HomeMy WebLinkAboutBuilding Permit 11. 1275 (Labor & Industry Info) 1z
443 Lafayette Road N. / 5
MINNESOTA DEPARTMENT
St. Paul, Minnesota 55155 3 ENT OF (651) 284 -5005
www.dli.mn.gov LABOR ���
Aglakk
LH DuS`�" I TTY: (651) 297-4198 I
97 4 98
January 12, 2012 L . ✓11 z /g/ C. pi— i■ u, .
alt Sabre Plumbing Heating and ��" �N
15535 Medina Road g Air Conditioning
Plymouth, MN 55447
Gentlemen/Ladies:
Subject: REQUEST FOR ADDITIONAL INFORMATION regarding plumbing at Chase Buildin 43
Fountain Hills Dr NE, Prior Lake, Scott County, Minnesota, Plan No. PLB 1201 -00007 g' 85
We are NOT able to grant approval at this time of the plans and specifications submitted for the
designated project. The following comment(s) outline the changes and/or additional information that must be
submitted so that we can further evaluate the plans and specifications for compliance with the above- standards of
department: e of this
1. The plumbing plans were reviewed for this project and it has been determined that the submitted fee
payment is incorrect. The plans show six water closets, five lavatories, one kitchen sink, one urinal, and four
2 -inch floor drains. These fixtures provide a total of 54 drainage fixture units, which results in a $350
Plumbing System Review Fee. An accelerated plan review was requested, which doubles the fee to $700.
Since a fee payment of $300 has already been submitted for this project, please provide a $400 check or
money order to account for the balance of the review fee.
2. Provide water riser diagrams for the new plumbing. All new plumbing fixtures, equipment connected to
the
plumbing system, and pipe sizes must be identified on the diagrams. The project submittal included only
waste and vent riser diagrams.
3. Provide a floor plan showing the location of all plumbing fixtures, horizontal waste piping, and all '
sizes in Unit D. The floor plan provided for the Dance Studio was readable, but the floor plan showing other
areas of the building was too small and unreadable. g pipe
4. Provide information on the pipe materials to be used for the plumbing system. Include the type and al'
standard (e.g. ASTM, ANSI, etc.) for the pipe materials.
5. Provide a fixture list which includes the manufacturer and model number of each plumbing fixture. q tty
6. Indicate whether any of the fixtures shown on the waste and vent riser diagram are existing fixtures. It
appears that the Women's Room fixtures may be the only new fixtures in the Dance Studio, but the
plumbing plans show all fixtures and none are indicated as existing fixtures.
Please submit the requested information promptly so we may complete our plan review. No construction related
to the above - referenced plans shall begin until approval is provided by our office. When submitting additional
information, please refer to Plan No. PLB 12 01- 00007. If you have any questions, contact me at 651/284 -580
Sincerely, 3
Scott Sawyer, P.E.
Public Health Engineer
Plumbing Plan Review and Inspections Unit
65 1 /284 -5803
cc: City of Prior Lake Building Official
File
This information can be provided to you in alternative formats (Braille, large print or audio).
An Equal Opportunity Employer
9,7.1 1 CENTER STAGE DANCE Classes Start - 9/6/11
- 2011-2012 DANCE SCHEDULE
Dance Classes Ages Time Mon , . Tue. Wed. Thu. Sat.
Preschool Dance & Tumbling 3-4 45 min. 5:00(13) 6:00 (M) 10:15 (K)
6:45 (J)
13allet/Tap 5 1 lir. 6:15 (N1) 5:45 (13) 9:15 (K)
Ballet / Tap/Jazz 6-7 1 11r. 1571,171tr u.43 13 6:45 (J) 10:00 (NI)
Ballet / Tap / Jazz 8-9 1 % Ilrs. 5:30 (J) 6:30 (M) — 1 - 1 . 70814*
Ballet / Tap / Jazz 10-11 1 Y. Hrs. 4:30 (M) 7:45 (J)
Lyrical/rap/1w 12 & up 1 % Hrs. 6:30 (M)
Kickline 8-12 45 min. —1171.5-04)
Kickline 12 & up 45 min. 7:15 (M)
BOYS Hip Hop & Tap Age 6 & up 1 lir. 11:00 (M)
Hip Hop 8-11 45 min. 4:30 (M) 3:•4 01)
Teen Hip Hop 12-18 45 min. 7:45 (M)
Classical Ballet Level 1 1 11r. 4:15 (F)
Classical Ballet Level 2 1 11r. 4:15 (F)
Classical Ballet Level 3 1 Hr. 6:30 (F)
Classical Ballet Level 5 .. 1 lir. 5:15 (F)
Classical Ballet Level 6 1 lir. 7:00 (F)
Ballet Technique 1 lir. 8:00 (F)
Ballet Technique 45 nun. 11:00 (K)
Pointe Beginning Invitation 30 min. 8:45 (F)
Pointe Level I Invitation 45 min. 6:15 (F)
Adult Jart & Tap 1 11r. 7:45 (B)
ZUNI BA & Toning Adult I Hr. 8:00 (!) 8:00 (P) 9:00 (P)
ZUNI BA for Dancers 1 lir. 10:00(P)
- - -, - '-
COM PE'f 1TION '11.:AMS
Petite Dreamangels audition 1 % Hrs. 4:3(1(13)
Petite Dreamgirls audition 1 % Hrs. 4:15 (B/W)
Petite Showgirls audition 1 Y. Hrs. 4:30 (B/W)
Junior Showgirls audition 1 % Hrs. 4:30 (B/W)
Teen Dreamgirls audition 1 % Hrs. 7:45 (B&W)
Teen Showgirls audition I 1 ,4 Hrs. 6:15 (B&W)
Senior Showgirls audition 1 % Hrs. 8:00 (B&W)
Teen/Senior TAP audition 40 min. 6:45 (B&W)
Production audition 1 lir. 5:45 (B&W)
.Junior Character audition 40 min. 4:30 (B/W)
Sr. Character audition 40 min. 7:25 (13/W)
Open Large Group audition 35 min. 3:55 (B/W)
Lyrical PDA/PDG(non competitive) Optional 45 min. 1 12:30 (K)
Lyrical Small Group audition 30 min. 7:30 (B/W)
Jazz Small Group audition 35 min. 5:1(1 (B/W)
Petite Comp Hip flop audition 45 min. 5:I5(1)
Junior Comp Hip Hop audition 45 min. 4:30 (M)
Senior Comp Hip Hop audition 45 min. 8:45 (M)
Dads & Daughters competition 45 min. 9:15 (M)
Turns (PDA & PDG) competition 30 min. 12:00 (M)
Turns (Petite Showgirls & Juniors competition 45 min. 11:45 (K)
Turns (Teens & Seniors) competition 45 min. 12:30 (11)
Leaps (Petites & Juniors) competition 45 min. 11:00 (11)
Leaps (Teens & Seniors) competition 45 min. 11:45 (II)
Technique Level 1 competition 30 min. 6:00 (NI)
Technique Level 2/3 competition 30 min. 6:00 (13)
Technique Level 2/3 competition 45 min. 6:45 (B)
Technique Level 4 competition 45 min. 8:00(13) 4:15 (B)
8:45 (B)
Petite Competition Ballet audition 1 % Hr. 6:15 (F)
Junior Competition Ballet audition 1 'A Hr. 5:15 (F)
Teen Competition Ballet audition 1 ii Hrs. 4:30 (F)
Senior Competition Ballet audition 1 '4 Hrs. 7:45 (F)
Competitive Pointe competition 1 Y. Hrs. 7:30 (F)
When art erriarund which closes to relioter your nonuklaughtero for, pleaoo use the me category as merely a guide-line. C115, pla Cement . l on your tiono/daughtero taschtuctue and dance
ever.r.C.e.
Teaching Staff:
Lisa Rene 1151, Kristen Bertelsen (10, Shannon Fahey (F), Anita Hershey (11), Jessie Nsil PI, Julie Millinersky (51), Michelle Wanout 01, -Notch Peterson (P)
I'lease Note: — INDICA') ES CLASS CLOSED AND/OR CANCELLED.
Class Descriptions
Preschool 45 minutes 5 years old 60 minutes 6-7 years old 60 minutes
• Basic Ballet and tumbling • Ballet & Tap • Ballet, Tap & Jazz
• Two sessions — Fall & Spring • Full year commitment • Full year commitment
• Performance in studio at the end of the • Perform Ballet & Tap dance in Spring • Perform Ballet , Tap and Jazz dance in
session. Recital Spring Recital
8 years old 75 minutes 10 years old 75 minutes 12 years old 75 minutes
• Ballet, Tap, and beginning Jazz • Ballet, Tap and Jazz • Lyrical, Tap & Jazz
• Full year commitment • Full year commitment • Full year commitment
• Perform Ballet, Tap and Jazz dance in • Perform Ballet, Tap and Jazz dance in • Perform Lyrical, Tap and Jazz dance in
Spring Recital Spring Recital Spring Recital
14 years old 60 minutes Hip Hop (9 45 minutes Teen Hip Hop (13 and up) 45 minutes
• Lyrical & Jazz • Boys & girls • Boys & girls
• Full year commitment • Fundamentals of Jazz with a Music • Fundamentals of Jazz with a Music
• Perform Lyrical and Jazz dance in Video image Video image
Spring Recital • Full year commitment • Full year commitment
• Perform one dance in Spring Recital • Perform one dance in Spring Recital
Kick line 45 minutes Classical Ballet 1 Classical Ballet 2
• High Kick • Minimum age = 6 years old • Requires at least 1 year of Classical
• Full year commitment • Requires completion of Age 5 ballet/ tap Ballet level I
• Perform High Kick in Spring Recital • Full year commitment • Full year commitment
• Perform one dance in Spring Recital • Perform one dance in Spring Recital
Classical Ballet 4 Classical Ballet 5 Beginning Pointe only
• Requires completion of Classical Ballet • Requires completion of Classical Ballet • Students are required to take two
Level 1, 2 & 3. Level 1,2,3, and 4. classical ballet level classes
• Able to successfully maintain use of • Knowledge of advanced barre and • Basic principles of beginning Pointe
alignment and turnout at barre and cen- center work work will be established.
ter. • Full year commitment • Full year commitment
• Full year commitment • Perform one dance in Spring Recital
• Perform one dance in Spring Recital
_
Pointe Level 1—invitation only Pointe Level 2—invitatIon only Competitive Pointe—invitation only
• Students are required to take two • Student are required to take two • Students are required to take two
classical ballet level classes, classical ballet level classes. classical ballet level classes.
• Requires completion of beginning Pointe • Requires completion of Pointe level 1 • Audition is required for placement
• Master the basic principles of Pointe • Students will be executing intermediate • Advanced Pointe technique will be
and beyond. principles of Pointe. established as well as preparing for
• Full year commitment • Full year commitment competitive performance.
• Performs one dance in Spring Recital • Performs one dance in Spring Recital • Full year commitment
• Perform at local competitions & qualify-
ing nationals.
• Perform all dances at all recitals
- _
Performing Companies
By Audition Only Multiple Classes 5
• Full year commitment
• Perform at local competitions & qualifying nationals.
• Perform all dances at all recitals
Page 1 of 1
"A =
a-7 4 7 7101,
•-
•
11/22/2011
http://www.danceesds.com/wpirnages/wp4e99678c_Ofjpg
Plumbing Heating & Air Conditioning, Inc.
15535 Medina Rd, Plymouth, MN 55447
Phone: (763) 473 -2267 Fax: (763)473 -8565
January 26, 2011
Bid Submittted to: Andy Chase
Project: Prior Lake Bldg Build -out #1 Safe Step
4385 Fountain Hills Dr (east Tennant)
Prior Lake
Flow Results as follows:
Upper Level Unit servicing back office space- Lennox 4 -ton , 100,000 btu furnace providing 1990 cfm distrubul
Office 1 main floor- one 6" supply at 75 cfm
Office 2 main floor- one 6" supply at 75 cfm
Office 3 main floor- one 6" supply at 75 cfm
Office 4 main floor- one 6" supply at 75 cfm
Office 5 main floor- one 6" supply at 75 cfm
Office 6 main floor- one 6" supply at 75 cfm
Office 7 main floor- one 6" supply at 75 cfm
Lunch room main floor- two 6" supply at 75 cfm ea, total 150 cfm
Main floor middle area- two 8" supplies at 200 cfm ea, total 400 cfm
Upper floor- three 10" supplies at 305 cfm ea, total 915 cfm
Steve Hucovski
Sabre Plumbing, Heating and Air Conditioning,Inc.