Loading...
HomeMy WebLinkAboutElectrical Permit 11.086 04 PR/0,, //-- U TX �.LV. L-, d d e go 44/04ESO HOMEOWNER REQUEST FOR ELECTRICAL INSPECTION Date Rough -In Inspection Required? 'Yes Inspection Other Than Rough -in: 0 Ready Now Homeowner Must Schedule All Rough -In Inspections Homeowner Must Schedule All Final Inspections ®IVill Schedule Address of Inspection - Street / 72 - Why06� /ESS T 7d L Project Description: 1 Owner Name ._ / � 0 � s r �iG W�i ^ /� !�� /�"' Owner Phone \J 11' Home: Cell: Owner Mailing Address (if different from above) SAME Electrical Utility By signing this document, I certify that I am the owner as defined by Minn. Stat.325.01 and will legally perform the electrical work. Owner Sig) e /- J / i FEE CALCULATION New Home or Associated Structure Existing Home /Structure Remodel or Addition New Home Service /Power Supply 0 -400 ampere @ $35 /2-- - 7. -" /( 3 ,r 3,57' New Home Service 401 - 800 ampere @ $60 New Service /Power Supply 401 -800 ampere , $60 New Home Feeders /Circuits New /Extended Feeders /Circuits Up to 15 Feeders /Circuits ( ) Up to 30 Feeders /circuits $100 Feeders /Circuits @ $6 Each or 16 to 30 New Home - More than 30 Feeders /Circuits (in addition to above New /Extended Feeders /Circuits - More than 30 Feeders/ ( ) Feeders /Circuits up to 200A @ $6 Each Circuits ( ) Feeders /Circuits Up to 200 A @ $6 Each Other (Specify) Reconnected Feeders /Circuits ( ) @ $2 Each Manufactured Home Park Lot Supply ( ) $35 Each Special Inspection Fee ( ) Hours @ $80 Per Hour Plus ( ) Miles @ The IRS Mileage Rate of ( ) Detached Garage or Other Associated Structure Detached Garage or Other Associated Structure New Home Service /Power Supply 0 -400 ampere @$35 New Home Service /Power Supply 0 -400 ampere @ $35 New Feeders /Circuits ( ) @ $6 Each New /Extended Feeders /Circuits ( ) @ $6 Each Other (Specify) € l� /O ✓/tom „ ._ C) Reconnected Feeders /Circuits ( ) @ $2 Each Other (Specify) State Surcharge = $5.00 S _ TOTAL (the fee calculated above or $35 multiplied by the TOTAL (the fee calculated above or $35 multiplied by the number of required inspection trips, whichever is greater) number of required inspection trips, whichever is greater) • Receipt # • )C � /' Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing d ate. f Th owner must have the work completed within the 12 month period or submit another REI that includes the inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to another. A service charge of $28 will be added for all dishonored checks. I hereby certify that I inspected the electrical installation herein on the dates stated: Rough - Inspection (s) Date Walt Lusian, Electrical Inspector 952.934.0229 Final Inspection Date 1 o. VRZ ___ 1 lNES HOMEOWNER REQUEST FOR ELECTRICAL INSPECTION C Date 9 ? 12 (Yes Inspection Required? 'Yes Inspection Other Than Rough -in: Q Ready Now C 4' Homeowner Must Schedule All Rough -In Inspections Homeowner Must Schedule All Final Inspections COMO Schedule Address of Inspection - Street Project Description: 774 Owner Name 0 .. ,r 8066 L,G t�l/L%'L c,�"Y�'L Owner . Home: Cell: Owner Mailing Address Of different from above) S ,1m Electrical Utility By signing this document, I c girl_ rtify that I am the owner as defined by Minn. Stat.325.01 and will legally perform the electrical work, Owner Sig t L+ FEE CALCULATION New Home or Associated Structure Existing Home /Structure Remodel or Addition New Horne Service /Power Supply 0 -400 ampere @ $35 New Home Service/Power Supply 0 -400 ampere 0535 New Home Service 401 - SOD ampere 0 $60 New Service/Power Supply 401 4300 ampere @ $60 New Home Feeders/Circuits New/Extended Feeders/Circuits Up to 15 Feeders /Circuits ( ) Up to 30 Feeders/circuits $100 Feeders/Circuits 0 $6 Each or 16 to 30 New Home - More titan 30 Feeders/Circuits On addition to above New/Extended Feeders/Circuits - More than 30 Feeders/ ( ) Feeders/Circuits up to 200A 0 $6 Each Circuits ( ) Feeders/Circults Up to 200 A 0 $6 Each Other (Specify) Reconnected Feeders/Circuits ( ) 0 $2 Each Manufactured Home Park Lot Supply ( ) $35 Each Special Inspection Fee ( ) Hours @ Sao Per Hour Plus Miles 0 The IRS Milea e Rate of Detached Garage or Other Associated Detached Garage or Other Associated Structure New Home Service/Power Supply 0-400 ampere 0$35 New Home Service/Power Supply 0-400 ampere @ $35 New Feeders/Circuits ( ) 0 $6 Each New/Extended Feeders/Circuits ( ) @ $6 Each a ti Other (Specify) State Surcharge = $5.00 TOTAL the fee calculated above or $35 multiplied by the TOTAL (the fee calculated above or $35 multiplied by the number of required inspection trips, whichever is greater) number of required ins. ection tri s, whichever is : eater r r Receipt # Am Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing date. 4 u owner must have the work completed within the 12 month period or submit another REI that includes the inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to another. A service charge of $28 will be /4 iii Z-G; _ /I added for all dishonored checks. I hereby certify that I inspected the electrical installation herein on the dates stated: -• -- Rough -In Inspection (s) Date Walt Lusian, Electrical Ins. 4r 952.934.0229 ] -0' Final Inspection Date , / 0 ., ' 5,2165- t P1 lei fee., NW. l•-• R4C • LIT:S..% r.....,, , $ g.. - RAC, XiivI -r 7.�.�, .,�-E