HomeMy WebLinkAboutJoint Water Project PowerPointJoint Water Study &Joint Water Study & Source Water Options StudySource Water Options Study May 21, May 21, 20122012 City Council Work SessionCity Council Work Session Current System Needs Current Treatment Capacity of 7.5  MGD Planned for additional well  Issues with development of Well 10  Pumping in 2007 and 2008 reached  7.05 and 6.42 MGD Current Peak Rates 5.0 MGD  1 Current System Capacity 20-Hour Pumping24-Hour Pumping FirmTotal FirmTotal CapacityCapacityCapacityCapacity Well Capacity (MGD)5.046.486.057.78 0.28 Capacity Deficit (MGD)2.461.021.45 (Surplus) Capacity Deficit (gpm)17007001000200 (Surplus) Source Options Construct Well 10  Connect Well 6 to WTF  Savage Interconnect  Joint Facility with SMSC  2 Well 10 Currently planned next to Fire  Station #1 Raw Water Piping from Wells 8 & 9  in Place Jordan Aquifer  Capacity Impacted by Well  Interference Well 6 Connection Located in Wilds  Jordan Aquifer  Good production well  Meets quality standards, historically  experienced aesthetic issues Currently used as backup only  Requires 4.5 miles of watermain  3 Savage Interconnect Current emergency connection  Incompatible water  Not a long-term option  SMSC Joint Facility Shared source, storage and  treatment Provides more water  movement in western areas 4 System Components SMSC System Needs One water supply well feeding north  treatment plant Storage needed to meet fire  protection standards Reverse Osmosis capacity of 250  gpmwith future needs of 350 gpm 5 Recommended Joint Facility Expansion of Current SMSC WTF  New 1,000 gpmJordan aquifer well  Additional Iron and manganese removal  filtration treatment 200,000 Gallon Storage  Reverse Osmosis Treatment for SMSC  Option Comparison Joint Facility with Construct New Water Main for Savage SMSCWell 10Well 6Interconnect Capital Construction $2,684,000$950,000$2,015,000$750,000 Cost Increase in Yearly Water Production 43826343814 (MG) Operational Cost per $0.46$0.74$0.74$2.98 1000 Gallons Bond Payment Cost $0.41$0.29$0.37$4.30 per 1000 Gallons Total Cost per 1000 $0.87$1.03$1.11$7.28 Gallons 6 Option Comparison SMSC CostPrior Lake Cost SMSC-Expand North Plant for Future Demands $5,120,000- Prior Lake-Build New 1000 gpmPlant and Wells for -$5,000,000 West Side Expansion SMSC & Prior Lake-Expand SMSC North Plant for $3,520,000$2,684,000 Future Demands with Additions for Prior Lake Savings With Joint Facility $1,600,000$2,316,000 Agreement Guidelines Water plant will serve both Prior Lake and SMSC based on 20  year estimated growth SMSC owned and operated facility  Prior Lake must agree to purchase 438 million gallons/yr  (annual volume based on needed capacity) at established rate Established rate based on capital payment plus operating cost  Chemical and pumping costs adjusted annually based on  average pricing for prior year Payback terms of capital to SMSC assumed at 3% over 20  years for analysis 20 Year agreement, structured renegotiation terms at 20  years Prior Lake maintains purchased capacity after 20 years  7 Next StepsNext Steps 1.1.Present Study Results to Governing BodiesPresent Study Results to Governing Bodies 2.2.Incorporate Feedback into Final Draft of StudyIncorporate Feedback into Final Draft of Study 3.3.Adopt StudyAdopt Study 4.4.Prepare Draft AgreementPrepare Draft Agreement 5.5.Adopt AgreementAdopt Agreement 6.6.Design FacilityDesign Facility 7.7.ConstructionConstruction Questions/CommentsQuestions/Comments 8