HomeMy WebLinkAboutElectrical Permit 12. 498 PERMIT # 12- 0 Or
,t,)
"G Ps CONTRACTOR /REGISTERED EMPLOYER REQUEST FOR
ELECTRICAL INSPECTION
Date Rough -In Inspection Required? 0 Yes Inspection Other Than Rough -in: d Ready Now
12 -13 -12 Contractor /Employer Must Schedule All Rough -In Inspections Contractor /Employer Must Schedule All Final Inspections
)(Will Schedule
Address of Inspection - Street Project Description:
5807 150th St. SE
°wIackiee Changed out panel
Owner Phone
Home: Cell: 612 - 636 -8749
Contractor %Registered Employer Name Contractor /Registered Employer Mailing Address
G.F. Hayes & Sons Electric, Inc,,, 6403 Dague Ave SE Delano, MN 55328
Contractor /Employer Telephone Number Contractor /Employer E -mail Address Electrical Utility
Work: 763- 972 -3952 cell: 612- 685 -3779 gfhayes @frontiernet.net
Contractor ; plover Aut - zed Signature Contractor License Number Job /Project Contact Person:
Ai/ / �( / _ % EA000820 Ga 1- 4._
FEE CALCULATION
Service /Power Supply 0 -400 ampere @ $35 rr Technology Systems Devices ( ) @ $ .75 Each
Service /Power Supply 401- 800 ampere @ $60 Separate Bonding Inspections for Swimming Pools and
Equipotential Planes ( ) @ $35 Each
Service /Power Supply Above 800 ampere @ $100 Center Pivot Irrigation Booms ( ) @ $35 Each
Plus ( ) Electrical Drive Units @ $5 Each
New /Extended Feeders /Circuits Up to 200 A ( ) @$6 Each Luminaire Retrofit Modifications ( ) @ $.25 Each
Feeders /Circuits Above 200A ( ) @ $15 Each Concrete- Encased Electrode Inspection ( ) @ $35 Each
Reconnected Feeders /Circuits (24 @ $2 Each Investigative Fee $70 Or The Total Inspection Fee,
48 Whichever is Greater Up to $1,000
Manufactured Home Park Lot Supply ( ) @ $35 Each Special Inspection Fee ( ) Hours @ $80 Per Hour
Plus ( ) Miles @ The IRS Mileage Rate of ( )
Recreational Vehicle Site Supply Equipment
( ) Circuits Originating in the Equipment @ $6 Each Other
Street, Parking Lot, Lighting Standard ( ) @ $5 Each Over 600 Volts - Add the combined service /power supply and
feeder /circuit fee to result in double the regular fee (does not
apply to electric sign and outiine lighting)
Transformers Up to 10 kva ( ) @ $15 Each 1 ( ) New Multi- Family Dwellings @ $70 Each
( ) State Surcharge of $5.00
( ) Additional Circuits Above the 20 Allowed
Per unit @ $6 Each
Transformers Over 10 kva ( ) @ $30 Each TOTAL (the fee calculated above or $35 multiplied by the
number of required inspection trips, whichever is greater) 88.00
Receint # p 1 79 f
Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing date. The owner -
must have the work completed within the 12 month period or submit another REI that includes the inspection fee for
the uncompleted work. Inspection fees do not carry over from one REI to an�o af ." � A se ice char of us will be
added for all dishonored checks. L�-4� �L t� !Y
l!/ O
4'
� ! b
I hereby certify that I inspected the electrical installation herein on the
dates stated:
Rough -In Inspection (s) Date Walt Lusian, Electrical Inspector
952.934.0229
Final Inspection Date
1
lYu 'aa PERMIT # 12- DWI_
�j �c�, c W■Uti
�b • [PLOVER REQUEST FOR
wo m ed ckAtwma EON
u o o r j \ r / , m Other Than Rough -in: Cl Ready Now
"V ` ' j ` 1 or /Employer Must Schedule All Final Inspections
XIXNill Schedule
M\D— Oc ji).,b)) Description:
, [ !aj langgd out panel
or /Registered Employer Mailing Address
G.F. Hayes & Sons Electric Inc. 1 6403 Dague Ave SE Delano, MN 55328
Contractor /Employer Telephone Number Contractor /Employer E -mail Address Electrical Utility
'16'3-972-3952 Cell: 612 - 685 -3779 gfhayes @frontiernet.net
Contracto,g•yerAu zed Signature Contractor License Number Job /Project Contact Person:
�� EA000820 Gaylen Hayes
FEE CALCULATION
Service /Power Supply 0 -400 ampere @ $35 Technology Systems Devices ( ) @ $ .75 Each
Service /Power Supply 401— 800 ampere @ $60 Separate Bonding Inspections for Swimming Pools and
Equipotential Planes ( ) @ $35 Each
Service /Power Supply Above 800 ampere @ $100 Center Pivot Irrigation Booms ( ) @ $35 Each
Plus ( ) Electrical Drive Units @ $5 Each
New /Extended Feeders /Circuits Up to 200 A ( ) @$6 Each Luminaire Retrofit Modifications ( ) @ $.25 Each
Feeders /Circuits Above 200A ( ) @ $15 Each Concrete - Encased Electrode Inspection ( ) @ $35 Each
Reconnected Feeders /Circuits (2 ) @ $2 Each 4 Investigative Fee $70 Or The Total Inspection Fee,
Whichever is Greater Up to $1,000
Manufactured Home Park Lot Supply ( ) @ $35 Each Special Inspection Fee ( ) Hours @ $80 Per Hour
Plus ( ) Miles @ The IRS Mileage Rate of ( )
Recreational Vehicle Site Supply Equipment
( ) Circuits Originating in the Equipment @ $6 Each Other
Street, Parking Lot, Lighting Standard ( ) @ $5 Each Over 600 Volts — Add the combined service /power supply and
feeder /circuit fee to result in double the regular fee (does not
apply to electric sign and outline lighting)
Transformers Up to 10 kva ( ) @ $15 Each ( ) New Multi- Family Dwellings @ $70 Each
( ) State Surcharge of $5.00
( ) Additional Circuits Above the 20 Allowed
Per unit @ $6 Each
Transformers Over 10 kva ( ) @ $30 Each TOTAL (the fee calculated above or $35 multiplied by the $4.00
number of required inspection trips, whichever is greater)
Receipt # �i 0) (J
Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing date. The owner
must have the work completed within the 12 month period or submit another REI that includes the inspection fee for
the uncompleted work. Inspection fees do not carry over from one REI to another. A service charge of $28 will be
added for all dishonored checks.
I hereby certify that I inspected the electrical installation herein on the
dates stated:
Rough -In Inspection (s) Date Walt Lusian, Electrical Inspector
952.934.0229
Final Inspection Date