HomeMy WebLinkAbout7B Ord 94-02 City Code
. ............ti.
&
AGENDA #:
PREPARED BY:
SUBJECT:
DATE:
INTRODUCTION:
BACKGROUND:
DISCUSSION:
7 (B)
RALPH TESCHNER FINANCE DIRECTOR
CONSIDER ORDINANCE 94-02 AMENDING PRIOR LAKE CITY
CODE TITLE 9 CHAPTERS 4 & 5
JANUARY 3,1994
There are a number of enterprise fund fees that are established within the
Prior Lake City Code which require an ordinance amendment to change.
Therefore Ordinance 94-02 has been drafted to incorporate increases for
the following charges:
City WAC (connection fee)
City SAC (connection fee)
Water Tower Charge
MWCC SAC (reserve capacity charge)
Sewer Billing Rate
The water tower charge increase is the amount identified for payable year
1994 in the feasibility report approved by the City Council on 5/11/87 for
the construction of the one million gallon water tower on the north side of
the lake. The City connection charges were tentatively approved by the
Council on 9/20/93 during the CIP hearing process.
The increases, as indicated within the proposed ordinance amendment, are
outlined below:
FEE DESCRIPfION CURRENT PROPOSED
Water Connection Fee $350.00 $450.00
Sewer Connection Fee $350.00 $450.00
Water Tower Charge $500.00 $600.00
MWCC SAC $750.00 $800.00
Sewer Billing Rate $2.10 $2.30
The City connection fees have not been increased since 1980 and are
necessary to fund greater costs associated with the anticipated future
expansion of the City's municipal trunk system as well as escalating
expenditures in the area of water and sewage treatment.
The water tower charge is based upon projected annual connections of
from 220 per year in 1994 to 240 thru the year 2007. This revenue stream
provides the underlying financing for the $1,500,000 water revenue bonds
sold to construct the tower.
4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 I Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLDYER
.II 1
.. -'.
The Metropolitan Waste Control Commission is responsible for
establishing the metro areawide SAC charge which basically has been
increased by $50.00 incremental steps each year for the past five years.
This charge is therefore adopted by reference within our City Code.
Finally, the sewer rate adjustment is necessary because of higher treatment
costs attributed to our budgeted MWCC installment of nearly $615,000.
This .20 (cent) increase represents an overall water and sewer billing
increase of 6.3% on an estimated flow of 310 million gallons during 1994.
ALTERNATIVES:
The following alternatives are available to the City Council:
1. Adopt Ordinance 94-02 thereby approving all of the related
fee increases.
2. Change certain fees to reflect specific fee amounts as desired
by the Council.
3. Delay action on the ordinance adoption if additional
information is required by the Council.
RECOMMENDATION: Staff would recommend that the City Council adopt Ordinance 94-02 in its
present form. These charges would then become effective for all building
permits applied for at the beginning of the year while the new sewer rate
would be implemented upon the 2/1194 water bills which represents the
first billing cycle of the year.
ACTION REQUIRED: A motion to approve Ordinance 94-02 Amending Prior Lake City Code
TItle 9, Chapters 4 and 5.
A3.WRT
CITY OF PRIOR LAKE
ORDINANCE NO. 94-0~
1
AN ORDINANCE AMENDING PRIOR LAKE CITY CODE TITLE 9, CHAPTERS 4
AND 5.
The City Council of the City of Prior Lake does hereby ordain:
1.
The first sentence of Section 9-4-4(C) of the Prior Lake City
Code is hereby amended to read as follows:
(C) A cOnnection fee of four hundred fifty dollars ($450.00)
shall be charged per unit connected Subject to an adjustment
as determined by the City Council.
II.
Section 9-4-10(B) of the Prior Lake City Code is hereby amended
to read as follows:
(B) Water Tower Charge:
1. The water tower charge shall be determined on an annual
basis in accordance with a fee schedule effective
January 1 of each year as determined by the City
Council. The following fee schedule is effective
through calendar year 1994:
$150.00 for 1973
150.00 for 1974
150.00 for 1975
150.00 for 1976
150.00 for 1977
150.00 for 1978
150.00 for 1/1/79 - 7/31/79
200.00 for 8/1/79 - 12/31/79
200.00 for 1980
200.00 for 1981
200.00 for 1982
$250.00 for 1983
250.00 for 1984
250.00 for 1985
250.00 for 1986
250.00 for 1987
350.00 for 1988
350.00 for 1989
400.00.for 1990
400.00 for 1991
500.00 for 1992
500.00 for 1993
600.00 for 1994
Said fees shall be placed in a fund maintained by the
City to accumulate funds for the construction of future
water storage facilities and needed future wells.
III.
The second paragraph of Section 9-4-10(C) of the Prior Lake City
Code is hereby amended to read as follows:
,.' __'_'''H. _'~"_._._..."...~....^_~"..."_.,,....._.__.._"....~__
a
If water service is terminated by the City for delinquency
in the payment of a water usage bill or for any other
reason, a fee of twenty-five dollars ($25.00) will be made
for turning on said water service, payable in advance. If
said water service is turned on during a time other than
normal business hours, a fee of fifty dollars ($50.00) shall
be charged to cover the City's expense for call-back time.
IV.
The first sentence of Section 9-5-5(B) of the Prior Lake City
Code is hereby amended to read as follows:
(B) A connection fee of four hundred fifty dollars ($450.00)
shall be charged per unit connected subject to an adjustment
as determined by the City Council.
V.
The first sentence of Section 9-5-9(A) of the Prior Lake City
Code is hereby amended to read as follows:
(A) Rates: Effective February 1, 1994, a billing charge of two
dollars thirty cents ($2.30) per one thousand (1,000)
gallons of water consumption.
VI.
Section 9-5-10(B) of the Prior Lake City Code is hereby amended
to read as follows:
(B) Establishment of Charges: For the purpose of paying costs of
reserve capacity allocated to the City each year by the
Metropolitan Sewer Board, there is hereby established a
charge for:
1. The availability of treatment works and interceptors
comprising the metropolitan disposal systemj and
2. Connections, direct and indirect, to the metropolitan
disposal system.
The charge imposed on each building or structure in the
City, and each connection to the metropolitan disposal
system directly or through the City's system, inside
any sewer service area established by the Metropolitan
Sewer Board, construction of which commenced on or
after January 1, 1973. The charge shall be payable upon
the issuance of a building permit or a connection
permit, as the case may be, but no charge shall be due
upon the issuance of a connection permit if a charge
was paid upon issuance of a building permit. The charge
for each building or structure shall be equal to the
"""""""-'--"~'----'''''''-''._''-'--'--__'''_'M___~'__.__~""" ....._....,.,.
1
number of units of sewage volume which it will
discharge, multiplied by the following:
$275.00 for 1973 $425.00 for 1984
300.00 for 1974 475.00 for 1985
325.00 for 1975 475.00 for 1986
350.00 for 1976 525.00 for 1987
375.00 for 1977 525.00 for 1988
400.00 for 1978 575.00 for 1989
425.00 for 1979 600.00 for 1990
425.00 for 1980 650.00 for 1991
425.00 for 1981 700.00 for 1992
425.00 for 1982 750.00 for 1993
425.00 for 1983 800.00 for 1994
A unit of sewage volume shall be one hundred thousand
(100,000) gallons per year and shall be assigned as
follows:
1. Single-family houses, townhouses and duplex units shall
each comprise one unit.
2. Condominiums and apartments shall each comprise eighty
percent (80%) of a unit.
3. Mobile homes shall each comprise eighty percent (80%)
of a unit.
This ordinance shall become effective from and after its passage
and publication.
Passed by the City Council of the City of Prior Lake this ____
day of , 1993.
ATTEST:
City Manager
Mayor
Published in the Prior Lake American on the ____ day of
1993.
Drafted By:
Lommen, Nelson, Cole & Stageberg, P.A.
1800 IDS Center
Minneapolis, Minnesota 55402
. .,...-."...'"....,-.,_.__...~.._~_.M...._____,__....."A.."._........_