'�Mx�so'�
CITY COUNCIL AGENDA REPORT
MEETING DATE: JUNE 24, 2013
AGENDA #: 5J
PREPARED BY: JEFF MATZKE, PLANNER
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION APPROVING A FINAL PLAT
FOR JEFFERS POND 7T" ADDITION AND AUTHORIZING THE MAYOR AND
CITY MANAGER TO EXECUTE A DEVELOPMENT CONTRACT
DISCUSSION: Introduction
The Jeffers Foundation has submitted request for approval of a Final Plat to be
known as Jeffers Pond 7th Addition. The area of consideration for the Final Plat
applies to an undeveloped portion of Jeffers Pond known as The Shores. The
site is located south of Jeffers Parkway, east of McKenna Road, and %4 mile
west of CSAH 21. The development plan calls for a residential development
consisting of 23 single family lots and 2 outlots.
Current Circumstances
The City Council approved the preliminary plat application on April 8, 2013. The
final plat of Jeffers Pond 7th Addition consists of approximately 5.3 acres to be
subdivided into 23 single family lots, and 2 outlots. Oulots A, and B are to be
platted for location of public utility lines. The Final Plat proposes the construction
of the Shore Crest Drive cul-de-sac. Staff has reviewed the final plat and finds it
to be in substantial compliance with the approved preliminary plat.
ISSUES: The principal requirements for final plat approval include conformance with all
aspects of the preliminary plat and an agreement to a Development Contract
identifying the surety for the installation of utilities and streets. The Development
Contract also specifies the development fees for the platted lots.
FINANCIAL Approval of this final plat will allow construction of new dwelling units, which will
IMPACT: contribute to the City's tax base.
ALTERNATIVES: The City Council has the following alternatives:
1. Adopt a resolution with conditions approving the final plat and Development
Contract for Jeffers Pond 7th Addition.
2. Amend or deny the resolution approving the final plat.
3. Defer this item and provide staff with specific direction.
Staff recommends Alternative #1.
RECOMMENDED 1. A motion and second to adopt a resolution approving the final plat and De-
MOTION: velopment Contract for Jeffers Pond 7th Addition and authorizing the Mayor
and City Manager to sign the Development Contract.
EXHIBITS: 1. Location Map
2. Final Plat dated May 20, 2013
3. Jeffers Pond 7th Addition Development Contract #13-104
O � PRIp
� �
4646 Dakota Street SE
`�rH�so� Prior Lake, MN 55372
RESOLUTION 13-xx
A RESOLUTION APPROVING THE "JEFFERS POND 7T" ADDITION" FINAL PLAT AND
AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE A DEVELOPMENT CONTRACT
Motion By: Second By:
WHEREAS, On April 8, 2013, the City Council approved the preliminary plat known as "Jeffers Pond
7tn Addition", subject to conditions identified by Resolution 13-043; and
WHEREAS, The Jeffers Fountlation (the "Developer") has submitted an application to the City of Prior
Lake for approval of a Final Plat for Jeffers Pond 7� Atltlition; and
WHEREAS, The City Council has found that the final plat of "Jeffers Pond 7th Addition" is in substantial
compliance with the approved preliminary plat for Jeffers Pond 7�.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein as if fully set forth.
2. The final plat of "Jeffers Pond 7th Addition" is approved subject to the following conditions, which shall be
met prior to release of and recording of the final plat:
a. A current title opinion or commitment of title insurance is submitted acceptable to the City Attorney.
b. Payment of all fees prior to release of the final plat mylars.
c. Reductions of the entire final plat be submitted, to the following scales: 1" = 200'; and one reduction
at no scale which fits onto an 81/2" x 11" sheet of paper.
d. Three mylar sets of the final plat with all required signatures are submitted.
e. The Developer provides financial security, acceptable to the City Engineer, prior to release of the
final plat mylars.
f. The final plat and all pertinent documents must be filed by the Developer with Scott County within 60
days from the date of final plat approval. Failure to record the documents by August 24, 2013, will
render the final plat null antl void.
3. The Mayor and City Manager are hereby authorized to execute the Development Contract on behalf of
the City.
PASSED AND ADOPTED THIS 24TH DAY OF JUNE, 2013.
YES NO
Hedber Hedber
Keene Keene
McGuire McGuire
Mo�ton Morton
Souku Souku
Frank Boyles, City Manager
. � • � � � �
• � • � �
���� � ��� � � ���� � � � � �� � ��� � �� ��
ar •� ��
�'• :�;� . - r •� ►
�',' •.':':• - ,, i ►,::r:'��•: � :
nL��./��� i �. �' � I �► �iiiii� � � ��.. �
' mnu��� ■7 71�� ` ` �-._� ���'.�I�
�: ;�= ;; • � = � -��_ ��
�,..,.� � ,�.` __ .�D %
41��l► �'Ii�O r • z'�' ���
` ��� � \ ' �� �i , V • " � � �':�• �!�
.� ��, �� � ' '. .��0 I:..
�. • �I• :i ����/I('' ua�_: ` •c:>
I ,u.�-' � -•
��• -���- � � ���, '...'V��4ijn � .
�� j� I 1 i t j��n u yV%i�T ;
� I� ♦ I. �� ..., A oY.;_,�� i_..\"�`�:� � ,
'� •► ��I��� \��I� i" 'I"I_i!����i, ii
• � ►�1 �` �:�C:I :�=%:�=�� � '
�_ •♦ � ''b ".: i�1v'p1U� .
�...n� _ 'y� �Y.. �. nnn�i�ri_ � +'�
- - :;: i.. I .. � i- � � �
�- �.n. = �1 � •.;'� �....' �, /��
''L•►. ` � / ��� �Qi�� y
�� �' _ � • �� 'p� C•.,�: 11� / ���
L � . � ` . /, , � : i �� ►y �� A `
� iv.•: 1 �
,� ■ ���uuq� � : . :.� �.` �
,�:1::, .�, .,,,. � ti .�,, �; ;
� ■ ■ • �. N' c , � � v��0.. �� � J.
',����,,'"
. .�,
�
. �_
0
. �
�
���. �y.
� � r � e hr , �
, .
��.� , ��� -� p �-
y . „�
.� �° �
,�
'� �" �� , �
�::,• ;� ��:
x ;E� �� _� . � . � .
- � ,
�� � � ,. ,.
,� ��;- � � �
�>
,
���,'.
��
_�
i;
.p a'd. 3 � L. y '^.:
F�� "�"°
� ��' ` s Y, � � q _
i *� _
wX
*� ���� .
� � .
�.
�, r
• � I ��
I��
e *.
I �
� � � � i � ? ` r fi y�"
- � ' 4
+ '=e
:. ,: .. � .:... ., . . .. .. . , h .. t � �� * y�
.�� �
d+
�€
W � �
z�
��
a€
E a� ' g � 9 l � !
� ° �,
s� E s � �
� o
l � �� � � � �
� � c� Q
e g
� � �
. 5 � � s
•W e a R p a ca �,
o I u 5 m
�
€ ;�� €_ � ` � � y ` �
a _ 9 $ a � °� � fi u . a�
,�� Sa R � s$
y' �_ � \ � � �
O ° §,fi '� �'8fi � ' � 5 � $o
� z � o � � �'s � � � Z _ I
'b ._" �� `�a � e � 5 ` � "ga
� i� '�' �� ^°B k �. o�£ N a�
� �o so €s�n v 's Y _ _R
_
F
Z
w
�
�J..�
�
�
z
�
� €
5 ° E
� i � _ � �a -
w r '� � � x � �
w '� � o€ 5 N � � �'�yBF e
� _ = � �6 S � � ° E e � • € >
� s �3b fi � u 5 � �s� �a
,§g o �" °�' ' E � a.v;' ,sy
-_ E 6 e �I a: �
fr� � 5; _ a� z°¢5^ aa
iV 5 e s = 1 � �� : fr .
i c g 5 Y _ "
�. a � � e S � a ��
'��' D $ a � ° i v � x= � e$ a S
€ $ � 3 � • < s � 4 ' � 5 �
m R $ E a o � � u�i E � ... nS'b' L
� a � a 9 � � a � �� S i S � 0 8$ z
x� d z°'�$ _e � � �CiE;� `_�e.csfi
.�� �
� v�
� �g �
: h� � � �
��
��, ,;� .�,:u^°,� W �
r- �� �. W
' �1 ____ ��lL� l--� i
� wc' � o � ''I � � �
56 .�.�.9 } `�.� r j ` r-�
�� � �.0 �2� 3� m n p-1 G
`� \ vom �/ /� j«�\
�5 �\' &��\� � �� �/ i' i\�� ��
TN ���/ � 8 ^� �� O,\� �� ��� J i \`$f
� � ' � -� � .O i �,
5b�� ^x a� ^ � °%� `� \` \`� �.,�'\ `\� " a, +' e~ h � ``� �
5 � .� \� �\ �� � �+� l � �\ � t / 8 �q N �� Y 'r
�1'L" , ., ao" .o-�"` ��`% � '. \` �\ � ` � $^ �` �� `� j/' �� '" ` 'i <y
'h. � 9� �� � �� �O� � tt � �...�,iw ';� °��' � '^ �
59E .�� L_ ~�' :� � ^ � � `�`� � �� , �° e 't� � ':o�±s �a
N6 � �,,A' .' ' :�\ �� `�` �� 5 �� \� G �� �� � �� ,1y, °� 2 r's,(a"''"�" � M� `)
,..* o +`� •' �i' � � \ ` � \ �� `� — �i^v. � i
-' �' � � `\ �� � �`�� `� �. \> �� j� I � ° �i^ •- % � zp
� �,
F / �s�; A� �� ag o � ��- � ,�,./" I "$ e �� Y ./ t'y Y' 6C �Ct
n '� / � \�� •°� `� •' , / r ' a �• � � �
; � \\ ; 4i :s� F_ � c � D�949.00 3 -�. 1 Y,ZB5 I \ ! � `��."_"'�� ��N��
/ � .�� \\ d .^ c o, . C)w/ 77.38 SO'S9 l� l
°i \ ' , a ��� 4 sro^ `1 ;� M.6f.C.98N
3 � ? �j � 6>'99
N (,r \ ` `e a�.�> /��, :�� �s����`\; �� :�r ��
m �; '�:;:��.,��" o�e,io��,, ' � '�, `-�,�� �s a p
<�� u �' s
y '� M "�:.' v����i ^ c � ;L �� �' z
� i �
.� �___ :i. � 4� .Si \` t . i
� �:�� °� • •� i
Z --------� � � ,,. ., ,. �
�_� ----_
o , ��, -x«:�-, � , ��;. � ,�.�
n � �. ,� � _ , �-� ; � ,
_ ,
, � �
F— n a1 N T�6 r� ------�-" --� c� � �
— _ - � ��cm
p ' °'° '" '�-------------�" � � `a
, ,� � : �;,o
.o � �.m
Q 3 �-----------� I, � --- ti�u�as - � w ` € yg
i i,• y ��< €
Q �'wcu___wislsms � $ i M �: 2 N � z `�e�.�i�
+ ��
.
Y .1 ^ a �
Ig � � � <
�o ,�".� � �fi i � ��� °`a _��b'�z 3
_ � � J :" I `---------«.��; � W
` � ��<N �:W
r� a � �.�..cocs � mS���'a
Cl'[tt ' 3.tS.fS.88N w S e �4�� N�€�O�
� � I �
Z • 5 8� N I � Wo .i r� �'
$ �� g �� � e <
W �• � : a�z �
� N � u I a i i 3 <gxb 8 �
� `-------°-� a .: s 3a_�
w =k�° 3 •�
a
� � uw� - 3�ascw� � o � gW$g a�'a€�3
-
� - --'---.�--- I„ � o m5<m : am'8=_�
.�� �
Q m `vaga 'r',.� � j� � �
z
Z e�-':� �R g b�� i
O � �� �° :\\ i
o .\ J
� '�' �'e\ % / 1 �
�
y ` V .�
� r � � ,pa, A I
� �H a � � ?� �' � - �
w � � �e�s
�� +\ �� i _.
� d'� a r g@i G �o o-! ����
W a� "� DY P \� i ou q I �a�5
� 3+ �� ry i �` ::\�/.� e - a _1_J `�
abd�'l � C) �\`77 � � W Q - � - -� �sg�
O . � i g=
H°� '�' i ey ` �9r � '@� 2 & Z� 1 Fa��
� OJ �� \\',. �• v����, � K� mJ `�€c�
(A i �� ow � C`_'
rr b � � i�e+� •'sj, W � ��
� `'g ��! .- ♦4 \ j m�.��
� ��' � > �
.�' <' �. � :
"$ g¢� ; ' „ .a,- •.8
`s' ; • •� . \ ra��a
,� � � �.. � ° s
p� .v�i�� \n \ M�
J �� f � e�` ��� � M �Y�
� 1 h
. a M a °` s r �,
Vn •i+ ` -_ � _' " 7 � � �
-y m ��___�- ae,� � � n g �'� `�,;�� �
v> �' 9 j P { � Ni ' v1 � u' �
-`• ° 1 �� � � `� �
. �
3 I N_____ I• 3 '__"_' _"_" aZ6
"" ^ �I I r` m � � �F�
�,� -° ^� �; - I I , ��
� L___ r�l S+ - i �o
y
�'�c.e--uim+l'"iS z � � � h
.� ",—" Z
. ,
r� w �P ' ; , , o
i - � ^----- ;p � �-------�--- -� �
yT ' x{'S RP ;�] o0<i / N
g � ttWl _ J � � ��c+ �
2 �_�_ �_ � �p �f� r / �
f9'9ll 3.£1.80.6BN ��^�c�. c� �/ '
$ /
'°r qj =� '' � ¢ ��\ 6 g y .` f �
� ��� ya' 4' ' /�\ , / / i
� =j, �- a� /
t,
� / � ��,�1�� / /
/ !,�
� ���`✓ ��
/ i
/ °° �
DEVELOPMENT CONTRACT
JEFFERS POND 7 ADDITION
PROJECT #13-104
This DEVELOPMENT CONTRACT is entered into this 24th day of June, 2013, by and between
the CITY OF PRIOR LAKE, a Minnesota municipal corporation ("City"), and the Jeffers Foundation, a
Minnesota Nonprofit Organization (the "Developer"). Based on the mutual promises and covenants set forth
herein, the sufficiency of which is not disputed, the City and the Developer (collectively "Parties") agree as
follows:
1. RF.�IIF..4T FOR P,ATAPPROVAI_. The Developer has asked the City to approve a Plat
for Jeffers Pond 7�' Addition (referred to in this Development Contract as the "Plat"). The land is legally
described as shown on aitached E�chibit A which is incorporated herein as if fully set forth. The parties
acknowledge that the project is a re-plat and certain public improvements have been installed with a previous
plat.
2. CONDITIONS OFPLATAPPROVAL. The City hereby approves the Plat on condition that
the Developer enter into this Development Contract, furnish the Security required by it, and record the Plat
Page 1
6/24/13
and Development Contract with the County Recorder or Registrar of Titles within 60 days after the City
Council approves the final Plat.
3. RIC�HT TO PROCEED. Within the Plat or land to be platted, the Developer may not
construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all
the following conditions have been satisfied: 1) this Development Contract has been fully executed by both
parties, 2) the necessary security, development fees and insurance have been received by the City, and 3) the
City Engineer or Designee has issued a letter that all conditions have been satisfied and that the Developer
may proceed. The foregoing restriction on the Developer's "Right to Proceed" does not apply to grading or
other approvals set forth in Resolution No. 13-043, dated Apri18, 2013, approving the Preliminary Plat for
the Jeffers Pond 7�' Addition.
4. PHASED D. ..OPMF.NT. If the Plat is a phase of a multiphased preliminary Plat, the
City may refuse to approve Final Plats of subsequent phases if the Developer has breached this Development
Contract or any terms or conditions set out in the Resolution approving the Final Plat and the breach has not
been remedied. In addition, no other subsequent phases may proceed until the City approves Development
Contracts for such phases. Fees and charges collected by the City in connection with infrastructure, public
improvements and parkland dedication requirements are not being imposed on outlots, if any, in the Plat that
are designated in an approved Preliminary Plat for future subdivision into lots and blocks. Such charges will
be calculated and imposed when the outlots are subdivided into lots and blocks.
5. PRFIIMIN RYP .AT �S'TATUS. If the Plat is a phase of a multiphased preliminary Plat,
the Developer shall submit a Staging Plan for City Council approval which may allow the Developer more
than one (1) year to subdivide the property into lots and blocks.
6. D OPM NT P AN . The Plat shall be developed in accordance with the Plans
identified below. The Plans shall be approved by the City Engineer prior to consideration of the Final Plat
and Developer's Contract by the City Council. The plans shall not be attached to this Development Contract,
Page 2
6/24/ 13
but are incorporated by reference and made a part of this Development Contract as if fully set forth herein. If
the plans vary from the written terms of this Development Contract, the more specific or stringent controls
shall apply. The Plans are:
Plan A-- Final Plat Dated Stamp Dated May 20, 2013 (Prepared by Pioneer
Engineering)
Plan B-- Final Grading, and Erosion Control Plan(s) as stamped approved by the City
Engineer (Prepared by Pioneer Engineering)
Plan C-- Landscaping Plan Stamp Dated May 20, 2013 (Prepared by Pioneer
Engineering)
Plan D-- One set of Plans and Specifications for Developer Installed Improvements
Stamp Dated as stamped approved by the City Engineer (Prepared by Pioneer
Engineering)
All plans set forth above are incorporated herein and made part of this Development Contract.
7, nFVELOPER INSTAL.L-ED IMPROVEM�NTS. The Developer shall install and pay for
the following to the extent not previously installed with the previous plat:
A. Sanitary Sewer System
B. Water System
C. Storm Sewer
D. Streets
E. Concrete Curb and Gutter
F. Street Lights
G. Site Grading and Ponding
H. Underground Utilities
I. Traffic Control Signs
J. Street Signs
K. Setting of Iron Monuments
L. Sidewalks and Trails
M. Landscaping
N. Wetland Buffer Signage
Page 3
6/24/ I 3
The Developer Installed Improvements shall be installed in accordance with the City's Subdivision
Ordinance, City standard specifications for utilities and street construction, the City's Public Works Design
Manual, and any other applicable City ordinances, all of which are incorporated herein by reference. The
Developer shall submit plans and specifications, which have been prepared by a Minnesota registered
professional civil engineer to the City for approval by the City Engineer. The Developer shall obtain all
necessary permits and approvals from any other agencies having jurisdiction before proceeding with that
aspect of the construction as it relates to that permit. The Developer, its contractors and subcontractors, shall
follow all instructions received from the City's authorized personnel as are related to the project. The
Developer or the Developer's engineer shall schedule a preconstruction meeting with all parties concerned,
including the City staff, to review the program for the construction work. In accordance with Minnesota
Pipeline Safety law revisions effective January l, 2006 the Developer will be responsible for installing a
tracer wire mechanism for all newly installed service lines in public right-of-way. The proposed tracer
mechanism shall be approved by the City prior to installation. All costs associated with furnishing and
installing the tracers shall be the Developer's responsibility. Before the Security for the completion of utilities
is released, iron monuments must be installed in accordance with Minn. Stat. §505.02. The Developer's
surveyor shall submit a written notice to the City certifying that the monuments have been installed.
8. ('ONSTRUCTION OBSERVATION. The City's authorized personnel shall provide
construction observation during the installation of the Developer Installed Improvements in accordance with
the Public Works Design Manual. These services by the City shall include:
A. Construction observation during installation of required Developer Installed
Improvements, which include grading, sanitary sewer, watermain, storm sewer/ponding and street system.
B. Documentation of construction work and all testing of Developer Installed
Improvements.
Page 4
6/24/ 13
C. Field document as-built location dimensions for sanitary sewer, watermain and storm
sewer facilities. The Developer's Engineer is responsible for data collection and preparation of as-built record
plans.
9. DFVELOP�R PROVIDED CONS'TRUCTIDN SERVICES The Developer shall be
responsible for providing all other construction services including, but not limited to:
A. Construction surveying
B. As-built drawings of grading plans.
C. As-built drawings showing location, dimensions and elevations of all utility
improvements, including but not limited to top nut of hydrants, manhole rims, manhole inverts. (Field tie
dimensions to sewer and water services shall be provided to the Developer's Engineer, by City staff or City
consultants). As-built record drawings shall follow the requirements set forth in the Public Works Design
Manual (PWDM). The as-built record drawings shall be submitted to the City for approval within six (6)
months of substantial base pavement course placement.
D. Project Testing: The Developer is responsible, at the Developer's sole cost, to provide
testing to certify that Developer Installed Improvements were completed in compliance with the approved
final plans and specifications. A copy of all testing documentation must be submitted to the City. The
personnel performing the testing shall be certified by the Minnesota Department of Transportation. The City
Engineer has the sole discretion to deternune if additional testing is necessary. The cost of additional testing
is to be paid by the Developer.
E. Lot corners and monuments.
F. Engineering / Project Management
10. BOUL.E.VARA NDARF.A R. TO ATION. The Developer shall seed or lay cultured sod
in all boulevards within thirty (30) days, or within a timeline established by the City Engineer, of the
completion of street related improvements and restore all other areas disturbed by the development grading
Page 5
6/24/13
operation. Boulevard and Area Restoration shall be in accordance with the approved erosion control plan.
Upon request of the City Engineer, the Developer shall remove the silt fences after turf establishment.
1L �I�BDIVISlONMONUMENTS. The Developer shall install all subdivision monumentation
within one (1) year from the date of recording the plat, or the monumentation shall be installed on a per lot
basis at the time the building permit for the subject lot is issued, whichever occurs first. At the end of the one
(1) year period from recording of the Plat, the Developer shall submit to the City Engineer written verification
by a registered land surveyor that the required monuments have been installed throughout the plat.
12. TIME OFPERFORMAN . The Developer shall install all required public improvements
by December 31, 2013, with the exception of the final wear course of asphalt on streets. The final wear
course on streets shall be installed by July 30�', of the first suminer after the base layer of asphalt has been in
place for one freeze thaw cycle. If necessary, the Developer and the City sha11 consult about an extension of
time. If an extension is granted, it shall be in writing and conditioned upon updating the Security posted by
the Developer to reflect cost increases and the extended completion date.
13. ll .N E. The Developer hereby grants the City, its agents, employees, officers and
contractors a non-revocable license to enter the Plat to perform all work and inspections deemed appropriate
by the City in conjunction with the development of the Plat.
14. F. ROSIDN CONTROL
A. Prior to initiating site grading, the erosion control plan, Plan B, and Stormwater Pollution
Prevention Plan (SWPPP) shall be implemented by the Developer and inspected and approved by the City.
The City may require the Developer, at no cost to the City, to install additional erosion control measures
if they are necessary to meet erosion control objectives. All areas disturbed by the excavation and
backfilling operations shall be reseeded immediately after the completion of the work in that area. All
seeded areas shall be mulched, and disc anchored as necessary for seed retention. The parties recognize
that time is of the essence in controlling erosion. If the Developer does not comply with the erosion
Page 6
6/24/13
control plan and schedule or supplementary conditions imposed by the City, the City may take such action
as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of
any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or �
obligations hereunder. The Developer shall be solely responsible for any costs incurred by the City for
erosion control measures. The Developer shall fully reimburse the City for any cost incurred within ten
(10) days of the date of the City's invoice. If the Developer does not reimburse the City for any cost the '
City incurred for such work within ten (10) days, the City may, without further notice to the Developer,
draw down the Irrevocable Letter of Credit to pay any costs. No development, utility or street construction
will be allowed unless the Plat is in full compliance with the erosion control requirements. The notice
provisions set out in Paragraph 41 shall not apply to notifications to the Developer under this paragraph.
B. The Developer shall seed or lay cultured sod in all boulevard areas behind curb within
thirty (30) days, or within a timeline established by the City Engineer, of the completion of street related
improvements.
C. The Developer shall restore all other areas disturbed by the development grading and
construction operations within this time period.
D. Boulevard and disturbed area restoration shall be in accordance with the approved Plan
B and SWPPP. (No building permits will be issued until the Developer has installed silt-fence behind the
sod line of all buildable lots). It is expressly understood that once silt fence has been installed it shall
become the builders' responsibility to maintain the silt fence, unless the silt fence is damaged by the
Developer's utility contractors.
15. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from
any and all construction wark by the Developer, homebuilders, contractors and subcontractors, their agents
or assigns. Prior to any construction in the Plat, the Developer shall identify, in writing, a responsible party
and schedule for erosion control, street cleaning, and street sweeping. If the Developer fails to perform the
Page 7
6/24/13
required clean-up within 24 hours of receiving instructions and notice from the City, the City, without further
notice, will perform the work and charge the associated cost to the Developer. If the Developer does not
reimburse the City for any cost the City incurred for such work within ten (10) days of receipt of the invoice,
the City may draw down, without further notice, the Irrevocable Letter of Credit to pay any costs incurred by
the City. Due to time sensitive nature of clean up, the notice provisions set out in Paragraph 41 shall not
apply to notifications to the Developer under this paragraph.
16. GRADING PLAN
A. The Plat shall be graded in accordance with the approved grading plans. All e�sting and
proposed contours must be shown and approved as a part of the building permit application. The graded
plans, as well as the grading and erosion control work shall conform to City of Prior Lake Public Works
Design Manual.
B. As-builts. Before the City releases the Grading Security, the Developer shall provide
the City with an as built grading plan and a certification by a registered land surveyor or engineer that all
ponds, swales, and ditches have been constructed on public easements or land owned by the City. The as-
built plan shall include field verified elevations of the following: a) cross sections of ponds, b) location and
elevations along all swales and ditches, and c) lot corners and house pads. The City may withhold issuance
of building permits until the approved certified grading plan is on file with the City and all erosion control
measures are in place as deternuned by the City Engineer. The Developer shall also submit a land tabulation
certified by a registered engineer showing that all pads have been corrected in accordance with project
specifications.
17. OWN�RSHIP OFDEVELOPER INSTALLED IMPROVEMENTS. Upon completion of
the Developer Installed Improvements required by this Development Contract; (1) final written acceptance
by the City Engineer and, (2) adoption of a resolution of acceptance by City Council, the improvements lying
within public right-of-way and easements shall become City property. The Developer shall be responsible
Page 8
6/24/13
for all pond and rain garden maintenance until written acceptance by the City of the Developer installed
improvements where upon the City shall assume all maintenance.
18. ST F_F.T AINT N N . Developer shall be responsible for all street maintenance until
final written acceptance by the City of the Developer Installed Improvements. All private street or private
parking lot maintenance shall remain the Developer's and homeowner's association responsibility in
perpetuity. Warning signs and detour signs, if determined to be necessary by the City Engineer, shall be
placed when hazards develop in streets to prevent the public from traveling on same and directing attention
to detours. If and when streets become impassable, such streets shall be barricaded and closed. For the
purpose of this subparagraph, "street maintenance" does not include snow plowing or normal sweeping.
19. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, public
utility construction, and street construction is restricted to Fountain Hills Drive, and Jeffers Parkway. No
construction traffic is permitted on the adjacent local streets.
20. IMPROVFMENT`4I�F.�1lIIRF.D B.FORF. I U N . OF B I.DIN � PE R�fIT .
A. Grading, utilities, curbing, and one lift of bituminous shall be installed on all streets
providing access and adjacent to a lot prior to issuance of any building permits for that lot. Grading as-builts
for the proposed building permit shall be approved prior to issuance of any building permit. Before a building
permit will be issued a minimum of one (1) active fire hydrant within 300 feet of the unit must be available
for fire protection. If building permits are issued prior to the acceptance of Developer Installed
Improvements, the Developer assumes all liability and costs incurred as a result of delays in completion of
the Developer Installed Improvements; including damages to Developer Installed Improvements caused by
the Developer, its contractors, subcontractors, material men, employees, agents or third parties.
B. Any Wetland Buffer Signage must be installed prior to the issuance of any building
pernuts within the development.
Page 9
6/24/ 13
C. A temporary or permanent Certificate of Occupancy shall not be issued for any
building in the plat until water and sanitary sewer improvements have been installed and the streets have been
completed and the first lift of bituminous has been placed and said improvements have been inspected and
deternuned by the City to be available for use.
21. CITYADMINISTRATION, The Developer shall pay a fee for City administration. City
administration will include all activities necessary to implement this Developer's Contract. These activities
include, but are not limited to, preparation of the Development Contract, consultation with Developer and its
engineer on the status of or problems regarding the development of the Plat, project monitoring during the
warranty period, processing of requests for reduction in security, and any consulting or legal fees incurred by
the City. Fees for this service shall be four percent (4%) of the estimated construction cost as detailed in
E�ibit D, assuming normal construction and project scheduling. The previous escrowed funds currently
retained by the City as a result of a Preliminary Plat Application will be credited towards the City
Administration four percent (4%) fee. The Developer has previously escrowed $10,000.00 for City
Administrative Review. The remaining City Administration Fee shall be $5,570.00. This fee was calculated
as four percent (4%) of the estimated construction cost less the previously established $10,000.00 escrow
fund. Costs incurred by the City over and above the four percent (4%) Administration fee shall be billed to
the Developer.
22. REIMBURSEMENT OF CITY ADMINISTRATION FEES. The City and Developer
acknowledge that the calculation of the City Administration Fee is based on construction cost estimates
provided by the Developer to the City. Although the City reviews and accepts the construction cost estimates
provided by the Developer, the review and acceptance is based on an assessment by City Engineering Staff
that the costs provided to the City are reasonable. Actual construction costs may vary. Once the City approves
the construction cost estimates from the Developer for the Developer Installed Improvements, the City
Page 10
6/24/ 13
Administration Fee will not be subsequently adjusted in order for the City to collect additional administrative
fees from the Developer or to reimburse the Developer for fees paid to the City.
23. CITY CONSTRUCTION OBSERVATIDN. Construction observation shall include, but is
not limited to, part or full-time inspection of proposed grading, public utilities and street construction, City
legal costs, and City consultant expenses related to the development. The Developer shall deposit an amount
equal to five percent (5%) of the estimated construction cost, for construction observation performed by the
City's authorized personnel and incurred pass-through legal expenses. This amount shall be maintained by
the City in escrow until final acceptance of all Developer Installed Improvements by the City. Any balance
remaining in the escrow account will be returned to the Developer at that time. Costs incurred by the City
over and above the five percent (5%) Construction Observation fee shall be billed to the Developer.
24. TRUNK STORM WATER ACREAGE CHARGE. The Developer shall pay a storm water
trunk charge of $14,715.00 prior to the City signing the final Plat. The amount was calculated as follows:
5.27 acres at $2,790.00 per acre. This calculation was determined by the Fee Determination Study adopted
by City Council Resolution #OS-18 on January 18, 2005
25. TR INK WAT .R A F.AGF. AR .. A trunk water acreage charge of $29,008.00 shall
be paid by the Developer for watermain trunk improvements prior to the City signing the final Plat. The
amount was calculated as follows: 5.27 acres at $5,500.00 per acre. This calculation was determined by the
Fee Determination Study adopted by City Council Resolution #OS-07 on January 3, 2005.
26. TR UNK SEWER ACRF.A (�_F. CKA R(�_F., A trunk sewer acreage charge of $16,034.00 shall
be paid by the Developer for sanitary sewer trunk improvements prior to the City signing the final Plat. The
amount was calculated as follows: 5.27 acres at $3,040.00 per acre. This calculation was determined by the
Fee Determination Study adopted by City Council Resolution #OS-18 on January 18, 2005.
27. STRF. .T OV .RSI .. A.RF.A HARG .. This Development Contract requires the
Developer to pay a street oversize acreage charge of $25,949.00 for street improvements prior to the City
Page 11
6/24/13
signing the final Plat. The amount was calculated as follows: 5.27 acres at $4,920.00 per acre. This calculation
was deternuned by the Fee Determination Study adopted by City Council Resolution #OS-18 on January 18,
2005.
28. IITILITYC0IVNECTIONCK.4RGE. A Utility Connection Charge was satisfied as part of
the Development Contract for Jeffers Pond 1 S Addition. No additional charge is required.
29. PARK ND TRAIL DEDICATION. Park and Trail dedication requirements were satisfied
as part of the Development Contract for Jeffers Pond 1 S Addition. No additional dedication is required.
30. STRE T.I HTS' ND OPE.RATIONAL COSTS. The Developer is responsible for the
installation of the street lighting. The Developer shall pay the full capital cost of every light to be installed;
this includes poles, fixtures, underground wiring, and all appurtenant work. The Developer shall pay
operation and maintenance for the streetlights until the City accepts the Developer Installed Improvements,
at which time the billing shall be transferred to the City. The street light plan must be acceptable to the City
Engineer and in accordance with the Public Works Design Manual.
31. LANDSCAPING (s�inple-Familv Residential). In accordance with the City Subdivision
Ordinance, each residential lot in the Plat must have at least two (2) front yard trees (at least four (4) trees on
corner lots). The Developer or lot purchaser shall plant the two (2) front yard trees (four (4) trees for corner
lots) on every lot in the Plat that does not already meet this requirement prior to receiving final certificate of
occupancy as part of the building permit. The Developer or lot purchaser shall sod the front yard, boulevard,
and side yards to the rear of every structure on every lot prior to the issuance of the final certificate of
occupancy. If this section is to be satisfied by existing trees, a tree protection security ("escrowed funds")
may also be required. If the required landscaping is not installed, the City is granted a license to enter upon
a lot and install the landscaping using the escrowed funds deposited by the builder at the time the building
permit was issued. Upon satisfactory completion of the landscaping, the escrowed funds less any draw made
by the City shall be returned to the person who deposited the funds with the City.
Page 12
6/24/13
32. TRF.E. PRF..4E.RVATION AND RF.P .,41'F.M .NT. Subject to approved Plan B, the tree
removal on this site does not exceed the allowable removal. Therefore, no tree replacement is required.
33. .4 - R7TY, To guarantee compliance with the terms of this Development Contract, payment
of the costs of all Developer Installed Improvements, and construction of all Developer Installed
Improvements, the Developer shall furnish the City with an Irrevocable Letter of Credit or a cash deposit in
an amount equal to 125% of the estimated Developer Improvement Costs. The Irrevocable Letter of Credit
("Security") shall be in the form attached hereto as E�ibit B, from a bank for $486,569.00. The amount of
the Security was calculated as follows:
DEVELOPER INSTALLED IMPROVEMENTS COSTS:
Sanitary Sewer $ 74,608.50
Watermain $ 81,493.00
Storm Sewer $ 77,865.20
Streets $ 155,288.12
ESTIMATED DEVELOPER INSTALLED IMPROVEMENTS $ 389,254.82
X 1.25
TOTAL SECURITY AMOUNT $ 486,569.00
This breakdown is for historical reference; it is not a restriction on the use of the Security. The bank
on which the Irrevocable Letter of Credit is drawn shall be subject to the approval of the City. The bank shall
be authorized to do business in the State of Minnesota with a principal branch located within the seven County
Twin City Metropolitan area. The Letter of Credit should extend through the warranty period and shall not
have an expiration date earlier than December 31, 2014. Individual Security instruments may be for shorter
terms provided they are replaced at least forty-five (45) days prior to their expiration. If the required
Developer Installed Improvements are not completed at least thirty (30) days prior to the expiration of the
Page 13
6/24/ 13
Security, the City may draw it down. If the Security is drawn down, the proceeds shall be used to cure the
default.
34. CITYDE.VE.L.OPME.NT FE.�S. The Developer shall also furnish the City with a cash fee
of $110,739.00 for City Development Fees. The amount of the cash fee was calculated as follows:
CITY DEVELOPMENT FEES:
City Administration Fee (4%) (less $10,000 escrow) $ 5,570.00
City Construction Observation (S%) $ 19,463.00
Trunk Storm water Acreage Charge $ 14,715.00
Trunk Water Acreage Charge $ 29,008.00
Trunk Sewer Acreage Charge $ 16,034.00
Street Oversize Acreage Charge $ 25,949.00
Utility Connection Charge $ 0.00
Park and Trail Dedication Fee (if in lieu of land) $ 0.00
TOTAL CITY DEVELOPMENT FEES $ 110,739.00
35. RF.D TION OF 1TY. Upon receipt of proof satisfactory to the City that the
required work has been satisfactorily completed and financial obligations to the City have been satisfied, the
Security may be reduced by seventy-five percent (75%) of the financial obligations that have been satisfied
upon written authorization by the City Engineer. Any requests for reductions in the Security must be made
in writing to the City Engineer and must be accompanied by lien waivers from any contractor or subcontractor
for the Developer. Twenty-five percent (25%) of the Security shall be retained until all Developer Installed
Improvements and other obligations under this Development Contract have been completed, including, but
not limited to, all financial obligations to the City, and the receipt of all required as-built street, utility and
grading plans by the City. Once the City has accepted the project, as-builts have been completed, all punch
Page 14
6/24/ 13
list items are completed and warranty bonds submitted, the Irrevocable Letter of Credit may be reduced to
5%. Upon completion of the warranty period the 5% Irrevocable Letter of Credit may be released. In no
event shall the five percent (5%) Security be released until the Developer provides the City Engineer with a
certificate from the Developer's registered land surveyor stating that all irons have been set following site
grad'mg and utility and street construction.
36. W RRANTY. The Developer warrants all Developer Installed Improvements required to be
constructed by it pursuant to this Development Contract against poor material and faulty workmanship. The
Developer shall post warranty bonds in the amount of twenty-five (25%) of the improvements as security.
The warranty period for streets is one (1) year. The warranty period for underground utilities is two (2) years.
The warranty period on Developer Installed Improvements shall commence on the date the City Engineer
issues written acceptance of the improvement. All punch list items must be completed and "as-built"
drawings received prior to the commencement of the warranty period. The retained Security may be used by
the City to pay for warranty work. The City standard specifications for utilities and street construction identify
the procedures for final acceptance of streets and utilities. These standards are set out in the Public Works
Design Manual.
37. OVE.RSI7.ING. City and Developer agree that the Developer Installed Improvements should
be oversized for the benefit of future development. Oversizing is the construction of a Developer Installed
Improvement to City specifications that exceeds those that would otherwise be required of the Developer.
Oversizing improvements include, but are not limited to, sanitary sewer, water, storm drainage facilities, and
road improvements. If the City Engineer determines that oversizing is required, the City shall reimburse the
Developer for the costs associated with this work and as approved in this contract. City and Developer agree
that the cost of system oversizing to be reimbursed to the Developer is $0.00.
Page 15
6/24/ 13
38. �'I,9Ih1�
A. City Authorized to Commence Interpleader Action. In the event that the City
receives claims from labor, materialmen, or others that work required by this Development Contract has been
performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking
payment from the City, the Developer hereby authorizes the City to commence an Interpleader action
pursuant to the Minnesota Rules of Civil Procedure for the District Courts, to draw upon the Irrevocable
Letter of Credit Security in an amount up to 125% of the claim(s) and deposit the funds in compliance with
the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further
proceedings as it pertains to the Irrevocable letters of credit deposited with the District Court, except that the
Court shall retain jurisdiction to determine attorneys' fees pursuant to this Development Contract.
B. Prompt Payment to Subcontractors Required. The Developer shall pay any
subcontractor within ten (10) days of the Developer's receipt of payment by the City for undisputed services
provided by the subcontractor. If the Developer fails within that time to pay the subcontractor any undisputed
amount for which the Developer has received payment by the City, the Developer shall pay interest to the
subcontractor on the unpaid amount at the rate of 1'/2 percent (1.5%) per month or any part of a month. The
minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. For an unpaid
balance of less than $100, the Developer shall pay the actual interest penalty due to the subcontractor. A
subcontractor who prevails in a civil action to collect interest penalties from the Developer shall be awarded
its costs and disbursement, including attorney's fees incurred in bringing the action, from the Irrevocable
Letter of Credit or other security provided by the Developer to the City. (See Minn. Stat. §471.425, Subd.
4a.)
39. RESPONSIBILITY FOR COSTS
A. The Developer shall reimburse the City for costs incurred in the enforcement of this
Development Contract, including engineering and attorneys' fees.
Page 16
6/24/ I 3
B. Except as provided in Paragraphs 14 and 15 of this Development Contract, the
Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Development
Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may issue a stop work
order until the bills are paid in full.
40. DEVELOPER'S DEFAULT
A. Definition. In the context of this Development Contract, "Event of Default" shall
include, but not be limited to, any one or more of the following events: (1) failure by the Developer to pay,
in a timely manner including but not limited to all real estate property taxes, utility charges, and assessments
with respect to the development property; (2) failure by the Developer to construct the Developer Installed
Improvements pursuant to the terms, conditions and limitations of this Development Contract; (3) failure by
the Developer to observe or perform any covenant, condition, obligation or agreement on its part to be
observed or performed under this Development Contract; (4) transfer of any interest in the Plat without prior
written approval by the City Council (for the purpose of this paragraph, the sale of a lot, except an outlot, to
a builder is not an event of default); (5) failure to correct any warranty deficiencies; (6) failure by the
Developer to reimburse the City for any costs incurred by the City in connection with this Development
Contract; (7) failure by the Developer to renew the Irrevocable Letter of Credit at least forty-five (45) days
prior to its expiration date ;(8) receipt by the City from the Developer's insurer of a notice of pending
termination of insurance; (9) failure to maintain a current insurance certificate on file with the City meeting
City requirements; (10) failure to maintain an Irrevocable Letter of Credit or security in good standing; (11)
a breach of any material provision of this Development Contract. With respect to this paragraph, "material
provision" shall be construed broadly to offer the City the fullest protection and recourse possible.
B. Event of Default - Remedies. Whenever an Event of Default occurs, the City, after
providing the Developer with ten (10) days written notice in accordance with the terms of Paragraph 41 of
this Development Contract, may take any one or more of the following actions:
Page 17
6/24/13
1. The City may suspend its performance under this Development Contract.
2. The City may cancel or suspend this Development Contract.
3. The City may draw upon or bring action upon any or all of the Securities
provided to the City pursuant to any of the terms of this Development Contract.
4. The City may take whatever action, including legal or administrative action,
which may be necessary or desirable to the City to collect any payments due under this Development Contract
or to enforce performance and/or observance of any obligation, agreement or covenant of development under
this Development Contract.
5. The City may suspend issuance of building permits and/or certificates of
occupancy on any of the lots, including those lots sold to third parties.
6. The City may draw upon the Irrevocable Letter of Credit if the City receives
notice that the bank elects not to renew the Irrevocable Letter of Credit.
7. The City may, at its option, install or complete the Developer Installed
Improvements using the Irrevocable Letter of Credit to pay for the related costs.
8. Suspend the release of any escrowed dollars.
9. Use of escrow dollars or other security to satisfy any outstanding financial
obligations to the City including, but not limited to, all real estate property t�es, utility charges, and
assessments with respect to the development property;
10. Any fees incurred by the City associated with enforcing any of the provisions
set out in sections 1-9 above shall be the sole responsibility of the Developer.
C. Election of Remedies. None of the actions set forth in this Section are exclusive or
otherwise limit the City in any manner.
4L NOTICE.S Whenever any paragraph in this Development Contract, with the exception of
paragraphs 14 and 15, requires Notice to be provided to the Developer, the notice shall include the following:
Page 18
6/24/13
(1) the nature of the breach of the term or condition that requires compliance by the Developer, or the Event
of Default that has occurred; (2) what the Developer must do to cure the breach or remedy the Event of
Default; and (3) the time the developer has to cure the breach or remedy the Event of Default.
Required Notices to the Developer shall be in writing, and shall be either hand delivered to the
Developer, its employees or agents, or mailed to the Developer by certified mail at the following address:
2605 Fernbrook Lane, Suite B-1, Plymouth, MN 55447. Notices to the City shall be in writing and shall be
either hand delivered to the City Manager, or mailed to the City by certified mail in care of the City Manager
at the following address: City of Prior Lake, 4646 Dakota Street SE, Prior Lake, Minnesota 55372.
Concurrent with providing Notice to the City, Notice(s) shall be served upon the City Attorney, Suesan Lea
Pace, Esq. at Nilan, Johnson & Lewis, 400 One Financial Plaza, 120 South Sixth Street, Minneapolis,
Minnesota, 55402-1808.
42. INDEMNIFICATION. Developer shall indemnify, defend, and hold the City, its Council,
agents, employees, attorneys and representatives harmless against and in respect of any and all claims,
demands, actions, suits, proceedings, liens, losses, costs, expenses, obligations, liabilities, damages,
recoveries, and deficiencies, including interest, penalties, and attorneys' fees, that the City incurs or suffers,
which arise out of, result from or relate to this Development Contract. The responsibility to indemnify and
hold the City harmless from claims arising out of or resulting from the actions or inactions of the City, its
Council, agents, employees, attorneys and representatives does not extend to any willful or intentional
misconduct on the part of any of these individuals.
43. ND THIIZD PARTYRF.COURSE.. The City and Developer agree that third parties shall have
no recourse against the City under this Development Contract. The Developer agrees that any party allegedly
injured or aggrieved as a result of the City's approval of the Plat shall seek recourse against the Developer or
the Developer's agents. In all such matters, including court actions, the Developer agrees that the
indemnification and hold harmless provisions set out in Paragraph 42 shall apply to said actions.
Page 19
6/24/ 13
44. IN ,4N . RF.� IRF.M .NT . Developer, at its sole cost and expense, shall take out
and maintain or cause to be taken out and maintained, until the expiration of the warranty period(s) on the
Developer Installed Improvements, public liability and property damage insurance covering personal injury,
including death, and claims for property damage which may arise out of Developer's work or the wark of its
subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death
shall be not less than $1,000,000 for one person and $2,000,000 for each occurrence; limits for property
damage shall be not less than $500,000 for each occurrence; or a combination single limit policy of
$1,000,000 or more. The City sha11 be named as an additional insured on the policy, and the Developer shall
file with the City a certificate evidencing coverage prior to the City signing the Plat. The certificate shall
provide that the City must be given thirty (30) days advance written notice of the cancellation of the insurance.
The Certificate shall be in the form attached hereto as E�ibit C. All insurance certificates shall have
expiration dates falling on June 30�` or December 31 S of each year. Each insurance certificate shall have the
project name and City project number clearly shown.
45. RECO IN D. ..OPM NT ONT A T This Development Contract shall run with
the land. The Developer, at its sole cost and expense, shall record this Development Contract against the title
to the property within sixty (60) days of the City Council's approval of the Development Contract. The
Developer shall provide the City with a recorded copy of the Development Contract. The Developer
covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the property
being final platted and/or has obtained consents to this Development Contract, in the form attached hereto,
from all parties who have an interest in the property; that there are no unrecorded interests in the property
being final platted; and that the Developer indemnifies and holds the City harmless for any breach of the
foregoing covenants.
46. SPE.CIAL. PROVI ION4. 'The following special provisions sha11 apply to Plat development:
A. Compliance with all of the conditions listed in the Resolution approving the final Plat.
Page 20
6/24/13
B. The Developer is required to submit the final Plat in electronic format. The electronic
format shall be compatible with the City's current software. In addition, upon completion of the project the
Developer shall provide the City with as-built utility plans in electronic format compatible with the City's
current software and with layers, colors, and line-types formatted in accordance with City standards.
Additionally, three (3) full size (22 X 34 inch) paper copies and one (1) reduced (11 X 17 inch) copy shall be
certified and submitted to the City.
C. The Developer hereby waives any claim against the City for removal of signs placed
in the right-of-way in violation of the City Zoning Ordinance and State Statutes. The City shall not be
responsible for any damage to, or loss of, signs removed pursuant to this provision.
47. MI . . .AN .O .
A. Compliance With Other Laws. The Developer represents to the City that the Plat
complies with all county, metropolitan, state, and federal laws and regulations, including but not limited to:
subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the Plat
does not comply, the City may, at its option, refuse to allow construction or development work in the Plat
until the Developer does comply. Upon the City's demand, the Developer shall cease work until there is
compliance.
B. Severability. If any portion, section, subsection, sentence, clause, paragraph, or
phrase of this Development Contract is for any reason held invalid, such decision shall not affect the validity
of the remaining portion of this Development Contract.
C. Amendments. There shall be no amendments to this Development Contract unless in
writing, signed by the parties and approved by resolution of the City Council. The City's failure to promptly
take legal action to enforce this Development Contract shall not be a waiver or release.
Page 21
6/24/13
D. Assignment. The Developer may not assign this Development Contract without the
prior written approval of the City Council. 'The Developer's obligation hereunder shall continue in full force
and effect even if the Developer sells one or more lots, the entire Plat, or any part of it.
E. Interpretation. This Development Contract shall be interpreted in accordance with
and governed by the laws of the State of Minnesota. The words herein and hereof and words of similar
import, without reference to any particular section or subdivision, refer to this Development Contract as a
whole rather than to any particular section or subdivision hereof. Titles in this Development Contract are
inserted for convenience of reference only and sha11 be disregarded in constructing or interpreting any of its
provisions.
F. Jurisdiction. This Development Contract shall be governed by the laws of the State
of Minnesota.
6/24/13 Page 22
CITY OF PRIOR LAKE
By:
(SEAL) Ken Hedberg, Mayor
B
Frank Boyles, City Manager
DEVELOPER:
By:
Its:
B
Its:
STATE OF MINNESOTA )
( ss.
COUNTY OF SCOTT)
The foregoing instrument was acknowledged before me this day of , 2011, by
Ken Hedberg, Mayor, and by Frank Boyles, City Manager, of the City of Prior Lake, a Minnesota municipal
corporation, on behalf of the corporation and pursuant to the authority granted by its City Council.
NOTARY PUBLIC
STATE OF MINNESOTA )
( ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of , 20_,
by
NOTARY PUBLIC
DRAFTED BY:
City of Prior Lake
4646 Dakota Street SE
Prior Lake, Minnesota 55372
Page 23
6/24/13
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
, fee owners of all or part of the
subject property, the development of which is governed by the foregoing Development Contract, affirm and
consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that
portion of the subject property owned by them.
Dated this day of , 20
STATE OF MINNESOTA )
( ss.
COUNTY OF )
The foregoing instnament was acknowledged before me this day of , 20 ,
by
NOTARY PUBLIC
DRAFTED BY:
City of Prior Lake
4646 Dakota Street SE
Prior Lake, Minnesota 55372
Page 24
6/24/13
MORTGAGEE CONSENT
TO
DEVELOPMENT CONTRACT
, which holds a ortgage on the
subject property, t development of which is governed by the foregoing Development C tract, agrees that
the Development C tract shall remain in full force and effect even if it forecloses on i mortgage.
Dated this ay of , 20
STATE OF MINNESOTA )
( ss.
COUNTY OF )
The foregoing instrument was acknowled efore me this day of ,
20 , by
NOTARY PUBLIC
DRAFTED BY:
City of Priar Lake
4646 Dakota Street SE
Prior Lake, Minnesota 55372
6/24/13 Page 25
CONTRACT PURCHASER CONSENT
TO
DEVELOPMENT CONTRACT
, ch/who has a
contract purchaser's terest in all or part of the subject property, the development of w ch is governed by
the foregoing Develop ent Contract, hereby affirms and consents to the provisions th eof and agrees to be
bound by the provisions the same may apply to that portion of the subject pro in which there is a
contract purchaser's interes
Dated this day o , 20
STATE OF MINNESOTA )
( ss.
COUNTY OF )
The foregoing instrument was acknowl ged be e me this day of ,
20 , by
NOTARY PUBLIC
DRAFTED BY:
City of Prior Lake
4646 Dakota Street SE
Prior Lake, Minnesota 55
6/24/13 Page 26
. . '1 .
EXHIBITA
YC���� 3 ���� �� g �� P f �
� -# a
k! t ' s � � $ 9�� � �� �� i � ��
��� sa � � J � gg 4 ��
� � x O ��.G i' �
�� �� � � £E #�3
�3 ; j a� � g e �
�`�"� �� � �� �� � ��
���'� s� �1`s 4 ��
. ����g � _ ��� �
fs�s � ;� ; �y 3 ��
;! a • §
s i � # � � � : � : � 6 3 � g g 4 �
_� t �•
;� i � �� �� l �� o ��
�} ' � $O � �� 5 tO
�� �s��: � �' $ 's� i �c
�g ��� F g g � 4 � L
s ����� � � _ �' � {� �
s
� � Y � �l
� ���s� ��° � 3� � _ �''
� � , ; �
_� � : � • i
s, � g � e (n
� $ - F7
O
Z
- O
�
fT1
<
�
Z
�
2
(� � � � � ( � � ��$ �° �� �� �
I g� r •. R v� f- Q
1 �' Z I $ x � � s � � � � '�
^•5 � � 23 A � � � o �
�;� R�� �� �Fa � ,
�,
�� �
� p$� �
3 g � � a � ��
� ¢ Y �� ��
� g � � � �
� � 6 � � .Q� �g � S � �� •
� � � � � �, :
£ �
W
s � � � �� .
'� �. � t � a �
� �z � � � �xg ; i
� � � � �� l
� � g � �� �
p � � � � � t
W � � S � 8
�E
� � � ; ��
��
��
�
� � �,
R
� ��
�
,� � �
A �
, �� ,
, �� �,
, �., �;' i @
� ��� ��
� L.r •i �°�
� �, ; �'� � �'ya��,���g' �3
` � ,/� 9°!�� '��i reaw'�a•e ne.as
� // / �, ,` ,� a � i�y - ��
r --- --,--------, � g
� • �� � Y� J �3� r�
v � � i � { EL�iR+^_rS_-1'=-rC H
;�� , ~� ( ' �I � �� f___��_�_ i �� �.\
9 I � t�f i• i
�$ ���___."_'I .. �{'� o Yf N I A
�� � �� . 1 �1 �� � IC i.Si� ���5 ��
� y � {�.e'.s'�,� _ '�• . t -- -� � i�`�� N
\
�i � w 1
_ D ' =<S 4 `� ;
a � `C�fj"� g � ' � �i��
�
�b` ,� :�� a4'�% �� .
•� '�e � ' � `�'� `'�.
����� i � ���� �f
s � �� `6� �y '� � \ 6 �i
�A3�� i �$ _ �q��„\ `y �' � u' � �
i�o� � i � � �. O
"s� � 's� � .. '$� �''�'J, .�'
���� i _ '�- �� ° � � \�, o `v a � O Y � a° � �,� L
�� -�- . �: ar, ,�
��9� Lq � � I � L\ 6+•$, " `` � ' '� ,5 � �
� � q �� � �� _ ,� , � 4 � ��' �
�" i y? � \o�°� fTl
� �``� � �� ��e (n
n
t� � � �� !� �
�� . °j t e Q
33 � `� � �u4�j Z
� �
� � Jj + B � Ll °B �
= � %R ��� � '� �1� "
A = t 4 ��RR � n� i_�Sti�+C__5+_° --•�-- 13 m
������ � � �----------� .� j., �� �
7���R �`�,� � � �! N '� ! $ Z
5 A i � � HldSY31'E UAt7
P� Y$ �'� � � ier�»±'t....47L� � -- " - uaTi -�- i "�
Y�� � ti � r-,an -------- � c� a� Ki .� iS � _
S4R��. �S� � W �� '_ �� �� � D
���� �, n� A�:: ; � � �x�'� __rtr_J s
> ,. ,
eR���C '"� o� L-Y±+7ti ---�`-'�--' I r --- ` l� 0
______.._
� � a �; �r------------- �y � �� < � fl
< . � �
^�� �� �... . ' s� � N ih �
� r �`•�`$:+� ` y o� l _ . `�='�"_' f �' O
� �' � . f�s M � gf---____ _�"- �, Z
%, ``�`. Y ii 4 � 4 ~� u
� ( pi ♦ .v qi' � � I
� �Q � -S ; � C) �; Y �� ��y� W � a �
�� J �A O b � �� . i� ` a 0 %fd� 8r.� z� �� �o
� !_ �' \ i 'b �f \\\ '�r ��4 / R
6S.S9 �g4 � � �.� � '� � � � . �� ��J � �
\dSV73y'� .1 �� i t' . \ •
L y�'+ '�._"��_� 6 503 07 p� e ��y i /. b i �^���� i�O
S � � '� �2'sa'Jg•f � ,1LSk6L^V � o /�✓ � Z 3 `�� ���� � i
a -� �. . . .
s,,�, � ; � j ,p ?% #�� �•�; �� �� , � � g� � �`.�. � � ; iy
, �� �� �y �. „ ,, ; � � .,
f �• fi �- y �� � � � �� ` ` � 't/M,
� � 'rY'.' � t ' g \ N � " \ i ` `� ` `\ � ` `S '� `�� ��
`i`` ct''' '' S� ' �` d� j 1 ' `\ � i ; V `, ` \4 . i� '� 'I a�,i,Y�+Y"r V
� �` �` � �l,� �'� � �� � � oo � �� .� � � � � ° qr •tt , `
'� .` t� ,� 'aj, � ;'� y • � ; :, � ;, ; :,(; n 'a°.1
� � + +��' > E � � � � � � �� �.'n tJ��
�� .$ � � �� i ` � \ ` � �
,,5 �� i � 4' �` � p � ` ` g � i �,' o�` fpY`
� � � ¢
Q�� �� � �f O f.� � - • � , `y ! ��'
� � ~ti�� 'e
7 � i� d ��j" a
� / ♦
'�d ;' ` ' ''"� c' � Qyc J.°s
� � "y�--- ,� v
� '9b �� ``�, :
�.�
� � ks+ ri y.� �
a auv ��
� � �� .
¢ i a
� 1�
EXHIBIT "B"
SAMPLE IRREVOCABLE LETTER OF CREDIT
No.
Date:
TO: City of Prior Lake
4646 Dakota Street SE
Prior Lake, Minnesota 55372
Dear Sir or Madam:
We hereby issue, far the account of (Name of Developerl and in your favor, our Irrevocable Letter
of Credit in the amount of $ , available to you by your draft drawn on sight on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. , dated , 20_, of
(Name ofBank�"•
�
b) Be signed by the Mayor or City Manager of the City of Prior Lake.
c) Be presented for payment at (Address of Bank�, on or before 4:00 p.m. on December 31, 20_
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-five (45)
days prior to the next annual renewal date (which shall be December 31 of each year), the Bank delivers written notice
to the Prior Lake City Manager that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is
effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to
the next annual renewal date addressed as follows: Prior Lake City Manager, Prior Lake City Hall, 4646 Dakota Street
SE, Prior Lake, Minnesota 55372-1714, and is physically received by the City Manager at least forty-five (45) days
prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended,
amplified, or limited by reference to any document, instrument, ar agreement, whether or not referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be
made under this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for
Documentary Credits, International Chamber of Commerce Publication No. 600.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored
upon presentation.
BY:
Its
Page 29
6/24/13
EXHIBIT "C"
SAMPLE CERTIFICATE OF INSURANCE
PROJECT:
CERTIFICATE HOLDER: City of Prior Lake
4646 Dakota Street SE
Prior Lake, Minnesota 55372
INSURED:
ADDITIONAL INSURED: City of Prior Lake
AGENT:
WORKERS' COMPENSATION:
Policy No.
Effective Date: Expiration Date:
Insurance Company:
COVERAGE - Workers' Compensation, Statutory.
GENERAL LIABILITY:
Policy No.
Effective Date: Expiration Date:
Insurance Company:
( ) Claims Made ( ) Occurrence
LINIITS: [Minimum]
Bodily Injury and Death:
$1,000,000 for one person $2,000,000 for each occurrence
Property Damage:
$500,000 for each occurrence
-OR-
Combination Single Limit Policy $1,000,000 or more
COVERAGE PROVIDED•
Operations of Contractor: YES
Page 30
6/24/13
Operations of Sub-Contractor (Contingent): �
Does Personal Injury Include Claims Related to Employment? �
Completed Operations/Products: YES
Contractual Liability (Broad Form): �
Governmental Immunity is Waived: YES
Property Damage Liability Includes:
Damage Due to Blasting YES
Damage Due to Collapse YES
Damage Due to Underground Facilities YE
Broad Form Property Damage YES
AUTOMOBILE LIABILITY:
Policy No.
Effective Date: Expiration Date:
Insurance Company:
(X) Any Auto
LIlVIITS: [Minimum]
Bodily Injury:
$1,000,000 each person $2,000,000 each occurrence
Property Damage:
$500,000 each occurrence
-OR-
Combined Single Limit Policy: $1,000,000 each occurrence
ARE ANY DEDUCTIBLES APPLICABLE TO BODILY INJURY OR PROPERTY DAMAGE ON ANY OF
THE ABOVE COVERAGES:
If so, list: Amount: $
[Not to exceed $1,000.00]
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELED BEFORE THE EXPIItATION
DATE THEREOF, THE ISSUING COMPANY WILL MAIL THIRTY (30) DAYS WRITTEN NOTICE TO
THE PARTIES TO WHOM THIS CERTIFICATE IS ISSUED.
Dated at On
BY:
Authorized Insurance Representative
6/24/13 Page 31
�xhir�i i u
, ..
COST ESTIMATE ZQ13
PROJEGT NAME: leffers Pass 7th
ENGINEER: Pioneer
Bid Date & Time
DESCRIPTION OF WORK QUANTITY UNIT ADJ, PRICE EXTENSION
1 Section A- Sanitarv Sewer
2 8" PVC SDR 35, 10'-12' Depth 50.00 LF $38.50 $1,925.00
3 8" PVG SDR 35, 12'-14' Depth 70A0 LF $38.50 $2,695.00
4 8" PVG SDR 35, 14'-16' Depth 15.00 LF $38.50 $577.50
5 8" PVC SDR 35, 14'-16' Depth 364.00 LF $38.50 $14,014.00
6 8" PVC SDR 35, 16'-18' Depth 293.00 LF $38.50 $11,280.50
7 8" PVC SDR 35, 18-20' Depth 173.00 LF $38.50 $6,660.50
8 4" PVC SDR 26 Riser Pipe 75.00 LF $19.30 $1,447.50
9 4" PUG SDR 26 Service Pipe 871.00 LF $13.50 $11,758.50
10 8"x4" PVC Servlce WYE 20.00 EA $125.00 $2,500.00
li Sanitary Sewer Manhole (0'-10' Depth) 7.00 EA $2,240.00 $15,680.00
12 Sanitary Sewer Manhole Extra Depth 43.70 VF $100.00 $4,370.00
13 Test Sanitary Sewer 1.00 LS $250.00 $250.00
14 Televise Sanitary Sewer 1.00 LS $1,450.00 $1 450.00
15 SUBTOTAL $74 608.50
16
17 Section B - Watermain
18 6" D.I.P. CIasS 52 40.00 LF $32.00 $1,280.00
19 8" D.I.P. Class 52 1,200.00 LF $32.80 '$39,360.00
20 Fire Hydrant w/6" Gate Valve 3.00 EA $3,980.00 $11,940.00
21 D.I.P. Fittings 600.00 LB $8.85 $5,310.00
22 1" Corporation Stop 23.00 EA $93.00 $2,139.00
23 1" Curb Stop & Box 23.00 EA $175.00 $4,025.00
24 1" Copper (Type-K) Service Pipe 761.Q0 LF $19.00 $14,459.00
25 8" Gate Valve & Box 1.00 EA $1,530.00 $1,530.00
26 Insulate Storm Crossinq 1,00 EA $250.00 $250.00
27 Connect to Exisitn9 �Natermain 1.00 EA $760.00 $700.00
28 Watermain Test 1.00 LS $500.00 $500.00
29 SUBTOTAL $81493.00
30
31 Section C- Storm Sewer
32 12" RCP Class 5 38.U0 LF $22.90 $870.20
33 15" RGP Class 5 60.00 LF $24.00 $1,440.00
34 18" RCP Class 5 765.00 LF $26.40 $20,196A0
35 21" RCP Class 4 225.00 LF $28.00 $6,300.00
36 24" RCP Class 3 $2.00 LF $34.00 $2,788.00
37 30" RCP Class 3 29.40 LF $44.00 $1,275.00
38 12" RCP FES 2.00 EA $680.00 $1,360.40
39 30" RCP FES 1.00 EA $1,200.U0 $1,200.00
40 24" x 36" Catch Basin 3.00 EA $1,765.00 $5,295.00
41 48" Catch Basin Manhole (0'-10' Depth) 8.00 EA $2,220.00 $17,760.00
42 48" STMH ( 0-10 ) 4.00 EA $2,070.00 $8,280A0
43 60" Catch Basin Manhole (0'-10' Depth) 1.00 EA $2,950.00 $2,950.00
44 60" STMH ( 0-SO ) 1.00 EA $2,800.00 $2,800.00
45 Storm Sewer Manhole Extra Depth 7.60 VF $150.00 $1,140.00
46 4" PVG Perforated Draintile (Streets) 280.00 LF $6.00 $1,680.00
47 Catchbasin Inlet Protection & Maintained (Street) 12.00 EA $100.00 $1,200.00
48 RiP RaP CI. 3< 19.00 CY . $70.00 $1,330.00
Page 1 of 2
txhir�ii u
DESCRIPTION OP WORK QUANTITY UNIT ADl. PRICE EXTENSION
49 SUBTOTAL $77,865.20
50
51 Section D - Streets
52 Mobilization 1.00 LS $5,600.00 $5,600.00
53 Subqrade Prepearation 5,284.00 SY $0.50 $2,642.00
54 24" Granular Borrow (MnDOT 3149) 5,024.00 SY $2.00 $10,048.00
55 9" Class 5 100% Crushed (MnDOT 3138) 4,701.00 SY $7.74 $36,385.74
56 2" Bituminous Base fMnDOTType 316) 4,034.00 SY $7.04 $28,399.36
57 Tack Coat (MnDOT 2357� 225.00 GL $3.10 $697.50
58 1,5" Bituminous Wear (MnDOT Type 41B) 4,034.00 SY $6.33 $25,535.22
59 Surmountable Curb ` 2,228.00 LF $9.50 $21,166.00
60 6618 Curb and Gutter 100.00 LF $14.00 $1,400.00
61 Adjust Gate Valve Box 1.00 EA $250.00 $250.00
62 Adjust Catch Basin Casting ( Inc, infishields ) 10.00 EA $0.01 $0.10
63 Adjust Manhole Castinq 13.00 EA $350.00 $4,550.00
64 Backflll Curb & Gutter and Grade Boulevard 1.00 LS $560.00 $560.00
65 8' Trai) W/ CI. 5 389.00 LF $27.80 $iQ,814.20
66 3' Sod Back of Curb 776.00 SY $4.50 $3,492.00
67 Concrete Pedestrian Ramp 2.00 EA $1,125.00 $2,250A0
67 3-4" PVG Conduits 4.00 EA $350.00 $1,400.00
6$ Sawcut Bitumfnous 28.00 LF $3.50 $98.00
69 SUBTOTAL $155,288.12
70
�� RECAP
72 Tota/SanitarySewerCont�actAmount $74,608.50
73
74 Tota/ Watermain ContractAmount $81,493,00
75
76 Total Storm Sewer ContractAmount $77,865,20
77
78 Tota/ Street Contract Amoutrt $155,Z88.12
79
80
81 TOTAL CONTRACTAMOUNT $389,Z54,82
82
83
84
85
86
87
88 **********Standard ualifications***************
89
40 This is a lega! binding document.
91 This document sha!l be a part of any contractual agreements and its gualiFcations shall take precedent over
92 any and al/ projectspecitications, special provisions, plans or contractual agreements
93 Performance Bond & Cost Is nat included
94 Tra�c Contro/ is included
95 Temporary fencing fs nof lncluded
96 Erosion Control Devices, Seeding,/SWWPPP is not fnduded
97 Ex,vort of excess sails is not Included
98 Surveying Js not included
99 So/l Tesing Is not included
100 Tree c%aring fs not included
101 Wet/and/Corp/ Watershed permits notlnduded
102
103
104
105 Respectfu submilted,
106 NORT WFSTASPHALT, ,
107
108
109
110 9/18/1Di3
111 Ty er E g Date
Page 2 of 2
EXHIBIT "E"
TO
DEVELOPMENT CONTRACT
CONDITIONS OF PLAT APPROVAL
a. All utilities and roads shall be constructed in conformance with the Public Works Design Manual.
b. Prior to release of the signed final plat mylars, the developer shall pay all fees detailed in the
Development Contract.
c. The Developer shall be responsible for submitting reductions of the Jeffers Pond 7` Addition
Final Plat to the following scales: 1" = 200'; and one reduction at no scale which fits onto an 8
1/2" x 11" sheet of paper.
d. Four mylar sets of the final plat with all required signatures must be submitted.
e. The final plat and all pertinent documents must be filed with Scott County within 60 days from the
date of final plat approval. Failure to record the documents by August 24, 2013, will render the
final plat and Development Contract null and void.
Page 34
6/24/13