DISCUSSION:
CITY COUNCIL AGENDA REPORT
October 16, 2000
SA
AL FRlEDGES, PARKS SUPERVISOR
BUD OSMUNDSON, PUBLIC WORKS DIRECTOR
CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING THE AWARD
OF BIDS AND EXECUTION OF CITY'S STANDARD CONTRACT FOR THE
CONSTRUCTION OF THE THOMAS RYAN MEMORIAL PARK
RESTROOM/CONCESSION BUILDING
The purpose of this agenda item is to award the bids for the Thomas Ryan Memorial
Park Restroom/Concession Building.
History
At the April 17, 2000 City Council meeting staff was directed by Council to prepare the
plans and specifications for a restroom/concession building at Thomas Ryan Memorial
Park (the former Busse property). At the June 19, 2000 Council meeting, the plans and
specifications and solicitation of bids were authorized.
To save money on the construction of this building, we would act as our own general
contractor and bid the sub-contractors individually. This practice was used on the
Memorial Park building and the Lakefront Park Pavilion.
Bids were solicited for the following nine categories:
1. Earthwork
2. Concrete
3. Masonry
4. Carpentry
5. Hardware and Doors
6. Tile
7. Painting
8. Mechanical
9. Electrical
CurrentCucumsmnces
Bids were opened on Wednesday, September 27,2000. Bids were received for the
earthwork, concrete, masonry, carpentry, painting and electrical portion of the building.
Quotes were solicited for hardware and doors, tile, mechanical, and restroom
accessories. We did not receive bids for hardware and doors, tile or mechanical. Since
none of these items exceeds $25,000, staff solicited quotes for these items; consistent
162(J@J~€reek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
~
with the City's purchasing policy.
In addition to the items where there are bids and quotes, the concession area needs to
be equipped. Concession equipment includes sliding windows, shutters, sink,
refrigerator, drinking fountain and food processing related equipment. The concession
equipment will be purchased by staff and not exceed $6,400.00.
The building will be constructed of colored block, metal doors, cedar trim and shutters
and is very similar in material and color as the Memorial Park Restroom/Concession
building. The attached drawing depicts the proposed building.
The restrooms and concession stand will be open during games, tournaments and
special events.
Should the Council authorize the award of bids, quotes and purchase of concession
equipment, construction will start in November. Footings and sub grade work is
anticipated to be completed before "freeze up" and the remainder of the building will
be constructed during the winter months.
ISSUES:
This agenda item raises numerous issues of City Council concern:
Why weren't three bids obtained for this work as desired by the Council?
In this case multiple bids were received for some items, but they were not acceptable.
In one case, the vendor failed to supply a bid bond as called for in the specifications.
Another bidder provided a total price for six of the categories, but did not identify each
individual bid. In addition to being higher in price, the bid did not meet our
specifications.
There are a number of reasons for the lack of bids. First and foremost, the economy is
assuring these contractors a full schedule. Second, this project is comparatively small
so most vendors did not submit a bid.
Why is the cost of the building as bid above the estimate?
We were advised that the building would cost $145,000 and the sewer extension
$45,000 for a total project cost of $190,000. Jeff Ortel is the architect for this project
and he claims that he has always estimated the cost between $200,000 - $250,000
depending upon whether the City acts as the general contractor or not.
Could the City reduce the cost by re-bidding this project?
The economy could change and bidders could become more available if the economy
slows down. This is an imponderable. Couple this with the fact that the scope of the
project is small and does not draw high levels of attention. I am not aware of an
upcoming project which we could merge this with for better prices.
The likelihood of receiving better bids is further undermined by the fact that we are
acting as the general contractor just as we did with the Memorial and Lakefront
buildings. Adding a general contractor would increase the costs of the project between
25-50 percent.
Thomas Ryan
FISCAL IMPACT:
ALTERNATIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
Thomas Ryan
Finally, the equipment needed to operate the concession facility was not included in the
original estimate and raises the price by $6400.
Is sufficient money left in the Park and Library Referendum Account?
The Council will recall that the staff projected an uncommitted balance of about
$700,000 before the restroom / concession facility ($190,000), the playground
equipment ($30,000) and the band shelter ($54,000) were authorized. Approval of the
restroom / concession facility as bid ($176,048) and the sewer extension ($45,000) will
reduce the remaining balance by an additional $31,048 more than originally projected
($251,048 VS. $220,000).
Budf!et Impact
Approving the project as explained in this report will reduce the Park and Library
Referendum budget $31,048 more than originally projected. The present unallocated
Referendum balance is $556,692.
The alternatives are as follows:
1. Approve Resolution OO-xx authorizing the award of bids and execution of City's
Standard Contract for the construction of the Thomas Ryan Memorial Park
Restroom/Concession building.
2. Table this agenda item for a specific reason.
3. Deny this agenda item for a specific reason.
Staff recommends alternative number 1.
Tr
109
RESOLUTION OO~
RESOLUTION AUTHORIZING THE AWARD OF BIDS AND EXECUTION OF CITY'S
ST ANDARD CONTRACT FOR THE CONSTRUCTION OF THE THOMAS RYAN
MEMORIAL PARK RESTROOM/CONCESSION BUILDING.
MOTION BY:
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
SECOND BY:
On February 25, 1997 the citizens of Prior Lake passed a Parks and Library
Referendum which included the development of an athletic facility; and
the funding source for the restroom/concession building will be drawn from
the Parks and Library Referendum; and
the plans and specifications for the restroom/concession building have been
approved by the City Council; and
bids have been solicited and received for the restroom/concession building;
and
it appears that the following companies are the lowest responsible bidders
Mahowald Builders
Cannon Construction Co.
Greystone Construction
Jerry R. Conley Tile
Lonsdale Painting,
Hayes Electric,
Pumper Plumbing and Heating,
Kully Supply Co.;
and
the City is responsible for certain portions of the construction including
fountains, concession windows, and concession equipment that will not
exceed a cost of$6,400.00.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that bids are hereby awarded to the following companies in the following
amounts not to exceed a total of$176,048.00:
Mahowald Builders
Cannon Construction Co.
Greystone Construction
Earthwork
Concrete
Masonry
$16,080.00
$10,900.00
$45,520.00
Thb~J&aA.lShelmalllrK'a9tC&1<<S~iPr8Jtl~ke, Minnesota 55372 / Ph. (612) 440-9675 / Fax (612) 440-9678
AN EQUAL OPPORTUNITY EMPLOYER
"7"-'-"
Cannon Construction Co.
Cannon Construction Co.
Jerry R. Conley Tile
Lonsdale Painting Co.
Pumper Plumbing and Heating
Hayes Electic
Kully Supply Co.
In House
TOTAL
and
Carpentry
Hardware, Doors
Tile
Painting
Mechanical
Electrical
Restroom Accessories
Concession Windows
and Accessories
$40,695.00
$ 4,450.00
$ 6,175.00
$ 4,635.00
$20,898.00
$10,870.00
$ 9,425.00
$ 6.400.00
$176,048.00
FURTHER, that staff is authorized to expend $6,400 for in-house portion of the project; and,
FURTHER, the total expenditures for the restroom/concession building are not to exceed
$176,048; and,
FURTHER, the funds for the restroom/concession building will be drawn from the Parks and
Library Referendum; and,
FURTHER, the City Manager is hereby authorized to return bid securities submitted with the
proposals to vendors, following the execution of contracts; and,
FURTHER, the Mayor and the City Manager are authorized to execute the City's Standard
Contract on behalf of the City for each of the restroom/concession contracts.
Passed this 16th day of October 2000.
YES
NO
Mader Mader
Ericson Ericson
Gundlach Gundlach
Petersen Petersen
Zieska Zieska
{ Seal }
Thomas Ryan Memorial Park Concession Bldg ag res
City Manager
City of Prior Lake
1 c'
r- ~_~~__________~______________~l_
i.;rl; >(. . ' >(. ':~~r 1
o
"
~
j;;
'~B
~~
'" CD
i:t:'
r'
r
a;.
~
r
i
~ ~ ~
- ~.
r---, ~ ;, ;, \' ,",
:~'''~- 0;
.___ n",
_. LJ~
i; I
1'0
..~
1:0
.
.:;
,;:
~
is't.:
c:
;::
~
~ ~ ~ ~
in
'ii~'" :;:
:..' " .': g
~ ~i{:
,..,
--------------------------- .
---------
$:. ~
~~
..,
<c
PRIOR LAKE
PROTOTYPE PARK SHELTER
q
I
DATE:
6-12-2000
r1---
I I
I I
I I
I I
I I
I I
I I
I I ,_"
I I Ci
I I r.1
'I n
I I ~
I I -<
, I ~
I I (5
I I Z
, I
I I
I I
I I
I I
I I
I I
: I
d----
r1----
I I
: I
I I
I I
I I
I I
I I
I I v"l
I I '5
I I m
,I ~
I I ~
I I ,>
I I
I I 0
I I Z
I I
I I
I I
I I
I I
I '
I I
I I
LJ----
..,
..,
:.,
::1"
)-
<::;
'"
~ ~ -
: .;' --. ~
~ump
en
_ "'<r>
~ ~~
~
~
~
6 :>
~ =1
, T,
C IJ:'. Z
Z :-,.,~
:;: ~ ~
I ~~)
'.
~
:~.
i'tI ;"...
~~
~"'I :E
~~
;:....
'!""1 (-.
~~
6~
:;~
~~
.,'
;=
,.:r.
..
'w'
i:
r-
eo
.t::
'"
'"
.
OERTEL ARCHITECTS
79-:. 5,A.lt_"T eLf-!f. ~.\'E. ::i. P.L,~_. M~~ e'51C"5
(65;; €95-:1fG (65,.; 6:3G-::::.E. FAY
'~----,r--'----'----.. '
,
,
,
,
,
I r--
LJ
r......__
l_r---
~~
~~ ,
::....
.. ::
~
,.
~
.
-
- IIID
-
I
I-
/~ = =
/ ~
EB
EB
EB = ;,
-I EB
.;,~
EB
I
1=lIT-
1] IU
'" '~
t "'
g: ~
:>- ,;1
" <5'
'T< '"" -
8 :i~
~ S ~
~ S :J,
~ 8
~ ~
~ n
'"
~
t
'-~
"1
r', v:.
~ c
c '"
~~~
J~~
r
..,
n
~
r-L_
I
I
I
: ~
I ;
I -n
I ,-
q
co
~
7\)
rr.
',.
7Il
~
m
<:
~.,.
-I
<5
z:
-n
'"
Cl
3
P
..."
<::
:::;
s
:.:~
;.
~
~
,-,
, ,
! ~
, r
LJ
8
~
d'
tJ'
~
:'.l\
~ S
S ~
~ ~~ ~
~ L ::
~:2 C)
~
><
~
l"
'S'
6
z
...
'"
'5
S'
-<
<5'
~
o
~
r;;
T...
r
SO
"
~
D
Q
>,
...
?'~
~
,,,;
."
~
-<
'!'.
-<
9
'"
-,.
Q
~
z
~
~
DATE:
.
OERTEL ARCHITECTS
PRIOR LAKE
PROTOTYPE PARK SHELTER
6-12-2000
~7?-:-' S.A.'''!"T C~A\;? ^'.'E. s~. ~.';LJL, IJ:'! ~'5105
{05") G9S-:1t.6 (65~: 696.:~f.e FI'-/