CITY COUNCIL AGENDA REPORT
DATE:
AGENDA #:
PREPARED BY:
MAY 18,1998
10B
GREG ILKKA, DIRECTOR OF PUBLIC WORKS/CITY
ENGINEER
CONSIDER APPROVAL OF: 1) RESOLUTION 98-XX
ADOPTING AN INTERIM STORM WATER TRUNK FEE
AND REVISING THE ASSESSMENT POLICY AND THE
PUBLIC WORKS DESIGN MANUAL TO ELIMINATE
POND EXCAVATION AND POND LANDSCAPING AS
STORM WATER DRAINAGE IMPROVEMENT COSTS
ELIGIBLE FOR REIMBURSEMENT FROM THE TRUNK
RESERVE FUND; AND 2) RESOLUTION 98-XX
AUTHORIZING WSB & ASSOCIATES, INC. TO PREPARE
A STORM WATER TRUNK FEE JUSTIFICATION
REPORT.
AGENDA ITEM:
DISCUSSION:
HISTORY
Recent events have caused City staff to review the storm
water policy and methods for reimbursing developers for the
installation of storm water improvements. These
reimbursements are applicable to developments in the City
which presently pay storm water fees based on an area
charge.
As part of the subdivision (land development) process the
City presently collects a storm water fee of 16.8 cents per
square foot for R-1, R-2, and R-4 developments; 19.5 cents
per square foot for R-3 developments; and 20.3 cents for B-
1, B-2, B-3, 1-1 and 1-2 developments. Proceeds from these
fees are deposited in the City's Trunk Reserve Fund. The
theory of this fee is that everyone, those at the top of the hill
and those at the bottom, are responsible for paying for storm
water conveyance and storage. The costs for storm water
facilities for the property are paid from this money. For
properties at the bottom of the hill, the cost of storm water
facilities often exceed their contribution. While the costs of
storm water facilities at the top of the hill will be less than the
162a&<E"8~eek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
T r" .,..-.-
contribution that property made. In this way all properties .
assume responsiblity for storm water management.
Storm water facilities are generally installed by the developer
as part of the plat infrastructure. City policy provides for the
reimbursement of developer installed storm sewer
improvements from the Trunk reserve Fund. The City's
Assessment Policy currently allows for the reimbursement of
storm sewer and pond excavation as eligible expenses for
storm water improvements. The City's Public Works Design
Manual currently allows pond landscaping as an an eligible
expense for storm water improvements. If a Storm Water
Trunk Fee is adopted these documents will be revised to
reflect the change.
CURRENT CIRCUMSTANCES
In an effort to address concerns about the method currently'
used to develop storm water improvements in the City, and
to provide justification for the fees that are collected, staff
has developed a proposal to adopt a Storm Water Trunk
Fee. Under a trunk fee policy, the City will collect a trunk
acreage fee. We anticipate this fee will be at a lesser rate
than the current square footage fee, but will only pay for
trunk facilities. Trunk facilities would include City required
oversizing of pipes or ponds. In this manner the policy
parallels that which is currently applied to the water and
sanitary sewer systems.
ISSUES
As Council is aware, the City is in the process of evaluating
the fees the City currently charges for development. As one
part of this effort we have requested proposals from WSB &
Associates, Inc., and Howard R. Green Company, both
consulting engineering firms, to prepare a Storm Water
Trunk Fee Justification Report for the City. The proposals
were $18,560.00 and $20,000.00 respectively.
The impetus for this change was to eliminate reimbursing
developers for the entire cost of their storm water
improvements. Staff proposes that the City adopt the Storm
Water Trunk Fee effective immediately in an interim amount
of $3,180 per acre, subject to revision based upon receipt of
the Justification Report, and annually thereafter. The $3,180
TRKSTORM.DOC
FINANCIAL IMPACT:
ALTERNATIVES:
TRKSTORM.DOC
per acre is similar to Shakopee's Storm Water Trunk Fee,
the basis for which was a Justification Report. While we
anticipate a Fee Justification Report will determine the
appropriate fee to be similar to this amount, it will most
certainly be something different. Therefore, it is further
recommended that during this interim period all
Development Contracts entered into by the City include a
provision to provide for a reconciliation of the Storm Water
Trunk Fee based upon the final fee adopted upon receipt of
the Justification Report. In this way neither the City (if the
interim fee is to low) nor the developers (if the interim fee is
too high) are harmed by using the interim fee.
CONCLUSION
The Development Review Committee (DRC) has reviewed
this issue and unanimously recommends adoption of the.
Storm Water Trunk Fee and these revisions to the
Assessment Policy and the Public Works Design Manual.
Adoption of a Trunk Storm Water Fee will reduce the
revenue into the Trunk Reserve Fund, however, it should be
offset by reductions in expenditures from the Trunk Reserve
Fund as the City will only be paying for trunk facilities. Upon
completion of the Fee Justification Report and adoption of
the recommended fee the revenues should cover the
expenses incurred over the time it takes to fully develop the
system.
Funding for the proposed study would be from the Trunk
Reserve Fund which had a balance of $1,885,565.23 as of
May 1, 1998.
The alternatives are as follows:
1. Approve Resolution 98-XX adopting an interim Storm
Water Trunk Fee and revising the Assessment Policy and
the Public Works Design Manual to eliminate pond
excavation and pond landscaping as storm water
improvement costs eligible for reimbursement from the
Trunk Reserve Fund; and 2) Resolution 98-XX authorizing
WSB & Associates, Inc. to prepare a Storm Water Trunk Fee
Justification Report.
2. Table this Agenda item for a specific reason.
....---..-. T
I
RECOMMENDED
MOTION:
REVIEWED BY:
TRKSTORM.DOC
3. Deny this Agenda item for a specific reason.
1) Motion and second to adopt Resolution 98-XX adopting
an interim Storm Water Trunk Fee and revising the
Assessment Policy and the Public Works Design Manual to
eliminate pond excavation and pond landscaping as storm
water improvement costs eligible for reimbursement from the
Trunk Reserve Fund.
2) Motion and second to adopt Resolution 98-XX authorizing
WSB & Associates, Inc. to prepare a Storm Water Trunk Fee
Justification Report for a fee not to exceed $18,560.00 to be
paid from the Trunk R serve Fund.
RESOLUTION 98-XX
A RESOLUTION ADOPTING AN INTERIM STORM WATER TRUNK FEE AND
REVISING THE ASSESSMENT POLICY AND THE PUBLIC WORKS DESIGN
MANUAL TO ELIMINATE POND EXCAVATION AND POND LANDSCAPING AS
STORM WATER DRAINAGE IMPROVEMENT COSTS ELIGIBLE FOR
REIMBURSEMENT FROM THE TRUNK RESERVE FUND
MOTION BY:
SECOND BY:
WHEREAS, development within the City requires the construction of storm water
improvements, and
WHEREAS, trunk facilities related to the construction of these storm water
improvements are required by the City and have been funded in the past
by the City, and
WHEREAS, a study has been undertaken to confirm the appropriateness of such fee
and
WHEREAS, such study is expected to be completed by November 30,1998, and
WHEREAS, it is the City Council's desire to have a fair and equitable funding
mechanism for these storm water trunk facility improvements.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, a Storm Water Trunk Fee is hereby adopted at an interim rate of $3,180
per acre to be applied to all developments henceforth and to be adjusted based on the
results of a Storm Water Trunk Fee Justification Report, and annually thereafter.
BE IT FURTHER RESOLVED, the appropriate revisions to the Assessment Policy and
the Public Works Design Manual be made and published to eliminate pond excavation
and pond landscaping as storm water drainage improvement costs eligible for
reimbursement from the Trunk Reserve Fund.
Passed and adopted this 18th day of May, 1998.
TRKSTORM.DOC
T .
YES
NO
Mader Mader
Kedrowski Kedrowski
Petersen Petersen
Schenck Schenck
Wuellner Wuellner
{Seal}
Frank Boyles
City Manager
City of Prior Lake
TRKSTORM.DOC
RESOLUTION 98-XX
AUTHORIZING WSB & ASSOCIATES, INC. TO PREPARE A STORM WATER
TRUNK FEE JUSTIFICATION REPORT
MOTION BY:
SECOND BY:
WHEREAS, the City Council of Prior Lake has adopted an interim Storm Water Trunk
Fee to be collected from developers within the City limits, and
WHEREAS, the Storm Water Trunk Fees collected will be used to construct the storm
water trunk facilities required to be built in the course of development of
the City, and
WHEREAS, it is the City Council's desire to have a rational basis on which to justify
established development fees.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, WSB & Associates, Inc., is hereby authorized to prepare a Storm Water
Fee Justification Report for a fee not to exceed $18,560.00.
BE IT FURTHER RESOLVED, funding for this justification report will be from the Trunk
Reserve Fund.
Passed and adopted this 18th day of May, 1998.
YES
NO
Mader
Kedrowski
Peterson
Schenck
Wuellner
Mader
Kedrowski
Peterson
Schenck
Wuellner
{Seal}
Frank Boyles
City Manager
City of Prior Lake