HomeMy WebLinkAboutElectrical Permit 12. 461 x
U
�,.4` &!g sot° 1 CONTRACTOR /REGISTERED EMPLOYER REQUEST FOR
ELECTRICAL INSPECTION
es Inspection Other Than Rough -in:
Ready Now
Date Rough -In Inspection Required? -�
I 21,11 Contractor /Employer Must Schedule All Rough In Inspections Contractor /Employer Must Schedule All Final Inspections ill Schedule
Project Description:
Addy l 514: io o ree IAi WA • v0 ��/n� (,,
Ow a e uO - 1 ` M n
In
Owner Phone
Home: Cell: Contractor /Registered Emplo er Mailing Address �
, (Ai
Contractor /Registered Employer Name � ` r' / ( j
Contractor /Employer E -mail Address Electrical Utility
Contractor /Employer Telephone Number 'n'n r' ` � ��
G t `
wor S2 A c to.i " I IY It � 1 Ic
JJ ` � lob /Project Contact Person:
C ractor /E pl r Authorized Signature
Contra or License ber
FEE CALC LATION
0 -400 am ere @ $35 Technology Systems Devices ( ) @ $ .75 Each
Service /Power Supply P
ere @ $60 Separate Bonding Inspections for Swimming Pools and
Service /Power Supply 401- 800 ampere Equipotential Planes ( ) @ $35 Each
Center Pivot Irrigation Booms ( ) @ $35 Each
Service /Power Supply Above 800 ampere @ $100 Plus ( ) Electrical Drive Units @ $5 Each
New /Extended Feeders /Circuits Up to 200 A ( ) @$6 Each
Luminaire Retrofit Modifications ( ) @ $.25 Each
Feeders /Circuits Above 200A ( ) @ $15 Each Concrete - Encased Electrode Inspection ( ) @ $35 Each
Reconnected Feeders /Circuits ( ) @ $2 Each Investigative Fee $70 Or The Total Inspection Fee,
Whichever is Greater U . to $1,000
Manufactured Home Park Lot Supply ( ) @ $35 Each Special Inspection Fee ( ) Hours @ $80 Per Hour
Plus ( ) Miles @ The IRS Mileage Rate of ( )
Recreational Vehicle Site Supply Equipment Other
( ) Circuits Originating in the Equipment @ $6 Each
Street, Parking Lot, Lighting Standard ( ) @ $5 Each Over 600 Volts - Add the combined service /power supply and
feeder /circuit fee to result in double the regular fee (does not
a ..1 to electric si a and outline li : tin:
( ) New Multi- Family Dwellings @ $70 Each
Transformers Up to 10 kva ( ) @ $15 Each ( ) State Surcharge of $5.00
( ) Additional Circuits Above the 20 Allowed
Per unit @ $6 Each
Transformers Over 10 kva ( ) @ $30 Each TOTAL (the fee calculated above or $35 multiplied by the 1
number of required inspection trips, whichever is greater) / U V
l I Receipt # , 776 K
Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing date. The owner
must have the work completed within the 12 month period or submit another REI that includes the inspection fee for
the uncompleted work. Inspection fees do not
for all dishonored from d one REI to another. A service charge of $28 will be
o
I hereby certify that 1 inspected the electrical installation herein on the
dates stated: Walt Lusian, Electrical Inspector
Rough In Inspection (s) Date 952.934.0229
Final Inspection Date
t 4.
r