HomeMy WebLinkAboutElectrical Permit 12. 0053 Rr ° �' ` [RMIT#u- 53
•'' : '1. -' r'' CONTRACTOR /REGISTERED EMPLOYER REQUEST FOR
ELECTRICAL INSPECTION
Date i Rough -In Inspection Required? C a, y
e$,) Inspection Other Than Rough -in: B Ready Now
a I 10 �I 2 Contractor /Employer Must Schedule All Rough -In Inspections Contractor /Employer Must Schedule All FinalCpeclinns. . _
0 Will Schedule Address of Inspection - Street I 1i ffi ^ 1 C _ Project Description:
Owner Name
1 (1� Y N nAC LOW FEZ 1 514
Owner Ph e " , `��"'
Home: I • g 2 /00 Cell:
Contractor /Registered Employer Name Contractor /Registered Employer Mailing Address
/ -/A'Je E -4 & r4'r c — 714 - ) ‘ : , 9929' / y,� a /9�4- /(04.- J 04) ,,,i,ve;,To 47L'
Contractor /Employer Telephone Number Contractor /Employer E -mail Address Electrical Utility
Work: Cell:
95, - /!i a c� IN 9 i ' 4, -<� ,—her
Contract Employer Authorized Signature Contractor license Number Job /Project Contact Person:
FEE CALCULATION
Service /Power Supply 0 -400 ampere @ $35 Technology Systems Devices ( ) @ $ .75 Each
Service /Power Supply 401 - 800 ampere @ $60 Separate Bonding Inspections for Swimming Pools and
Equipotential Planes ( ) @ $35 Each ,
Service /Power Supply Above 800 ampere @ $100 Center Pivot Irrigation Booms ( ) @ $35 Each
Plus ( ) Electrical Drive Units @ $5 Each
New /Extended Feeders /Circuits Up to 200 A ( ) @$6 Each Luminaire Retrofit Modifications ( ) @ $.25 Each
Feeders /Circuits Above 2004 ( ) @ $15 Each Concrete - Encased Electrode Inspection ( ) @ $35 Each
Reconnected Feeders /Circuits ( ) @ $2 Each Investigative Fee $70 Or The Total Inspection Fee,
Whichever is Greater Up to $1,000 ,
Manufactured Home Park Lot Supply ( ) @ $35 Each Special Inspection Fee ( ) Hours @ $80 Per Hour
Plus ( ) Miles @ The IRS Mileage Rate of ( )
Recreational Vehicle Site Supply Equipment
( ) Circuits Originating in the Equipment @ $6 Each Other
Street, Parking Lot, Lighting Standard ( ) @ $5 Each Over 600 Volts - Add the combined service /power supply and
feeder /circuit fee to result in double the regular fee (does not
apply to electric sign and outline lighting)
' Transformers Up to 10 kva ( ) @ $15 Each (,%New Multi - Family Dwellings @ $70 Each
( ) State Surcharge of 55.00
( ) Additional Circuits Above the 20 Allowed
Per unit @ 56 Each � t
Transformers Over 10 kva ( ) @ $30 Each TOTAL (the fee calculated above or $35 multiplied by the qr
number of required inspection trips, whichever is greater)
Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing date. The owner
must have the work completed within the 12 month period or submit another REI that includes the inspection fee for
the uncompleted work. Inspection fees do not carry over from one REI to another. A service charge of $28 will be
added for all dishonored checks. /26 �p % ,0 65 o 6
1 hereby certify that I inspected the electrical installation herein on the
dates stated:
Rough -In Inspection (s) Date Walt Lusian, Electrical Inspector
952.934.0229
Final Inspection Date