AGENDA #:
PREPARED BY:
SUBJECT:
DATE:
BACKGROUND:
DISCUSSION:
STAFF AGENDA REPORT
~~ANK BOYLES, CITY MANAGE~~ \
CONSIDER APPROVAL OF ADD~~N ALLOCATIONS FOR OFFICE
REMODELING AND MICRO CO R NETWORK PROJECTS
FEBRUARY 21, 1995
The City Council at their November 7 meeting authorized total
expenditure not to exceed $75,000 for the City Hall office remodelling
project, and $80,000 for the establishment of a new micro computer
network (see attacned agenda report). Costs for these projects have
escalated beyond the original amounts and, therefore, an additional
allocation should be considered by the City Council.
Office Remodelling Project - The Architectural firm of Boarman, Kroos has
been coordinating the proposed office remodelling project. The project
has remained within budget until we recently learned that the supports
inside the council chamber walls run horizontally rather than vertically.
Cost estimates had been done assuming that the studs run vertically
which is far more typical of modern construction. Consequently, the
electrician based his bid on the assumption that electricity would be
drawn from above the suspended ceiling and run down the wall vertically.
Since the studs run horizontally, the electricity, telephone and computer
wiring must be run outside of the wall through a rubber molding which
integrates with the office dividers. As a result of this change, the total
project cost has increased approximately $12,000.
The Finance Director has asked that the wall between the sewer and
water cashier and accountant be eliminated to allow for three offices in
this area to accommodate a future position. The cost of this demolition is
$3000. While this work is not immediately needed, it makes sense to
include it as part of this project. These two items combined would
increase this project from $75,000 to $90,000.
Micro Computer Network - About a year ago Epic USA conducted a study
of the city's micro computer needs. At that time we agreed that a 486
SX33 platform was appropriate for our system. The continued
advancement of computers has led us to change our perspective.
I asked Epic USA to once again examine our needs and coordinate the
micro computer project. The cost of this work is $5000 which I had not
included in our origir.al project estimates. As the first step in the process,
they re-reviewed the city's equipment needs. They recommended that
the city buy at minimum, 486DX2/66 machines which are faster and more
powerful with math co-processors than the original equipment specified.
Dropping computer prices mitigated against the increase in price created
-1-
.:',~
16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
, . ,.
by this change. This equipment will serve more complex software which
will inevitably become available in the future. The proposal also provides
even higher powered computers to run the computer aided drafting
system which will be needed by the engineering department.
ISSUES:
All in all, the project assumes 21 computers, 18 of which are regular size
machines and three of which are expanded for computer aided drafting.
The final project also provides for one additional printer and the costs
associated with toggling between the new DOS system and Alpha Micro
system. All things considered, these costs bring the project to $110,000
or $30,000 more than the $80,000 originally allocated. For safety's sake,
I have included a $5000 contingency in this project.
In either project, it would be possible to keep the costs at or below the
original estimate set forth earlier. I believe that this is a penny wise and
pound foolish move. The office remodelling project would have to be
scaled back so that our needs could not be met in one phase. They
would simply have to be deferred to a subsequent phase when they
would probably cost more and create more disruption of day to day
business.
FISCAL IMPACT:
Similarly, the computer project could be revised so that the phase 2
installation is delayed until sufficient money is available. I believe that this
will simply serve to disrupt day to day work operations by placing half of
our departments on one computer system and the other half on another.
Computer pricing may also be less favorable in the future than it is now.
I am not pleased by the escalation in prices, but I believe that they
represent necessary expenditures in order for us to accomplish both
projects as they need to be accomplished.
This is the good news. As shown in Finance Director Teschner's
quarterly financial report on the consent agenda, we expect to fund QQth
of these projects including the increase in budget through the 1994
budget without relying upon the 1995 contingency. As the council will
recall, I had expected to utilize $30,000 of the 1995 contingency for these
projects. This will not be necessary. Instead, we will have the opportunity
to redirect these funds to revise the old fire station so it can be used to
store city files and as a locker, training and lunchroom facility for the
police department. We are obtaining estimates which I will share with the
Council once they are available.
ALTERNATIVES:
The Council has at least two alternatives:
1. Approve by adoption of the attached resolution additional
allocations to provide for the completion of the two projects
as recommended herein.
2. Retain existing project cost maximums requiring partial
project implementation and delay.
RECOMMENDATION: Alternative #1. In the case of office remodelling project, the city council
chamber wall supports are a surprise which would have been difficult to
anticipate. The project needs to be completed along existing timelines to
minimize disruption so that we may prepare for the important work ahead
this spring and summer.
-2-
, ,.
ACTION REQUIRED:
REMOOLWRT
The micro computer project escalated in cost because of the revised
platform we are using and the identification of additional equipment which
was needed to provide a fully operational system. I believe both
expenditures are necessary and would recommend the Council's
approval of additional allocations.
Motion and second to adopt the attached resolution allocating additional
funds to the city hall remodelling project and micro computer network
project as set forth above.
-3-
T
r
MOTION BY:
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
{Seal}
RSX.WRT
RESOLUTION 95-X
SECONDED BY:
in a staff report to the City Council on November 7, 1994, the Council
allocated $75,000 from various sources to fund the city hall office
remodelling project; and
through Resolution 94-59, the City Council allocated $80,000 for the DOS
Computer Network; and
the cost for each project has increased; and
the Council is desirous of completing the projects in a fashion that will serve
the city's needs for the maximum time period.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
PRIOR LAKE, MINNESOTA,that it should and hereby does:
1. Authorizes funding for the office remodelling project not to exceed
$90,000.
2. Authorizes funding for the DOS Computer Network not to exceed
$110,000.
3. Such funding shall be drawn from the 1994 contingency fund
budget.
Passed and adopted this 21 st day of February, 1995.
YES
NO
Andren
Greenfield
Kedrowski
Scott
Schenck
Andren
Greenfield
Kedrowski
Scott
Schenck
Frank Boyles
City Manager
City of Prior Lake
16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
"-'1"--"
.. .._.._.__.._~_.-y-
.
. ,
AGENDA #:
PREPARED BY:
SUBJECT:
DATE:
BACKGROUND:
DISCUSSION:
STAFF AGENDA REPORT
(l
8B ~'~J
FRANK BOYLES, CITY MANAGER \. "\ y
CONSIDER AUTHORIZATION Q _/UPGRADE OF CITY WIDE
COMPUTER NETWORK THROUGH STATE OF MINNESOTA
COOPERATIVE PURCHASING PROGRAM NOT TO EXCEED $80,000
NOVEMBER 7, 1994
The City's existing computer system is an Alpha Micro, non DOS based
system that is approximately ten years old. The system has been
upgraded both in hardware and software over its ten year life span.
General consensus is that the ten year life span in computer technology
is rather remarkable. In order to make the most effective use of city
employees, both clerical, professional and technical a computer upgrade
is essential.
Since I arrived at Prior Lake I have been concerned about the age and
productivity of our computer system. While it has been well maintained
and upgraded, at ten years old the level of reliability is not what it once
was. A more important consideration is the fact that since the Alpha
Micro system is not a DOS based computer, we are restricted both in the
type of software we acquire, the user friendliness of that software and the
fact that the software system is not the norm. I have asked computer
users to share their perspective on the existing Alpha Micro computer
equipment. Their comments are summarized in attachment #1 entitled
.User Concerns About Alpha Micro Computer, October, 1994".
In brief, our existing system has the following undesirable qualities:
1 Non DOS based - There are simply a wider range of
programs available to meet our computer needs on DOS
based systems rather than our existing system. For
example, in Parks and Recreation alone, field scheduling,
and recreation program registration software are available in
the DOS world but not for Alpha Micro. Similarly, in Building
Inspection a building permit issuance, scheduling and
tracking program is available, but not in the Alpha Micro
world. Moreover, equipment maintenance, record systems
and computer aided design are ayailable in the DOS world,
but not in the Alpha Micro. In short, because we are unable
to use this software we are not receiving the full range of
services which we should expect from our computer
hardware.
-1-
4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
2. User Friendliness - The existing system tends to be more
oriented to the technician, consequently, commands require
multiple keystrokes which may be difficult to remember and
execute. Some functions do not exist in this system where
they would be readily available in DOS software, for
example, a word processing program has no thesaurus, no
out of paper indicator and its ability to alphabetize is limited.
Moreover, automatic column ability used in tables like the
City Council directives is limited. Reduced user friendliness
and limited functions make the system more difficult to use
and production more time consuming. Frustration and time
consumption lead to lost productivity. Finally, what is shown
on the screen is not the way it looks in printed format. Most
DOS programs offer WYSIWYG (what you see is what you
get). This feature alone will increase efficiency and lower
users frustrations.
3. Employee Training - Whether we are talking about new full
time employees or temporary replacements, training on the
Alpha Micro system is considerable. The essential reason
for this is that the Alpha Micro system is a non standard
computer system. That is, most employers do not use it.
Consequently, individuals who are hired by the city for the
short or long term are totally unfamiliar with this system.
Training is longer and therefore the City must wait for a
longer span of time for the employee to become fully
productive in his or her role. Once this occurs they are still
frustrated with a system that is not as "user friendly" as it
could be which slows down ongoing production, nor will they
ever have the full range of software available to meet their
needs under the existing system. In addition, most
employees have DOS based computer experience and may
own them for personal use.
To resolve this situation, I recommend that we purchase a new computer
system consisting of a file server and twenty-one computer work stations.
Without becoming technical the job of the file server is to store data
created as a result of program use, to facilitate print and file saver sharing
and to ease data base sharing. For example, this memorandum would be
part of the data stored in the file server. The file server will also be the
home for computer programs used by everyone on the system. The
network will allow work stations to share data so that documents may be
shared between departments. For example, if Parks wishes to use a
notice of bids document previously created by Engineering as a template
they can easily do so by simply calling up the notice of bids on their work
station, copying it and modifying it rather than completely typing the
document. Similarly, developer's agreements or staff reports involving
more than one department can be prepared in part by each department
and then finalized by one department.
The initial network would consist of fifteen basic work stations and six
computer aided design work stations for a total of twenty-one work
stations. These stations would serve Administration, Finance, Planning,
Parks and Recreation, Building Inspection and Engineering. Over time
there may be the necessity to add work stations as new employees are
-2-
'-'''T-'-'''--''-
..............-........-".....,,--......-...................-.-T"'
r
. .
ISSUES:
hired and as the Alpha Micro is completely phased out of operation.
With the initial network we would purchase the Microsoft Office integrated
software package. This package which is designed to work with Windows
includes Word which is a word processing program, Excel, a spreadsheet
program, Power Point, a presentation software and Mail, an electronic
mail software package. Included with the price is cabling and training for
each work station. Attachment 2 is a personal computer network quote
provided by Ameridata. Ameridata has obtained the State contract for
computer systems. As a member of the State Cooperative Purchasing
System, Prior Lake is eligible to purchase from Ameridata without going
through the Request for Bid Process since that has already been
accomplished by the State. By way of comparison, we asked Index
Computer for a quotation. The prices are very similar with Index slightly
better on the file server, but slightly higher on the work stations.
My concern with Index is two fold. First the computers they propose are
.clones" consisting of parts supplied by various vendors and assembled
without a name brand. Clones are only as strong as the the components
they contain. Secondly, as a relatively small firm, Index does not have the
number of persons and level of support I believe is essential for
supporting a computer network of this size. Index Computer is now
working with the Police Department to support its system, but I believe
that as the system expands it is more appropriate to receive support from
a larger more established company.
In addition to providing for the best prices, using reputable equipment with
a proven track record, Ameridata has had significant experience in
working with municipalities to meet their computer network needs. Within
the last few years Ameridata has established and supported computer
networks for cities which include, Plymouth, Apple Valley and Chaska. I
have had personal experience with Ameridata and have confidence in
their ability to provide hardware, support the network and provide training
and trouble shooting which are essential to the ongoing well being of the
computer network. .
There is no question in my mind that a new computer system is needed if
the City of Prior Lake is to continue to address the work load which
promises to do nothing but escalate as our development future unfolds.
The key is how do we pay for such a system? I propose that the network
we contemplate estimated at a total cost of about $80,000 would be
financed as follows:
1994 Data Processing Account
1994 Contingency Budget
1995 Data Processing Budget
1995 Contingency Account
$15,000
$30,000
$20,000
$15.000
$80.000
As the Council is aware, our 1994 Budget projections suggest a very tight
budgeting year. We expect that we will have a surplus of $16,000 once
the year is over. That is a very slim margin of error. Accordingly, I would
like to structure this acquisition so that payment will be made in 1995
giving us maximum flexibility to draw a greater amount of the 1995
contingency if a lesser amount of money is available in the 1994
contingency. By the same token, if our projections for 1994 are overly
-3-
conservative, we would be able to draw a greater amount of money out of
the 1994 contingency and rely less upon the 1995 budget.
An additional financial challenge involves the office reconfiguration at the
end of this year. It seems appropriate to accomplish both projects, that is
the office relocation and computerization at the same time, since wiring
for the computers will be part of that project and we may be able to
achieve some cost savings. From a financial perspective, unfortunately,
this will also require reliance upon the 1994 contingency. We expect the
office relocation project to cost $75,000. Those costs would be drawn
from:
1994 Buildings & Plant Budget -
1994 Contingency Budget
1995 Contingency Budget
$30,000
$30,000
$15.000
$75.000
ALTERNATIVES:
A number of alternatives are available:
1. Approve acquisition of the computer system as
recommended in this memorandum with the proviso that
staff is to time the acquisition in such a fashion that it does
not exceed our financial abilities to pay.
2. Direct staff to provide additional information to address
Council concerns.
3. Do nothing and stay with the existing Alpha Micro system.
RECOMMENDATION: I recommend Alternative #1. While an acquisition such as this can
always be deferred, the impact of such deferral is to reduce employee
productivity. Considered cumulatively, this erosion of productivity and the
associated frustration it creates can ultimately cause greater city
expenditures through higher turn over of employees and hiring of
additional personnel which might not otherwise be required with fully
versatile computerization. In short, a modem, effective and user friendly
computer system can squeeze the most of our personnel complement.
Such action is consistent with the Council's lean staff philosophy.
ACTION REQUIRED: Adopt the attached Resolution authorizing the acquisition of a computer
network from Ameridata Corporation under the State of Minnesota
Cooperative Purchasing program at a cost not to exceed $80,000.
AGNDSS.WRT
-4-