MIMf~ ; the 1:1<.' _ and IITfF --",...;tr ofPRlOR LAKE STATE BANK. organized and existlXlg w>ler the laws of the State of MiDnCsota, on its-bebalf. - ~~ Nota# Public' - THIS INSTRUMENT WAS DRAl'l,t,lJ BY: eMu bELL KNUTSON professional Association 317 Eagandale Office Center 1380 Corporate Center eurve EagaD. MN 55121 Telephone: (612) 452-5000 kg1n (3693/118) .. e JOAN M. MUElXEN NOTARY F'UBl..lc-MlNNESOTA SCOTT COUNTY M1l;. ,.., EGs.WU1.2IDI 53169 ,..... ,.&, ,~l ... .-----.- -\ /' / PAYESTIMATENUMBER1 ~ PROJECT: FISHPOINT ROAD SAP 201-105-06._'11- 0 :t PIKElAKEROADSAP201.114-03 ~q7-/7 MUSHTOINN ROAD '1')'-" 7 OWNER: CITY OF PRIOR lAKE. MINNESOTA OPENING DATE: AUGUST 4,1997 ENGINEER: HOWARD R. GREEN COMPANY 1 c 9/31/97 SCHEDULE 1,0 FISH POINT ROAD (STREET) 1 MOBILIZATION LS 1 4,000,00 0,50 2.000,00 2 COMMON EXCAVATION CY 1105 5,00 1105,00 5.525,00 3 SUBGRADE EXCAVATION CY 500 6,50 0,00 0,00 4 TOPSOIL BORROW CY 1066 7,00 0,00 0,00 5 SUBGRADE PREPARATION RDSTA 12 125,00 12,00 1.500.00 6 GEOTEXTILE FABRIC TYPE V SY 1500 1,00 0,00 0,00 7 AGGREGATE BASE, CLASS 5 TON 3850 7,25 2650,80 19.218,30 8 3' MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 7,25 0,00 0,00 9 TYPE 41A, 21/2' BITUMINOUS PATHWAY TON 300 42.00 0,00 0,00 10 TYPE 41A.1/IIEAA COURSE MIXTURE TON 700 24,50 0,00 0,00 11 TYPE 31B, BASE COURSE MIXTURE TON 1410 21,00 0,00 0,00 12 BITUMINOUS MATERIAL FOR TACK COAT GAl 220 1,50 0,00 0,00 13 ADJUST GATE VAlVE EA 4 100,00 0,00 0.00 14 ADJUST FRAME AND RING CASTING EA 8 165.00 0,00 0,00 15 4' CONCRETE Wp.JJ( SF 5786 1,70 0,00 0,00 16 CONCRETE CROSSWALK SPECIAL SF 360 4.20 0,00 0,00 17 CONCRETE CURB & GlITTER, B618 LF 4600 6,20 4295,00 26,629,00 18 CONCRETE PEDESTRIAN RAMP EA 8 190,00 0,00 0,00 19 CONCRETE TRIANGUlAR VAlLEY GUTTER SF 150 5.25 66,00 346,50 20 CONCRETE VAlLEY GlITTER LF 75 15,50 47,50 736.25 21 PERMANENT BARRICADE EA 2 325,00 0,00 0,00 22 PAVEMENT STRIPING, 4' EQUIV, INlDTH LF 5000 0,50 0,00 0,00 23 FURNISH & INSTAlL SIGN PANELS. TYPE C SF 102 23.00 0,00 0,00 24 BAlE CHECK EA 30 15,00 0,00 0,00 25 SILT FENCE. HEAVY DUTY LF 525 2,50 53,00 132.50 26 CATCH BASIN SEDIMENT BARRIER EA 17 125,00 0,00 0,00 27 DUST CONTROL WATER MGAL 60 15,00 0,00 0,00 28 SEED MIXTURE 500 AC 1,1 1,000,00 0.25 250.00 29 SODDING, LAINN & BOULEVARD SY 2350 2.00 0,00 0,00 30 WOOD FIBER BLANKET TYPE REGULAR SY 1825 1,00 1218,00 1,218,00 31 TRAFFIC CONTROL LS 1 1,500,00 1,00 1,500,00 32 SUBGRADE DENSITY TEST, INPLACE EA 2 55,00 2,00 110,00 33 CLASS 5 GRADATION TEST EA 2 55,00 2.00 110,00 34 CLASS 5 PROCTOR TEST EA 1 100,00 1.00 100.00 35 CLASS 5 DENSITY TEST. INPLACE EA 3 55,00 3,00 165,00 36 CONCRETE TESTING EA 9 75,00 4,00 300,00 37 BITUMINOUS AIR VOID TEST EA 6 100,00 0,00 0,00 38 BITUMINOUS CORE DENSITY TEST EA 6 25.00 0,00 T SCHEDULE 1.0 FISH POINT ROAD (STREET) - TOTAL 59,840,55 n:\clerical\PA YESTl.XLS PAGEl ~ 9/31197 SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER) 1 12" RC PIPE SEWER DESIGN 3006 CLASS V LF 2 15. RC PIPE SEWER DESIGN 3006 CLASS V LF 3 18" RC PIPE SEWER DESIGN 3006 CLASS III LF 4 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 5 CONNECT TO EXISTING MANHOLE EA 6 CONNECT TO EXISTING PIPE EA 7 CONST DRAINAGE STRUCTURE, DESIGN 48-4020 EA 8 CONST DRAINAGE STRUCTURE, DESIGN SPECIA EA 9 SUBGRADE PROCTOR EA 10 SUBGRADE DENSITY - INPLACE EA T SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER). TOTAL SCHEDULE 3.0 PIKE LAKE TRAIL (STREET) 1 MOBILIZATION LS 2 CLEARING AC 3 GRUBBING AC 4 CLEARING EA 5 GRUBBING EA 6 SALVAGE AND REINSTALL CMP LF 7 REMOVE BITUMINOUS SURFACE SY 8 COMMON EXCAVATION CY 9 SUBGRADE EXCAVATION CY 10 SALVAGE TOPSOIL RESPREAD CY 11 MODIFIED SELECT GRANULAR BORROW CY 12 GEOTEXTILE FABRIC TYPE V SY 13 AGGREGATE BASE, CLASS 5 TON 14 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 15 3. BITUMINOUS DRIVEWAY RESTORATION SY 16 TYPE 41A. WEARING COURSE MIXTURE TON 17 TYPE 31B. BASE COURSE MIXTURE TON 18 BIT, MATERIAL FOR TACK COAT GAL 19 MODULAR BLOCK RETAINING WALL SF 20 ADUST FRAME AND RING CASTING EA 21 4" CONCRETE WALK SF 22 CONCRETE CURB AND GUTTER, DESIGN B618 LF 23 CONCRETE DRIVEWAY PAVEMENT SY 24 CONCRETE PEDESTRIAN RAMP EA 25 TRAFFIC BARRIER DESIGN AB307 LF 26 FURNISH & INSTALL SIGN PANELS, TYPE C SF 27 SILT FENCE. HEAVY DUTY LF 28 CATCH BASIN SEDIMENT BARRIER EA 29 WOOD FIBER BLANKET SY 30 SEED MIXTURE 500 AC 31 SODDING, LAWN & BOULEVARD SY 32 DUST CONTROL WATER MGAL 33 PAVEMENT STRIPING. 4" EQUIV, WIDTH LF 34 TRAFFIC CONTROL LS 35 ClASS 5 GRADATION TEST EA 36 CLASS 5 PROCTOR TEST EA 480 23,75 870 25,25 70 27.00 200 10,00 1 500,00 1 475,00 9 1,050,00 9 825,00 1 85.00 8 40,00 1 3,000,00 0,9 2,500,00 0,9 1,250,00 28 150,00 28 110,00 30 15,00 280 3,00 4960 3,50 500 5,00 1080 2,50 1920 7.00 1500 1,00 4075 7,25 930 7,75 85 42,00 550 25.00 900 22,00 230 1,50 6000 14,30 3 160,00 6400 1,75 2700 6,30 30 28,00 2 190,00 570 13,00 103 23,00 1200 2,75 13 125,00 50 3,00 1 500,00 1600 2,00 35 20,00 6225 0,45 1 55,00 2 55,00 100,00 n:\clericalIPAYESfl.XI..S PAGE 2 T 448,00 10,640,00 867,00 21,891.75 74.00 1.998.00 0,00 0,00 1,00 500,00 1,00 475,00 9,00 9,450,00 9,00 7,425,00 1,00 85.00 5,00 200,00 52,664,75 0,50 1,500.00 1,50 3,750.00 1,50 1,875,00 28,00 4,200,00 28,00 3,080,00 0,00 0,00 0,00 0,00 0,00 0.00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0.00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 895,00 2,461,25 0,00 0,00 0.00 0,00 0,00 0,00 0.00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 ,...., ..il .Mo. 9/31/97 37 CLASS 5 DENSITY- INPLACE EA 3 55,00 0,00 0,00 38 CONCRETE TESTING EA 4 75.00 0,00 0,00 39 BITUMINOUS AIR VOIDS EA 6 100,00 0,00 0,00 40 BITUMINOUS CORE DENSITY EA 6 25,00 0,00 0,00 41 SUBGRADE DENSITY-INPLACE EA 4 55,00 0,00 0,00 T SCHEDULE 3,0 PIKE LAKE TRAIL (STREET) - TOTAL 16,866.25 SCHEDULE 4,0 PIKE LAKE TRAIL (TRUNK STORM SEWER) 1 4. PERFORATED THERMOPLASTIC PIPE DRAIN LF 360 9,50 0,00 0,00 2 RANDOM RIP RAP CLASS III CY 8,5 53.00 0,00 0,00 3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 4 EA 2 1,050,00 0,00 0,00 4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 6 EA 3 1,490,00 0.00 0,00 5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 8 EA 1 2,400,00 0,00 0,00 6 CONSTRUCT DRAINAGE STRUCTURE. DESIGN S EA 8 825,00 0.00 0,00 7 CONNECT TO EXISTING STORM SEV\lER MANHOL EA 1 475,00 0,00 0,00 8 12. RC PIPE SEWER. DESIGN 3006 CLASS V LF 127 23,00 0,00 0,00 9 15. RC PIPE SEWER, DESIGN 3006 CLASS V LF 292 24,30 0,00 0,00 10 18" RC PIPE SEWER. DESIGN 3006 CLASS III LF 552 26.30 0,00 0,00 11 21. RC PIPE SEWER. DESIGN 3006 CLASS III LF 122 28,50 0,00 0,00 12 24. RC PIPE SEWER. DESIGN 3006 CLASS III LF 255 30,30 0,00 0,00 13 27" RC PIPE SEWER, DESIGN 3006 CLASS III LF 184 36,60 0,00 0,00 14 36. RC PIPE SEWER. DESIGN 3006 CLASS III LF 150 50.50 0,00 0,00 15 36. RC PIPE APRON EA 1 1,250.00 0,00 0,00 16 SUBGRADE PROCTOR EA 1 80,00 0,00 0,00 17 SUBGRADE DENSITY - INPLACE EA 8 38,00 0,00 0,00 18 PIPE FOUNDATION MATERIAL CY 50 13,70 0,00 0,00 T SCHEDULE 4.0 PIKE LAKE TRAIL (STORM SEWER) - TOTAL 0,00 SCHEDULE 5,0 PIKE LAKE TRAIL (WA TERMAIN) 1 CONNECT TO EXISTING WATERMAIN EA 2 480,00 0,00 0,00 2 HYDRANT WITH 6. VAl..VE EA 5 1,750,00 0,00 0,00 3 6. GATE VALVE EA 1 455,00 0,00 0,00 4 8" GATE VAl..VE EA 1 600,00 0.00 0,00 5 10" GATE VAl..VE EA 1 840,00 0,00 0,00 6 12. BUTTERFLY VAl.. VE EA 2 775,00 0,00 0,00 7 6. DIP WATERMAlN, CLASS 52 LF 163 16,50 0,00 0,00 8 8. DIP WATERMAlN, CLASS 52 LF 48 19,20 0,00 0,00 9 10. DIP WA TERMAlN, CLASS 52 LF 773 21,80 0,00 0,00 10 12. DIP WATERMAlN, CLASS 50 LF 553 23,30 0,00 0,00 11 FITTINGS LBS 3150 1,55 0,00 0,00 n:\clericallP A YESTI.XLS PAGE 3 111 , 9/31197 0,00 0,00 0,00 12 13 14 SUBGRADE PROCTOR SUBGRADE DENSITY - INPLACE PIPE FOUNDATION MATERIAL EA EA CY 1 10 50 80,00 40,00 14,00 0,00 0,00 0,00 SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN) - TOTAL 0,00 SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER) 1 8' PVC SEWER SDR 35 (10-12') DEEP LF 427 16,00 0,00 0,00 2 4' PVC PIPE SEWER LF 40 8,80 0,00 0,00 3 8")(4' PVC WYE EA 29.00 0,00 0,00 4 CONNECT TO EXISTING SAN IT ARY SEWER MANH EA 3 500,00 0,00 0,00 5 48' DIAMETER SANITARY MANHOLE EA 2 1,425,00 0.00 0,00 6 SUBGRADE PROCTOR EA 1 80,00 0,00 0,00 7 SUBGRADE DENSITY - INPLACE EA 2 40,00. 0,00 0,00 8 PIPE FOUNDATION MATERIAL CY 50 14,00 0,00 0,00 T SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER) - TOTAL 0,00 SCHEDULE 7,0 MUSHTOWN ROAD (STREET) MOBILIZATION LS 3,500,00 0,50 1,750,00 2 CLEARING AC 1 3,000,00 1,00 3,000,00 3 GRUBBING AC 1 1,750,00 1,00 1,750,00 4 CLEARING EA 1 400,00 1.00 400,00 5 GRUBBING EA 1 250,00 1,00 250,00 6 COMMON EXCAVATION CY 9037 2.50 7000,00 17,500,00 7 SUBGRADE EXCAVATION CY 650 4,25 650,00 2,762,50 8 SALVAGE TOPSOIL AND RESPREAD CY 2775 1,75 0,00 0,00 9 GEull:AliLE FABRIC TYPE V SY 1950 1,00 0,00 0,00 10 MODIFIED SELECT GRANULAR BORROW CY 3530 8,00 2169,57 17.356,56 11 AGGREGATE BASE. CLASS 5 TON 3425 7.25 3617,11 26,224,05 12 3' MINUS 100% CRUSHED QUARRY LIMESTONE TON 1210 7,75 3580,87 27,751.74 13 TYPE 41A, WEAR COURSE MIXTURE TON 650 25,00 0.00 0,00 14 TYPE 31 B, BASE COURSE MIXTURE TON 1025 21,00 0,00 0,00 15 BITUMINOUS MATERIAL FOR TACK COAT GAL 340 1,50 0,00 0,00 16 TYPE 41A. 2112" BITUMINOUS PATHWAY TON 150 42,00 0,00 0,00 17 BITUMINOUS DRIVEWAY SY 45 9,00 0,00 0,00 18 ADJUST HYDRANT EA 2 225,00 0,00 0,00 19 ADJUST FRAME AND RING CASTING EA 1 250.00 0,00 0,00 20 CONCRETE CURB & GUTTER. B618 LF 4630 6,15 0,00 0,00 21 CONCRETE VALLEY GUTTER SF 500 4,20 0,00 0,00 22 SILT FENCE. HEAVY DUTY LF 1100 2,75 1000,00 2,750,00 23 BALE CHECK EA 30 15,00 0,00 0,00 24 CATCH BASIN SEDIMENT BARRIER EA 11 125,00 0,00 0,00 25 SODDING, LAWN & BOULEVARD SY 10300 2,00 0,00 0,00 26 SEEDING MIXTURE 500 AC 1.6 1,000,00 0,00 0,00 27 SEEDING MIXTURE 250 AC 0,4 1,000,00 0,00 0,00 28 WOOD FIBER BLANKET SY 1600 1,75 0,00 0,00 29 DUST CONTROL WATER MGAL 60 10,00 0,00 0,00 30 TRAFFIC CONTROL LS 1 55,00 1,00 55,00 31 SUBGRADE DENSITY TEST, INPLACE EA 4 55,00 4,00 220,00 32 CLASS 5 GRADATION TEST EA 2 100,00 2,00 200,00 33 CLASS 5 PROCTOR TEST EA 1 55,00 1,00 55,00 34 CLASS 5 DENSITY TEST. INPLACE EA 4 75.00 4,00 300,00 35 CONCRETE TESTING EA 5 100,00 0,00 0,00 36 BITUMINOUS AIR VOID TEST EA 5 50,00 0.00 0,00 37 BITUMINOUS CORE DENSITY TEST EA 5 25,00 0,00 0,00 T SCHEDULE 7.0 MUSHTOWN ROAD (STREET) - TOTAL 102,324,85 n:\clericalIPA YESTl,XLS PAGE 4 1 ., ._..._.. _,' .... ._ ==-'=_ .__ .-__.='l_ ...'. ...., . . ,._,..,' .,_,_,_. '.' ...... ,_. _,_,.., .'_"'~_' _,,__._,__ __'_"._. J 9/31/97 SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) 1 12" RCP CLASS V LF 293 23,60 230,00 5,428.00 2 15" RCP CLASS V LF 28 25,00 28,00 700,00 3 18" RCP CLASS III LF 159 26,80 149,00 3,993.20 4 24" RCP CLASS III LF 44 30,80 38,00 1,170,40 5 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 1670 9,50 1500,00 14,250,00 6 STORM MANHOLE 48" DIA EA 2 1,000,00 2,00 2,000.00 7 STORM MANHOLE 48. DIA WITH 3' SUMP EA 1 1,200,00 1,00 1,200,00 8 STORM MANHOLE 60" DIA WITH 3' SUMP EA 1 1,850,00 1,00 1,850.00 9 CATCH BASIN EA 7 840.00 7,00 5,880,00 10 18. RCP APRON EA 1 590,00 1,00 590.00 11 24" RCP APRON EA 1 775,00 1,00 775.00 12 RIPRAP CLASS III TON 15 55,00 15,00 825,00 13 SUBGRAOE PROCTOR EA 1 80.00 1,00 80,00 14 SUBGRAOE DENSITY - INPLACE EA 5 40,00 5,00 200,00 15 PIPE FOUNDATION MATERiAl CY 100 14,00 0,00 0,00 T SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) - TOTAL 38,941,60 TOTAL CONSTRUCTION COST SCHEDULE 1,0 FISH POINT ROAD (STREET) 59,840,55 SCHEDULE 2,0 FISH POINT ROAD (STORM SEWER) 52.664.75 SCHEDULE 3,0 PIKE lAKE TRAIL (STREET) 16,866,25 SCHEDULE 4,0 PIKE LAKE TRAIL (TRUNK STORM SEWER) 0,00 SCHEDULE 5,0 PIKE lAKE TRAIL (WATERMAlN) 0,00 SCHEDULE 6,0 PIKE lAKE TRAIL (SANITARY SEWER) 0,00 SCHEDULE 7.0 MUSHTOWN ROAD (STREET) 102,324,85 SCHEDULE 8,0 MUSHTOWN ROAD (STORM SEWER) 38,941,60 TOTAL CONSTRUCTION COST 270.638.00 AL TERNA TE 1.0 MUSHTOWN ROAD (STREET) 1 MOBILIZATION LS 1 2,200,00 0,75 1,650,00 2 CLEARING AC 0,1 3,000,00 0,10 300,00 3 GRUBBING AC 0.1 2,000.00 0,10 200.00 4 COMMON EXCAVATION CY 1000 4,00 700,00 2.800,00 5 SUBGRAOE EXCAVATION CY 125 6,00 125,00 750,00 6 SAlVAGE AND TOPSOIL RESPREAD CY 200 3,50 0,00 0,00 7 GEvlCAllLE FABRIC TYPE V CY 300 1,00 0,00 0,00 8 MODIFIED SELECT GRANUlAR BORROW CY 680 7,50 680.00 5,100,00 9 AGGREGATEBASE,CLASS5 TON 700 8.00 887.73 7,101.84 10 3. MINUS 100% CRUSHED QUARRY LIMESTONE CY 100 9.00 654.82 5.893,38 11 TYPE 41A, WEAR COURSE MIXTURE TON 130 28,75 0,00 0,00 12 TYPE 31B. BASE COURSE MIXTURE TON 200 25,00 0,00 0,00 13 BITUMINOUS MATERiAl FOR TACK COAT GAL 67 2,00 0,00 0,00 14 TYPE 41A 2112" BITUMINOUS PATH TON 45 55,00 0,00 0,00 15 CONCRETE CURB & GUTTER. B618 LF 835 7,35 0,00 0,00 16 BAlE CHECK EA 10 20,00 0,00 0,00 17 CATCH BASIN SEDIMENT BARRIER EA 4 125,00 0,00 0,00 18 SILT FENCE, HEAVY DUTY LF 100 1,50 100,00 150,00 19 SODDING, LAWN & BOULEVARD SY 320 3,00 0,00 0,00 20 SEEDING MIXTURE 500 AC 0,2 1,500,00 0,00 0,00 21 SEEDING MIXTURE 250 AC 0,2 1,500,00 0,00 0,00 22 WOOD FIBER BLANKET SY 450 1,50 0,00 0,00 23 DUST CONTROL WATER MGAl 15 200,00 0,00 0,00 24 TRAFFIC CONTROL LS 1 55,00 1,00 55,00 25 SUBGRADE DENSITYTEST.INPLACE EA 1 65,00 1,00 65,00 26 CLASS 5 GRADATION TEST EA 1 65,00 1,00 65,00 27 CLASS 5 PROCTOR TEST EA 1 75,00 1.00 75,00 28 CLASS 5 DENSITY TEST. INPLACE EA 1 75,00 1,00 75,00 n:\c1ericalIPA YESTl.laS PAGES . 9/31197 0,00 0,00 0,00 29 30 31 CONCRETE TESTING BITUMINOUS AIR VOID TEST BITUMINOUS CORE DENSITY TEST EA EA EA 75,00 75,00 75.00 0,00 0,00 0,00 T ALTERNATE 1.0 MUSHTOWN ROAD (STREET). TOTAL 24,280,22 AL TERNA TE 2.0 MUSHTOWN ROAD (STORM SEWER) 1 12" RCP CLASS V LF 12 23,60 12,00 283,20 2 15" RCP CLASS V LF 38 25,00 28,00 700,00 3 18" RCP CLASS III LF 148 26,50 148,00 3,922,00 4 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 150 9,50 150,00 1,425,00 5 STORM MANHOLE 48. DIA EA 1 1,000,00 1,00 1,000,00 6 CATCH BASIN EA 3 850,00 3,00 2,550,00 7 SUBGRAOE PROCTOR EA 1 80,00 1,00 80,00 8 SUBGRAOE DENSITY - IN PLACE EA 4 40.00 1,00 40,00 T ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER). TOTAL 10,000,20 AL TERNA TE 3,0 PIKE LAKE TRAIL (STORM SEWER) 1 4. PERFORATED THERMPLASTIC PIPE DRAIN LF 360 9.50 0.00 2 RANDOM RIP RIP CLASS III CY 8,5 55,00 0,00 3 CONSTRUCT DRAINAGE STRUCTURE. DESIGN 4 EA 4 1,025,00 0,00 4 CONSTRUCT DRAINAGE STRUCTURE. DESIGN 6 EA 1 1,500,00 0,00 5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 7 EA 1 2,400,00 0,00 6 CONSTRUCT DRAINAGE STRUCTURE. DESIGN S EA 8 850,00 0,00 7 CONNECT TO EXISTING STORM SEWER MANHOL EA 1 475,00 0,00 8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF 127 23,00 0,00 9 15. RC PIPE SEWER, DESIGN 3006 CLASS V LF 292 24,50 0.00 10 18. RC PIPE SEWER, DESIGN 3006 CLASS III LF 552 26.30 0,00 11 21" RC PIPE SEWER, DESIGN 3006 CLASS III LF 439 28,50 0,00 12 30" RC PIPE SEWER. DESIGN 3006 CLASS III LF 150 41,00 0,00 13 30" RC PIPE APRON EA 1 950,00 0,00 14 SUBGRAOE PROCTOR EA 1 80,00 0,00 15 SUBGRADE DENSITY - INPLACE EA 8 40,00 0,00 16 PIPE FOUNDATION MATERIAL CY 50 14,00 0,00 T ALTERNATE 3,0 PIKE LAKE TRAIL (STORM SEWER)-TOTAL 0.00 TOTAL CONSTRUCTION COST FOR ALTERNATE AL TERNA TE 1,0 MUSHTOWN ROAD (STREET) 24,280,22 ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER) 10,000,20 ALTERNATE 3,0 PIKE LAKE TRAIL (STORM SEWER) 0,00 TOTAL 34,280.42 I HEREBY CERTIFY TIIATTIIIS IS AN ACCURATE TABULATION OF TIIE BIDS RECEIVED FOR TIIE ABOVE MENTIONED PROJECT, NAME: JEFF EVENS DATE: OCTOBER 10,1997 n:\clcricallP A YESTI.XLS PAGE 6 _..., T1" CDnS~YllC \ tG'Y\ ~lA l-L-h' ~ UlLC Ly 25, J 991 ~ -- 1997 STREET & UTILITY IMPS BIDS CLOSE AUG 4 Prior Lake MN ADVERTISEMENt FOR BIDS - 1997 Street and Utility Improve- ments in the City of Prior Lake City Pro~ect No. 97-02 City Pro~ect No, 95-07 City Project No, 97.17 NOTICE IS HEREBY GIVEN that sealed proposals will be received by the CityC"ouncil of the City of Prior Lake. Minnesota at the Prior Lake City Hall, located at 16200 Eagle Creek Avenue S.E" Prior Lake. MN 55372 until 10:00 a.m" local time, on the 4th day of August, 1997, and will be publicly opened at said time and place by two or more designated offi- cers or agents of the City of Prior Lake, saia proposals for the furnishing of all labor and materials for the con- struction. complete in place of the fol- lowing: APPROXIMATE QUANTITIES Concrete Curb ana Gutter 11930 LF Class 5 Aggregate Base 11350 Ton Bituminous Paving 5685 Ton Storm Sewer 2100 LF Concrete Sidewalk 12186 SF Pavement Striping 8725 LF Watermain 1450 LF Sanitary Sewer 430 LF Retaining Wall 6000 SF Proposals arriving after the desig- nated I1me will be returned unopened, The Bids must be submitted on the Jlroposal forms provided in accor- aance with contract documents. plans. and specifications as prepared by Howard R. Green Company, 1326 Energy Park Drive. SI. Paul" MN 55108. Contract documents. plans. and si>ecifications may be obtained from Howard R, Green Company upon deposit of One hundred dollars ($100,00) non-refundable deposit per set. No bids will be considered unless sealed and filed with the City Clerk of Prior Lake and accompanied by a cash deposit. cashier's check. bid bond, or certified check payable to Clerk of the City of Prior Lake, for five (5%) per- cent of the amount bid to be forfeited as liguidated damages in the event that the oid be accepted and bidder shall fail to enterJromptly into a written contract an furnish the required bond, No bids may be withdrawn for a p<;riod of sixty (60) days from the date of opening of bids, The City of Prior Lake reserves the right to reject any or all bids, Further. the City reserves the right to acceft a bid higher than the lowest bid i . in the opinion of the Council. the public interest will be better served, Frank Boyles City Manager City of Prior Lake, Minnesota 07-11/07-18/07-25 II III llil -) -- --- Professional Association Attorneys at Law q-,- 11 REO&1VlIl. JUl 2 4 1997 , CAMPBELL KNUTSON Thomas J, Camrhell Roger N, Knutson Thomas M, Scott James R, Walston Elliott [I, Knetsch Suesan Lea Pace (612) 452-5000 Fax (612) 452-5550 Writer's Extension: 212 Writer's Fax: 452-5550 Joel J, Jamnik Andre,] McDowell Poehler Matthew K, Rwkl* John F. Kelly Matthew.l, F<lli Marguerite M, McCarn 111 George T. Stephens<ln "/\I~(! U(l'llSd III \Y"IS({In\1I1 July 23, 1997 (l/C:(IHn,l'i (-'my G Fuchs Ms, Sue McDermott Engineering Dept, City of Prior Lake 16200 Eagle Creek Avenue S,E, Prior Lake, MN 55372 Re: City of Prior Lake / Pike Lake Trail Wensmann Easement Acquisition Our File No, 3693/118 Dear Sue: Enclosed per your request is the revised proposed Grant of Permanent Easement for the acquisition of a 33-foot roadway, drainage and utility easement from Herbert and Elaine Wensmann, It is my understanding that your office will be negotiating the easement acquisition and obtaining the necessary signatures, The legal description that is attached as Exhibit A is the description for the easement area as provided by Howard R. Green Company, In the interest of clarity, I have eliminated only the part of the description that is repetitive, A marked copy of the Howard R. Green Company description is enclosed so that you can see the change, The description used in Exhibit A is consistent with the Howard R. Green Company map attached, Please note that also attached to the proposed Easement is a Consent to Easement form to be executed by Prior Lake State Bank. If you would like me to take care of obtaining the Consent, please have Mr. and Mrs, Wensmann complete and return to me the Consent Authorization form that is enclosed, If you need anything further or have further questions, please call. Thank you, Sincerely, CAMPBELL KNUTSON Prof_SsW:: ~7Cia <on_ By: ~-!.; __ Kelly M~e~gal Assistant Suite 317 · Eagandale Office Center · 1380 COf!,orate Center Curve · Eagan, MN 55121 1111 III 1111 II I~ 1 ENGINEER'S ESTIMATE FOR: FISH POINT ROAD SAP 201-105-06 PIKE LAKE ROAD SAP 201-114-03 MUSHTOWN ROAD CITY OF PRIOR LAKE, MINNESOTA 97-02 97-17 95-07 ~ _ll.~.~ SCHEDULE 1.0 FISH POINT ROAD (STREET) 1 MOBILIZATION LS 1 15000,00 15,000,00 2 COMMON EXCAVATION CY 1105 1.75 1,933,75 3 SUBGRADE EXCAVATION CY 500 5.40 2,700,00 4 SALVAGE TOPSOIL AND RESPREAD CY 1066 3,00 3,198,00 5 SUBGRADE PREPARATION RDSTA 12 120.00 1,440,00 6 GEOTEXTILE FABRIC TYPE V SY 1500 0.90 1,350.00 7 AGGREGATE BASE, CLASS 5 TON 3850 7.00 26,950.00 8 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 10,00 9,300.00 9 TYPE 41A, 21/2" BITUMINOUS PATHWAY TON 300 50,00 15,000.00 10 TYPE 41A, WEAR COURSE MIXTURE TON 700 25,00 17,500.00 11 TYPE 31B, BASE COURSE MIXTURE TON 1410 24.00 33,840,00 12 BITUMINOUS MATERIAL FOR TACK COAT GAL 220 1,50 330.00 13 ADJUST GATE VALVE EA 4 175.00 700.00 14 ADJUST FRAME AND RING CASTING EA 8 200.00 1,600.00 15 4" CONCRETE WALK SF 5786 3.00 17,358.00 16 CONCRETE CROSSWALK SPECIAL SF 360 7.00 2,520.00 17 CONCRETE CURB & GUTTER, B618 LF 4600 5.50 25,300.00 18 CONCRETE PEDESTRIAN RAMP EA 8 400.00 3,200.00 19 CONCRETE TRIANGULAR VALLEY GUTTER SF 150 4.00 600,00 20 CONCRETE VALLEY GUTTER LF 75 2.50 187.50 21 PERMANENT BARRICADE EA 2 225.00 450.00 22 PAVEMENT STRIPING, 4" EQUIV, WIDTH LF 5000 0.50 2,500.00 23 FURNISH & INSTALL SIGN PANELS, TYPE C SF 102 20,00 2,040.00 24 BALE CHECK EA 30 7,00 210.00 25 SILT FENCE, HEAVY DUTY LF 525 2,00 1,050,00 26 CATCH BASIN SEDIMENT BARRIER EA 17 50,00 850.00 27 DUST CONTROL WATER MGAL 60 15,00 900,00 28 SEED MIXTURE 500 AC 1,1 1500,00 1,650,00 29 SODDING, LAWN & BOULEVARD SY 2350 1,50 3,525.00 30 WOOD FIBER BLANKET TYPE REGULAR SY 1825 1,50 2,737.50 31 TRAFFIC CONTROL LS 1 500,00 500.00 32 SUBGRADE DENSITY TEST, INPLACE EA 2 40,00 80.00 33 CLASS 5 GRADATION TEST EA 2 65,00 130,00 34 CLASS 5 PROCTOR TEST EA 1 80,00 80.00 35 CLASS 5 DENSITY TEST, INPLACE EA 3 45,00 135.00 36 CONCRETE TESTING EA 9 125,00 1,125,00 37 BITUMINOUS AIR VOID TEST EA 6 125,00 750.00 38 BITUMINOUS CORE DENSITY TEST EA 6 150,00 900.00 .... ~I 1111 1 III _lIll1(~.;",;~I._11..." ~{:::}}':'?:'::::::::::::::'::::::::::::}EEj::}::::::::::}}}}}:::::E",. ,'.,.. ....:.:....~:,'::,,':.::::~C::::~:~:.~:::::::~~::::::L:::::::':::':':':'.:...,",:":':":':.;;::ili:,::,:,::.:.::,:,:~'::,,',.,= .,. "",.,'"",.,,'., ",""", ... ...,. ,. . ~ T SCHEDULE 1,0 FISH POINT ROAD (STREET) . TOTAL $ 199,619.75 SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER) 12" RC PIPE SEWER DESIGN 3006 CLASS V LF 480 24,00 11,520.00 2 15" RC PIPE SEWER DESIGN 3006 CLASS V LF 870 26,00 22,620,00 3 18" RC PIPE SEWER DESIGN 3006 CLASS III LF 70 28.00 1,960,00 4 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 200 8.00 1,600.00 5 CONNECT TO EXISTING MANHOLE EA 1 500.00 500.00 6 CONNECT TO EXISTING PIPE EA 1 500.00 500.00 7 CONST DRAINAGE STRUCTURE, DESIGN 48-4020 EA 9 1200.00 10,800,00 8 CONST DRAINAGE STRUCTURE, DESIGN SPECIAL EA 9 900,00 8,100,00 9 SUBGRADE PROCTOR EA 75,00 75.00 10 SUBGRADE DENSITY - INPLACE EA 8 40.00 320.00 T SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER) - TOTAL $ 57,600,00 SCHEDULE 3,0 PIKE LAKE TRAIL (STREET) MOBILIZATION LS 25000.00 25,000.00 2 CLEARING AC 0,9 1200,00 1,080.00 3 GRUBBING AC 0,9 1200.00 1,080,00 4 CLEARING EA 28 120.00 3,360.00 5 GRUBBING EA 28 120.00 3,360,00 6 SALVAGE AND REINSTALL CMP LF 30 6.00 180.00 7 REMOVE BITUMINOUS SURFACE SY 280 3.50 980,00 8 COMMON EXCAVATION CY 4960 6.00 29,760,00 9 SUBGRADE EXCAVATION CY 500 5.40 2,700,00 10 TOPSOIL BORROW CY 1080 10.00 10,800,00 11 MODIFIED SELECT GRANULAR BORROW CY 1920 5,00 9,600.00 12 GEOTEXTILE FABRIC TYPE V SY 1500 0,90 1,350.00 13 AGGREGATE BASE, CLASS 5 TON 4075 7,00 28,525,00 14 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 10,00 9,300,00 15 3" BITUMINOUS DRIVEWAY RESTORATION SY 85 15,00 1,275.00 16 TYPE 41A, WEARING COURSE MIXTURE TON 550 25,00 13,750,00 17 TYPE 31B, BASE COURSE MIXTURE TON 900 24,00 21,600.00 18 BIT, MATERIAL FOR TACK COAT GAL 230 1,50 345.00 19 MODULAR BLOCK RETAINING WALL SF 6000 13,50 81,000.00 20 ADUST FRAME AND RING CASTING EA 3 180,00 540.00 21 4" CONCRETE WALK SF 6400 3,00 19,200.00 22 CONCRETE CURB AND GUTTER, DESIGN B618 LF 2700 5,50 14,850.00 23 CONCRETE DRIVEWAY PAVEMENT SY 30 26,50 795.00 24 CONCRETE PEDESTRIAN RAMP EA 2 400,00 800,00 25 TRAFFIC BARRIER DESIGN A8307 LF 570 13,00 7,410,00 26 FURNISH & INSTALL SIGN PANELS, TYPE C SF 103 20,00 2,060,00 1I JI 1lil U 27 SILT FENCE, HEAVY DUTY LF 1200 2,00 2,400,00 28 CATCH BASIN SEDIMENT BARRIER EA 13 50,00 650.00 29 WOOD FIBER BLANKET SY 50 1,25 62.50 30 SEED MIXTURE 500 AC 1500.00 1,500,00 31 SODDING, LAWN & BOULEVARD SY 1600 1,50 2,400,00 32 DUST CONTROL WATER MGAL 35 15.00 525.00 33 PAVEMENT STRIPING, 4" EQUIV, WIDTH LF 6225 0,50 3,112.50 34 TRAFFIC CONTROL LS 1 2500 2,500,00 35 CLASS 5 GRADATION TEST EA 2 65,00 130,00 36 CLASS 5 PROCTOR TEST EA 1 80.00 80.00 37 CLASS 5 DENSITY-INPLACE EA 3 45,00 135.00 38 CONCRETE TESTING EA 4 125,00 500.00 39 BITUMINOUS AIR VOIDS EA 6 125.00 750.00 40 BITUMINOUS CORE DENSITY EA 6 " 150.00 900.00 41 SUBGRADE DENSITY-INPLACE EA 4 50,00 200.00 T SCHEDULE 3,0 PIKE LAKE TRAIL (STREET) - TOTAL $ 306,545.00 SCHEDULE 4.0 PIKE LAKE TRAIL (STORM SEWER) 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 360 8.00 2,880,00 2 RANDOM RIP RAP CLASS /II CY 8,5 35,00 297.50 3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 48-4020 EA 4 1800,00 7,200,00 4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 60-4020 EA 1 2500,00 2,500.00 5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 72-4020 (SUMP) EA 1 1550.00 1,550.00 6 CONSTRueT DRAINAGE STRUCTURE, DESIGN SPECIAL EA 8 900.00 7,200.00 7 CONNECT TO EXISTING STORM SEWER MANHOLE EA 1 1000.00 1,000.00 8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF 127 24.00 3,048.00 9 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 292 26.00 7,592.00 10 18" RC PIPE SEWER, DESIGN 3006 CLASS 1/1 LF 552 28.00 15,456,00 11 21" RC PIPE SEWER, DESIGN 3006 CLASS /II LF 439 31.00 13,609.00 12 30" RC PIPE SEWER, DESIGN 3006 CLASS /II LF 150 35.00 5,250,00 13 30" RC PIPE APRON EA 1 800.00 800.00 14 SUBGRADE PROCTOR EA 1 75.00 75.00 15 SUBGRADE DENSITY - INPLACE EA 8 40.00 320.00 T SCHEDULE 4,0 PIKE LAKE TRAIL (STORM SEWER) - TOTAL $ 67,582,50 SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN) 1 CONNECT TO EXISTING WATERMAIN EA 2 700.00 1,400.00 2 HYDRANT WITH 6" VALVE EA 5 2500.00 12,500.00 3 6" GATE VALVE EA 1 750.00 750,00 4 8" GATE VALVE EA 1 540.00 540.00 5 10" GATE VALVE EA 1 785.00 785,00 6 12" BUlTERFLYVALVE EA 2 1200.00 2,400.00 7 6" DIP WATERMAIN, CLASS 52 LF 163 18.00 2,934.00 II ill ~n I Iii 8 8" DIPWATERMAIN, CLASS 52 LF 48 21,00 1,008.00 9 10" DIPWATERMAIN, CLASS 52 LF 773 25,00 19,325.00 10 12" DIP WATERMAIN, CLASS 52 LF 553 29,00 16,037.00 11 FITTINGS LBS 3150 1,50 4,725.00 12 SUBGRADE PROCTOR EA 1 75.00 75,00 13 SUBGRADE DENSITY - INPLACE EA 10 40.00 400.00 T SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN) - TOTAL $ 62,404.00 SCHEDULE 6,0 PIKE LAKE TRAIL (SANITARY SEWER) 1 8" PVC SEWER SDR 35 (10-12') DEEP LF 427 21,00 8,967,00 2 4" PVC PIPE SEWER LF 40 12,50 500,00 3 8"X4" PVC W'(E EA 1 200,00 200,00 4 CONNECT TO EXISTING SANITARY SEWER MANHOLE EA 3 1000,00 3,000.00 5 48" DIAMETER SANITARY MANHOLE EA 2 1500,00 3,000.00 6 SUBGRADEPROCTOR EA 75,00 75.00 7 SUBGRADE DENSITY - INPLACE EA 2 40,00 80,00 T SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER) . TOTAL $ 15,822.00 SCHEDULE 7.0 MUSHTOWN ROAD (STREET) 1 MOBILIZATION LS 6000.00 6,000,00 2 CLEARING AC 1200.00 1,200.00 3 GRUBBING AC 1200.00 1,200.00 4 CLEARING EA 120.00 120.00 5 GRUBBING EA 1 120.00 120,00 6 COMMON EXCAVATION CY 9037 6.00 54,222,00 7 SUBGRADE EXCAVATION CY 650 6.00 3,900.00 8 SALVAGE TOPSOIL AND RESPREAD CY 2775 3,00 8,325,00 9 GEOTEXTILE FABRIC TYPE V SY 1950 0.90 1,755.00 10 MODIFIED SELECT GRANULAR BORROW CY 3530 5.00 17,650.00 11 AGGREGATE BASE, CLASS 5 TON 3425 7,00 23,975,00 12 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 1210 10.00 12,100.00 13 TYPE 41A, WEAR COURSE MIXTURE TON 650 25,00 16,250,00 14 TYPE 31 B, BASE COURSE MIXTURE TON 1025 24,00 24,600.00 15 BITUMINOUS MATERIAL FOR TACK COAT GAL 340 1,50 510.00 16 TYPE 41A, 21/2" BITUMINOUS PATHWAY TON 150 50,00 7,500.00 17 BITUMINOUS DRIVEWAY SY 45 15,00 675,00 18 ADJUST HYDRANT EA 2 200.00 400.00 19 ADJUST FRAME AND RING CASTING EA 1 200,00 200,00 20 CONCRETE CURB & GUTTER, B618 LF 4630 5.50 25,465,00 21 CONCRETE VALLEY GUTTER SF 500 2,50 1,250,00 22 SILT FENCE, HEAVY DUTY LF 1100 2,00 2,200,00 23 BALE CHECK EA 30 7,00 210,00 24 CATCH BASIN SEDIMENT BARRIER EA 11 50,00 550.00 11' II ]TI I 1'1 , . j'- , ~.illllllBl.i_ 25 SODDING, LAWN & BOULEVARD SY 10300 1,50 15,450,00 26 SEEDING MIXTURE 500 AC 1,6 1500,00 2,400.00 27 SEEDING MIXTURE 250 AC 0.4 900.00 360,00 28 WOOD FIBER BLANKET SY 1600 1.50 2,400,00 29 DUST CONTROL WATER MGAL 60 15 900.00 30 TRAFFIC CONTROL LS 1 4000,00 4,000,00 31 SUBGRADE DENSITY TEST, INPLACE EA 4 40.00 160.00 32 CLASS 5 GRADATION TEST EA 2 65.00 130.00 33 CLASS 5 PROCTOR TEST EA 80,00 80.00 34 CLASS 5 DENSITY TEST, INPLACE EA 4 45,00 180,00 35 CONCRETE TESTING EA 5 125.00 625,00 36 BITUMINOUS AIR VOlD TEST EA 5 125.00 625,00 37 BITUMINOUS CORE DENSITY TEST EA 5 150,00 750,00 T SCHEDULE 7,0 MUSHTOWN ROAD (STREET) - TOTAL $ 238,437.00 SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) 1 12" RCP CLASS V LF 293 24,00 7,032,00 2 15" RCP CLASS V LF 28 26,00 728,00 3 18" RCP CLASS III LF 159 28,00 4,452.00 4 24" RCP CLASS III LF 44 35,00 1,540,00 5 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 1670 8,00 13,360.00 6 STORM MANHOLE 48" DIA EA 2 1200,00 2,400.00 7 STORM MANHOLE 48" DIA WITH 3' SUMP EA 1 1800,00 1,800.00 8 STORM MANHOLE 60" DIA WITH 3' SUMP EA 1 2500,00 2,500.00 9 CATCH BASIN EA 7 900,00 6,300.00 10 18" RCP APRON EA 500,00 500,00 11 24" RCP APRON EA 1 800,00 800.00 12 RIPRAP CLASS III TON 15 35.00 525.00 13 SUBGRADE PROCTOR EA 1 75,00 75.00 14 SUBGRADE DENSITY - INPLACE EA 5 40,00 200.00 T SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) - TOTAL $ 41,937.00 TOTAL CONSTRUCTION COST SCHEDULE 1,0 FISH POINT ROAD (STREET) SCHEDULE 2,0 FISH POINT ROAD (STORM SEWER) SCHEDULE 3.0 PIKE LAKE TRAIL (STREET) SCHEDULE 4,0 PIKE LAKE TRAIL (STORM SEWER) SCHEDULE 5,0 PIKE LAKE TRAIL (WATERMAIN) SCHEDULE 6,0 PIKE LAKE TRAIL (SANITARY SEWER) SCHEDULE 7.0 MUSHTOWN ROAD (STREET) SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) $ 199,619.75 $ 57,600,00 $ 306,545,00 $ 67,582,50 $ 62,404,00 $ 15,822,00 $ 238,437.00 $ 41,937,00 I al lIll r T l~ TOTAL CONSTRUCTION COST $ 989,947,25 ALTERNATE 1.0 MUSHTOWN ROAD (STREET) 1 MOBILIZATION LS 1 3000.00 3,000.00 2 CLEARING AC 0.1 1200.00 120,00 3 GRUBBING AC 0,1 1200,00 120,00 4 COMMON EXCAVATION CY 1000 6.00 6,000,00 5 SUBGRADE EXCAVATION CY 125 6,00 750.00 6 SALVAGE AND TOPSOIL RESPREAD CY 200 3.00 600,00 7 GEOTEXTILE FABRIC TYPE V CY 300 0,90 270,00 8 MODIFIED SELECT GRANULAR BORROW CY 680 5,00 3,400,00 9 AGGREGATE BASE, CLASS 5 TON 700 7,00 4,900.00 10 3" MINUS 100% CRUSHED QUARRY LIMESTONE CY 100 10,00 1,000.00 11 TYPE 41A, WEAR COURSE MIXTURE TON 130 25,00 3,250.00 12 TYPE 31B, BASE COURSE MIXTURE TON 200 24,00 4,800.00 13 BITUMINOUS MATERIAL FOR TACK COAT GAL 67 1,50 100,50 14 TYPE 41A 21/2" BITUMINOUS PATH TON 45 50,00 2,250.00 15 CONCRETE CURB & GUTTER, B618 LF 835 5,50 4,592.50 16 BALE CHECK EA 10 7,00 70.00 17 CATCH BASIN SEDIMENT BARRIER EA 4 50,00 200.00 18 SILT FENCE, HEAVY DUTY LF 100 2.00 200,00 19 SODDING, LAWN & BOULEVARD SY 320 1,50 480.00 20 SEEDING MIXTURE 500 AC 0,2 1500.00 300.00 21 SEEDING MIXTURE 250 AC 0,2 900.00 180.00 22 WOOD FIBER BLANKET SY 450 1.50 675.00 23 DUST CONTROL WATER MGAL 15 15.00 225,00 24 TRAFFIC CONTROL LS 1 4000.00 4,000.00 25 SUBGRADE DENSITY TEST, INPLACE EA 1 40,00 40,00 26 CLASS 5 GRADATION TEST EA 1 65,00 65.00 27 CLASS 5 PROCTOR TEST EA 1 80,00 80.00 28 CLASS 5 DENSITY TEST, INPLACE EA 1 45,00 45,00 29 CONCRETE TESTING EA 125,00 125.00 30 BITUMINOUS AIR VOID TEST EA 125,00 125.00 31 BITUMINOUS CORE DENSITY TEST EA 150,00 150.00 T ,ALTERNATE 1.0 MUSHTOWN ROAD (STREET) - TOTAL $ 42,113.00 ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER) 1 12" RCP CLASS V LF 12 24,00 288.00 2 15" RCP CLASS V LF 38 26,00 988.00 3 18" RCP CLASS III LF 148 28.00 4,144.00 4 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 150 8.00 1,200,00 5 STORM MANHOLE 48" DIA EA 1 1200,00 1,200.00 6 CATCH BASIN EA 3 900,00 2,700.00 7 SUBGRADE PROCTOR EA 1 75,00 75.00 [I 111 ml lill 8 SUBGRADE DENSITY - INPLACE EA 4 45.00 180.00 T ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER). TOTAL $ 10,232,00 TOTAL eONSTRueTION COST FOR ALTERNATE ALTERNATE 1,0 MUSHTOWN ROAD (STREET) ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER) $ 42,113,00 $ 10,232.00 TOTAL $ 52,345.00 II ~I JIll T III JUL-08-1997 14:27 '> : ADVERTISEMENT FOR BIDS 1997 Street and utility 1LUt'J.ovements in the City of Prior Lake City Project No. 97-02 City Project No. 95-07 City Project No. 97-17 P.02/03 ~ NOTICE IS HEREBY GIVEN that sealed proposals will be received by the City Council of the City of Prior Lake, Minnesota at the Prior Lake City Hall, located at 16200 Eagle Creek Avenue S.E., Prior Lake, MN 55372 until 10:00 a,m. local time, on the 4th day of August, 1997, and will be publicly opened at said time and place by two or more designated officers or agents of the City of Prior Lake, said proposals for the furnishing of all labor and materials for the constluction, complete in place of the following: At"t'KOXIMATE QUAN UIWS Concrete Curb and Gutter Class 5 Aggregate Base Bituminous Paving Stonn Sewer Concrete Sidewalk Pavement Striping Watermain Sanitary Sewer Retaining Wall 11930 11350 5685 2100 12186 8725 1450 430 6000 Proposals arriving after the designated time will be returned unopened, LF Ton Ton LF SF LF LF LF SF The Bids must be submitted on the proposal forms provided in accordance with contract documents, plans, and specitications as prepared by Howard R. Green Company, 1326 Energy Park Drjve~ St. Paul~ MN 55108. Contract documents, plans~ and specifications may be obtained from Howard R. Green CUlu,pany upon deposit of One hundred dollars ($100.00) non.refundable deposit per set. No bids will be considered unless sealed and filed with the City Clerk of Prior Lake and accompanied by a cash deposit~ cashier's check; bid bond~ or certified check payable to Clerk of the City of Prior Lake, for five (5%) percent of the amount bid to be forfeited as liquidated damages in the event that the bid be accepted and bidder shall fail to enter promptly into a written contract and furnish the required bond. No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The City of Prior Lake reserves the right to reject any or all bids. Further. the City reserves I. 111 1111 'Ii IIII JUL-08-1997 14:28 P.03/03 ~ l' ~ the right to accept a bid higher than the lowest bid if, in the opinion of the Council. the public interest will be better served. DATED', S/s Frank Boyles City Manager City of Prior Lake, Minnesota To be published in the Prior Lake American on July 12. 1997 and July 19, 1997 To be published in me Construction Bulletin on July 11, 1997. July 18, 1997. and July 25, 1997 TOTAL P.03 II II 11I1 1:11 ..,..' "'U' 1IT1 '.~~ r ~~ ~ ~ \ \C;~1 \C\ ADVERTISEMENT FOR BIDS 1997 Street and Utility Improvements in the City of Prior Lake City Project No, 97 c02 City Project No, 95~07 City PtojectNb,97-17 NOnCE IS HEREBY GIVEN that sealed proposals will be re~ived by the City Council of the City of Prior Lake, Minnesota .at the Priot Lake City Hall, l(;~ated atl 6200 EagleCreek,A venue S,E., Poor Lake, MN 55372unttllO:OO a.m, local tillie, on the4thd~y oi~1igust, 1997, and will be publicly opened at said tune and place by two or more designated offic- erS or agents of the City of Prior Lake, said proposals for the furnishing of alllabor and materials fOt the construction, complete in place of the following: .'.. ' . APPROXIMATE QUAl'-lllllcS eoncrete Curb and Gutter. 11930 tF Class 5 Aggregate Base 113S0Ton Bituminous PaVirtg 5685 ton Storm Sewet 2100 LF Concrete Sidewalk 12186 SF Pavement Striping 8725 LF Watermain 1450 LF Sanitary Sewer . 4~0 LF Retaining Wall. .. 6000 sF Proposals arriVing after the designated time will be returned unopened, The Bids must be submitted on the proposal forms provided in accordance with contract documents, plans, and speci- fications as prepared by Howard R, Green 'Company, 1326 Energy Park Drive, St. Paul, MN 55108, Contract documents, plans, and specificationsrnay be obtained from Howard R, Green Company upon deposit of Orie hundte4 dollars ($1 00,00) non-refundable deposit per set. No bids will be considered unless sealed and filed with the City Clerk of PriOr Lake and accompanied by a cash deposit, cashier's check, bid bond, or certified check pay.able to Clerk oithe City of Prior Lake, , for five (5%) of .the amount bid to be fOrfeited a.~liquidateddamages in the event that the bid be accepted and bidder shall fail to enter promptly into a written contract and furnish the required bond. No bids may be withdrawn for a pe- riodof sixty (60) days from the date of opening of bids. The City of Prior Lake _ reserves the right to reject any or all bid,S. · Further, the City reserves the right to accept a bid higher than the lowest bid if. in.the opinion of the Council, the public interest will be better served, ,.. Frank Boyles City. Manager City of Prior Lake, Minnesota (Published in the Prior Lab American on Saturdays, July 12 and 19. 1997; No. 3201) . ' T l~ .11 ill j' ~ =4 Li..ll:1 =4 ~'J I ::t ~ ~~~ tJ~ ~ '~L11 l ~ 1997 STREET &: UTILITY IMPS BIDS CLOSE AUG 4 Prior Lake, MN ADVERTISEMENT FOR BIDS - 1997 Street and Utility Improve- ments ' in the City of Prior Lake City ProJect No. 97-02 City ProJect No. 95-07 City Project No. 97-17 NOTICE IS HEREBY GIVEN that sealed proyosals will be received by the City Council of the City of Prior Lake. Minnesota at the Prior Lake City Hall, located at 16200 Eagle Creek Avenue S.E.. Prior Lake, MN 55372 until 10:00 a.m., local time, on the 4th day of August, 1997, and will be publicly opened at said time and place by two or more designated offi- cers or agents of the City of Prior Lake, said prol'Osals for the furnishing of all labor and materials for the con- struction, complete in place of the fol- 10w~ROXlMATE QUAl'< lUllS Concrete Curb and Gutter 11930 LF Oass 5 Aggregate Base 11350 Ton Bituminous Paving 5685 Ton Storm Sewer 2100 LF Concrete Sidewalk 12186 SF Pavement StripingJl725 LF Watermain 1450 LF Sanitary Sewer 430 LF Retaining Wall 6000 SF Proposals arriving after the desig- nated tIme will be returned unopened, The Bids must be submitted on the proposal forms provided in accor- Oance with contract documents, plans, and specifications as prepared by Howard R. Green Company, 1326 Energy Park Drive, St. Paul, MN 55108. Contract documents, plans, and specifications may be obtained from Howard R. Green Company upon de.rosit of One hundred dollars ($IOO,W) non-refundable deposit per set No bids will be considered unless sealed and tiled with the City Oerk of Prior Lake and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to Oerk of the City of Prior Lake, for five (5%) per- cent of the amount bid to be forfeIted as liquidated damages in the event that the Did be accepted and bidder shall fail to enter promptly into a written contract and furnish the required bond, No bids may be withdrawn for a pc;riod of sixty (60) days from the date of opening of bids, The City of Prior Lake reserves the right to reject any or all bids, Further, the City reserves the right to accept a bid higher than the lowest bid if, in the opinion of the Council. the public interest will be better served. Frank Boyles City M~er Ci of Prior Lake. Minnesota 07~1I07-18/07-25 1I1l Ii IIII ,,",, ,.u. .. I BID TABULATION 17~ 17 PROJECT: FISHPOINT ROAD SAP 201.105-06 PIKE LAKE ROAD SAP 201-114-03 MUSHTOWN ROAD CITY OF PRIOR LAKE. MINNESOTA AUGUST 4,1997 HOWARD R. GREEN COMPANY OWNER: OPENING DA TE: ENGINEER: ......,....,..'..,.,',..........-..,.-...-.........,..'." ..,...............-- .... ..................-,. .. .................,. .. ..... .................. ",;.'..... "..:.;.;.:,:,;..........;.:.:.;;:::;::.;.;.;.:,:-;..., :.;,;:::;:::;::.:.:.:';.>;.;::-:.;........... '(:IG:::::"::'~:~"::::::;:;;;:;~:{::;:::;:~::::::;;::::;j::~;~~~Pl~~ [::::::':::::::::::::.:::::: :::::':':'::::::::::;::::::::::::::::::, .""...., I:::::::""""':',':':':':.",,., "',:::'::,',.::' a__1 SCHEDULE 1,0 FISH POINT ROAD (STREET) MOBILIZATION LS 1 4,000,00 4,000,00 10,500,00 10,500.00 2 COMMON EXCAVATION CY 1105 5,00 5,525,00 3,85 4,254,25 3 SUB GRADE EXCAVATION CY 500 6,50 3,250,00 4,25 2,125,00 4 TOPSOIL BORROW CY 1066 7,00 7,462,00 8,75 9,327,50 5 SUBGRADE PREPARATION RDSTA 12 125,00 1,500,00 170,00 2.040,00 6 GEOTEXTILE FABRIC TYPE V SY 1500 1,00 1,500,00 1,35 2,025,00 7 AGGREGATE BASE, CLASS 5 TON 3850 7,25 27,912,50 7,98 30,723,00 8 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 7,25 6,742,50 8,35 7,765,50 9 TYPE 41A, 2 1/2. BITUMINOUS PATt-foNAY TON 300 42,00 12,600,00 32,10 9,630.00 10 TYPE 41A, WEAR COURSE MIXTURE TON 700 24,50 17,150,00 26,96 18,872,00 11 TYPE 318, BASE COURSE MIXTURE TON 1410 21,00 29,610,00 25,68 36,208,80 12 BITUMINOUS MATERIAL FOR TACK COAT GAL 220 1,50 330,00 1,07 235.40 13 ADJUST GATE VALVE EA 4 100,00 400,00 125,00 500,00 14 ADJUST FRAME AND RING CASTING EA 8 165,00 1,320,00 150,00 1,200,00 15 4" CONCRETE WALK SF 5786 1,70 9.836,20 1,91 11,051.26 16 CONCRETE CROSSWALK SPECIAL SF 360 4,20 1,512,00 4,28 1,540,80 17 CONCRETE CURB & GUTTER. B618 LF 4600 6,20 28.520,00 6,31 29,026.00 18 CONCRETE PEDESTRIAN RAMP EA 8 190,00 1,520,00 192,60 1.540,80 19 CONCRETE TRIANGULAR VALLEY GUTTER SF 150 5,25 787,50 5,35 802,50 20 CONCRETE VALLEY GUTTER LF 75 15,50 1,162,50 16,05 1,203,75 21 PERMANENT BARRICADE EA 2 325,00 650,00 272,85 545,70 22 PAVEMENT STRIPING, 4" EQUIV, WIDTH LF 5000 0,50 2,500,00 0.47 2,350,00 23 FURNISH & INSTALL SIGN PANELS, TYPE C SF 102 23,00 2,346,00 23,01 2,347,02 24 BALE CHECK EA 30 15,00 450,00 8,50 255,00 25 SILT FENCE, HEAVY DUTY LF 525 2,50 1,312,50 2,85 1,496,25 26 CATCH BASIN SEDIMENT BARRIER EA 17 125,00 2,125,00 45,00 76500 27 DUST CONTROL WATER MGAL 60 15,00 900,00 17,00 1,020,00 28 SEED MIXTURE 500 AC 1,1 1,000,00 1,100,00 2.011,60 2,212.76 29 SODDING, LAWN & BOULEVARD SY 2350 2,00 4,700,00 1,93 4,535,50 30 WOOD FIBER BLANKET TYPE REGULAR SY 1825 1,00 1,825,00 2,14 3,905,50 31 TRAFFIC CONTROL LS 1 1.500,00 1,500.00 1,500,00 1,500.00 32 SUBGRADE DENSITY TEST, INPLACE EA 2 55,00 110,00 69,55 139,10 33 CLASS 5 GRADATION TEST EA 2 55,00 110,00 37.45 74,90 34 CLASS 5 PROCTOR TEST EA 100,00 100,00 90.95 90,95 35 CLASS 5 DENSITY TEST, INPLACE EA 3 55,00 165,00 37.45 112,35 36 CONCRETE TESTING EA 9 75.00 675,00 165.85 1,492.65 ,37 BITUMINOUS AIR VOID TEST EA 6 100,00 600,00 117,70 706,20 38 BITUMINOUS CORE DENSITY TEST EA 6 25,00 150,00 133,75 802,50 T SCHEDULE 1,0 FISH POINT ROAD (STREET) - TOTAL 183,958,70 204,922,94 o:lclericalll OZ074BT, xis PAGE 1 III1 ...., -~. ( .., ....... ...... :::;:::;:;:::;:;:::::::::::::;:;:;:::::::::::::;:::: ......................-... . . . . . . . . . . . . . . . . . . . . . . . ..................... :i::\ .., ",:\i:i\\:\i:l.ii\II~I~II\~~I~(I~;::I:: ...........~~l.f\...,.,:.:::~::\\\\i\Ii:~ilil,\:\:~~~II;~~i ....~........ ....... ......................... ..... ......~.......................,......... Illiiiiiltlm {$.f::{..:}}}:i$i ....., .. .., .., ....................... . . . . . . . . . . . . . . . . . . . . . .................. ,\,:I't::::\:":::::: .................................. .:::::{{)'tEivtoesci=llPTiOli(::...... SCHEDULE 2.0 FISH POINT ROAD (STORM SE~R) 1 12" RC PIPE SEWER DESIGN 3006 CLASS V LF 480 23,75 11,400.00 24,39 11,707,20 2 15. RC PIPE SEWER DESIGN 3006 CLASS V LF 870 25,25 21,967,50 25,70 22,359,00 3 18" RC PIPE SEWER DESIGN 3006 CLASS III LF 70 27,00 1,890,00 27.46 1,922,20 4 4. PERFORATED THERMOPLASTIC PIPE DRAIN LF 200 10,00 2,000,00 11,65 2,330,00 5 CONNECT TO EXISTING MANHOLE EA 1 500,00 500,00 750,00 750,00 6 CONNECT TO EXISTING PIPE EA 1 475,00 475,00 650,00 650,00 7 CONST DRAINAGE STRUCTURE, DESIGN 48-4020 EA 9 1,050,00 9,450,00 1,375,00 12,375,00 8 CONST DRAINAGE STRUCTURE, DESIGN SPECIA EA 9 825,00 7,425,00 1,250,00 11,250,00 9 SUBGRADE PROCTOR EA 1 85,00 85,00 75,00 75,00 10 SUBGRADE DENSITY - INPLACE EA 8 40,00 320,00 45,00 360,00 T SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER) - TOTAL 55,512,50 63,778,40 SCHEDULE 3.0 PIKE LAKE TRAIL (STREET) 1 MOBILIZATION LS 1 3,000,00 3,000,00 10,500,00 10,500,00 2 CLEARING AC 0,9 2,500.00 2,250,00 2,500,00 2,250,00 3 GRUBBING AC 0,9 1,250,00 1,125,00 2,500,00 2,250,00 4 CLEARING EA 28 150,00 4,200,00 175,00 4,900,00 5 GRUBBING EA 28 110,00 3,080,00 100,00 2,800,00 6 SALVAGE AND REINSTALL CMP LF 30 15,00 450,00 15,50 465,00 7 REMOVE BITUMINOUS SURFACE SY 280 3,00 840,00 2,50 700,00 8 COMMON EXCAVATION CY 4960 3,50 17 ,360,00 4,25 21,080,00 9 SUBGRADE EXCAVATION CY 500 5,00 2,500,00 4,50 2,250,00 10 SALVAGE TOPSOIL RESPREAD CY 1080 2,50 2,700,00 4,50 4,860,00 11 MODIFIED SELECT GRANULAR BORROW CY 1920 7,00 13,440,00 12,49 23,980,80 12 GEOTEXTILE FABRIC TYPE V SY 1500 1,00 1,500,00 1,35 2,025,00 13 AGGREGATE BASE, CLASS 5 TON 4075 7,25 29,543,75 7,99 32,559,25 14 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 7,75 7,207,50 8,52 7,923,60 15 3" BITUMINOUS DRIVEWAY RESTORATION SY 85 42,00 3,570,00 50,29 4,274,65 16 TYPE 41A, WEARING COURSE MIXTURE TON 550 25,00 13,750,00 26,96 14,828,00 17 TYPE 31B, BASE COURSE MIXTURE TON 900 22,00 19,800,00 25,68 23,112,00 18 BIT, MATERIAL FOR TACK COAT GAL 230 1,50 345,00 1,07 246,10 19 MODULAR BLOCK RETAINING WALL SF 6000 14,30 85,800,00 13,95 83,700,00 20 ADUST FRAME AND RING CASTING EA 3 160,00 480,00 150,00 450,00 21 4" CONCRETE WALK SF 8400 1,75 11,200,00 1,97 12,608,00 22 CONCRETE CURB AND GUTTER, DESIGN B618 LF 2700 6,30 17,010,00 6.42 17,334,00 23 CONCRETE DRIVEWAY PAVEMENT SY 30 28,00 840,00 28,89 866,70 24 CONCRETE PEDESTRIAN RAMP EA 2 190,00 380,00 192,60 385.20 25 TRAFFIC BARRIER DESIGN A8307 LF 570 13,00 7,410,00 13.48 7,683,60 26 FURNISH & INSTALL SIGN PANELS, TYPE C SF 103 23,00 2,369,00 23.01 2,370,03 27 SILT FENCE, HEAVY DUTY LF 1200 2,75 3,300,00 2,85 3,420,00 28 CATCH BASIN SEDIMENT BARRIER EA 13 125,00 1,625,00 45,00 585,00 29 WOOD FIBER BLANKET SY 50 3,00 150.00 2,14 107,00 30 SEED MIXTURE 500 AC 1 500,00 500.00 2,011,60 2,011,60 31 SODDING, LAWN & BOULEVARD SY 1600 2,00 3,200,00 1,93 3,088,00 32 DUST CONTROL WATER MGAL 35 20,00 700.00 17,00 595,00 33 PAVEMENT STRIPING, 4" EQUIV, WIDTH LF 6225 0,45 2,801,25 0,47 2,925,75 34 TRAFFIC CONTROL LS 55,00 55,00 4,500,00 4,500,00 35 CLASS 5 GRADATION TEST EA 2 55.00 110,00 69,55 139,10 36 CLASS 5 PROCTOR TEST EA 1 100,00 100,00 90,95 90,95 n:lclericall I 02074BT, xis PAGE 2 III 1 37 CLASS 5 DENSITY.INPLACE EA 3 55,00 165,00 37,45 112,35 38 CONCRETE TESTING EA 4 75,00 300,00 165,85 663,40 39 BITUMINOUS AIR VOIDS EA 6 100,00 600,00 117,70 706,20 40 BITUMINOUS CORE DENSITY EA 6 25,00 150,00 133,75 802,50 41 SUBGRADE DENSITY.INPLACE EA 4 55,00 220,00 37,45 149,80 T SCHEDULE 3.0 PIKE LAKE TRAIL (STREET) - TOTAL 266,126,50 306,298,58 SCHEDULE 4.0 PIKE LAKE TRAIL (TRUNK STORM SEWER) 1 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 360 9,50 3,420,00 11,65 4,194,00 2 RANDOM RIP RAP CLASS III CY 8,5 53,00 450,50 69,50 590,75 3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 4 EA 2 1,050,00 2,100,00 1,375,00 2,750,00 4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 6 EA 3 1,490,00 4,470,00 1,975,00 5,925,00 5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 8 EA 1 2,400,00 2,400,00 4,375,00 4,375,00 6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN S EA 8 825,00 6,600,00 1,250,00 10,000,00 7 CONNECT TO EXISTING STORM SEWER MANHOL EA 1 475,00 475,00 750,00 750,00 8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF 127 23,00 2,921,00 24,38 3,096.26 9 15. RC PIPE SEWER. DESIGN 3006 CLASS V LF 292 24,30 7,095,60 25,70 7,504,40 10 18" RC PIPE SEWER, DESIGN 3006 CLASS III LF 552 26,30 14,517,60 27,46 15,157,92 11 21" RC PIPE SEWER, DESIGN 3006 CLASS III LF 122 28,50 3,477 ,00 29,93 3,651.46 12 24" RC PIPE SEWER, DESIGN 3006 CLASS III LF 255 30,30 7,726,50 32,24 8,221,20 13 27. RC PIPE SEWER, DESIGN 3006 CLASS III LF 184 36,60 6,734.40 38,99 7,174,16 14 36. RC PIPE SEWER, DESIGN 3006 CLASS III LF 150 50,50 7,575,00 56,36 8,454,00 15 36. RC PIPE APRON EA 1 1,250,00 1,250,00 974,86 974,86 16 SUBGRADE PROCTOR EA 1 80,00 80,00 75,00 75,00 17 SUBGRADE DENSITY - INPLACE EA 8 38,00 304,00 45,00 360,00 18 PIPE FOUNDATION MATERIAL CY 50 13,70 685,00 16,75 837,50 T SCHEDULE 4,0 PIKE LAKE TRAIL (STORM SEWER) - TOTAL 72,281,60 84,091,51 SCHEDULE 5,0 PIKE LAKE TRAIL (WATERMAIN) 1 CONNECT TO EXISTING WATERMAIN EA 2 480,00 960,00 750,00 1,500,00 2 HYDRANT WITH 6. VALVE EA 5 1,750,00 8,750,00 1,863,81 9,319,05 3 6. GATE VALVE EA 1 455,00 455,00 471,44 471,44 4 8" GATE VALVE EA 1 600,00 600,00 881,50 881,50 5 10" GATE VALVE EA 840,00 840,00 881,61 881,61 6 12" BUTTERFLY VALVE EA 2 775,00 1,550,00 878,10 1,756,20 7 6" DIP WATERMAIN, CLASS 52 LF 163 16,50 2,689,50 17,70 2,885,10 8 8" DIP WATERMAIN, CLASS 52 LF 48 19,20 921,60 18,97 910,56 9 10" DIP WATERMAIN, CLASS 52 LF 773 21,80 16,851.40 20,88 16,140,24 10 12" DIP WATERMAIN, CLASS 50 LF 553 23,30 12,884,90 24,19 13,377 ,07 11 FITTINGS LBS 3150 1,55 4,882,50 1,38 4,347,00 n: Iclericall 102074BT,xls PAGE 3 11' !II 1m 'I IIII l' ......--......... .....-........... ................. ................. ................. ................. ................. ................. .... . ....... ........ .................. .... .................... ...................... .................... .................. ................... . .................... .................... ............... . !::I;;') ,:::,::::ti:EiifOESCRlPTION':::':::':':':':' :Jffi"mme~~iBN~If}if% .::ti~~:;~::.:::::::'llir~fjfCe::: 12 SUBGRADE PROCTOR EA 1 80,00 80,00 75,00 75.00 13 SUBGRADE DENSITY.. INPLACE EA 10 40,00 400,00 45,00 450,00 14 PIPE FOUNDATION MATERIAL CY 50 14,00 700,00 16,85 842,50 SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN).. TOTAL 52,564,90 53,837,27 SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER) 8. PVC SEWER SDR 35 (10-12') DEEP LF 427 16,00 6,832,00 23,50 10,034,50 2 4" PVC PIPE SEWER LF 40 8,80 352,00 12,00 480,00 3 8.X4" PVC WYE EA 1 29,00 29,00 47,75 47,75 4 CONNECT TO EXISTING SANITARY SEWER MANH EA 3 500,00 1,500,00 750,00 2,250,00 5 48" DIAMETER SANITARY MANHOLE EA 2 1,425,00 2,850,00 1,675,00 3,350,00 6 SUBGRADE PROCTOR EA 1 80,00 80,00 75,00 75,00 7 SUBGRADE DENSITY .. INPLACE EA 2 40,00 80,00 45,00 90,00 8 PIPE FOUNDATION MATERIAL CY 50 14,00 700,00 16,85 842,50 T SCHEDULE 6,0 PIKE LAKE TRAil (SANITARY SEWER).. TOTAL 12,423,00 17,169,75 SCHEDULE 7,0 MUSHTOWN ROAD (STREET) MOBILIZATION lS 3,500,00 3,500,00 10,500,00 10,500,00 2 CLEARING AC 3,000,00 3,000,00 2,250,00 2,250,00 3 GRUBBING AC 1 1,750,00 1,750,00 2,250,00 2,250,00 4 CLEARING EA 1 400,00 400,00 175,00 175,00 5 GRUBBING EA 1 250,00 250,00 125,00 125,00 6 COMMON EXCAVATION CY 9037 2,50 22,592,50 4,25 38,407,25 7 SUBGRADE EXCAVATION CY 650 4,25 2,762,50 4,75 3,087,50 8 SALVAGE TOPSOil AND RESPREAD CY 2775 1,75 4,856,25 4,50 12,487,50 9 GEOTEXTILE FABRIC TYPE V SY 1950 1,00 1,950,00 1,35 2,632,50 10 MODIFIED SELECT GRANULAR BORROW CY 3530 8,00 28,240,00 12,49 44,089.70 11 AGGREGATE BASE, CLASS 5 TON 3425 7,25 24,831,25 7,99 27,365,75 12 3' MINUS 100% CRUSHED QUARRY LIMESTONE TON 1210 7,75 9,377,50 8,35 10,103,50 13 TYPE 41A, WEAR COURSE MIXTURE TON 650 25,00 16,250,00 26,96 17 ,524,00 14 TYPE 31B, BASE COURSE MIXTURE TON 1025 21,00 21,525,00 25,68 26,322.00 15 BITUMINOUS MATERIAL FOR TACK COAT GAL 340 1.50 510,00 1,07 363.80 16 TYPE 41A, 2 112" BITUMINOUS PATHWAY TON 150 42,00 6,300,00 32,10 4,815,00 17 BITUMINOUS DRIVEWAY SY 45 9,00 405,00 7.49 337,05 18 ADJUST HYDRANT EA 2 225,00 450,00 350,00 700,00 19 ADJUST FRAME AND RING CASTING EA 250,00 250,00 150,00 150,00 20 CONCRETE CURB & GUTTER, B618 LF 4630 6,15 28,474,50 6.31 29,215,30 21 CONCRETE VALLEY GUTTER SF 500 4,20 2,100,00 4,28 2,140,00 22 SilT FENCE, HEAVY DUTY lF 1100 2,75 3,025,00 2,85 3,135.00 23 BALE CHECK EA 30 15,00 450,00 8,50 255,00 24 CATCH BASIN SEDIMENT BARRIER EA 11 125,00 1,375,00 50,00 550,00 25 SODDING, LAWN & BOULEVARD SY 10300 2,00 20,600,00 1,93 19,879,00 26 SEEDING MIXTURE 500 AC 1,6 1,000,00 1,600,00 2,011,60 3,218,56 27 SEEDING MIXTURE 250 AC 0,4 1,000,00 400,00 5,221,60 2,08864 28 WOOD FIBER BLANKET SY 1600 1,75 2,800,00 2,14 3,42400 29 DUST CONTROL WATER MGAL 60 10,00 600,00 17,00 1 ,020 00 30 TRAFFIC CONTROL lS 55,00 55,00 6,500.00 6,500,00 31 SUBGRADE DENSITY TEST, INPLACE E,,^ 4 55,00 220,00 37,45 149,80 32 CLASS 5 GRADATION TEST EA 2 100.00 200,00 69,55 139.10 33 CLASS 5 PROCTOR TEST EA 1 55,00 55,00 90,95 90.95 34 CLASS 5 DENSITY TEST, INPLACE EA 4 75,00 300,00 37.45 149,80 35 CONCRETE TESTING EA 5 100.00 500,00 165,85 829,25 36 BITUMINOUS AIR VOID TEST EA 5 50,00 250,00 117,70 588,50 37 BITUMINOUS CORE DENSITY TEST EA 5 25,00 125.00 133.75 668.75 T SCHEDULE 7,0 MUSHTOWN ROAD (STREET) - TOTAL 212,329,50 277,72720 n:\c1erical\ 1 02074BT, xIs PAGE 4 :I III 1 I::: .................. ................. .................. .................. ............... .. . ............... ................................ .............................. . ...........................-.... ............................... ................................ ............................... ................................. .... .....-... ................ . . ........ ............ . . . . . . . . . . . . . . . . . . . . ................... .................... ................... .................... ................... . . . . . . . . . . . . . . . . . . . . ,.,."'.,.'.,.'.'.'.'{iNit' ,."","""QTY,,:':; ....1 " . . , , ' ., ............................................. ..............-.............................- '.. -.- ,,::ItEM;:;:;:::::, i::: ,,:, ,00;:;:;:;:::":. ;};;}}]'tEiiifoEscRij>ooli(;;;:':"";"'::;' .................. . . . . . . . . . . . . . . . . . . .................. .................. .................. .................. .................. ..........,....... .......... ......,..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............................ ................. ..... ............................................................. ........ ...................................................................... ...................................................................... .','.................................................................................................................................... ..... .... .................... .................... SCHEDULE 8,0 MUSHTOWN ROAD (STORM SEWER) 12" RCP CLASS V LF 293 23,60 6,914,80 24,38 7,143,34 2 15" RCP CLASS V LF 28 25,00 700,00 25,70 719,60 3 18" RCP CLASS III LF 159 26,80 4,261,20 27.46 4,366,14 4 24. RCP CLASS III LF 44 30,80 1,355,20 32,89 1,447,16 5 4. PERFORATED THERMOPLASTIC PIPE DRAIN LF 1670 9,50 15,865,00 9,85 16,449,50 6 STORM MANHOLE 48. DIA EA 2 1,000,00 2,000,00 1,375,00 2,750,00 7 STORM MANHOLE 48. DIA WITH 3' SUMP EA 1 1,200,00 1,200,00 1,525,00 1,525,00 8 STORM MANHOLE 60. DIA WITH 3' SUMP EA 1 1,850,00 1,850,00 2,375,00 2,375,00 9 CATCH BASIN EA 7 840,00 5,880,00 1,275,00 8,925,00 10 18" RCP APRON EA 1 590,00 590,00 525,00 525.00 11 24" RCP APRON EA 1 775,00 775,00 595,00 595,00 12 RIPRAP CLASS III TON 15 55,00 825,00 38,50 577.50 13 SUBGRADE PROCTOR EA 1 80,00 80,00 75,00 75,00 14 SUBGRADE DENSITY.. INPLACE EA 5 40,00 200,00 45,00 225,00 15 PIPE FOUNDATION MATERIAL CY 100 14,00 1.400,00 16,85 1,685,00 T SCHEDULE 8,0 MUSHTOWN ROAD (STORM SEWER)- TOTAL 43,896,20 49,383,24 TOTAL CONSTRUCTION COST SCHEDULE 1,0 FISH POINT ROAD (STREET) 183,958,70 204,922,94 SCHEDULE 2,0 FISH POINT ROAD (STORM SEWER) 55,512,50 63,778,40 SCHEDULE 3,0 PIKE LAKE TRAIL (STREET) 266,126,50 306,298,58 SCHEDULE 4,0 PIKE LAKE TRAIL (TRUNK STORM SEWER) 72,281,60 84,091,51 SCHEDULE 5,0 PIKE LAKE TRAIL (WATERMAIN) 52,564,90 53,837,27 SCHEDULE 6,0 PIKE LAKE TRAIL (SANITARY SEWER) 12,423,00 17.169,75 SCHEDULE 7,0 MUSHTOWN ROAD (STREET) 212,329,50 277,727.20 SCHEDULE 8,0 MUSHTOWN ROAD (STORM SEWER) 43,896,20 49,383,24 TOTAL CONSTRUCTION COST 899,092,90 1,057,208,89 AL TERNA TE 1,0 MUSHTOWN ROAD (STREET) 1 MOBILIZATION LS 1 2,200,00 2,200,00 7,500,00 7,500,00 2 CLEARING AC 0,1 3,000,00 300,00 5,000,00 500,00 3 GRUBBING AC 0,1 2,000,00 200,00 5,000,00 500,00 4 COMMON EXCAVATION CY 1000 4,00 4,000,00 5,25 5,250,00 5 SUBGRADE EXCAVATION CY 125 6,00 750,00 5,50 687,50 6 SALVAGE AND TOPSOIL RESPREAD CY 200 3,50 700,00 4,50 900 ,00 7 GEOTEXTILE FABRIC TYPE V CY 300 1,00 300,00 1,35 405,00 8 MODIFIED SELECT GRANULAR BORROW CY 680 7,50 5,100,00 12,79 8,697,20 9 AGGREGATE BASE, CLASS 5 TON 700 8,00 5,600,00 8,50 5,950,00 10 3" MINUS 100% CRUSHED QUARRY LIMESTONE CY 100 9,00 900,00 8,75 875,00 11 TYPE 41A, WEAR COURSE MIXTURE TON 130 28,75 3.737,50 28,89 3,755,70 12 TYPE 31B, BASE COURSE MIXTURE TON 200 25,00 5,000,00 27,82 5,564,00 13 BITUMINOUS MATERIAL FOR TACK COAT GAL 67 2,00 134,00 1,07 71,69 14 TYPE 41A 2 1/2" BITUMINOUS PATH TON 45 55,00 2,475,00 32,10 1,444,50 15 CONCRETE CURB & GUTTER. B618 LF 835 7,35 6,137,25 7.49 6,254,15 16 BALE CHECK EA 10 20,00 200,00 8,50 85.00 17 CATCH BASIN SEDIMENT BARRIER EA 4 125,00 500,00 50,00 200,00 18 SILT FENCE, HEAVY DUTY LF 100 1,50 150.00 3,50 350.00 19 SODDING, LAWN & BOULEVARD SY 320 3,00 960,00 4,82 1,542.40 20 SEEDING MIXTURE 500 AC 0,2 1,500,00 300,00 3,937,60 787,52 21 SEEDING MIXTURE 250 AC 0,2 1,500,00 300,00 5,221,60 1,044,32 22 WOOD FIBER BLANKET SY 450 1,50 675,00 2,68 1,206.00 23 DUST CONTROL WATER MGAL 15 200,00 3,000,00 20,00 300,00 24 TRAFFIC CONTROL LS 1 55,00 55,00 1,750,00 1,750,00 25 SUBGRADE DENSITY TEST, INPLACE EA 1 65,00 65,00 37.45 37.45 26 CLASS 5 GRADATION TEST EA 1 65,00 65,00 69,55 69,55 27 CLASS 5 PROCTOR TEST EA 1 75.00 75,00 90,95 90.95 28 CLASS 5 DENSITY TEST, INPLACE EA 1 75,00 75,00 37.45 37.45 n:\c1erical\ I 02074BT, xis PAGE 5 ..' 111 ." ,I IIII T 29 CONCRETE TESTING EA 75,00 75,00 165,85 165,85 30 BITUMINOUS AIR VOID TEST EA 75,00 75,00 117,70 117,70 31 BITUMINOUS CORE DENSITY TEST EA 75,00 75,00 133,75 133,75 T ALTERNATE 1,0 MUSHTOWN ROAD (STREET) - TOTAL 44,178,75 56,272,68 ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER) 1 12" RCP CLASS V LF 12 23,60 283,20 25,69 308,28 2 15" RCP CLASS V LF 38 25,00 950,00 27,01 1,026,38 3 18. RCP CLASS III LF 148 26,50 3,922,00 28,76 4,256.48 4 4. PERFORATED THERMOPLASTIC PIPE DRAIN LF 150 9,50 1.425,00 11,65 1,747,50 5 STORM MANHOLE 48" DIA EA 1 1,000,00 1,000,00 1.400,00 1.400,00 6 CATCH BASIN EA 3 850,00 2,550,00 1,325,00 3,975,00 7 SUBGRADE PROCTOR EA 1 80,00 80,00 85,00 85,00 8 SUBGRADE DENSITY" INPLACE EA 4 40,00 160,00 55,00 220,00 T AL TERNA TE 2.0 MUSHTOWN ROAD (STORM SEWER) " TOTAL 10,370,20 13,018,64 ALTERNATE 3.0 PIKE LAKE TRAIL (STORM SEWER) 1 4" PERFORATED THERMPLASTIC PIPE DRAIN LF 360 9,50 3,420,00 11,65 4,194,00 2 RANDOM RIP RIP CLASS III CY 8,5 55,00 467,50 73,50 624,75 3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 4 EA 4 1,025,00 4.100,00 1,375,00 5,500,00 4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 6 EA 1 1,500,00 1,500,00 1,975,00 1.975,00 5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 7 EA 1 2,400,00 2,400,00 3,275,00 3,275,00 6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN S EA 8 650,00 6,600,00 1,275,00 10,200,00 7 CONNECT TO EXISTING STORM SEWER MANHOL EA 1 475,00 475,00 750,00 750,00 8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF 127 23,00 2,921,00 24,38 3,096,26 9 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 292 24,50 7,154,00 25,70 7,504,40 10 18. RC PIPE SEWER, DESIGN 3006 CLASS III LF 552 26,30 14,517,60 27,46 15,157,92 11 21" RC PIPE SEWER, DESIGN 3006 CLASS III LF 439 28,50 12,511,50 30,24 13,275,36 12 30" RC PIPE SEWER, DESIGN 3006 CLASS III LF 150 41,00 6,150,00 43.46 6,519,00 13 30" RC PIPE APRON EA 1 950,00 950,00 777,57 777,57 14 SUBGRADE PROCTOR EA 1 80,00 80,00 85,00 85,00 15 SUBGRADE DENSITY - INPLACE EA 8 40,00 320,00 55,00 440,00 16 PIPE FOUNDATION MATERIAL CY 50 14,00 700,00 16,85 842,50 T ALTERNATE 3.0 PIKE LAKE TRAIL (STORM SEWER)-TOTAL 64,466,60 74,216,76 TOTAL CONSTRUCTION COST FOR AL TERNA TE ALTERNATE 1,0 MUSHTOWN ROAD (STREET) 44,178,75 56,272,68 ALTERNATE 2,0 MUSHTOWN ROAD (STORM SEWER) 10,370,20 13,018,64 AL TERNA TE 3,0 PIKE LAKE TRAIL (STORM SEWER) 64.466,60 74,216,76 TOTAL 119,015,55 143,508,08 I HEREBY CERTIFY THAT THIS IS AN ACCURATE TABULATION OF THE BIDS ~R ~~' <NT<ONrneRrum. NA~E: CRA~' EBELING, P,E, - DATE: AUGUS 4.1997 MN REG, NO,: 12025 n: \c1erical\ 1 02074 BT, xis PAGE 6 .'.1 ml il III , . . , . ., ( PRELIMINARY REPORT FOR THE CITY OF PRIOR LAKE ON 1997 PUBLIC IMPROVEMENT PROJECTS SANITARY SEWER, WATERMAIN, STORM SEWER, GRADING, CURBING, WALKS, STREET PAVING, SURFACE IMPROVEMENTS, AND APPURTENANT WORK FEBRUARY 25, 1997 I hereby certify that this Feasibility Report was written by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Minnesota. Greg~ Reg. No. 22557 z-/~s- /Yr- bate · _.~. ...." IIII ( " PRELIMINARY REPORT AND ESTIMATE OF COST FOR ItlE CITY OF PRIOR LAKE ON 1997 PUBLIC IMPROVEMENT PROJECTS SANITARY SEWER, WATERMAIN, STORM SEWER, GRADING, CURBING, WALKS, STREET PAVING, SURFACE IMPROVEMENTS, AND APPURTENANT WORK FEBRUARY 25, 1997 TYPE OF WORK The improvements proposed for construction during 1997 include sanitary sewer, watermain, storm sewer, sidewalk, bike path, bituminous overlayment, street surface improvements, and street reconstruction, including grading, concrete curb and gutter, retaining walls, boulevard restoration and appurtenant work. The proposed project locations within the city limits of Prior Lake are shown by Exhibit 1. A brief description of the improvements shown by Exhibit 1 is as follows: AREA 1 - Mushtown Road Mushtown Road from approximately 1,400 feet south of Tower Street to the southeast for 2,900 feet to a point approximately 800 feet beyond Ridgewood Court by the construction of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous trail, bituminous surfacing and appurtenant work. AREA 2 - Pike Lake Trail Pike Lake Trail from CSAH 42 south to the proposed north plat line of Knob Hill by the construction of sanitary sewer, watermain, storm sewer, grading, aggregate base, concrete curb and gutter, concrete sidewalk, bituminous path, bituminous surfacing and appurtenant work. s:"""jeclllcity\97FEAS,DOC 2 III~ ) AREA 3 - CSAH 42 from Ferndale to McKenna Road CSAH 42 from Femdale Avenue west to McKenna Road by the construction of grading, storm sewer, aggregate base, concrete curb and gutter, trunk sanitary sewer and watermain, trails, bituminous surfacing and appurtenant work. AREA 4 - Street Sealcoatin~ The seal coating of bituminous paved streets throughout the city. AREA 5 - Lakefront Park Road Pavin~ Paving of Lakefront Park roads, trails and parking lots by the construction of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work. LOCATION OF THE PROJECTS The five projects shown by Exhibit 1 are located in the following areas: AREA 1 - Mushtown Road Mushtown Road from the south plat line of Maple Acres approximately 2,900 feet south past the City limit line within the north half of Section 11, Township 114 north, Range 22 west, Scott County, Minnesota. AREA 2 - Pike Lake Trail Pike Lake Trail from County Road 42 to the proposed north plat line in the plat of Knob Hill in Section 26, Township 115 north, Range 22 west, Scott County, Minnesota. AREA 3 - CSAH 42 from Ferndale to McKenna Road CSAH 42 from Femdale Avenue to. McKenna Road within the south half of Section 22, 23 and 24, Township 115 north, Range 22 west, Scott County, Minnesota. AREA 4 - Street Sealcoatin~ The seal coating of bituminous paved streets will be on the older streets with excessive cracks and surface deterioration throughout the city. AREA 5 - Lakefront Park Road Pavin~ Lakefront Park within the south half of Section 35, Township 115 north, Range 22 west, a:', ,; ...' :ity\97FEAS,DOC 3 1111 1 and the north half of Section 2, Township 114 north, Range 22 west, Scott County, Minnesota. DESCRIPTION OF PROJECT A more detailed description of the projects that are proposed to be assessed are as follows: AREA 1 - Mushtown Road Mushtown Road runs south-east from Panama Avenue (CSAR 23) for approximately one-half mile, The section of road proposed for improvement is shown by Exhibit 2 and begins where the current bituminous surface ends. That portion of Mushtown Road is rural in nature with a gravel surface and no curb and gutter. Storm water runoff currently flows overland to shallow ditches and isolated wetlands, There are three wetlands adjacent to the road which are recognized by the National Wetlands Inventory map, and one man-made pond. These existing wetlands and pond are shown on Exhibit 2. If any filling of the wetlands is done, permits form the Minnesota Department of Natural Resources and the U.S. Corps of Engineers will be required. The condition of Mushtown Road is worst in the spring. During the freeze-thaw season, the gravel road becomes soft and unstable due to frost action. Proposed improvements include upgrading the street to a bituminous surface, concrete curb and gutter, and storm sewer. A permit from the Prior Lake/Spring Lake Watershed District will be required for the storm sewer improvements, Scott County records show no defined right-of-way for Mushtown Road except within platted areas adjacent to the road. The platted section adjacent to W oodridge Estates 3rd has a 50-foot right-of-way and the preliminary plat application for the Windstar Development has a 33-foot right-of-way. Costs for acquiring the remaining right-of-way and/or easements are included in the project cost for Mushtown Road. Benefiting developer of Woodridge Estates 3rd and the developer of the proposed Windstar Development will be assessed, while the balance of the project costs will be paid from the Project Levy and the Street Collector Fund. AREA 2 - Pike Lake Trail Pike Lake Trail is shown on Exhibit 4. The street is designated as a Municipal State Aid route. Currently, the street has a gravel surface and is rural in nature with no curb and gutter. The terrain is hilly and is heavily wooded on both sides of the road. The portion of Pike Lake Trail south of the Maple Hill Subdivision will be built by the developer as part of the Knob Hill Subdivision; therefore, costs for the street reconstruction within Knob Hill are not included in this report. The plat of Maple Hill is proposing to extend the existing sanitary sewer from the Holy Cross Church property south to serve their entire plat in the spring of 1997. Be. .; ..~, :lty\91FEAS,DQC 4 -~. ..." IIII 1,' i! Proposed improvements includes street reconstruction with storm sewer, retaining walls, concrete curb and gutter, concrete sidewalk, bituminous trails, and bituminous surfacing. Street reconstruction provides the opportunity to extend the sanitary sewer and loop the watermain with the Knob Hill Subdivision. As shown on Exhibit 5, this road is proposed to be built to a 9 ton design. Pike Lake Trail from Carriage Hills Parkway to CSAH 42 is designated as a minor collector street. Some of the project will be financed by the City Street Collector funds. Benefiting property owners will be assessed. Trunk Reserve funds will be used to finance the City portion of the sanitary sewer, watermain, and trunk storm sewer. FEASIBILITY From an engineering standpoint, project nwnber 1,2,3, and 5 are feasible, independent of each other, and can be accomplished as proposed, and not in conjunction with each other or any other project. So project nwnber 4 (Sealcoating) has been determined not to be feasible due to the fact that all city streets built prior to 1993 have been seal coated and it would not be cost effective to sealcoat any streets at this time. ESTIMATED COST The following costs were prepared based upon an Engineer's Estimate and are subject to change, depending on the final design of the project, bids received, and actual work performed. The method of assessment and rate will be determined at the Assessment Hearing. The estimated project cost for each project is for the installation of associated improvements and includes indirect project costs. Project costs in Areas 1 & 2 include special assessments. AREA 1 - Mushtown Road Mushtown Road from 1400 feet south of Tower S1. to 800 feet south of Ridgewood Ct: ITEM Street/Storm Sewer 8' Bituminous Path Right-of-way Acquisition SUBTOTAL *Indirect Costs (30%) TOTAL PROJECT COST COST $256,051.00 $8,329.00 $25.000.00 $289,380.00 $86.814.00 $376,194.00 501/723.7.7 "$IO/77t,'5'-'105"1]'6 9()5/,3'b ('300co.. Z75'1,Yb o S \ 0, '7~,(j,S q~ ?J7Ao tOq, 007.o~ a:', .; ...1city\91FEAS,DOC 5 "... fll "1IlI1I ili IIII AREA 2 - Pike Lake Trail 1 Pike Lake Trail from CSAH 42 south to proposed north plat line in the plat of Knob Hill: ITEM Storm Sewer/Street Trunk Storm Sewer Sanitary Sewer Watermain Path/Sidewalk SUBTOTAL *Indirect Costs (30%) TOTAL PROJECT COST AREA 3 - CSAH 42 COST $165,566.00 $47,421.00 $10,348.00 $36,591.00 $37.328.00 $297,254.00 $89.175.00 $386,429.00 CSAH 42 from Femdale Avenue to McKenna Road. ITEM Sanitary Sewer Watermain SUBTOTAL **Indirect Costs (12%) Total Utility Cost Storm SewerlPonds Roadway/ Curb/Bit. path SUBTOTAL Financing (8%) Total Roadway Cost TOTAL PROJECT COST *Indirect costs include: Engineering (17 %) Administration (5 %) Financing (8 %) * * Indirect costs include: Construction Engineering (7 %) Administration (5 %) s;lpmjecu\city\97FEAS,DQC 'II gl I1I1 ,I COST $99,900.00 $159.700.00 $259,600.00 $31.152.00 $290,752.00 $136,900.00 $160.100.00 $297,000,00 $23.760.00 $320,760.00 $611,512.00 6 WI c..-/'J "'I1~e-A r_. Zsth!;4fo,Yt'2 ~b/ 11.(,_.,Fo -/~S9o Ih-TP 3.0- ~4/ 4(,,0.(.,0 1Z-/rZ-~/oo 52-/ ~61/J{) 1// 5' e, t?, 0 () ~S,.r'bl, 00 II ~/ fp7t:f. JO 5/4) t$S.SD IIII 1 AREA 4 - Sealcoatio!! of Citv Streets Sealcoating of bituminous streets has been determined not to be cost effective for 1997 and is not feasible. PROJECT COST $0 AREA 5 - Lakefront Park Paving of Lakefront Park's trails, roads and parking lots: PROJECT COST $ 75,000 The following is a summary of the projects: Project Area 1 2 3 4 5 Area Project Total $376,194 $386,429 $611,512 $0 $75,000 $1,449,135 Mushtown Road Pike Lake Trail CSAH 42 Bituminous Sealcoating Lakefront Park TOTAL Project Areas 3 and 5 will be included in the Minnesota Statutes Chapter 429 Special Assessment Bond issue but will not be assessed. These two projects have general overall City benefit and are paid by ad valorem tax levy. PROPERTY TO BE ASSESSED The area proposed to be assessed is every lot, piece, arid parcel within the City limits benefiting from said improvement, whether abutting or not, within the following described areas: AREA 1 - Mushtown Road Part of the Northwest 1/4 of Section 11 Township 114 north, Range 22 west, Scott County, Minnesota. Specific property descriptions included in the above-described area, but not inclusive, are as follows: .:lprojeas\city\97FEAS.DOC -J] 7 ~ n l Property abutting Mushtown Road including: Proposed Windstar Addition Woodridge Estates 3rd Addition AREA 2 - Pike Lake Trail Part of the North half of Northeast 1/4 of Section 26 Township 115 north, Range 22 west, Scott County, Minnesota. The Northeast 1/4 of the Northwest 1/4 of Section 26 Township 115 north, Range 22 west, Scott County, Minnesota. ESTIMATED ASSESSMENTS The improvement cost will be assessed on an adjusted front footage basis to the benefiting properties as per the Assessment Policy adopted by the City Council on February 21, 1989, and as amended. AREA 1 - Mushtown Road Total Project Cost Project Levy Collector Street Fund (CIP for 2001) Project Assessment Woodridge 3rd Letter of Credit Net Assessment Project Assessable Front Footage Project Assessment Rate AREA 2 - Pike Lake Trail Total Project Cost Trunk Reserve CO,llector Street Fund Assessment Project Assessment Watermain Assessment Assessable Front Footage Assessment Rate s:\pI'ojec1S\city\97FEAS.DOC 8 .. III II' "I $ 376,194 4-D 4,007,05' $ 220,000 $ 62,154 $ 94,040 $ 85,177 $ 8,863 150FF $ 59.09/FF $ 386,429 ~/41 -ZS~, 30 $ 79,687 $ 114,104 $ 192,638 $ 192,638 $ 47,569 2511FF $ 18.94/FF ::~ r Sanitary Sewer Assessment Assessable Front Footage Assessment Rate $ 13,452 2036FF $ 6.61/FF Street/Storm Sewer Assessment Assessable Front Footage Assessment Rate $ 208,193 2511FF $ 82.91/FF PROJECT FINANCING SUMMARY Project Area Assessments Tax City MSA Trunk Collector Project Total I Area Levy Funds Reserve Street Fund Mushtown Road $94,040 $220,000 $62,154 $376,194 2 Pike Lake Trail $192,638 $79,687 $1l4,104 $386,429 3 CSAH 42 $320,760 $290,752 $61l,512 4 Bituminous Sealcoating $0 $0 5 Lakefront Park $75,000 $75,000 TOTALS $286,678 $615,760 $370,439 $176,258 $1,449,135 Minnesota Statutes Chapter 429 Special Assessment Bond issue requires that at a minimum of 20% of the total bond amount be recovered through special assessments. With a total project cost of$I,449,135, an estimated bond of $900,000, and an assessment total of $286,678, the assessed amount would be 32%. From an economic standpoint, project number 1,2,3, and 5 are feasible PROJECT SCHEDULE The following project schedule outlines an approach to complete the assessable projects in 1997: Accept Feasibility Study/Call for Public Hearing Hold Public Informational Meeting I Conduct Public Hearing! Accept Project/Order Plans and Specifications 3/3/97 3/97 4/7/97 s:lprojecu\city\97FEAS.DOC 9 III. II III T Hold Another Public Informational Meeting Approve Plans and Specifications/Order Advertisements for Bids Open Bids Authorize Amount to be Assessed/Schedule Assessment Hearing for 8/18/97 Conduct Assessment Hearing! Adopt Assessment Rolli Accept Bids/Award Contract Begin Construction Complete Base Course of Bituminous 5/97 6/16/97 7/14/97 7/21/97 8/18/97 8/25/97 10/15/97 CONCLUSION The total estimated cost of the proposed improvements is $1,449,135. A portion of these projects are proposed to be assessed to the benefiting property owners and the remainder through other funding sources. The projects are feasible from an engineering and economic standpoint, and will benefit the properties proposed to be assessed. s:', ..;.... ..... J7FEAS.DOC 10 111. II Illi r I ~ "1 ~-___L J - J -'~--"'1".. \- _ .2J - - - .-- .-...- -::-::r-. -"-- ..-: ~-:- ---_.~- i - - ------- --_.-- ... '~I\~. <..":, I: ~'-- - ~ ::: ~.~._I_____l- ~ ._ _-.oN""" ii i crrv Of PRlOfILAKE BASE MAP -- -- .,. ~- .. l~ ~ o 400 \ "...\ o "...\ ~ ~ +~ .J.r 1____ -~ SANITARY SEWER AND WAIt.reMAIN /t STUBS UNDER ROAD /" ( BY DEVELOPER /' PL057EX MUSHTOWN .ROAD S I NEt: I IMPAOVEME~ I 0 LOCA 110N MAP ~~IXlD~nu 2 i... In i1il ---- - -.-------.-..--.-..... ------- --_._.._"~ -..-- . . , i:I' ROW 50' ADJACENT TO PLAT 33' TO BE ACQUIRED ROW -S' BIT. PATH 28' FACE TO FACE 2' - " rBS'8. CONCRETE. CURB &: .GUTTER . .. _ ,,~{:r.,-~_L.+ ~ 2,~~~.......... ~/.. JFTL~ ..... r - ~ ~ ROUND TRANSIT1)N 'Q. A -. - - ~~~E CHANGING Q..5' (rt?) - ~ , 1/2- TYPE 4'A BITUMINOUS ~R COURSE 4- DRAINilLE TACK COAT WHERE 2.5- TYPE 31 B BllUMINOUS BASE COURSE NECESSARY 6- CLASS 5 AGGREGATE BASE 12- SUBCUT / SELECT GRANULAR BORROW MUSHTOWN ROAD ~~IXJD~Dii .3 MUSHTOWN ROAD PROPOSED S I HCL I SECTION 1... In "I III r ~~H~El l!, BY OTHERS j{PROPOSED RE _ ~ TAININC WALLS --------------- ..,,"" ''''" , _ ~ ..",,'" , ,.",_ I ~ ' ,_.... ,'-:--;; _ --.!1~.1;: " "., . .. -!-SEcnON LINEr:EET I ~ 00' ~ '- -.,. "." _.f 0 -----. _~ ., ," ".T ,.C, _.__ ...:.. _ . U ~ -~~"i'":QHT_OF~.' ~ - _"":.h-~ '-",,,~ J ; ~'~~."" ..,;-.-.::::;:,:::~.,,,,,,}c,. -:-.~ ! _ _ ".ow. .. ,'" .. "''lB'' " III O( S1llttT c C ~ ,-5 L -' . I ~'-+-- -' ::\ \-II\- ,."" '" ' ',"---' , ,_ '.O,k " A ORClE St.\) - - \' '?'itO'?O 'i--,-"O<o \IIt>-~\-S \ , \\ ~~ ~ - :>( _A( - - T,A _ - - - lIENSIotANN REAlTY LEO 8, .. HnDl A. \1ERUNC ED \1El1UNC ~ I ~ ... ~ ~ ~ yS';\..- :,r1'1'1. PROPOSED SANITARY SewER (THIS PROJECT) STREET IMPROVEMENTS -.-<- PROPOSED STORM SEWER (') . C' EXISllNG SANITARY SEWER · . PROPOSED 8- SANITARY SEWER (BY OTHERS) PROPOSED 8- WA TERMAIN (THIS PROJECT) WENSIotANH REAl. TY rUTURE~ WATt:Rt.AAIN I I ~ I~ ~ LTTlUTY AND STl1c:c I IMPROVEMENTS PIKE LAKE TRAL @ '"' Ej o 200 ~~1XI0ImOil' 4 Iii Ii !I!I! WEST ROW fRET A1NING WAlL AS REOUIRED - 5' SIDEWALK ,- -) <t 45' PROPvx.u 45' OR 75' EAST ROW RETAINING WALl\ AS REQUIRED 8' BIT. PATIi- 32' FACE TO FACE ~ rS18 CONCRETE CURB & GUTTER ~ .sbv..1/4"/n. " t-" 2.00% '/4-" IFf. ~ , J ---. .... ---- ~~. _ _ -';Jr....,.,. jO<' ~ _ _........._ (.~.: - -'. - -' - \. - ...".....:.;;j;~~ :-~~....~'j, ii:.t4.~: . i - - il.. In - 2" TYPE 41A BITUMINOUS WEAR COURSE TACK COAT 3" TYPE 31 B BITUMINOUS BASE COURSE r CLASS 5 AGGREGATE BASE TYPICAL ~ I Mt:t: I SECTION 9 TON DESIGN PIKE LAKE TRAIL ,. 'f - ---- ~~IMJD~Olf 5 \ Assessable totals Pike Lake Trail Page 1 l' NOTICE OF PUBLIC ASSESSMENT HEARING PUBLIC IMPROVEMENT PROJECT #95-07, MUSHTOWN ROAD AND PUBLIC IMPROVEMENT PROJECT 97-17, PIKE LAKE TRAIL RECONSTRUCTION IMPROVEMENT PROJECT GRADING, STORM SEWER, AGGREGATE BASE, CONCRETE CURB AND GUTTER, BITUMINOUS SURFACING, SANITARY SEWER, W ATERMAIN, AND APPURTENANT WORK IN THE CITY OF PRIOR LAKE, SCOTT COUNTY, MINNESOTA Notice is hereby given that the City Council of the City of Prior Lake, Minnesota will meet in the Council Chambers at Fire Station No.1, 16776 Fish Point Road, on Monday, the 3rd of November, 1997 at 7:30 P.M. to consider, and possibly adopt, the proposed assessment ofthe installation of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sanitary sewer, watermain, and appurtenant work for the improvement of the following streets: MUSHTOWN ROAD The area proposed to be assessed is every lot, piece, and parcel benefiting from said improvement, whether abutting or not, within the following described areas: Part of the Northwest 1/4 of Section 11, Township 114 north, Range 22 west, Scott County, Minnesota. Specific property descriptions included in the above described area, but not inclusive, are as follows: Lot 1, Block 2, Windstar Addition Woodridge Estates 3rd Addition PIKE LAKE TRAIL The area proposed to be assessed is every lot, piece, and parcel benefiting from said improvement, whether abutting or not, within the following described areas: Part of the North half of Northeast 1/4 of Section 26, Township 115 north, Range 22 west, Scott County, Minnesota. NOTPHASS.DOC 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER 1 III r The Northeast 1/4 of the Northwest 1/4 of Section 26, Township 115 north, Range 22 west, Scott County, Minnesota. Specific property descriptions included in the above described area, but not inclusive, are as follows: Lot 8, Block 1, Maple Hill Addition The estimated total of both Assessment rolls is $455,866.80. The Council proposes to proceed under the authority granted by Chapter 429 M.S.A. The proposed assessment roll is on file for public inspection in the City Manager's office and any written or oral objections will be considered at the public hearing. No appeal may be taken as to the amount of any assessment unless a signed, written objection is filed with 1i1.e City Manager prior to the hearing or presented to the presiding officer at the hearing. An appeal to district court may be made by serving notice upon the Mayor or City Manager within 30 days after adoption of the assessment roll and filing such notice with district court within 10 days after service upon the Mayor or City Manager. The City also has adopted a deferred assessment ordinance whereby the City Council may defer the payment of special assessments for those individuals who are permanently disabled or have attained the age of 65 or older. Guideline criteria and applications are available at City Hall. Applications must . e made within 30 days following the adoption of the assessment roll by the City Co cil. (1, Frank~~ ) City MV Published in the Prior Lake American, October 18 and October 25, 1997. NOTPHASS.DOC II I. II I III I 91--rr NOTICE OF PUBLIC ASSESSMENT HEARING PUBLIC IMPROVEMENT PROJECT 97-17, PIKE LAKE TRAIL RECONSTRUCTION IMPROVEMENT PROJECT GRADING, STORM SEWER, AGGREGATE BASE, CONCRETE CURB AND GUTTER, BITUMINOUS SURFACING AND APPURTENANT WORK IN THE CITY OF PRIOR LAKE, SCOTT COUNTY, MINNESOTA Notice is hereby given that the City Council of the City of Prior Lake, Minnesota will meet in the Council Chambers at Fire Station No.1, 16776 Fish Point Road, on Monday, the 21st of December, 1998 at 7:30 P.M. to consider, and possibly adopt, the proposed re-assessment ofthe installation of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work for the improvement of: PIKE LAKE TRAIL The area proposed to be assessed is every lot, piece, and parcel benefiting from said improvement, whether abutting or not, within the following described areas: Part of the North half of Northeast 1/4 of Section 26, Township 115 north, Range 22 west, Scott County, Minnesota. The Northeast 1/4 of the Northwest 1/4 of Section 26, Township 115 north, Range 22 west, Scott County, Minnesota. The estimated total of the Assessment roll is $224,473.10. The Council proposes to proceed under the authority granted by Chapter 429 M.S.A. The proposed assessment roll is on file for public inspection in the City Manager's office and any written or oral objections will be considered at the public hearing. No appeal may be taken as to the amount of any assessment unless a signed, written objection is filed with the City Manager prior to the hearing or presented to the presiding officer at the hearing. An appeal to district court may be made by serving notice upon the Mayor or City Manager within 30 days after adoption of the assessment roll and filing such notice with district court within 10 days after service upon the Mayor or City Manager. The City also has adopted a deferred assessment ordinance whereby the City Council may defer the payment of special assessments for those individuals who are permanently disabled or have attained the age of 65 or older. Guideline 1620~g1~OCreek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER II" n I III :~ criteria and applications are available at City Hall. Applications must be made within 30 days following the adoption of the assessment roll by the City Co it. ~J, Frank BoIfes ./ City Man~ Published in the Prior Lake American, December 5 and December 12, 1998. PLTRANOT.DOC ... III III1 "' I .:; , l Affidavit of Mailing Assessment Hearing Notice State of Minnesota ) ) Council of Prior Lake) Janet Rim!benz . being first duly sworn, deposes and says: I am a United States citizen, over 21 years of age, and the employee of the City of Prior Lake, Minnesota. On December 4, 1998, acting on behalf of the said city, I deposited in the United States post office at Prior Lake, Minnesota, copies of the attached notice of a hearing on proposed special assessments, enclosed in envelopes, with postage thereon fully prepaid, addressed to the following persons at the addresses appearing opposite their respective names: Name Address Holv Cross Lutheran Church PO Box 177.14085 Pike Lake Trail NE. P.L. MN 55372 Herbert & Elaine Wensmann 1895 Plaza Drive. Eal.!an MN 55122 Mr. Ed Vierlinl.! 14310 Pike Lake Trail NE. P.L.. MN 55372 There is a delivery service by the United States mail between the place of mailing and the places so addressed. . ~ '-I1A/flCj JVL.9/ Slgn~e () tJ Subscribed and sworn to before me this 1 t:J:; day of.&. A ANGELA JASPERS ... . NOTARY PUBUC-MINNESOTA ... .. MyC"~~~~~31,2lXXl , 1911 /!;-;J,t: ~d G:\projects\1997\17pikeso.doc i... 10 iiil ~. Holy Cross Lutheran Church P.O. Box 177 14085 Pike Lake Trail NE Prior Lake, MN 55372 December 4, 1998 Subj: PUBLIC HEARING NOTICE ON RE-ASSESSMENTS FOR STREET IMPROVEMENTS ON PIKE LAKE TRAIL CITY PROJECT #97-17 Holy Cross Lutheran Church: During the construction of Pike Lake Trail, and AFTER the original assessment hearing for the subject project, the Prior Lake City Council approved change orders to the contract that REDUCED the project cost by $97,052.80. The City Council determined the project's street and storm sewer costs should be re-assessed so the assessments would accurately reflect the reduced costs. The watermain, sanitary sewer, and trunk acreage assessments did not change and therefore are not part of this re-assessment process. This letter is to notify you that your property is subject to this re-assessment for the street and storm sewer improvements to Pike Lake Trail. Please fmd enclosed an Assessment Hearing Notice for Public Improvement Project #97-17. This notice will be published in the December 5 and December 12, 1998 Prior Lake American and describes the notice of improvements and the area to be assessed. The Assessment Hearing is scheduled to be held on December 21, 1998. To provide 14 days notice of the re-assessments to the property owners, we have prepared the assessments based on the reduced project costs for this project. The original front footage rate for street and storm sewer was $151.30/FF. The proposed reduced front footage rate for street and storm sewer is $114.82/FF. In addition to the reduced assessments, based on your 1998 payment you will receive a total credit of $3,972.04 on your parcel. If you have any questions regarding the credit please contact the Finance Director. If you have other general questions, please call me at 447-4230. ;relY, pNI~ Gre~ P.E. Public Works Director/City Engineer CITY OF PRIOR LAKE RAHLET.DOC 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER II II I~ i~ ,.... .1It ~ pRELIMINARY REPORT AND ESTIMATE OF COST FOR 1.I:UJ CITY OF PRIOR LAKE ON 1995 PUBUC IMPROVEMENT PROJECTS SANITARY SEWER, W A.l~dAIN, STORM SEWER, GRADING, CURBING, WALKS, STREET PAVING, AND APPURTENA1~ WORK NOVEMBJfd.( 15, 1994 I h"..':':'f certify that this Feasibility Study was written by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Minnesota. ( / ~ ;r/~ <v".-v" ') Terry J. Ma , P.E. Reg. No. 15316 /1/;5194 Date Prepared by: Cindy Blanski, Staff Engineer 102-045-10 FEAS-I02.045 iill r PRELIMINARY REPORT AND ESTIMATE OF COST FOR .l.D.J!.. CITY OF PRIOR LAKE ON 1995 PUBUC ~~AOVEMENT PROJECTS GRADING, SANITARY SEWER, WAl.I!.KJ.~, STORM SEWER, CURBING, WALKS, STREET PAVING, AND APPURIJ!J~ANT WORK NOVEMBER 15, 1994 I. TI l"E OF WORK The improvements proposed for construction during 1995 include sanitary sewer, watermain, storm sewer, sidewalk, bikepath, bituminous overlayment, and street reconstruction, including grading, concrete curb and gutter, and boulevard restoration. The p.Lvpvsed project locations within the city limits of Prior Lake are shown by Exhibit 1. Areas 1 and 2 had been included previously in the 1994 Capital Improvement Report, dated January 3, 1994. A brief description of the improvements shown by Exhibit 1 is as follows: ARF.A 1 - Ridgemnnt Avenue Ridgemont Avenue from the existing concrete curb and gutter to Rutledge Street, including sanitary sewer, watermain, storm sewer, grading, aggregate base, concrete curb and gutter, concrete sidewalk, bituminous surfacing, and appurtenant work. A RF.A 2 - f"rPPk..ide Cirrle Street reconstruction of Creekside Circle, including grading, aggregate base, storm sewer, concrete curb and gutter, bituminous surfacing, and appurtenant work. ARF.A ::l - Tower Strf'Pt Street construction of Tower street, including grading, aggregate base, bituminous surfacing, and appurtenant work. ARF.A d - f"entpnni~1 StrPPt Street construction of Centennial Street, including storm sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work. .AREA ~ - Pike T.JlI kp Trail Pike Lake Trail Street construction and utility improvements, including sanitary sewer, watermain, storm sewer, grading, aggregate base, concrete curb and gutter, concrete FEAS-102.045 -2- 102~S-10 il. n illl l' sidewalk, bituminous path, bituminous surfacing, and appurtenant work. ARF.A 6 - Tihl~ Additinn Bituminous resurfacing of Martindale Drive, Henning Circle, and Hickory Lane within the Titus Subdivision. In addition, work includes the reconstruction of Martindale at Pike Lake Trail, including grading, aggregate base, bituminous curb, bituminous surfacing and appurtenant work. ARF.A 7 - pjYiP Pnint Cirf"lp Street reconstruction of Pixie Point Circle, including grading, aggregate base, storm sewer, concrete curb and gutter, bituminous surfacing, and appurtenant work. AREA i - O~k Rid~p ("nllrf: Sllhdivi~inn Street reconstruction of Oak Ridge Circle, Flandrau Circle, Fulbright Circle, Indian Ridge Circle, and Euclid Avenue, including storm sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing and appurtenant work. AREA Q - (".andy C(\Vp "Pa rk IT .ak~idp M~nnr Sllhdivi~inn~ Street reconstruction of Candy Cove Trail, Manor Road, Woodlawn, Hill and Lemley Circles, including grading, aggregate base, storm sewer, concrete curb and gutter, bituminous surfacing, and appurtenant work. ARR.\ 10 - Fi~h Pnint P~rk Drainage channel improvement from Forest Oaks Subdivision to Prior Lake within Fish Point Park, including channel excavation, channel lining, and appurtenant work. ll. WCATION OF IJ::U!. PROJECTS The ten projects shown by Exhibit 1 are located in the following areas: ARF.A 1 - Ridgpmnnt AvpnllP Ridgemont Avenue from approximately 300 feet north of Trunk Highway 13 to Rutledge Street within the following subdivisions: The Oaks Edwards 1st Addition Hannen 2nd and 3rd Addition Widerstrom 1st Addition Mitchell pond FEAS-102.045 -3- 102-045-10 illl Calvin Erbele's 1st Addition In Sections 35 and 36, Township 115 north, Range 22 west, Scott County, Minnesota. ARF.A 2 - C'rPPk~idp C'irdp Creekside Circle from Trunk Highway 13 to the cul-de-sac within la-Anna Stepka Hi- View 3rd Addition in Section 2, Township 114 north, Range 22 west, Scott County, Minnesota. ARRA :l - Towpr StrPPt Tower Street llulU County Road 23 to Duluth Avenue in Section 2, Township 114 north, Range 22 west, Scott County, Minnesota. AREr\ ~ - C'pntpnni91 StrPPt Centennial Street from Candy Cove Trail to the turnaround, within the Centennial Addition, and adjacent to unplatted property west of Candy Cove Trail. In Section 36, Township 115 north, Range 22 west, Scott County, Minnesota. ARRA 5 - Pikp T ~kp Trn.il Pike Lake Trail from County Road 42 to the proposed north plat line in the plat of Knob Hill in Section 26, Township 115 north, Range 22 west, Scott County, Minnesota. AREA " - Titus Addition Martindale Drive from Pike Lake Trail to end terminus; Henning Circle from Martindale Drive to cul-de-sac; Hickory Lane from Martindale Drive to end terminus; within Titus First Addition in Section 23, Township 115 north, range 22 west, Scott County, Minnesota. A RRA 7 - Piyjp Point C'irdp Pixie Point Circle, with the beginning and end at 150th Street within the following subdivisions: Eastwood 1st Addition Eastwood 2nd Addition Buckeye's 1st Addition Feons 1st Addition And, R.L.S. Number 1 in Section 25, Township 115 north, Range 22 west, Scott County, Minnesota. FEAS-I02.045 -4- 102..{)4S-10 i... In ,III ) AnoD Jl _ Oak 'Ridgp rnnrt Snhdiviann Oak Ridge Circle, with the beginning and end at Euclid Avenue; Euclid Avenue from 150th Street to Oak Ridge Circle; Indian Ridge Circle from Fairlawn Shores Trail to the cul*sac; Fulbright Circle hum Oak Ridge Circle to the cul-de-sac; Flandrau Circle from Oak Ridge Circle to the cul-de-sac, within the following subdivisions: Oak Ridge Court Oak Ridge Court 1st and 2nd Addition In Section 36, Township 115 north, Range 22 West, Scott County, Minnesota. AREA Q _ Candy rove ParklT .akfl"llilide Mannr Snhdivi~ion~ Candy Cove Trail, with the beginning and end at Trunk Highway 13; Woodlawn Circle from Candy Cove Trail to the cul-de-sac; Hill Circle from Woodlawn Circle to the cul-de- sac; and Manor Road from Woodlawn Circle to Candy Cove Trail within the following subdivisions: Candy Cove Park Lakeside Manor 1st, 2nd, and 3rd Additions In Section 36, township 115 north, Range 22 west, Scott County, Minnesota. ArPa 10 - Fi~h Point Park Channel improvements in Fish Point Park from Forest Court to Prior Lake, adjacent to Shangri-LA Subdivision, in Section 36, Township 115 north, Range 22 west, Scott County, Minnesota. ID. DESCR1r .1.lON OF PROJECT Project descriptions for the various areas are as follows: t\'RRA 1 - 'Ridgpmont Avenne Currently, Ridgemont A venue is the only access to quite a few residential platted areas. It is }I'.lu}lvsed that Ridgemont Avenue be J.~ustructed from the existing concrete curb and gutter north to Rutledge Street as shown by Exhibit 2. Ridgemont Avenue has been patched in numerous locations and has extensive cracks. The portion of road proposed for iml'.lVVement does not have concrete curb and gutter. Reconstruction of the existing road to an urban section with concrete curb and gutter and minor storm sewer iml'.lvvements is proposed. The typical street section is shown by Exhibit 3. FEAS-I02.045 -5- 102-045-10 illl 1 S~,,~ reconstruction }'.Lv.ides the "it'}'U'.L~.Jnity to extend a lateral sanitary sewer line south in order to provide service to the existing homes on the east side of Ridgemont and undeveloped parcels. In addition, the watennain will be extended south also. The proposed utility improvements are shown by Exhibit 4. The }'J.uject consists of 3,200 linear feet of concrete curb and gutter, 1,600 linear feet of bituminous surfacing and 900 feet of sanitary sewer and watennain. The Ridgemont Avenue project is a hold-over from the 1994 Capitol Improvement l'.L'uject and will be assessed to the benefitting property owners and included in the 429 bond issue. A RRA 2 - Creek!ii:idp. Cirdp. Creekside Circle is shown by Exhibit 5. The pavement on this street has pot holes and has been patched in several locations. There is extensive alligator cracking. Currently, storm water runoff is conveyed by existing ditches to the cul-de-sac where a catch basin collects the runoff and discharges it to the creek. The north end of the road has a bituminous berm that will be replaced with concrete curb and gutter. Other improvements include street reconstruction with new bituminous surfacing and stonn sewer improvements. The proposed typical sections consist of both an urban and rural section as shown by Exhibit 6. The rural portion will remain as is in order to maintain adequate cover over the existing watennain. This project consists of approximately 800 linear feet of concrete curb and gutter and 1,100 linear feet of bituminous surfacing. This project is also a hold-over from the 1994 Capitol Improvement project and will be assessed to the benefitting property owners and included in the 429 bond issue. AREA. l - Towp.r Street Tower Street, shown by Exhibit 7 is an existing gravel road with a rural section from County Road 23 to approximately Duluth A venue and is highly traveled due to its proximity to The Ponds Athletic Complex. It is anticipated that this stretch of Tower Street will be reconstructed in the future; therefore, concrete curb and gutter and stonn sewer is not warranted at this time. The proposed su.,^,~ section is shown by Exhibit 8. The project consists of 300 feet of street construction. The project will be paid by the City, utilizing general tax levy or street collector funds. ~ d - Centennial StrPPt Centennial Su.,^,~ is an existing gravel road and is shownx by Exhibit 9. Currently, stonn water runoff flows overland to a wooded area west of the wooded turnaround. It is i".I.u}'vsed that Centennial Street be reconstructed with bituminous surfacing and concrete curb and gutter and minor storm sewer improvements. The total length of street reconstruction is 600 feet. The typical street section is shown by Exhibit 10. As shown on Exhibit 9, drainage easements must be acquired. The project will be assessed to benefitting property owners. FEAS-102.045 -6- 102-045-10 :1.. 18 ",i J AB.E..& AI; - Pikp. T .akp. TnlliI Pike Lake Trail is shown by Exhibit 11. This street is designated as a Municipal State Aid (MSA) route. CUu..:,utIy, the ,)~w has a gravel surface and is rural in nature with no curb and gutter. The portion of Pike Lake Trail south of the Maple Hill Subdivision will be built by a develvy"'" as part of the Knob Hill Subdivision; therefore, costs for sl.....,;.;~ reconstruction within the Knob Hill Subdivision are not included in this report. Proposed improvement includes street reconstruction with storm sewer, retaining wall, concrete curb and gutter, concrete sidewalk, bituminous bike path, and bituminous surfacing. Street reconstru~tion provides the opportunity to extend the sanitary sewer south and loop the watermain to the Knob Hill Subdivision. As shown on the exhibits, right-of-way for the road and drainage easements must be acquired. Costs for acquiring any right-of-way or easements are included in the project cost for Pike Lake Trail. The F"VFVsed typical section is shown by Exhibit 12. Pike Lake Trail, north of Knob Hill will be designated as a Municipal State Aid route. Some of the y..vject will be financed by City Street Collector funds. Benefitting property owners will be assessed, and the project costs non-eligible for MSA funding will be included in the 429 bond issue. ARF.A 6 - Tihl~ Addition The YJ.v~rties within the Titus 1st Addition have wells and individual septic systems. It is not anticipated that City sewer and water will be extended to the area for at least 20 years. The Su.cds have extensive cracking and have had several large areas patched. The S~c.ci.S have a bituminous berm and storm sewer. Exhibit 13 shows the streets within Titus 1st Addition proposed for improvements, which includes milling the existing bituminous, blending it with existing base, and placing a 1.5" overlay. Martindale Drive will be reconstructed at Pike Lake Trail in order to improve the vertical curve at the intersection. This is currently very steep. In addition, areas with severe cracking will have the pavement removed and patched prior to the overlay. The project consists of resurfacing aypJ.vAirnately 3,000 linear feet of .)~c.ci. and reconstruction of 100 linear feet. The typical sections are shown by Exhibit 14. Benefitting property owners will be assessed, and the City portion of the project costs included in the 429 bond issue. A RF.A 7 - Pixip. Point C.irl"lp. Pixie Point Circle is shown by Exhibit 15. This street has bituminous pavement and existing storm sewer. The pavement has pot holes and extensive cracks. The proposed imFJ.uvement includes J.~nstruction of the existing street with new bituminous surfacing, including concrete curb and gutter and storm sewer replacement. The project consists of approximately 3,100 linear feet of concrete curb and gutter and 1,500 linear feet of bituminous surfacing. The proposed typical section is shown by Exhibit 16. The project will be assessed to the benefitting property owners and included in the 429 bond issue. FEAS-l02.045 -7- 102-045-10 1.. 1ft inI .1 .4.RR.4. Jl - Osak Ridgp ("onrt ~nhdivi!li:inn The ,)i....\Nls shown by Exhibit 17 within the Oak Ridge Court Subdivision have numerous cracks and patched areas. Currently, the street has bituminous curb and stuUlI sewer. Proposed iUl}o'udements include street reconstruction with bituminous surfacing, concrete curb and gutter, and storm sewer. The to....t' "sed typical sections are shown by Exhibit 18. The project consists of street reconstruction of 4,100 linear feet of bituminous surfacing and 8,000 linear feet of concrete curb and gutter. The project will be assessed to the benefitting property owners and included in the 429 bond issue. AREA Q - Candy ("ovp P1I~klT .akf>!li:idp Mannr ~nhdivi!li:inn!li: The streets shown by Exhibit 19 have numerous patches and cracks. The street has bituminous curb and storm sewer. The proposed improvement includes street .L,,-.vustruction, including concrete curb and gutter, and minor storm sewer improvements. The }o'.Lv}lOsed typical section is shown by Exhibit 20. This project consists of 5,200 linear feet of street reconstruction and 10,000 linear feet of concrete curb and gutter. The project will be assessed to the benefitting property owners and included in the 429 bond issue. .4.RR.4. 10 - Fi!li:h Point Park Fish Point Park is shown by Exhibit 21. The existing channel that conveys storm water runoff from adjacent drainage areas has eroded the banks of residential. properties in some areas while other areas the channel is virtually non-existent. The eroded soil is being deposited in the channel where there is minimal grade, and therefore making the channel undefined in one area. It is proposed the channel be re-established using rip-rap and a small water quality pond be created as shown by Exhibit 22. Existing culverts within the park will be replaced as necessary for ditch construction. This project will be paid for out of the Storm Water Utility fund. IV. FEASffiILITY From an engineering standpoint, these projects are feasible, independent of each other, and can be accomplished as proposed, and not in conjunction with each other or any other project. v. ESTIMAIW COST The following costs were prepared based upon an Engineer's Estimate and are subject to change, depending on the final design of the project, bids received, and actual. work performed. The method of assessment and rate will be determined at the Assessment Hearing. FEAS-102.045 -8- 102~S-10 ,. _ .0 illl 1 The estimated l'J.u:iect cost for each }'.....;ect is for the installation of associated improvements and includes indL..:.....l r.....;ect costs. Project costs in Areas 1, 2, and 4-9 include special assessments. AREA 1 - RidgPmnnt Avenue Ridgemont Avenue from al'l'~u'Aimately 300 feet north of Trunk Highway 13 to Rutledge Street: Street Stvuu Sewer Sanitary Sewer Watermain Subtotal $165,700 5,800 33,800 , l.,.4OO $226,700 Indirect Costs (30 % ) 6R I 000 TOTAL PROJECT COST $294,700 A RRA 2 - r1"PPk~id.. rU:cle Creekside Circle from Trunk Highway 13 to the cul-de-sac: Street Storm Sewer Subtotal $106,500 11 400 , $119,900 Indirect Costs (30 % ) TOTAL PROJECT COST 16JXlO $155,900 A RRA 3 - Tower StrPfl't Tower Street from County Road 23 to Duluth Avenue: Street $19,500 Indirect Costs (10 % ) 1 ,Q,\.Q TOTAL PROJECT COST $21,450 FEAS-I02.045 -9- 102-045-10 II" In '" ARE.A ,4 - rp.ntp.nni~1 St~ Centennial Street from Candy Cove Trail to the turnaround: Street $64,500 Indirect Costs (30 % ) Easement Acquisition 19,350 1 JX)O TOTAL PROJECT COST $84,850 ARRA ~ - Pikp. T JIIkp. Tnil Pike Lake Trail from County Road 42 to the north plat line of Knob Hill: Street Storm Sewer Water Quality Pond Sanitary Sewer Watermain Subtotal $169,750 14,350 68,800 35,577 1n,~ $325,077 Indirect Costs (30 % ) TOTAL PROJECT COST QV53 $422,600 ARRA 6 - Tihl~ Addition Martindale Drive, Henning Circle, and Hickory Lane: Street Storm Sewer Subtotal $91,200 4900 , $96,100 Indirect Costs (30 % ) ?R, ROO TOTAL PROJECT COST $124,900 FEAS-I02.045 -10- 102-045-10 II.. IR "I ,- - ...... A'REA 7 _ Pi.o.. Point CirrI.. Pixie Point Circle from 150th Street to 150th Street: Street Storm Sewer Subtotal Indirect Costs (30 % ) TOTAL PROJECT COST A'REA R - Oak 'Ridgp rourt Suhdivision 1 $174,800 Ii,~ $179,700 "4.,000 $233,700 Oak Ridge Circle, Euclid Avenue, Indian Ridge Circle, Fulbright Circle, and Flandrau Circle: Street Storm Sewer Subtotal Indirect Costs (30 % ) TOTAL PROJECT COST $481,200 ?Q, "00 $510,700 1 "1, '-00 $663,900 AREA Q - randy CovP. Park" .akP5i:idp. Manor Suhdivision Candy Cove Trail, Woodlawn Circle and Manor Road: Street Storm Sewer Subtotal Indirect Costs (30 % ) TOTAL PROJECT COST FEAS-I02,045 -11- $563,800 41;tOO $604,900 1 ~1500 $786,400 102-045-10 ill! T A RRA 1 0 Fi~h Point ~rk Channelization And Storm Sewer WetlandlWater Quality Pond Subtotal $76,300 10JRXl $86,900 Indirect Costs (25 % ) 21 ,700 TOTAL PROJECf COST $108,600 IV. PROrJ!.ATY TO BE ASSESSED The area proposed to be assessed is every lot, piece, and parcel benefitting from said improvement, whether abutting or not, within the following described areas. ARE,4. 1 - Ridgp-mont AVf'nuf' The south half of Sections 35 and 36, Township 115 north, Range 22 west, Scott County, Minnesota. St'"",Jic p.lvyc..l~ descriptions included in the above described area, but not inclusive, are as follows: R.L.S. No. 13, Tract E Hannen 2nd Addition, Lot 1 Mitchell Pond, Lots 1-3, Block 2 Calvin Erbele's 1st Addition, Lot 1 Edwards 1st Addition, Lot 2, Block 1 The Oaks, Lots 1-3, Block 1 Unplatted property south of Hannen 2nd Addition adjacent to Ridgemont Avenue. ARRA 2 - f'n>f'k~idf' f'irrlf' The south half of Section 2, Township 114 north, Range 22 west, Scott County, Minnesota. Specific }/J.vpCoJ.lj descriptions included in the above described area, but not exclusive, are as follows: Property abutting Creekside Circle including Lots 1-16 of the area known and platted as Ja-Anna Stepka Hi-View 3rd, and the FJ.vperties south of Lot 16 and Lot 2. FEAS-I02.045 -12- 102-045-10 ... In iill :l AREA .do - r"ntpnniSlll ~f'rppt The south half of Section 36, Township 115 north, Range 22 west, Scott County, Minnesota. sl'......:fic l'..vl'"..LJ descriptions included in the above described area, but not inclusive, are as follows: Property abutting Centennial Street including: Centennial Addition The unplatted property north of Centennial Addition adjacent to Centennial Street. The unplatted t'~'u}lerty south of Centennial Street and east of Centennial Addition. ARE.A ~ - Pikp T .JIkp Trnil The north half of Section 26, Township 115 north, Range 22 west, Scott County, Minnesota. St'""Jic t'w~~~i descriptions included in the above described area, but not inclusive, are as follows: Property abutting Pike Lake Trail including: Maple Hill, Lots 1, 8 & 9 Knob Hill Subdivision Unplatted property south of County Road 42 and adjacent to Pike Lake Trail owned by Minnesota Southern District of Lutheran Churches, and Wensmann Realty. ARF.A Ii - Tihl~ Addition The north half of Section 23, Township 115, north, range 22 west, Scott County, Minnesota. St'"",Jic p~u~~~y descriptions included in the above described area, but not exclusive, are as follows: Property abutting Martindale Drive, Henning Circle, and Hickory Lane in Blocks 1, 2, and 3, and outlot B, within the area known and platted as Titus 1st Addition. FEAS-I02.045 -13- l02~S-lO il II II ill .) A RF.A 7 - 'PhriP. Point Cin-Ip. The south half of Section 25, Township 115 north, Range 22 west, Scott County, Minnesota. Si""-aic l'.L\Jl'.....~j descriptions included in the above described area, but not exclusive, are as follows: Feons 1st Addition Eastwood 1st Addition, Lots 2-17 Eastwood 2nd Addition including Outlot A Buckeye's 1st Addition R.L.S. No. I, Tracts C-I & K-N R.L.S. No.2, Tract A AREA Jl - Oak Ritfgp C'onrt' Snhdivi~ion The north half of Section 36, Township 114 north, Range 22 west, Scott County, Minnesota. Specific l'l.V~J.;:Y descriptions included in the above described area, but not exclusive, are as follows: Oak Ridge Court Lot 6, Block 1, Lot 1, Block 2 Oak Ridge Court 1st Addition, Lots 1-21 & 23-25, Block 1, Block 2, Lots 4-9, Block 3 Oak Ridge Court 2nd Addition ARF.A Q - C'!Uldy C'ovP. Park/T ..akP-lOidp. Manor Snhdivi~ion Section 36, Township 115 north, Range 22 west, Scott County, Minnesota. Sl'"-aic l'J.v~J.iy descriptions included in the above described area, but not exclusive, are as follows: Lakeside Manor, Blocks 1 & 2 Lakeside Manor 1st Addition Lakeside Manor 2nd Addition, Blocks 1 and 2 Lakeside Manor 3rd Addition Candy Cove Park Lots 1-32 FEAS-I02.04S -14- 102-045-10 11 II ID i~ f ~ llJ.. ESTIMAuw ASSESSMENTS The improvement cost will be assessed on an adjusted front footage basis and unit basis to the benefitting .t'.Lvt'w~es as per the Assessment Policy adopted by the City Council on February 21, 1989, and amended on February 5, 1990. ~ 1 - RidgPmont Avpnup Total Project Cost Project Assessment (100%-S, W, & Streets) Project Assessment (60% - Street Only) Project Tax Levy (40% - Street Only) $294,700 194,372 60,197 40,131 For StrPP.t WJuorP SpwPt:..amf Wate... Will RP. F.rlpndpd Project Assessment (100% - Sewer, Water, & Streets) $194,372 Project Assessable Front Footage * 1,824 FF Project Assessment Rate $106.56/FF For StrPP.t Whprp Sewpr anti Watpr F.Yid- Project Assessment (60% - Street Only) Project Assessable Front Footage Project Assessment Rate $60,197 1,051 FF $57.28/FF * Note: Front fvv~e includes 964 FF for Lake Front Park which is adjacent to Ridgemont Avenue. The resulting City cost is 964 FF x $106.56 = $102,724 and is included under the tax levy column in the Project Financing Summary. In addition, a Trunk Charge for Trunk Sanitary Sewer and Watennain will be assessed based on property a"'J.C4ge: Trunk System Acreage Charge fo~ 1994 $3,000/ Acre ARF.A 2 - CrPPk~id.. rU:cle Total Project Cost $155,900 Project Assessment (60%) Project Tax Levy 93,540 62,360 93,540 2,609 FF $35. 85/FF Project Assessment Project Assessable Front Footage Project Assessment Rate FEAS-102.045 -15- 102-045-10 il I' 1ft IIII ~ ~ ~ - r~ntpnni~l Sf __ Total Project Cost $84,850 Project Assessment (100%) 84,850 Project Assessable Front FuulGge Project Assessment Rate 958 FF $88.571FF ARRA ~ - Pik... T.Jllkp TI"Sli1 Total Project Cost ;-- " , .'$422,600 Street Collector Fund Project Assessment (100%) 30,000 392,600 $46,250 1,395 FF $33. 15/FF Project Assessment (100% Sewer) Project Assessable Front Footage Project Assessment Rate Project Assessment (100% Watennain) Project Assessable Front Footage Project Assessment Rate $47,580 1,885 FF $25.24/FF Project Assessment (100% Stonn & Street) Project Assessable Front Footage Project Assessment Rate $298,770 2,035 FF $146.81/FF NOTE: A Trunk Charge for Trunk Sanitary Sewer and Watennain will be assessed based on property acreage: Trunk System Acreage Charge for 1994 $3,000/ Acre ARRA it - Tihl!li: Addition Total Project Cost $124,900 Project Assessment (60%) Project Tax Levy 74,940 49,960 Project Assessment Project Assessable Front Footage Project Assessment Rate 74,940 6,934 FF $10.811FF FEAS-I02.04S -16- 102~5-10 il I' 18 1 :~ 1 AR"RA 7 - PiYiP. Point Ci....lp. Total Project Cost $233,700 Project Assessment (60%) Project Tax Levy 140,220 93,480 Project Assessment Project Assessable Front Footage Project Assessment Rate 140,220 2,887 FF $48.57/FF AR'RA fC - Oak Ridgp C'onJ't Snhdivi~inn Total Project Cost . $663,900 Project Assessment (60%) Project Tax Levy 398,340 265,560 Project Assessment Project Assessable Front Footage Project Assessment Rate 398,340 6,235 FF $63. 89/FF AR'RA Q - C'.andy C'nvp. Park" .ak~idp. Mannr Snhdivi~inn Total Project Cost $786,400 Project Assessment (60%) Project Tax Levy 471,840 314,560 Project Assessment Project Assessable Front Footage Project Assessment Rate 471,840 8,978 FF $52.56/FF FEAS-I02.04S -17- 102-045-10 I" IH I illl 110 't\~- l;t} 6(S&H~ ~ltc, PETITION FOR THE IMPROVEMENT ~~~ ( OF PIKE LAKE TRAIL lr~~ As a resident of the Titus Addition,also known as oak::i~ Lake trail. Estates,I am concerned about the deplorable condition of Pike NAME ADDRESS Ii)~ ~ v#~ ~dw ~d~;") 4QQC3 ~~~ :~~h)~d1?;'#~ 1--170 J11(/IlZ~/I~rlrv (jJ;JA ~-LAI ~ / 13A3{ ~~I L/1IP /~' ~ /JVlo /;tG-- I-fJ /~ IN7 ~~ /3.200 j4~ c.-~ (/ ~ '/J23 !1bd~~ ~ llrtj '-tr\(:u1i.~~ ;));j:~~~~ ~,~ ~" ~o7-5>-f.m~ ,<~~ ..e;.'I..JKII-4-&Jr- 'fi9'8 /'4~n:Vo~, S h D.h1.LL D n-Prw +-1. 01 LI Y 1 q q + rn n h} J/IU'J oj () ~ ~'"' "-'~ ~ '-. ~ \\.. \\. \~ \\)\,,\,,~~~..~ V<0It.~ ~ y[)~fOJl'Y) J.fq::iJ ~ ~~ C'~ -' t.l920M~Lac9~1LJ~ .~C)r d,4L//d)~ tf9V';--~ I 4 0/ ? T) f7) ~J..A.. \ I." Ii PHONE If'S ~.fr. tj '/.:;-- 7 ~/9 ,- '-f4!5 ' J,.l ()>J7 4L./5-325S' Lftf~)JSMY 1-910 -659Y 7Y0~00YP ~'?~- 1'2;2 5 t/t./S- QZ24 L{ '1lo - Q52..,L;-3 Lt~l~ -05~3 '/~s- ~7h3 'fcfS'" --1 bP ( '7'7'6 -;23.4: +f5-~707 II 4l1S -.lCf76 y -/ -S- -.2Cj 7r:- ) PETITION FOR THE IMPROVEMENT OF PIKE LAKE TRAIL As a resident of the Titus Addition,also known as of Pike Lake Trail. Oakview Estates,I am concerned about the deplorable condition II II II ADDRE7' /.?.ffc!J~~ /3.3<f/J IidL ~ )~~ ~ #~f-; 'ft.fS- /,<il:z..7 / -f~~ ~ a~y {.~b-/9J7:., J /~~k'1~ <~.(j~E it/S--1170flrs: /3UCj - )../C/~ /trA-IfE #:s-:'fofooO - ~~7/ ~Rj,~J_,L;/- J/" Y~5/'/36~ 12.2-0/ l-IeJtft (htn Lf. lffr,- 0(; ~ / )3560 - jfCJ:.oflj Aj.ys- 37J' ~ PHONE ~~~d(p:<gJ 44 ~ - :<. g"~rr ( I~ ) AGREEMENT 15-.)./1 THIS AGREE:MENT made and entered into as of the . ",. - day of ~UY\.L , 1993, by and between the City of Prior Lake, a Minnesota muniCIpal corporation (hereinafter "City") and Holy Cross Lutheran Church of Prior Lake, Minnesota (hereinafter ''Holy Cross"). REillTALS WHEREAS, Holy Cross desires to construct a church building on its property in the City of Prior Lake, and WHEREAS, Holy Cros has requested that the City provide sewer service to its property line which will require extending sanitary sewer across County State Aid Highway 42 and along the length of property located on Pike Lake Trail, and WHEREAS, in order to extend said sewer line as requested by Holy Cross, the City requires reimbursement for certain construction costs and needs certain right-of-way easements for the City and Scott County NOW THEREFORE, in consideration of the mutual promises, convenants and agreements herein and in consideration of the City extending its sanitary sewer line to Holy Cross' property, the parties agree as follows: Page 1 I. _ III IIII 1. Holy Cross l:I.t1al1 pay City Four Thousand ($4]00.00) Dollars prior to the issuance of a building permit by the City to Holy Cross. 2. Holy Cross shall pay City Seventy-Four Thousand Six Hundred Eighty-Two And 47/100ths ($74,682.47) Dollars (the balance of the sanitary sewer extension construction costs and related fees) by July 19, 1993. In the event said balance is not received by the City by July 19, 1993, the City shall stop further building inspections and will not issue a Certificate of Occupancy. 3. Holy Cross shall execute and deliver all necessary easements required for the extension of the sanitary sewer project as prepared by the City and Scott Count:y. 4. The assumptions and understandings of the parties as set forth on Exhibit "A" attached hereto are incorporated herein and are part of this Agreement. 5. This Agreement may be amended by the parties hereto only by written instrument executed in accordance with same procedures and formality followed for the execution of this Agreement: 6. This Agreement may be simultaneously executed in several counterparts, each of which shall be an original and all of which shall constitute one in the same instrument. 7. The terms and conditions hereof shall be binding upon and inure to the benefit of the representatives, successors, and assigns of the parties hereto. 8. This Agreement shall be executed by the City Manager and the Mayor of the City only when authorized by the City Council. IN Vv IT1-mSS WHEREOF, City and Holy Cross have caused this Agreement to be duly executed as of the day and year first above written. Page 2 I." III IIII 1 ,I APPROVED BY /1 J . - I / , 1993. ---r' - ( ~ jd.- T~ CITY COUNCIL ON T~.2 DAY OF ,r-' bk;' I; T~ Q,,",JO , OR LAKE By I~~,&' ,/~~-- Frank'Bo.Y.~, b~ ~j~~ - r;ydlJYAndren, Mayor APP~VED AS TOFJar; By I'~~ ~, i [~ Glenn R. Kessel LOlMMEN, NELSON, COLE, & STAGEBERT, P.A. 80 South 8th Street, Suite 1800 ~eapolis,~ 55402 HOLY C~OSS LUTHERAN CHURCH By /?h, 11 ();: :h~Ies goz~ y \../, /. '-' , Gary Tho J~~tee BY'~ - David Busse, Trustee Page 3 II. .. I I~ .) STATE OF MINNESOTA) ) COUNTY OF SCOTr ) On the day of . 19 . before me, a Notary Public, within and for said County personally appeared Lydia Andren and Frank Boyles, to me personally known, being each by me duly swom did say that they are the Mayor and City Manager, respectively, of the City of Prior Lake, a Minnesota municipal corporation, named in the foregoing instrument; and that said instrument was signed on behalf fo the municipal corporation by authority of its City Council and acknowledged said instrument to be the free act and deed of said municipal corporation. Notary Public STATE OF MINNESOTA) ) COUNTY OF SCOTr ) On the / 5~ay of C\ .tlYl.L , 1993 before me, a Notary Public, within and for said County persomJilly appeared Charles Vig, Gary Thompson, and David Busse, to me personally known, being each by me duly swom did say that they are Trustees of Holy Cross Lutheran Church, and that said instrument was signed on behalf of the Church of authority of its Board of Trustees and acknowledged said instrument to.be the free act and deed of said Church. AGREE.WRT MARY A. MIEROW mO/)A.1 () /!l..il/)A'vU'- @,,?,OOo;"NOTARYpUBUC_MINNESOTA>lA {.!.! SOOlT COUNTY U . . \ CUn.,ll 'lIII~Od.15, 1996 otary Public L ...~::~~,",__r ,"\t\\lU\\ Page 4 il. .. 11 'I Tnr . . . )~ :, "EXHIBIT A" HOL V (;ROSS...LllIHERAN ~Hl.lRCH June 11, 1993 1. ASSUMPTTO~ A. Holy Cross will grant easements for street as prepared by Scott County and the City of Prior Lake -75 feet CSAH 42 -75 feet Pike Lake Trail B. Frontage and area charges based upon easements being provided. 2. City will extend sanitary sewer across CSAH 42 and extend the length of the property along Pike Lake Trail and provide a sewer service stub to the property line. The City understands that the church desires completion of the building by September 1, 1993. The City will make reasonable efforts to have the sewer available at.that time. In the event that the sewer is not available at that time, the City will not be liable for delays caused. 3. Sanitary sewer, watermain and paving imi"udements will be adjacent to the property along CSAH 42 & Pike Lake Trail in the future. Assessments and/or charges will be based upon the rates and poliCies at that time. 4. The CUu.;....t rates are as follows: Sewer Street Water $ 401F00t $ 401F00t $ 20/Foot Street Collector Trunk Sewer Trunk Water Storm Water Management $ 700/ Acre $1,375/Acre $1,375/Acre $. 168/Square Foot 5. The amount owed to the City based upon providing ROW is as follows: SANITARY SEWER A. Sanitary Sewer Trunk 6.29 Acres ($1,375/Acre) = $ 8,648.75 B. Sanitary Sewer Lateral Page 1 II II n I I~ .. 490 Feet ($'t\J.OOlFoot) = J19,6oo.00 $28,248.75 SUB TOTAL STREET COLI,ECTOR FEE 6.29 Acres ($700.00/Acre) STORM WATER MANAGEMENT FEE 6.29 Acres ($. 168/Square Foot) 43,560 Square Feet! Acre = $ 4,403.00 = $46,030.72 $78,682.47 TOTAL = 6. To facilitate cash flow for the church in lieu of collecting the amount owed to the City up front, the church will pay $4,000.00 prior to issuance of a building permit and the balance by July 19, 1993. In the event that payment is not made by July 19, 1993, the City will stop further building inspections and will not issue a Certificate of Occupancy. 7. City Staff will present this for Council approval at the June 21, 1993 Council Meeting. The church will agree to this in writing prior to placing it on the Council Agenda. CHURC1.WRT Page 2 II II II m 1 91 -\1- Holy Cross Lutheran Church Special Voter's Assembly December 22, 1997 Status report regarding Holy Cross' Appeal of Special Assessments. Frank J. Wicker Associates has completed it's Appraisal Report,"Street Improvements and Cost Benefit Analysis". Wicker appraised the property as vacant land, considering its highest and best use as residential since the parcel is adjacent to residences, with new residential developments occurring to the South and East of the parcel. The appraisal uses six comparable properties with limited utilities and six properties with full utilities. Wicker's professional conclusion is the Holy Cross property is worth (as of December 5, 1997): Value before improvements Value after improvements Total benefit of improvements $ 88,060 $188.700 $100,640 In 1994 we paid $78,682.47 for partial improvements. With an average escalation 5% per year, this would equal $92,900 when also brought to December 5, 1997. Therefore, Total economic benefit received from improvements $100,640 Previously paid $ 92.900 Remaining cost benefit for street improvement $ 7,740 11.. In :I~