HomeMy WebLinkAbout8B - Street Reconstruction
AGENDA ITEM:
MAY 1, 2000
8B
SUE MCDERMOTT, ASSISTANT CITY ENGINEER
BUD OSMUNDSON, CITY ENGINEERlPUBLIC WORKS
DIRECTOR
CONSIDER APPROVAL OF RESOLUTION OO-XX
APPROVING PLANS AND SPECIFICATIONS AND
AUTHORIZING ADVERTISEMENT FOR BIDS FOR
STREET RECONSTRUCTION FOR 2000 IMPROVEMENT
PROJECTS (CITY PROJECTS #12-00 AND #13-00)
MEETING DATE:
AGENDA #:
PREP ARED BY:
REVIEWED BY:
DISCUSSION:
History
Proposed street reconstruction improvements to Oak Ridge Circle,
Flandrau Circle, Fulbright Circle, Indian Ridge Circle, Euclid
Avenue, Maves Trail, Forsythe Road, Shannon Trail, Prior Circle,
and Shannon Circle (Project #12-00), overlay improvements to
Fairlawn Shores Trail from Fish Point Road to 150th Street and
Fish Point Road (Project #13-00), and reconstruction of Linden
Hills Circle (Project #14-00) are in the approved 2000 Capital
Improvement Program. Resolution 99-95 authorizing preparation
of plans and specifications for the projects was approved by the
City Council on September 20, 1999.
Public informational open houses were held in September of 1999
and February of 2000 to provide affected property owners the
opportunity to discuss the projects. Residents from each of the
projects were in attendance at the September meeting. Twelve
residents of the Oak Ridge Circle/Shannon Trail (Project #12-00)
attended the February meeting. Plans were available for review and
City staff was in attendance to answer questions from the public.
Current Circumstances
Pro;ect #12-00: Reconstruction of Oak Ridge Circle, Flandrau
Circle. Fulbright Circle. Indian Ridge Circle. Euclid Avenue.
Maves Trail, Forsvthe Road, Shannon Trail. Prior Circle, and
Shannon Circle
162(),Q,dt~tCreek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
This project includes storm sewer, concrete curb and gutter,
sanitary sewer repair, replacement of gate valves and hydrants,
aggregate base, bituminous surfacing, retaining walls, and
appurtenant work. The engineer's construction cost estimate is
$1,047,000. Indirect costs are estimated at 30%, and include
engineering (17%), administration (5%), and financing (8%) for a
total estimated project cost of $1,361 ,000. The construction of this
project is proposed to be funded through assessments, tax levy, and
Trunk Reserve fund.
Pro;ect #13-00: Fair/awn Shores Trail and Fish Point Road
Overlav
This project includes milling of bituminous edges, a 2-inch
bituminous overlayment, concrete repair and striping. The
engineer's construction cost estimate is $108,000. The estimated
project cost, which includes the 30% indirect costs, is $140,400.
This is slightly higher than the feasibility report estimate of
$135,395.00. The construction of this project is proposed to be
funded through assessments and tax levy.
Pro;ect #14-00: Linden Circle
Linden Circle is currently a gravel roadway. Project #14-00
includes construction of a 20-foot wide roadway with aggregate
base, concrete curb and gutter, bituminous surfacing, and
appurtenant work. The Engineer's Estimate for the construction is
$77,000. Adding the 30% indirect costs, the total estimated project
cost is $100,100. This is lower than the feasibility report estimate
of $109,720.00. The construction of Linden Circle is programmed
to be funded through special assessments.
Issues
1.) Project #12-00, Oak Ridge Circle, Flandrau Circle, Fulbright
Circle, Indian Ridge Circle, Euclid Avenue, Maves Trail, Forsythe
Road, Shannon Trail, Prior Circle, and Shannon Circle: There were
no real issues related to special assessments based on input from
the informational meeting. However, since that time the total
estimated project cost has been revised and has increased from the
feasibility estimate of $885,885.00 to the current estimate of
$1,361,000. The following table is a breakdown of the project
costs:
APPPLAN.DOC
Feasibility Estimate Current Estimate
Street Construction $573,550.00 $801,000.00
Storm Sewer $80,300.00 $130,000.00
Sanitary Sewer Repair $11,400.00 $31,000.00
Watermain Repair $16,200.00 $85,000.00
Est. Construction Cost $681,450.00 $1,047,000.00
Indirect Costs * $204,435.00 $314,000.00
TOT AL PROJECT $885,885.00 $1,361,000.00
PROJECT #12-00
* Indirect costs include engineering (17%), administration (5%),
and financing (8%).
In addition to the increase in bituminous prices due to rising oil
costs, a large portion of the estimated street construction cost
increase ($186,000) is due to poor subgrade conditions requiring
the road base to be subcut one-foot and filled with a layer of
granular material. This information was not available until after
the feasibility report was completed and soil borings and analysis
were done.
The increase in estimates for the utility work required are due to
information that was obtained during the design phase of the
project. The sanitary sewer pipes were televised and showed that
the main in Indian Ridge Circle between Fairlawn Shores Trail and
Oak Ridge Circle is in need of replacement due to broken and
crushed pipe. New gate valves and hydrants are also proposed to be
installed on the project. Staff recommends that this work be
funded through the Trunk Reserve fund.
The proposed storm sewer costs increased due to proposed
replacement of existing catch basins and castings that do not meet
current standards. A majority of the existing storm sewer pipe will
remain in place. Staff recommends that the storm sewer be funded
through the trunk fund.
The estimated assessment rate for this project based on the
Feasibility Report was $4,197.56 per unit or $36.18 per front foot.
U sing the current engineer's estimate and the recommendations
outlined above, the estimated assessment rate is $5,142.22 per unit
or $44.32 per front foot.
2.) Project #13-00, Fair Lawn Shores Trail and Fish Point Road
Overlays: There were no real issues related to special assessments
based on input from the informational meeting.
APPPLAN.DOC
FINANCIAL IMPACT:
3.) Project #14-00, Linden Circle: Easements are required from
four property owners to construct the proposed improvements. This
was a project which the property owners petitioned for. To date,
only two of the easements have been received. Attached to this
report is a request by one of the property owners for two conditions
to be met by the City prior to granting the easement. Condition 1
cannot be granted except through the zoning ordinances prescribed
process and criteria. It does not appear that the waiver is necessary.
Staff recommends that this project be delayed until the easements
are granted by the property owners. An alternative is for Council
to begin eminent domain proceedings.
Conclusion
The staff believes it is appropriate for the City Council to approve
project plans and specifications and authorize solicitation of bids
for PllOject #12-00, Oak Ridge Circle, Flandrau Circle, Fulbright
Circle, Indian Ridge Circle, Euclid Avenue, Maves Trail, Forsythe
Road, Shannon Trail, Prior Circle, and Shannon Circle and Project
#13-00, Fairlawn Shores Trail and Fish Point Road. The actual bid
amounts will verify the estimated assessments. If the Council has
concerns at that stage, they could direct appraisals to determine the
degree of benefit. The staff recommends that the Special
Assessment Committee meet once the bids are received to
formulate recommendations on bid award.
The total cost of this year's projects are estimated to be $1,502,000
and will be recovered through special assessments and Trunk
Reserve funds in addition to tax levy for bond repayment. The
table below outlines the project costs based on the engineer's
current estimate.
Project Assessments Tax Levy Trunk Reserve Total
Oak Ridge Circle $416,520.00 $624,680.00 $319,800.00 $1,361,000.00
/ Shannon Trail
(Project #12-00)
FairlawnlFish $56,160.00 $84,240.00 $0 $140,400.00
Point Overlay
(Project #13-00)
Total $472,520.00 $709,680.00 $319,800.00 $1,502,000.00
APPPLAN.DOC
-~~
'7'
AL TERNA TIVES:
RECOMMENDED
MOTION:
APPPLAN.DOC
The alternatives are as follows:
1. Approval of Resolution OO-XX approving plans and
specifications for Project #12-00, Oak Ridge Circle, Flandrau
Circle, Fulbright Circle, Indian Ridge Circle, Euclid Avenue,
Maves Trail, Forsythe Road, Shannon Trail, Prior Circle, and
Shannon Circle and Project #13-00, Fairlawn Shores Trail and
Fish Point Road and authorizing advertisement for bids. This
specifically excludes Project #14-00, Linden Circle.
2. Deny this item for a specific reason and provide staff with
direction.
3. Table this item until some date in the future.
Motion and second to approve Resolution OO-XX approving plans
and specifications for Project #12-00, Oak Ridge Circle, Flandrau
Circle, Fulbright Circle, Indian Ridge Circle, Euclid Avenue,
Maves Trail, Forsythe Road, Shannon Trail, Prior Circle, and
Shannon Circle and Project #13-00, Fairlawn Shores Trail and Fish
Point Road and authorizing advertisement for bids.
RESOLUTION OO-XX
A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS
AND AUTHORIZING THE ADVERTISEMENT FOR BIDS
FOR STREET RECONSTRUCTION FOR 2000 IMPROVEMENT PRO.JECTS
CITY PRO.JECTS #12-00 AND #13-00)
FOR THE CITY OF PRIOR LAKE, MINNESOTA
MOTION BY:
SECOND BY:
WHEREAS,
pursuant to Resolution 99-95, adopted on September 20, 1999, the City Engineer has
prepared plans and specifications for the utility improvement.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA that
1. Such plans and specifications, a copy of which is attached hereto and incorporated herein by this
reference, are hereby approved.
2. The City Manager shall prepare and cause to be inserted in the official paper and in the
Construction Bulletin an advertisement for bids for the making of the improvement pursuant to the
attached plans and specifications. The advertisement shall be published not less than 21 days prior
to bid opening, shall specify the work to be done, and shall state that the bids will be received by
the City Manager until 10:00 a.m. on Friday, June 2, 2000, at which time the bids will be publicly
opened at City Hall at 16200 Eagle Creek Avenue SE by the City Engineer. No bids will be
considered unless sealed and filed with the City Manager and accompanied by a cash deposit,
cashier's check, bid bond, or certified check payable to the City of Prior Lake in the amount of
five (5) percent of the amount of such bid.
3. The City reserves the right to reject any and all bids for any reason as determined solely by the
City.
Passed and adopted this 1st day of May, 2000.
Mader Mader
Ericson Ericson
Gundlach Gundlach
Petersen Petersen
Schenck Schenck
YES NO
{Seal} City Manager
City of Prior Lake
162QQ>~ecf:reek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
_,.~~.........."m.".~".~..<.
April 14, 2000
'-
.::~)~::~~
~ ,,~ -~;~: /7 lY /j7;'V
tj~/) ""I",.'
-, .f 1 7 '\ ///:~/
2,,",,/ ;, i
L.::, _'. :;i":0 iij
--', <. -::.....-:::--,. ~/I
-~~ '
-~---- /
~
Sue McDermott
Assistant City Engineer
City of Prior Lake
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
Dear Ms. McDermott:
The city of Prior Lake (the "City") has requested that I sign a quitclaim giving the City an
easement, triangular in shape, along my front property line in order to construct a new street. I
am willing to give the City the easement, provided that the City agrees to:
1. Grant my property a variance from the building code requirement that not more
than 30% of the lot be built, to the extent the City's easement causes my property to exceed the
30% maximum; and
2. Indemnify me against any costs and expenses resulting from any damage to or
destruction of the tree on my property which is identified with a circle on the attached Exhibit A,
including, but not limited to, tree replacement costs.
If you find these two preconditions to my execution of the quitclaim easement acceptable,
please indicate your acceptance by signing in the signature block below.
Very truly yours,
Dean Sutliff
3162 Linden Circle N.W.
Prior Lake, MN55372
Accepted and agreed to
this _ day of April, 2000
CITY OF PRIOR LAKE
By
Its
Doc# 1217896\1
ADVERTISEMENT FOR BIDS
2000 Improvements in the City of Prior Lake
City Project No. 12-00: Oak Ridge Circle, Euclid Avenue, Indian Ridge
Circle, Fulbright Circle, Flandrau Circle, Shannon Trail, Prior
Circle, Shannon Circle, Maves Trail, and Forsythe Road
City Project No. 13-00: Fairlawn Shores Trail and Fish Point Road Overlay
NOTICE IS HEREBY GIVEN that sealed proposals will be received by the City Council of
the City of Prior Lake, Minnesota at the Prior Lake City Hall, located at 16200 Eagle Creek
Avenue S.E., Prior Lake, MN 55372 unti110:00 a.m. local time, on the 2nd day of June, 2000,
and will be publicly opened at said time and place by two or more designated officers or agents
of the City of Prior Lake, said proposals for the furnishing of all labor and materials for the
construction, complete in place of the following:
APPROXIMATE MAJOR QUANTITIES PROJECT 12-00 & 13-00
Common Excavation
Subgrade Excavation
Concrete Curb and Gutter
Class 5 Aggregate Base
Bituminous Paving
Storm Sewer
Drainage Structures
Modular Block Retaining Walls
Sodding
6" Gate Valves
Hydrants wi Valves
2630
10029
14062
9925
7714
1865
52
1618
16240
20
17
CY
CY
LF
Ton
Ton
LF
Each
SF
SY
Each
Each
Proposals arriving after the designated time will be returned unopened.
The Bids must be submitted on the proposal forms provided in accordance with contract
documents, plans, and specifications as prepared by the City of Prior Lake Engineering
Department, 16200 Eagle Creek Avenue S.E., Prior Lake, MN 55372. Contract documents,
plans, and specifications may be obtained from Prior Lake Engineering Department by calling
(612) 447-9830. Copies may be obtained upon deposit of Seventy five dollars ($75.00) non-
refundable deposit per set.
16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
G:\PROJECTS\2000\120AKRDG\BIDADV2.DOGlN EQUAL OPPORTUNITY EMPLOYER
- - -------- - ...----.------------,---.. --.._------. ---.... - _. -_..--
No bids will be considered unless sealed and filed with the City Manager of Prior Lake and
accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City
of Prior Lake, for five (5%) percent of the amount bid to be forfeited as liquidated damages in the
event that the bid be accepted and bidder shall fail to enter promptly into a written contract and
furnish the required bond.
No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The
City of Prior Lake reserves the right to reject any or all bids. Further, the City reserves the right
to accept a bid higher than the lowest bid if, in the opinion of the Council, the public interest will
be better served.
DATED:
Frank Boyles
City Manager
City of Prior Lake, Minnesota
To be published in the Prior Lake American on May 13,2000 and May 20, 2000.
To be published in the Construction Bulletin on May 12,2000 and May 19,2000.
G:\PROJECTS\2000\120AKRDG\BIDADV2.DOC