HomeMy WebLinkAbout10B Trail Point Court O � PRIp
� �
U t:y
4646 Dakota Street SE
`�INxeso'��' Prior Lake, MN 55372
CITY COUNCIL AGENDA REPORT
MEETING DATE: MAY 13, 2013
AGENDA #: 10B ,
PREPARED BY: LARRY POPPLER, CITY ENGINEER / INSPECTIONS DIRECTOR
PRESENTER: LARRY POPPLER
AGENDA ITEM: CONSIDER APPROVAL OF A REPORT AND PROVIDE DIRECTION ON
THE CONVERSION OF TRAIL POINT COURT FROM A PRIVATE STREET
TO A PUBLIC STREET
DISCUSSION: I ntroduction
The purpose of this agenda item is to review the conversion of Trail Point Court
from a private street to a public street. Trail Point Court is within the Jeffers
Pond Development and is located off of Jeffers Pass near the Jeffers Pond
Elementary School.
Histo
In 2005 the City Council approved the planned unit development (PUD) of
Jeffers Pond. This PUD included several private streets including Trail Point
Court.
In 2006 the City approved the final plat for Jeffers Pond 2" Addition which
included the construction of Trail Point Court.
On December 7 2009, the City Council revised City Code to include section
701.900: Private Streets. This section of the City Code provides guidance and
criteria for conversion of private streets into public streets.
On April 5 2013, the City received a petition from the property owners within
the Jeffers Pond 2" Addition plat requesting the City to convert Trail Point
Court into a public street. The petition was signed by 100% of the property
owners within the plat.
Current Circumstances
In order to complete the conversion of this 350 foot private street to a public
street, the applicants must perFormed work according to City Code Section
701.900. Before the applicants undertake this costly effort, City Staff felt it
appropriate to discuss this topic and ramifications with the City Council.
City Code 701.900 is specific about the criteria for the conversion of private
streets. City Staff have reviewed this request and provide the following
observations to this request based on City Code.
"701.903 (1) Any petition requesting a Private Street be adopted as a Public
Street must include the signatures of 100% of the property owners having
interest in the roadway."
Response: This section of the City Code has been satisfied.
"701.903 (2) Ownership of the existing right of way or required easements must
be transferred to the City. "
Response: The current private roadway is located within an outlot. The
ownership of this outlot should be transferred to the City to comply with City
Code.
"701.903 (3) A registered land survey of the proposed public right of way must
be provided to the City. "
Response: This section of the City Code has not yet been satisfied. '
"701.903 (4) The existing right of way or easements shall be a minimum of 40
feet in width and shall be reviewed by the City Engineer to determine whether �
additional width is necessary for street maintenance. Any costs associated '
with providing the necessary right of way shall be the responsibility of the
petitioner(s). "
Response: The existing outlot width is 32 feet. An additional roadway
easement in the amount of a minimum of 4 feet on both sides of the roadway is
needed to satisfy this condition. Staff recommends an additional 10 feet of
roadway easement be dedicated to the City for snow storage.
"701.903 (5) All costs associated with the transfer of the street maintenance
responsibilities shall be paid by the petitioner(s)."
Response: The City Council should discuss if a one-time contribution should
be made by the petitioners to cover the additional maintenance responsibility.
If this direction is given, City Staff would calculate the annual maintenance cost
and determine the appropriate one-time contribution necessary to cover this
expense.
"701.903 (6) An evaluation of the street and condition shall be completed by
City Staff prior to acceptance. The City Council may require upgrade of
reconstruction of the street prior to acceptance by the City at 100% cost to the
petitioners. If upgrade or reconstruction is not required the street shall be
included in the City's standard maintenance policy for maintenance. "
Response: City Staff have performed an evaluation of the street condition.
The following are observations and recommendations
1. The street width of 32 feet is in compliance with City standards
2. Curb and gutter is in place and stormwater requirements were met
during initial installation.
3. It appears that very little maintenance has occurred since the street was
installed. This has led to a number of issues that can now be seen in
the pavement. The cracks are unusually wide for a street of this age.
Water intrusion through these cracks has led to settlements.
Settlements should be repaired with curb to curb removal and
replacement. Prior to marking the settlement areas, core samples of
the pavement and aggregate depth should be performed to determine if
they meet City standards.
2
4. Cracked or chipped concrete curb should be removed and replaced.
5. Crack sealing and seal coating is overdue and should be performed
prior to City acceptance or funds for this purpose should be given to the
City. If this street is not accepted by the City, it is strongly encouraged
that the homeowners perForm this maintenance on the street during the
summer of 2014 as any delay will further damage pavement conditions.
6. The cul-de-sac includes a parking and landscape area which are
typically not allowed in public st�eets. Two alternatives are available:
a. Removal of the parking area and landscaping island to comply with
City cul-de-sac standards. The removal is further complicated
because of the installation of a fire hydrant and catchbasin inlets. In
order to remove the island, the entire cul-de-sac area would need to
be removed, re-graded, and the fire hydrant relocated. �
b. Allow the landscape area. However, maintenance of the landscape
area shall be completed by the homeowners association including
mowing, irrigation, and removal of snow around the fire hydrant.
During the winter the City would not plow the parking area due the
need for specialized equipment.
ISSUES: The Jeffers Pond area is a Planned Unit Development (PUD). The purpose of
a PUD is to offer an alternative to standard development in order to offer the
developer greater flexibility and provide a greater value to the community. In
Jeffers Pond, the developer provided additional public amenities, such as the
parks and the fire station site. In return, the developer was allowed private
streets with reduced widths, reduced setbacks, smaller lot sizes, and additional
units. Together, all of these concessions mean greater density and therefore
return on investment for the developer. In addition to providing developable
area, the use of private streets also reduces City street maintenance costs.
In the case of Trail Point Court, development of a public street instead of a
private street would have resulted in a different development. Had Trail Point
Court been platted as a public street, the setbacks would not have allowed for
the current plat configuration. A public street would have meant lots would
have only been allowed on only one side of the street, effectively halving the
density on Trail Point Court.
Setbacks along private streets also differ from setbacks along public streets.
The current PUD allows structures along Trail Point Court to be setback 25'
from the curb line; on a public street, the setback is measured from the right-of-
way line, which is generally 5-10' from the curb. If converted to a public street,
this means houses along Trail Point Court will be located a minimum of 4'
closer to the public right-of-way.
Before accepting this street as a public street, the Council should evaluate
whether the intent of the PUD will remain intact. A builder controls 13 of the 21
lots on this block. The remaining 8 parcels are owner occupied. In some
respects, it seems like the developer/builder gets all the benefits of a PUD and
after approval or at least before build out requests that the property be
changed to characteristics more akin to a conventional property.
Conclusion
City Staff recommends that the if the City Council believes that the street
should be converted to public, then the criteria contained in the city code
section 701.900 and recommended by staff in this report should be required.
3
FINANCIAL Adding additional public street will have minor staffing and long term
IMPACT: maintenance implications. Trail Point Court is only 350 feet long so it's
maintenance in and of itself will not have a significant impact on the personnel,
equipment and supplies needed to maintain the street. Over time however as
these requests become more common there will ultimately be an impact upon
the city's operating expenses and very likely the property tax levy.
ALTERNATIVES: 1) Approve the report and direct the staff to prepare a letter to the
petitioner setting forth the conditions for conversion of the street
from private to public.
2) Deny this item and provide direction to City Staff.
3) Defer this item and provide direction to City Staff.
RECOMMENDED Alternative No. 1
MOTION:
4
i
;
7 � . . • •�. .. , . . �� :f J ��
�
� � P4titao3ti f�r A�iop�aa oY.Priv�te Stroet as a�b�ic StreeL � .
� 'I`o: C'dy of PriarLeko •
� ' �rY ��Pl� �Y ��tfore 33'i�ctor
l�e Faqu�ti�aR 1YsiCPoini Gnms �V be �dol� aa � pnl�lie scrs2t �e peNSieu �s beL�
' ���YP�Yovv�s cu� P�tut�COtut�llYaudalgopzo�ttyosr�uasas
�cu�cr,softhcklo2EowsQa JeffcxsWtt�csfc+ontFFOA.
� �as�� ��r �r ��
3816'['mI1'l'ntnl Comt �
39�Tzatt Ptuat Court I
. 39I2'fiaiE Potut Crntil i
3915 T'�Yed�COmt '
39l f � Fo€�x t'asat .
' 3889 7'ia�7. PaLrt C�wm
�SSt TxaifPai�uCourt
- 3869 T�it Pai�[ Cotat � _.._., �
14955� le$'e�s�asg Q � � � � . S.
L4967 7ef�ess Pass � d `
d�49T9 yc,�'ers�ss
� ; ' IR91t 3a�sPass
1 i5�317aFFecs Rass
� 369aT�a�lrom#�urr�. 1abe+��A-nl�s-d;ri ��.� �lo� ` '� ,
; � . i a.ne. �. ��'O�a� 0{��� ` ��
34!?7 �a�t Yoiat j�� t�. ttc cC+��
' � � �s��it�oc�c�c ! c� ���t�► I �'� r�' _ /�.
j 7�sott�s �eflFecs � ����� �,E- dr�� �- , u�r�►. � 7� .
� � �ira�rtJ k�Q-t � ��� ^�� •� �
ISU17l�sPass � "���''Y�`"�" �►1 .t'�A- .-� �� F'"�
� . ' .
' t34 3elCe�sA� � !'il�f�v �3. ��tL� ffetl:� �1'�4�� c:. � � `. �T��.r
� 1 �P CrG
` � 38�GRps➢beltYKidBe�OedN �.. • � it..`�-��ttci0t c.� cse �. �� .
' � ti �
� 381?I2aspDqrY��1�H 4�►0 �✓
f °
1
� ,� �v�, � � f�l, e � � L� �3t�f� � . , -
I , ��.+� lY S c1� � �S � ' ��+�„� �t�.. .
i
�
F - --._ ._ ..____.._._. . . ..�.-- - -- �- - _ _. . ._�...__ _... . . ..__. . .. ... _.. _..._
� _..__ . ..�_.__._.__.._______ _.. .__.____._ _.....___ ..._... __�., _...... ..
. • t
i _ _-------. �_.____ �. - - -