DISCUSSION:
HISTORY
Project #99-02 is the lift station renovation project that was
included in the 1999 Capital Improvement Program. The City has
entered into a contract for public improvements with Braun Pump
and Controls of New Prague, MN. This renovation program is
intended to renew three of thirty-one lift stations. By renovating
three lift stations per year, our objective is to maintain the
dependability of each to avoid breakdowns which negatively affect
our sewer customers.
The following items were changed during construction:
1. The City's record drawings showed a 2" force main at Lift
Station #13. When the contractor exposed the force main, it
was actually a 3" diameter pipe. Extra time was spent to
obtain the correct fittings and reconnect the force main.
Cost to correct: $675.00.
2. Due to the small diameter wet wells, the transducer, which
was specified and installed was giving false readings which
caused false lift station alarms. At the time the
specifications were prepared, staff was unaware that there
was a different type of transducer available for this
application. Cost to replace: $481.75.
3. The access covers that were specified for Lift Stations #9
and #13 were too large to be structurally safe and had to be
reordered at a cost of $950.00 each.
1626)Qn~le Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
T
FISCAL IMPACT:
AL TERNA TIVES:
RECOMMENDED
MOTION:
braunfinpay
The total amount of change order no. 2 is $3,224.56 and includes
sales tax and freight charges. A copy of change order no. 2 is
attached to this report.
Final quantity calculations and administrative requirements have
now been completed and the contract can be finaled out. A copy of
the final payment voucher is attached to this report.
CURRENT CIRCUMSTANCES
The contract was awarded on a lump sum basis per lift station on
July 19, 1999 in the amount of$117,800.00. The final contract cost
is $123,524.56, which includes Change Order Nos. I and 2.
Previous payments to date total $106,642.25, resulting in a final
payment including Change Order No.2, of $16,882.31.
ISSUES
There are no outstanding issues on this contract. The contractor's
signature on the final payment vouchers (copies attached) indicates
his acceptance of final payment and closure of the contract.
Approval of the final payment authorizes payment from the trunk
reserve fund as contemplated when the projects were approved.
The final contract amount of $123,524.56 is approximately 5%
more than the original contract amount due to change orders
resulting from field adjustments.
The alternatives are as follows:
1. Approval of final payment to Braun Pump and Controls in the
amount of $16,882.31 for the contract for construction of City
Project 99-02 Lift Station Renovations.
2. Table this item for a specific reason.
A motion and second approving Change Order No.2 and final
payment to Braun Pump and Controls in the amount of $16,882.31
for the contract for construction of city project 99-02 Lift Station
Renovations.
CHANGE ORDER
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVENUE SE
PRIOR LAKE, MN 55372
CHANGE ORDER NO.2
TO:
Braun Pump & Controls
RR 4, Box 474
New Prague, MN 56071
DATE: September 8, 2000
FOR:
Project No. 99-02, Lift Station Renovations
OWNER:
City of Prior Lake
You are hereby directed to make the following change to your contract dated July 19, 1999. The
change and the work affected thereby is subject to all contract stipulations and covenants. This
Change Order will increase the contract sum by:
Three-Thousand, Two-Hundred, Twenty-four and 56/100 Dollars ($3,224.56)
Add the following:
Item Description Unit Quantity Unit Amount
- -
Price
1. Change from 2" to 3" force main (LS #13) Hour 9 $75.00 $675.00
2. Exchange of XPS transducer (LS #9) LS 1 $481.75 $481.75
3. Change in size of access cover (LS #13) EA 1 $950.00 $950.00
4. Change in size of access cover (LS #9) EA 1 $950.00 $950.00
Sales tax and freight $167.81
Total Additions $ 3,224.56
Amount of Original Contract $ 117,800.00
Change Order No. 1 $ 2,500.00
Change Order No.2 $ 3,224.56
Revised Contract Amount $ 123,524.56
Contract time is not affected by this change.
G:\PROJECTSI J 999102LIFTSIC02.DOC
CONSTRUCTION PAYMENT VOUCHER
Estimate Voucher No. 4 (FINAL) For Period Ending: August 31, 2000
-.- Project NUmber: 99-02
Date: September 8, 2000
Class of Work: Lift Station Renovations
For: City of Prior Lake To: Braun Pump & Controls
RR4-Box474
New Prague, MN 56071
A. Original Contract Amount $ 117,800.00
B. Total Additions $ 5,724.56
C. Total Deductions $ 0.00
D. Total Funds Encumbered $ 123,524.56
E. Total Value of Work Certified to Date $ 123,524.56
F. Less Retained Percentage 0 % $ 0.00
G. Less Total Previous Payments $ 106,642.25
H. Approved for Payment, This Report $ 16,882.31
I. Total Payments Including This Voucher $ 123,524.56
J. Balance Carried Forward $ 0.00
APPROVALS
Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials
are satisfactory and the work properly performed in accordance with the plans and specifications and that the total
work is 100 % completed as of, August 31 , 2000, I hereby recommend payment of this voucher.
-
Project Engineer Approval:
This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work
certified herein is a fair approximate estimate for the period covered by this voucher.
Contractor: Signed By:
Date: Title:
CITY OF PRIOR LAKE
Approved for Payment:
Voucher Checked By Authorized Representative
Date: Date:
60"1.-Sloo, - S02