HomeMy WebLinkAbout9A - Ring Road DATE: AGENDA #: PREPARED BY: REVIEWED BY: AGENDA ITEM: DISCUSSION: CITY COUNCIL AGENDA REPORT 4-0 September 18, 2000 ') :~D OSMUNDSON, DIRECTOR OF PUBLIC WORKS ~/i-('~ FRANK BOYLES, CITY MANAGER ~1 CONSIDER APPROVAL OF RESOLUTION oo~ ~AUTHORIZING WSB & ASSOCIATES TO PROVIDE PROFESsioNAL ENGINEERING SERVICES FOR THE RING ROAD BETWEEN DULUTHITOWER ST. AND TORONTO AVENUE SE HISTORY On March 6, 2000, the City Council received a report on the proposed Ring Road between CSAH 23 and Franklin Trail and approved alternate Layout NO.2. On June 19, 2000 the City Council adopted the 2001-2005 Capital Improvement Program (CIP) which includes the segment of Ring Road between DuluthlTower Street and Franklin Trail in 2001. Per past practice and policy the segment of the Ring Road between Toronto Avenue and Franklin Trail will be completed by the developer of the Park Nicollet property. If this does not happen in 2001 staff will return to the City Council for further direction. Due to the proposed development of the Post Office on the Enivid Addition property and the need to determine the exact alignment of the Ring Road, staff requested proposals for professional engineering services for the proposed Ring Road segment between DuluthlTower and Toronto Avenue from the following three engineering firms: 1. Bonestroo, Rosene, Anderlik & Associates 2. Short, Elliott, Hendrickson (SEH) 3. WSB & Associates (WSB) Each of the above listed firms has expertise in the design of new streets and is familiar with the City. The engineering firm that is chosen will divide the project into two separate phases. The first phase will be for the Feasibility Report which will include the exact alignment of the new street, the estimated project costs and funding sources, and the preparation of legal descriptions of property to be acquired for the new street. The second phase is for the preparation of plans and specifications for the project. Both phases will be covered by one professional services agreement. The following table shows the submitted proposed compensation fees for the project 1 X:\ENGINEERIRRPROP.DOC 17073 Adelmann St. S.E., Prior Lake, Minnesota 55372 / Ph. (952) 440-9675 / Fax (952) 440-9678 AN EQUAL OPPORTUNITY EMPLOYER T Bonestro(), Rosene, Short, .Elliot, WSR& .~ Anderlik & Associates HendrickSon (SF.]H) Feasibility Report $31,500 $32,095 $11,676 Design $44,500 $39,458 $35,524 Geotechnical $10,000 $3,000 $3,000 Other ------- ------- $2,500 Total $86;000 $7 4,~53 $~7,'lOQ All of the firms have the expertise and knowledge to complete a project such as the Ring Road. Sue McDermott, City Engineer, and I have evaluated these proposals and discussed the choices. Based on our analysis, WSB & Associates was chosen for recommendation to the City Council. I have attached a copy of WSB's proposal to this report. Copies of the other proposals are available in my office. The proposed schedule for the project includes having the Feasibility Report completed and presented to the Council on November 7, 2000. At that meeting the preparation of the Plans and Specifications is to be ordered as will the direction to staff to begin the process to acquire the necessary properties. On February 5, 2001 the Council will be requested to approve the plans and specifications and authorize the advertisement for bids and approve the acquisition of properties. Bids will be received and a contract for construction is to be awarded in March 2001. Construction should be complete by August 2001. FINANCIAL IMPACT: The cost of the engineering services will come from a variety of sources as noted in the CIP. This segment of the Ring Road will be paid for by a combination of Municipal State Aid Funds, the Collector Street Fund, and Utility Funds. ALTERNATIVES: There are two alternatives for the City Council to consider: 1. Approve a resolution which authorizes WSB & Associates to provide engineering services for the Ring Road Improvements for a total fee not to exceed $52,700. 2. Deny this item for a specific reason and provide staff with direction. RECOMMENDED MOTION: Staff recommends adoption of Alternative NO.1. ACTION REQUIRED: to adopt the Resolution stated above. REVIEWED BY: 2 X:\ENGINEERIRRPROP.DOC RESOLUTION oo-~ 91 A RESOLUTION APPROVING WSB & ASSOCIATES TO PROVIDE ENGINEERING SERVICES FOR the RING ROAD IMPROVEMENTS MOTION BY: SECOND BY: WHEREAS, WHEREAS, it is proposed to construct the Ring Road between DuluthlTower Streets and Toronto Avenue SE, and; the Adopted Capital Improvement Program for 2001-2005 has designated this project as a priority for the City, and; engineering services including preliminary and final design are required for this project, and; WHEREAS, WHEREAS, based on tne review and evaluation of three proposals, the City Engineer and Public Works Director recommend acceptance of the proposal from WSB & Associates. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA that WSB & Associates is hereby authorized to provide engineering services for the Ring Road improvements between DuluthlTower Streets and Toronto Avenue SE for a total fee not to exceed $52,700 to be drawn from the Trunk Fund. Passed and adopted this 18th day of September, 2000. Mader Mader Ericson Ericson Gundlach Gundlach Petersen Petersen Vacant Vacant YES NO {Seal} City Manager City of Prior Lake 3 x:\Er1:;'ME1~1IDlJUl St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 440-9675 / Fax (612) 440-9678 AN EQUAL OPPORTUNITY EMPLOYER T N ~ ~ ~ jH ~ Z.~ ~ A WSB tel: 763-541-4800 fax: 763-541-1700 B.A. Mittelsteadt, P.E. Bret A. Weiss, P.E. Peter R. Willenbring, P.E. Donald W. Sterna, P.E. Ronald B. Bray, P.E. 8441 Wayzata Boulevard, Suite 350 Minneapolis, MN 55426 & Associates, Inc. September 8, 2000 Mr. Bud Osmundson, P .E. Public Works Director City of Prior Lake 16200 Eagle Creek Drive Prior Lake, MN 55372 Re: Ring Road Proposal WSB Proposal No. 078-000 Dear Bud: WSB & Associates, Inc. is pleased to submit this proposal to the City of Prior Lake for professional engineering services for the study, design and construction of the "Ring Road" between Toronto Avenue and Tower Street. We have assembled a project team that is highly qualified to provide the requested engineering services to the City of Prior Lake. We believe our proposed fee is very competitive for projects of this type, but would be willing to meet with City staffto further refine our work tasks and estimated hours if desirable. Weare extremely interested in providing quality and cost effective engineering services to the City of Prior Lake and look forward to your favorable consideration of our proposal. Please contact me at (763) 277-5795 if you have any comments or questions. Sincerely, David E. Hutton, P .E. Municipal Department Manager Enclosure Minneapolis · St. Cloud Infrastructure Engineers Planners EQUAL OPPORTUNITY EMPLOYER PIAAA _ ProposallPROPOSAlI078 OOO\090700bo wpd u r-- , :.~ .... PROPOSAL To Provide PROFESSIONAL ENGINEERING SERVICES To the city of PRIOR LAKE, MINNESOTA for .... Ring Road Toronto Avenue to Tower Street September 8, 2000 ~ WSB 350 Westwood Lake Office 8441 \MIyzata Boulevard Minneapolis. MN 55426 tel: 763-541-4800 fax: 763-541-1700 & AssociaIu. /ttc. Table of Contents I. Firm Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1 II. Project Understanding ................................................. Page 2 III. Project Approach and Work Plan ........................................ Page 3 IV. Project Personnel .................................................... Page 10 V. Representative Experience/References ................................... Page 12 VI. Project Schedule ................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Page 14 VII. Compensation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Page 15 ATTACHMENTS A. Estimate of Fee B. Schedule C. Fee Schedule D. Layout No.2 City of Prior Lake "Ring Road" betweell Toronto Avenue and Tower Street WSB Proposal No. 078-000 . WSB "-"'/rw:. L Firm Profile Firm Name and Business Address WSB & Associates, Inc. 350 Westwood Lake Office 8441 Wayzata Boulevard Minneapolis, Minnesota 55426 Telephone Number (763) 541-4800 (763) 541-1700 (Fax) e-mail: wsbeng.com Contact Person for Ring Road Project David E. Hutton, P .E. Project Manager History WSB & Associates, Inc. is a Minnesota owned infrastructure engineering firm with offices in Minneapolis and St. Cloud. WSB was founded in 1995 by Bernie Mittelsteadt, Bret Weiss, Ron Bray, Don Sterna and Pete Willenbring with a staff of seven, which has grown to over 70 professional staff in five years. WSB can provide thorough, quality service for a broad array of municipal, transportation and water resources engineering projects. From small studies to large reconstruction projects, WSB can assist our clients with all facets ofthe process. WSB takes special pride in our ability to communicate through a wide range of media. The five owners have over 100 years of combined experience in public engineering proj ects. WSB currently serves several communities as city engineer, township engineer, and as the principal consulting engineer and a substantial portion of our business has been developed through our existing clients, which is further testimony of their satisfaction. WSB takes pride in providing services to Minnesota cities and counties, Mn/DOT districts and watershed organizations. We are committed to our clients and to the industry we serve. City of Prior Lake "Ring Road" between Toronto Avellue alld Tower Street WSB Proposal No. 078-000 Page 1 .... WSB d: hsodalu. Inc. II Project Understanding The City of Prior Lake has requested a proposal to provide professional engineering services for street and utility improvements to construct a "Ring Road" between Toronto Avenue and Tower Street. Layout No.2 as provided by the City has been selected as the preferred option. It is proposed that the roadway will be constructed in 2001. A drawing depicting Layout No.2 is included in the Appendix. For the purposes of our proposal, we have divided the engineering services into three phases as follows: . Feasibility report . Design services . Construction The project scope includes 1,200 feet of 44' wide Municipal State Aid Street, with curb and gutter, sanitary sewer, watermain and storm sewer. A five-foot sidewalk would be installed on one side and an eight-foot bituminous trail on the other. Connections to existing streets would be made. We will prepare the legal descriptions and exhibits for all right-of-way/easements. The proposed street will provide access to the new Post Office site. The final street geometries will need to be coordinated with the development plans. The cost estimate for the project, including engineering costs and right-of-way acquisition costs is $1,280,000. City of Prior Lake "Ring Road" betweell Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 2 ~ WSB .I_or, Inc. IlL Project Approach and Work Plan Work Plan WSB's team approach and proposed work plan is based on our understanding of the project scope and experience on similar projects. WSB will complete the feasibility report and develop the final construction documents (plans, specifications and estimates) requested. We will dedicate the necessary personnel and resources to the project to meet your needs. The work plan has been separated into three (3) major areas: feasibility report, design services, and the construction phase. A. Feasibility Report WSB & Associates, Inc. is committed to completing the feasibility report by the requested completion date of November 7, 2000. Task 1 - Project Management This task includes coordination and meetings with City Staff, developers and property owners. The anticipated meetings include a project kickoff meeting with City Staff to further refine the scope of the project, discuss key project issues, gather information, and coordinate all future meetings and schedules. Three additional meetings with City Staff are budgeted throughout the project to review alignment options, discuss costs and funding alternatives/assessments and review the draft report and requested revisions. If desired, WSB will conduct one neighborhood meeting with the affected property owners to review the draft report. It is expected that City Staffwill assist in developing the mailing list and mailing the notices for this meeting. Attendance at two City Council meetings is budgeted within the proposal, including the official public hearing for the project. We would present the results of the study to the Council at the public hearing. Any additional meetings requested by the City over and above those cited may be accommodated if the budget allows. This task also includes supervision and coordination of all WSB team members during the completion of the report, including coordination of the geotechnical work. City of Prior Lake "Ring Road" between Torollto Avenue and Tower Street WSB Proposal No. 078-000 Page 3 .&. WSB clA..uociolu,lnc. Finally, this task includes coordination and communication with other necessary agencies such as MnlDOT, Scott County, Prior Lake Watershed District, etc. WSB will assist City staff in adding this new alignment to the City's Municipal State Aid System. Task 2 - Data Collection This task includes collecting the data necessary to complete the feasibility study. This data includes, but is not necessarily limited to: . Topography maps . Property ownership/section maps . Property owner names and addresses . Past special assessments . As-built information for any city streets, county highways or trunk highways as necessary . Soil and groundwater information from adjoining properties We would identify all of the data collection needs at the project kickoff meeting and the expectations are that the City would provide the information in a timely manner necessary to keep the study on schedule. Task 3 - SurveyslEasements This task consists of identifying property lines and ownership for purposes of establishing easement areas. The amount and location of permanent and temporary easements will be determined. This task includes the writing of legal descriptions and mapping for property acquisition. As indicated in the RFP, it is estimated that six parcels will be acquired as part of the final design process once construction limits have been established. All preliminary surveying horizontal and vertical control, basemapping, topography, alignments would be established as part of this task. Task 4 - Final Design Alignment/Preliminary Plan This task consists of laying out the fmal alignment that meets MSAS standards for the Ring Road. We will work with City staff, and property owners to develop the fmal alignment based on Layout No.2. This task also includes developing a preliminary street and utility design. Preliminary plan view drawings of the streets, water, sewer, storm and sidewalks/trail plans would be developed. City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 4 ... WSB "AuociiUu. Inc. Task 5 - Cost Estimate/Financing Once the preliminary street and utility design is completed a cost estimate will be prepared to determine the overall project cost, including construction costs and other non-construction, add-on costs. This task includes meeting with the Finance Department and other City Staff to discuss financing alternatives and special assessment policies. If special assessments will be used, a preliminary assessment roll will be generated that meets the City policies and practices. The staff memorandum which approved Layout No.2 indicates that County and State funds would be the main funding sources anticipated. This task includes arriving at a complete funding package for the entire project cost, which could include, but is not limited to the following components: State Aid funds, Scott County funds, special assessments, development fees, utility fees, or general tax revenues. Task 6 - Final Report This task consists of writing the draft and fmal feasibility report, including revisions as requested by City Staff. It is our intent to have the draft report to City Staffby October 23,2000 and the final report completed by November 1, 2000, assuming a timely review and comments by City Staff. The report would be presented at the November 7,2000 City Council meeting. Fifteen copies of the Feasibility Report will be delivered to the City. B. Final Design Task 1 - Project Management This task will consist of management and administration, project coordination and communication with the City of Prior Lake on the project. It includes periodic meetings with the City of Prior Lake and will also include billing preparation, invoicing, and other non-technical work associated with the preliminary engineering and final design process. Task 2 -- Geotechnical Investigation Subsurface exploration services will be performed to investigate the subsoil conditions along the proposed alignment. Borings will be drilled to the appropriate depths to determine groundwater elevations and subsoil consistency for the construction of streets and utilities. The geotechnical City of Prior Lake "Ring Road" betweelZ TorolZto Avenue and Tower Street WSB Proposal No. 078-000 Page 5 ... WSB d hsocialel. Inc. investigation information will be utilized to identify any soil concerns that may need to be corrected, along with determining the subsoil strengths (R-value) for the pavement design. Task 3 - Final Survey/Easements Once the final construction limits identified, a final right-of-way plan would be prepared and legal descriptions/exhibits prepared for each parcel. It is estimated that approximately 6 parcels would be involved. It is our understanding that the City would be responsible for negotiating and obtaining all right-of-way/ easements. It is important to complete this task early in the process to allow adequate time for appraisals, negotiations and possible eminent domain procedures to be completed prior to the bid letting. This task has the potential to delaying the project start if eminent domain is necessary. Task 4 - Final Design and Plan Preparation WSB will prepare a set of detailed construction plans for this project in accordance with all City and State Aid standards. We will work closely with all agencies to ensure that the design process meets their expectations to expedite the review and approval process. Design review meetings will be scheduled as needed and progress updates will be submitted periodically. The plans would be compatible to AutoCad 2000. At approximately 90% complete, a "final" set of plans will be submitted to the City and State for review and approval. Upon receipt of all redlines and comments, the final plans will be presented to the City Council for acceptance and bid authorization. The final construction plans will include the following items: · Title Sheet . Quantity/earthwork tabulations . Typical sections and pavement details . Construction staging/traffic control . Alignment! general layout . Existing utilities and removal plans . Roadway plan and profiles . Sanitary sewer and watermain plan and profiles . Storm sewer design elevations, detection ponds, profiles . Intersection details . Traffic striping/signing plan . Sidewalk. and trails . Erosion control . Landscaping and turf establishments City of Prior Lake "Ring Road" between Torollto Avenue and Tower Street WSB Proposal No. 078-000 Page 6 .. WSB "bIo<I<uu. Inc. r~ Based on the information in the RFP, signals are not anticipated with this project. Task 5 -- Plan Review and Approval WSB will submit the final plans, specifications and any other requirements to the City and MnlDOT State Aid for review and approval. Task 6 -- Specifications Special provisions will be written for unique items not covered adequately in the "Mn/DOT Standard Specification for Construction" or the City's standard specification. Each provision will contain a description, materials, construction requirements, method of measurement and basis of payment for each item. Deletions from and additions to standard specifications will be written and included as necessary. The specifications would be prepared to be compatible with Word 2000. Task 7 - Engineer's Cost Estimate We will prepare a construction cost opinion based on quantities generated as part of the preparation of the construction plans. Costs will be split by funding source, including percentage splits, and drainage split flow percentages required by State Aid. Task 8 - Bid Administration WSB will prepare the bidding documents, which will include, but not be limited to, special provision bidding instructions, sub-soil investigation report, bid proposal, and appropriate MnlDOT attachments. WSB will provide the City with both full size (22" x 34") and reduced size (11 "xI7") reproducible plan sets, along with the original bid proposal. WSB will be responsible for all activities related to contract bidding and award. Thirty (30) copies ofthe final plans and specifications and complete bidding documents will be prepared for distribution to bidders. WSB will be responsible for selling the plans. Once the bids are opened, WSB will tabulate and review the bids and offer a letter of recommendation to the City Council. We will attend the City Council meeting regarding the award of bid. WSB will prepare the necessary contract documents, including bonds, insurance, etc. City of Prior Lake "RiI'g Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 7 ... WSB & AsrociaJ". Inc. Task 9 - Permits WSB will prepare for the City's signature, all necessary pennit applications identified. The City will be responsible for all permit fees necessary for the construction of the project. The following is a list of potential local, state and federal permits and approvals that may be required. . Minnesota DNR (wetlands) . Prior Lake -- Spring Lake Watershed District( erosion control, stormwater ponding) . Metropolitan Council Environmental Services (sanitary sewer) . MPCA (sanitary sewer, NPDES) . Minnesota Department of Health (watermain) . County or State Right-of-Way Permits (if necessary) C. Construction Services As requested, WSB and Associates will provide a full range of construction services for this project. The following tasks are proposed: Task 1- Contract Administration The Project Engineer will be responsible for all construction administration activities. At the beginning of the project, a preconstruction meeting will be conducted. The Project Engineer will serve as the City's liaison with the Contractor. During the course of the project, weekly construction progress meetings will be conducted by the Project Engineer. Periodic visits to the site will be made by the Project Engineer. The Project Engineer will be responsible for preparing all pay estimates, change orders, reviewing shop drawings, materials and suppliers, and preparing the final acceptance letter. The Project Engineer will provide coordination to all utility companies, property owners, surveyors, and all project personnel. The construction observers, surveyors and geotechnical sub consultant will report directly to the Project Engineer. Periodic progress reports will be provided to the City staff as necessary. Task 2 - Construction Observation WSB will provide full-time construction observation using a MnlDOT certified inspector. The observer will keep daily records of all activities of the contractor, prepare reports, tabulate quantities and pay estimates, perfonn field measurements for pay items and record drawings, monitor all materials and testing, coordinate survey activities needed, and communicate the schedules with all utility companies. The observer will be required to attend the weekly construction meetings. At the City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 8 A WSB d A.wciafa./rw:. r completion of the project, a punch list will be prepared, final inspection performed and contract close out procedures followed. Task 3 - Construction Staking WSB will provide a full-time survey crew to do all construction staking for this project, including construction limits, grading alignment and grades for all sewer, water, storm and street facilities and appurtenances, signal signage locations, and any other survey needs for this project. Task 4 - Record Drawings Upon the completion ofthe project, WSB will prepare the final record drawings based on the field information and provide them to the City. Prior to submitting mylars, a blueline copy of the record drawings will be submitted to the City for review and comment. Record drawings will be submitted in digital format as well as hard copies. City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 9 ... WSB .1 Assodm... Inc. IV Project Personnel A. Introduction to Team WSB is committed to providing a team of experienced professionals capable of providing quality service to the City of Prior Lake. The following paragraphs briefly describe the team WSB proposes to utilize on the Ring Road improvement project. Detailed resumes of key personnel are available if desired. David E. Hutton, P.E. Project Manager As project manager, Mr. Hutton's responsibilities will be to schedule and coordinate necessary meetings, provide staffing for the project and facilitate communication between the design team and client. He will directly coordinate design activities, agency coordination, the development of construction documents, and construction of the project. Mr. Hutton has over 21 years of engineering experience, with 16 of those years spent as the Public Works Director/City Engineer for the Cities of Shakopee, Savage and West Bend, Wisconsin. He has been directly responsible for numerous State Aid projects and street utility projects throughout his public career. He understands the issues and procedures for these types of projects. Mr. Hutton's extensive technical and managerial expertise, along with his clear understanding of public works and engineering, will help to ensure a successful project. Bret A. Weiss, P.E., Principal-in-Charge Mr. Weiss, as principal-in-charge, will be responsible for quality assurance and control of the project. He will be responsible for monitoring the project schedule and budget, assisting in establishing the design parameters, and monitoring the preliminary and final design procedures. He will work closely with Mr. Hutton to ensure that the WSB team provides quality service to City staff. Andrew J. Brotzler, P.E., Project Engineer As Project Engineer, Mr. Brotzler will be responsible for the preliminary and final design. His role will be to assist Mr. Hutton with the coordination and design of the project. Mr. Brotzler has more than seven years of experience in municipal and transportation projects. Projects that he has coordinated the design of include: Municipal State Aid, County State Aid, MnlDOT Cooperative Agreement, and Federally Funded projects. Charles T. Rickart, P.E., Traffic Engineer Mr. Rickart will be responsible for traffic-related issues associated with the project. He will assist with the preliminary layout and traffic control plans, signing, striping, and other traffic operation features associated with the final design. Mr. Rickart has more than 17 years of experience in traffic operations. City of Prior Lake "Ring Road" between Torollto Avenue and Tower Street WSB Proposal No. 078-000 Page 10 A WSB '" bIocilllU. Jnc. T Rebecca L. Hauschild, E.L T., Design Engineer Ms. Hauschild will assist Mr. Rickart with the preliminary layout and traffic operation features associated with the project. Ms. Hauschild has over four years of experience as a traffic design engmeer. Joe Swentek, E.L T., Design Engineer As design engineer, Mr. Erichson will assist Mr. Brotzler and Mr. Hutton with detail design and development of plans and specifications. Mr. Swentek has four years of varied experience in the field of civil engineering. His experience includes the design of streets, storm sewer, sanitary sewer and watermain. Tim Cartony, Engineering Specialist Mr. Cartony will be responsible for the detailed design layout and coordination of all computer-aided design and drafting. Mr. Cartony has over 7 years of experience in the design field. Steve V. Ische, R.L.S., Registered Land Surveyor Mr. Ische is a Registered Land Surveyor with 21 years of experience. He will be responsible for coordinating the design and construction surveying for the project. His role will also include the preparation of the right-of-way plan and easement documents for property to be acquired. Blair Fowler, Construction Observer Mr. Fowler will be responsible for the construction observation phase of the project. He is a MnlDOT Certified Inspector with over 19 years of experience in the construction of municipal projects. Suhconsultant -- Geotechnical Investigation WSB will work with City staffto select a mutually agreeable geotechnical consultant to provide geotechnical services during the design ofthis project. A budget of$3,000 is estimated for this item. Any construction-related material testing would be established with the City as part of the direct costs for the construction services portion of the project. City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 11 ... WSB d: A.uodtJIU. Inc. IV. Representative Experience/References WSB has extensive experience designing and constructing projects similar to the Ring Road project. The following are similar projects WSB has recently completed: Client Proiect Thomas D. Burt City Administrator 1. Chippendale Street and Utility Improvements Design and reconstruction of 1.0 mile of municipal state-aid street, storm sewer, and utilities. City of Rosemount 2875 l45th Street West Rosemount, MN 55068-4997 Project Cost: $1,200,000 Phone No. (651) 423-4411 Bruce Loney, P.E. City Engineer 1. Southbridge Parkway Design and construction of 1.5 miles of divided roadway with a landscaped median, turn lanes, trunk utility systems and pedestrian accommodations. City of Shakopee 129 Holmes Street South Shakopee,MN 55379-1376 Project Cost: $6,050,000 Phone No. (952) 445-3650 2. CSAH 17 Street, Storm Sewer and Signal Improvements Design and construction of 0.75 miles of municipal state-aid divided roadway, stonn sewer, signal system and pedestrian accommodations. Project Cost. $750,000 City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 11 ... WSB & A=c/aIu. Inc. Client Proiect City of Monticello PO Box 1147 Monticello, MN 55362 1. Chelsea Road West Street and Utilities Rick W olfsteller City Administrator Design and construction of 0.75 miles of roadway to serve as an arterial roadway with trunk utility systems and stormwater/wetland related development. Phone No. (763) 295-2711 Project Cost.. $3,400,000 2. ,!h Street, Street and Utility Improvements Design and construction of 0.50 miles of municipal state-aid street, storm sewer, and utilities. Project Cost. $850,000 City of Savage 6000 McColl Drive Savage, MN 55378 1. TH 13 Widening Cooperative Agreement Two miles of widening TH 13 from 2 lanes to 4 lanes, including 4 traffic signals, channelization, medians, curb and gutter and storm sewer. Barry Stock Assistant City Administrator Phone No. (952) 882-2660 Project Cost. $4,000,000 City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 13 .. WSB d Auocimu, Inc. VL Project Schedule WSB & Associates, Inc. is prepared to start work on this project immediately upon receiving authorization. As requested, we will have the final plans ready for City approval by February 1, 2001 in anticipation of a spring bid letting, asswning all right-of-way/easements have been secured. WSB has the staff available to complete the project on schedule. The attached schedule outlines the tasks necessary to achieve this schedule. Key dates include the following: Kick Off Meeting Draft Feasibility Report to Staff Final Report to Council 90% Plan Review September 20, 2000 October 23, 2000 November 7, 2000 Construction Period January 1, 2001 February 1, 2001 March, 2001 May-July 2001 Final Plan Submittal Award Contract Please refer to the detailed schedule in the attachments. This schedule assumes the timely acquisition of all right-of-way/easements by City staff. The ambitious schedule does not allow for the 90-day quick take process, so it is asswned that the City will successfully negotiate the acquisitions. City of Prior Lake "Ring Road" between Toronto Avenlle and Tower Street WSB Proposal No. 078-000 Page 14 ... WSB olAuodatu. Inc. . 'T'" VII Compensation A. Feasibility and Design WSB & Associates, Inc. has estimated the study and design fees for the project as follows: A. B. C. Feasibility Report Final Design Direct Costs (non-salary expenses which includes reproduction costs of plan sets and geotechnical work) $11,700 $35,500 $5.500 Total $52,700 The cost to provide these services will be based on our current hourly rates with a "not-to-exceed" cap. B. Construction Services Based on an estimated construction cost of$710,000, WSB & Associates, Inc. is proposing an estimated fee of$53,300 for construction services (7.5%). This includes all contract administration, construction observation, staking and fmal close out/record drawings. If the actual bids vary significantly from the estimated cost due to the final scope and design of the project, WSB reserves the right to discuss this segment of our fee with the City. This fee does not include any material testing or laboratory fees associated with construction. I Total Estimated Compensation I I i I Total $52,700.00 $53.300.00 $106,000.00 Feasibility Report and Design Construction Services City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 15 A WSB .l.WociaIU, Inc. ATTACHMENTS City of Prior Lake "Ring Road" between Toronto Avenue and Tower Street WSB Proposal No. 078-000 Page 16 .. WSB " .btocimu. [n<. ..... Vl o U ~ o ~ ..... = e .~ ..... Vl ~ "0 = = = = - ~ ~ J. o ~ ..... ~ ~ J. ..... 00 J. rIl ~ 8 ~]~ S .~:S ~~~ <]~ St::~ 8 8..~ J. <!) 1""'0.. o~'-I ~ g~ I ._ ~ "O:9r\ ~ ~ '-I o <!) ~~ ~ = ~ 9:l1.!i ~~ f o o o N 00. .... <U ..0 E <U c.. <U (/J la~ ~ :~ ~ E Co o~; E- ~ g e'i:' ~UoE '" ;>, '" ~ ",- o t;; N ::I '-" Cil - tl ~-.:- 1:! .- oE '00 '2 ~ &3"fi~ ~ '" ... ::I = C t'i:' ." .~ 1:! oE ~ ~ '60 ~ "ClC~ ,s r,u'-" '" W;l C>O C - .- V) 'i:' t~oE .5 '2 ~ C>O c.~ ~CI)- ... o ." ;>, ~ u "C' '" t oE .~ a ~ C>O.,,~ ~ la '-" ....l ...~ U iU ... .~ ~~ elaO\ ~~~ 0; ~ ~~ I I~ i , i I ~I 1~100 ~ '" - '" oo~oo ooi"'"['" I , III II i IJ ! 1.51 EI' I c I iji. 1:: E II [ '~I ~ ' ii! "'I c c1'" .....' ~ ~1.52 E, 0 i B I t: Q::: C I u '" i >-1 <u: t:: <:l i:o .. '" ~'.... E I 0 .~ .~ ~ = w i <U'._ C. ~::::: o'IC:V;!iU .:- oQ u,U ;>, 'E-ir,ulC<: ~ 'i '5>15 t i ~ ~I t; I ~ .. r~ ... <U ::II'" 0 ._ I::l ... ~.Cl Cil ~!U:"- -INIJI~I.",i~I!1 Iii : 00 ole ~ o o "'~ ~ \0.. o o "'0 - "'" '" ~ -f-- o o "'~ -~ -- 00 o o og N 0, ~ -- o o 00 "'"~ N' ~ -- o o ",g -~ I-- I-- o o N~ N~ ~ -I-- o o ",,,0 N~ N' ~ ~ ::: ~ ~.l:J <:l ~ t;O e~ I~ ~ ~ I NN[0800ooN"'N t"'I1 V')i~ N.q- "l:t- I '" - II"," 00 "'" ~ I I I I I 100 ~ ~ 00 I ~QO~QOOO"'l:t 0", 0_ ~ I i iN ,"'" , I I 00 I ~oooo","ioo"," III , I I[ I ' , [ g I 0;, I I .~ III 2 ' - .~i ti 8: II' i:i ~15 '" < g. E, >/ ~ la "0 [.;::: t: ~I:: f:!:! ~ la ;g '" ~ I .~ la I ~: ~ C>O ~ .52 ~ I'~ I ~ ~ :g I' ~ 'j3 .;; fi ';::I"E' ~ t) gr/)o~s~"OI.~ C:l .'" -/0; 0; C C) -.<1 E ::: S 0 c c ~ 11,) tf) "01.... ~ ~ 8:~ ~ ~ ~,81~1~ - NI,..., "'" ~ '" ~10010\1 . , , ~ "'"I o o o.f "'~ "'"or> ,..., ~ o o 00 No 00 ~ -- o o 00 00", "'"~ or> ~ -I- o o 00 Noo ~oo ,...,' ~ '--- o o N"o O\~ or> ~ r-r- o o "'0 - 00 N 0\' fA -- o o 00 "'"~ ,...,' ~ 1--- o o NN ~O\ ",' ~ ~ ::: ~ ~.l:J <:l ~ t; 0 e~ I~ ~ o o ",".f "'~ ,..... ~ o o NoO O\~ "'"' ~ o o N"o ,..., o o NO ,...,~ 0" ~ o o N.f "'~ or> ~ o o 00 000 0\"," 0\' ~ ~ ::: ~ ~.l:J <:l ~ t; 0 e~ ~~ - - .s! ~ ~~ o o \O~ ,..., "'", ~ 0 0 0 0 0 0 0 0 ~ ~ ~' N' .,., ~ ~ 0; 0 E- "0 la ... " = 0 0 .,., N' ~ 0 C .52 u ::I "0 e c. '" C<: 0 0 0 M ~ 0 0; C) '2 ..c u '" 0 '" to- .2 Cil E- Cil 0 U E- U .l:J r,u t: C<: s .9 .... ~ 8 < oQ ~ = c: ra a:: ~ ~ =6 ra o 0:: Ol c: a: Qj -" ra ....J .... o ~ Ii: ,..., 00' ~ ~ Cts ..... '- .() i:: ~ -.... () ~ .- (.) "tJ Cts () a: 0) .s::: ~ ~I.l!! ~~ ! o c: o ttI C\l" ~ '"5 ., c: ::I ., <( Co ~ .0 Ol u.. o Ol o t::: - - H Il)oo '" . ~ 001 ell ~ ii5 M . 00.00..... co - ~ . ~ . i3 ~[}T. en ............................................._.............................................................................. ....................................................................... ................................_.... ....... ..................... ..._............................................... ............................................................_. ........................ c ::I <( Cl 52 t::: .t: _ I/)_ '2 Gl u:~ Cl 52 Cl t::a: ~'2 ;: o Q o ~ ell "0 Ol ~ o 0 e e o I'- ~ ~ ell Ol "0 "0 Ol Ol ~ ~ III c: >- o~ ~Ln ::1M o I/) >- tll "0 o I/) I/) >- >- tll tll "0 "0 Lt) . 0 C\l t: o Q, Gl a: Oll;' E_ tll= z.o .lI:0 I/) III tll Gl ~u. Ol .5 G5 Ol ~ 5 ~ o 2 iii o '2 .t: o Ol (5 Ol c:l >. Ol c: ::I en C o ti ~ (5 o ~ o o o ~ ~ Ol ::I ~ c: Ol '00 Ol o ~ tll c: :~ Qj n: o Q .,... ~ Ol ::I ~ o Q Lt) ~ o "0 Ol ~ I/) >- tll "0 LO t:: o c. Ol a: ~ :c '00 tll Ol u.. ~ l'!! o o ~ .,... .,... Ol ::I ~ o Q .,... -- .,... .,... "0 Ol ~ I/) >- tll "0 LO t:: o c. Ol a: ~ :c '00 tll Ol u.. iii c: u: rnrnrnrn 9 C\l CO) "'" LO co o Q t::: .,... .,... Ol ::I ~ o o ~ .,... .,... Ol ::I ~ I/) >- tll "0 o t:: o c. Ol a: I/) Ol > 'ij) o Ol a: '0 c: ::I o o ~ C3 I'- - ~ - (;) c: o ::E Cl ~ -- - - "0 Ql ;: III >- III "0 CO) ell c: 01 o Ql o "iii c: u:: <Xl o o 0; ~ Ol ::I ~ o Q ~ .,... .,... "0 Ol ~ I/) >- tll "0 o CO) c: o 'l'l l'!! tll C. Ol n: c: tll ii: rn Ol o o (0 ~ Ol ::I ~ o g ~ C\l .,... "0 Ol ~ I/) >- tll "0 LO I/) Ol 'l'l E tll ::I ~ o C1l c. en o o t2 .,... Ol ::I ~ o ~ ~ C\l .,... "0 Ol ~ I/) >- tll "0 LO C\l ~ Ol '> Ol a: c: tll 0:: "0 :0( Ol 1ii CiS .,... ~ C\i c: o ~ .,... Q ~ c: o ~ I/) >- tll "0 o '0 c: ::I o o ~ C3 .9 ~ 'E .0 ::I en c: ttI ii: iii c: u: o (0 ~ .,... it .,... Q ~ .,... c: o ~ I/) >- tll "0 Lt) .,... .l!l .~ Ol 0- .,... Q Lt) M c: o ~ ~ Ol ::I ~ I/) >- tll "0 o C\l c: o 'l'l l'!! "lii '2 'E "0 <( "0 ffi .,... Q ~ CO) 'C: u.. .,... Q ~ CO) it I/) >- tll "0 o Ol c: '2 Ol c. o "0 ffi .,... ~ .,... M c: o ~ c; 0; .,... M c: o ~ I/) >- tll "0 o I/) "0 :c "0 Co ~ <( rnrnG]rnrnrnrn o - .,... .,... C\l - CO) .,... "'" .,... LO .,... co - .~ ~ ::I .t: ~ o 3 C\i - it I/) ia' "0 o co ~ c:i >- e c: o ~ :i c:r () < >- III ;: - o .. .r: 01 a: I'- - ~ - ~ c: o ::E III >- III "0 co I'- Ql III III .c Q. c: o ;: () :l ... .. III c: o o <Xl .,... c; (0 .,... ~ c: o ~ I/) >- tll "0 o "0 Ol C1l g n: .9 Ol .S:! (5 z rnrnrn Ol .,... .,... ~ ~ I'- it € ~ Ol ::I ~ .,... g ~ c: o ~ .,... Q ~ Ol ::I ~ I/) >- tll "0 LO co I/) >- tll "0 o c: .2 ti S I/) c: o o c: o 'l'l Ol C. E o o ]i 'E tll "lii .0 ::I en Ol '"5 "0 Ol .t: o II! '0' ~ tll ~ (ij 0- Ol :c o z :s< Co 0- c: >- 32 o e co ..- ii o C\l .,... C\l ".'. . WSB & Associates, Inc. tel: 763-541-4800 fax: 763-541-1700 B.A. Mittelsteadt, P.E. Bret A. Weiss. P.E. Peter R. Willenbring, P.E. Donald W. Sterna, P.E. Ronald B. Bray, P.E. 8441 Wayzata Boulevard, Suite 350 Minneapolis, MN 55426 2000 Fee Schedule Billing RateIHour Principal Sr. Project Manager Project Manager/Engineering Specialist III Registered EngineerlEngineering Specialist II Project Engineer/Engineering Specialist I Graduate Engineer Scientist I Construction Observer $96.00 $89.00 $80.00 $71.00 $63.00 $56.00 $45.00 $57.00 $54.00 $47.00 $39.00 $42.00 $20.00 $82.00 $101.50 $116.00 $35.00 Engineering Technician III Engineering Technician II Engineering Technician I Office Technician II Office Technician I Registered Land Surveyor Survey (Two-Person Crew) Survey (Three-Person Crew) GPS Equipment All costs associated with word processing, vehicle mileage, reproduction of common correspondence and mailing are included in the above hourly rates. Reimbursable expenses include costs associated with plan, specification and report reproduction. Fee Schedule is adjusted annually. Minneapolis · St. Cloud Infrastructure Engineers Planners EQUAL OPPORTUNITY EMPLOYER F: \ WP WI Nlfees\2000100-fee. wpd