Loading...
HomeMy WebLinkAboutElectrical Permit 12. 161 t E 7iL 1N `PRI - yx U ES° f CONTRACTOR/ REGISTERED EMPLOYER REQUEST FOR ELECTRICAL INSPECTION s60,50 120 30 \ Date Rough- In Inspection Required ? Z5Yes Inspection Other Than Rough-in : Q Ready Now r � 1f) �� O / Contractor/Employer Must Schedule All Rough-In Inspections Contractor/Employer Must Schedule All Final Inspections " J ` C/ ill Schedule Addre f $pgction - t Project Description : n n lL 1 L l C N �. Owner N e j A Owner Phone V � yc �1 Home : Cell : Contractor/Registered Employer Name Contractor/Registered Employer Mailing Address Contractor/Empri/ory\erTeleph �one Number Contra ct'oor/Empl/o�ye/r E-mail A ddressElectrical Utility Wor ( j�ij fl r\ � l Q I I l v1 oCo ractJJor/E UpllVer Authorized Signature Contractor License Nu berJob/Project Contact Person : - M FEE CALC Service/Power Supply 0 -400 ampere @ $35 Technology Systems Devices ( ) @ $ .75 Each Service/Power Supply 401 - 800 ampere @ $60 Separate Bonding Inspections for Swimming Pools and E ui otential Planes @ $35 Each Service/Power Supply Above 800 ampere @ $100 Center Pivot Irrigation Booms ( ) @ $35 Each Plus Electrical Drive Units @ $5 Each New/Extended Feeders/Circuits Up to 200 A ( ) @$6 Each Luminaire Retrofit Modifications ( ) @ $.25 Each Feeders/Circuits Above 200A ( ) @ $15 Each Concrete-Encased Electrode Inspection ( ) @ $35 Each Reconnected Feeders/Circuits ( ) @ $2 Each Investigative Fee $70 Or The Total Inspection Fee, Whichever is Greater Up to $ 1,000 Manufactured Home Park Lot Supply ( ) @ $35 Each Special Inspection Fee ( ) Hours @ $80 Per Hour Plus Miles @ The IRS Milea a Rate of Recreational Vehicle Site Supply Equipment I ( ) Circuits Originating in the Equipment @ $ 6 Each Other 1 1 ( 11y " JAJW Ck*r Street, Parking Lot, Lighting Standard ( ] @ $5 Each Over 600 Volts - Add the combined servicei/power supply and feeder/circuit fee to result in double the regular fee (does not _ apply to electric sign and outline lighting) Transformers Up to 10 kva ( ) @ $ 15 Each ( ) New Multi-Family Dwellings @ $70 Each ( ) State Surcharge of $ 5 .00 ( ) Additional Circuits Above the 20 Allowed Per unit @ $6 Each Transformers Over 10 kva ( ) @ $30 Each TOTAL (the fee calculated above or $ 35 multiplied by the Triumber of required inspection trips, whichever is greateo Receipt # t Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing date . The owner must have the work completed within the 12 month period or submit another REI that includes the inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to another. A service charge of $ 28 will be added for all dishonored checks. I hereby certify that I inspected the electrical installation herein on the dates stated : Rough- In Inspection (s) Date Walt Lusian, Electrical Inspector 952 . 934. 0229 Final Inspection Date Order for Payment Z 3 1 Date Request for Inspection Serial Number Date Filed Electrical Contractorlinstaller / hip ZWC* i' License Number Ict ks Pe Al G � /orV VOL I/ OeE 0 0 0 r 9 zl Owner/Occupant County Job Address - Street Ci ownship 2 0 /A/%E P/�►s5 �i21C� This Order for Payment is for additional fees associated with the above referenced Request for Electrical Inspection , Fee Cal culation/Explanatio wale • Return this Order for P ment with your check payable to the in the amount of $ by (fourteen days from the date issued) A service charge of S30 will be added for all dishonored checks. Inspector ame and Number ) �^ A For Department Use Only L ZZ)45// / �'/ - Inspector Telephone Number 4 Y OZ2 Inspector E-mail Address/Website Inspect r S' ature — —