Prior Lake, MN 5HW t!JUNCIL AGENDA REPORT
DATE:
AGENDA #:
PREPARED BY:
REVIEWED BY:
AGENDA ITEM:
FEBRUARY 17, 2004
9C
MAKENZIE MCCORMICK, PUBLIC WORKS COORDINATOR
BUD OSMUNDSON, DIRECTOR OF PUBLIC WORKS
CONSIDER APPROVAL OF A RESOLUTION ACCEPTING THE
BIDS AND AWARDING THE CONTRACT FOR THE 2003-04
LIFT STATION REHABILITATION PROJECT, CITY PROJECT
NUMBER 03-05
DISCUSSION:
HISTORY
At the December 15, 2003 meeting the Council approved continuing to
use WSB to provide professional services regarding the rehabilitation of
four lift stations and further approved the addition of three lift stations to
the 2003-04 project. On January 20, 2004, the Council approved the
plans and specifications and authorized the advertisement of bids for the
lift station project. The purpose of this agenda item is to accept the bids
and award the contract for the rehabilitation of the seven lift stations
identified by City staff.
ISSUES:
The seven lift stations we are recommending to be completed in 2004 are:
. No.3 on Franklin Trail
. No.5 on Sycamore
. No.7 near Lakers
. No. 19 on Boudins
. No. 20 near Shady Beach
. No. 24 on Lime Road
. No. 28 on Fremont
Staff originally solicited bids last spring, but after receiving very high
prices, the Council rejected the bids and authorized staff to re-bid the
project. After the rejection of bids last July, Public Works staff
performed the specified renovations to the 150th Street and Condons lift
stations. These two lift stations were removed from the bid package and
three lift stations, Boudins, Shady Beach and Fremont, were added.
These lift stations all require major rehabilitation including replacement
of pumps, guide rails, electrical panels, other electrical components and
panels, wet well covers and hatches.
C:\Documents and Settings\KellyM\Local Settings\Temporary Inte~eR1el81H..~9lJfi\ij~e*Pm accept bids 2.17-04.DOC
Phone 952.447.4230 / Fax 952.447.4245
Bids were received and opened on Tuesday, February 10th, 2004 at
I :30pm. A total of five (5) bids were received for the lift station project.
The low bid was submitted by Carl Bolander & Sons Co. in the amount of
$637,884.00. This was lower than the engineer's estimate of $894,500.
As a result, staff is recommending awarding the bid to Carl Bolander &
Sons Co. for this project. The contractor has considerable experience in
such work.
FINANCIAL IMPACT: The funding for the project will come from the Sewer Operating Fund,
since it is the rehabilitation of existing sewer infrastructure. The
engineer's estimate for the total cost of engineering, materials and actual
repairs is approximately $1,200,000.00. The low bid totaled $637,884.00.
Engineering costs are $145,500. The City will need to purchase and
furnish additional materials for the project (SCADA, controllers, pumps,
etc.), the approximate cost is $272,000. We anticipate the total project
cost to be $1,055,384.00. The CIP has identified these lift station
rehabilitation projects as a priority.
ALTERNATIVES:
The alternatives for the City Council to consider are as follows:
I. Approve a resolution to accept the bids and award the contract for the
2003-04 Lift Station Rehabilitation, City Project Number 03-05.
2. Table this agenda item for a specific reason.
3. Deny this agenda item and provide staff with direction.
RECOMMENDED
MOTION:
Staff recommends adoption of Alternative No.1.
ACTION REQUIRED: A motion and a second to adopt the Resolution stated above.
REVIEWED BY:
2
C:\Documents and Settings\KellyM\Local Settings\Temporary Internet Files\OLK187\agenda receive and accept bids 2-17-04.DOC
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION 04-XX
A RESOLUTION TO ACCEPT ALL BIDS AND AWARD THE
CONTRACT FOR THE 2003-04 LIFT STATION REHABILITATION
PROJECT, CITY PROJECT NO. 03-05
MOTION BY:
SECOND BY:
WHEREAS,
City staff has identified seven lift stations requiring major rehabilitation this
year, including the Franklin Trail, Sycamore, Lakers, Boudins, Shady Beach,
Lime Road and Fremont lift stations and;
WHEREAS,
The adopted Capital Improvement Plan for 2003-2007 has identified these
rehabilitation projects as a priority for the City, and;
WHEREAS,
Pursuant to an advertisement for bids for the 2003-04 lift station rehabilitation
project, City Project No. 03-05; and
WHEREAS,
The following bids complying with the advertisement were received, opened,
and tabulated according to law:
BIDDER AMOUNT OF BID
Carl Bolander & Sons Co. $637,884.00
Landwehr Construction, Inc. $689,850.00
Park Construction $706,500.00
Barbarossa & Sons, Inc. $739,000.00
Northdale Construction, Inc. $809,000.00
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA that:
1. The recitals set forth above are incorporated herein.
2. The City Council has determined that Carl Bolander & Sons Co. of St. Paul,
Minnesota is the lowest responsible bidder.
3. The Mayor and City Manager are hereby authorized to execute the City's standard
contract with Carl Bolander & Sons Co. of St. Paul, Minnesota in the name of the City of
Prior Lake for the rehabilitation of seven lift stations.
4. The City Manager is hereby authorized and directed to return to all bidders the
deposits made with their bid once the contracts have been signed.
5. The funding for the project shall come from the Sewer Operating Fund.
C:\Documents and Settings\KellyM\Local Settings\Temporary InteWclMWe~~rfJfil~~e\~P,tt\ accept bids 2-1 7-04. DOC
Phone 952.447.4230 / Fax 952.447.4245
Passed and adopted this 17th day of February, 2004.
YES
NO
Blomberg Blomberg
Haugen Haugen
LeMair LeMair
Petersen Petersen
Zieska Zieska
{Seal}
Frank Boyles, City Manager
4
C:\Documents and Settings\KellyM\Local Settings\Temporary Internet Files\OLKI87\agenda receive and accept bids 2-17-04.DOC
STANDARD CONTRACT BETWEEN
THE CITY AND CONTRACTOR
THIS AGREEMENT made this 17th day of February, 2004, by and between the CITY OF PRIOR LAKE, a
Minnesota municipal corporation (hereinafter the "City') and Carl Bolander & Sons Co. (hereinafter the
"Contractor') .
Purpose: The City Council has determined that the City should rehabilitate/upgrade seven lift stations throughout
the City in accordance with the Plans and Specifications for the "2003 & 2004 Lift Stations Upgrade Project" dated
January, 2004. After completing the notification and bidding process, the City Council has awarded bid to Carl
Bolander & Sons Co. by Resolution 04-_, subject to entering into this contract.
The City and Contractor for the consideration stated below, agree as follows:
1. The Contractor agrees to perform and complete all the provisions of the specifications and plans indicated
below in Paragraph 2, as approved by the City for the rehabilitation and upgrade of seven lift stations in
accordance with the City's Plans and Specifications described above.
2. Contract and Contract Documents. The following documents attached hereto shall be referred to as the
"Contract Documents", all of which shall be taken together as a whole as the contract between the parties
as if they were set out verbatim and in full herein:
· As defined in General Conditions
a. Conflicting Provisions. If any provision in this "Standard Contract between the City and
Contractor" conflicts with any provision in the Contract Documents referenced above and incorporated
herein, the stricter provision which better protects the City and the public interest, shall apply.
3. The Proiect ("Work'" The Contractor shall perform all of the Work, as described for the rehabilitation of
the seven lift stations, required by the Contract Documents for the sum of Six hundred thirty-seven
thousand eight hundred eighty-four and 00/100 Dollars ($637,884.00).
4. Time of Commencement and Substantial Completion. The Work to be performed under this Contract
shall be commenced immediately after execution of this Agreement. The Work shall be substantially
completed by September 1,2004.
a. Startino the Work:
1. The Contractor shall commence the Work in such a manner and at such a time as to
expeditiously interface with the Work of other contractors, and shall pursue the Work
diligently to completion.
2. The execution of this Agreement by both parties constitutes a Notice to Proceed with the
Work, unless the City issues a separate Notice to Proceed designating a different starting
time. The Contractor shall promptly provide timely performance according to the immediate
progress requirement of the Work.
3. The Contractor shall commence the Work prior to the execution of this Agreement if a Letter
of Intent containing a Notice to Proceed is issued by the City.
Page 1 of 7
4. Upon receipt of a Notice to Proceed, the Contractor shall pursue and complete the Work
without voluntary interruption for any reason, as long as the Work can be performed. The
Contractor agreed that it shall continue the Work at all times the Work can be performed, at
a pace consistent with good industry practice regardless of pending or current disputes in
connection with the Contract Documents.
b. Timely Performance. It is the City's intent to complete the Project as soon as possible. The
Contractor agrees to cooperate in scheduling and performing the Work to achieve completion of
the Project as soon as possible.
5. Contract Sum. The City shall pay the Contractor in current funds for the performance of the Work, subject
to additions and deductions by Change Orders as provided in the Contract Document.
6. Final Payment. Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by
the City to the Contractor when the Work has been completed, the Contract fully performed, and the City
accepts the Work. The acceptance of final payment shall constitute a waiver of all claims by the Contractor
except those previously made in writing and identified by the Contractor as unsettled at the time of
Application for Final Payment.
7. Performance and Payment Bonds. The Contractor shall post a Performance and Payment Bond each in
an amount equal to one hundred percent (100%) of the payments due Contractor to insure the prompt and
faithful performance of this Contract by Contractor and to insure prompt payment to the subcontractor and
suppliers of the Contractor. The Bonds shall be in a form approved by the City. Contractor shall provide the
Bond to the City before commencing work and together with the executed contract document. If the
Performance and/or Payment Bond are not submitted as provided herein, this Contract shall be considered
void.
8. Insurance and Indemnification.
a. The Contractor shall purchase and maintain insurance to protect itself from claims under the
Worker's Compensation Act.
b. The Contractor shall purchase and maintain insurance to protect itself from claims for damages
because of bodily injury including personal injury, sickness or disease, or death of any of its
employees or any person other than its employees; and from claims for damages because of injury
to or destruction of tangible property including loss of use resulting therefrom and from claims
arising out of the performance of this Contract by the Contractor. The base limits of this policy shall
be $1,000,000 combines single limit.
c. Before the City executes this Contract, the Contractor shall provide the City with evidence of
insurance in a form of a Certificate from the insurer naming all policies. The City shall be an
additional named insured on the Contractor's insurance policy. The insurance policies shall contain
a provision that they may not be cancelled unless prior written notice thereof is given to the City not
less than ten (10) business days prior to the cancellation date.
Page 2 of 7
d. The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions
and programs in connection with the Work. The City shall not be responsible for or have control of
safety precautions and programs in connection with the Work.
e. Contractor provides the financial protection of the required insurance to benefit both City and
Contractor. Providing and paying for the insurance is part of the consideration which Contractor
offers City. The City does not represent or warrant that the types of limits of insurance specified in
this Article adequately protect Contractor's interest or sufficiently cover Contractor's liability.
f. The Contractor shall defend, hold harmless and indemnify the City, its officers, agents and
employees from and against any and all claims, demands, actions or causes of action (including
court costs and reasonable attorneys' fees) of whatever nature of character arising from the
Contractor's performance of the Work herein.
9. Warranty. The Contractor expressly warrants and guarantees to the City that all Work performed and all
materials furnished shall be in accord with the Contract Documents and shall be free from defects in
materials, workmanship, and operation which appear within a period of one (1) year, or within such longer
period as may be prescribed by law or in the terms of the Contract Documents, from the date of City's
acceptance of the Work. The City's rights under the Contractor's warranty are not the City's exclusive
remedy. The City shall have all other remedies available under this Contract, at law or in equity.
Should any defects develop in the materials, workmanship or operation of the system within the specified
period, upon notice from the City, the Contractor agrees, within fourteen (14) calendar days after receiving
written notice and without expense to the City, to repair, replace and in general to perform all necessary
corrective Work with regard to the defective or nonconforming Work or materials to the satisfaction of the
City. THE FOREGOING SHALL NOT IN ANY MANNER LIMIT THE CITY'S REMEDY OR THE
CONTRACTOR'S LIABILITY TO THOSE DEFECTS APPEARING WITHIN THE WARRANTY PERIOD.
The Contractor agrees to perform the Work in a manner and at a time so as to minimize any damages
sustained by the City and so as to not interfere with or in any way disrupt the operation of the City or the
public.
The corrective Work referred to above shall include without limitation, (a) the cost of removing the defective
or nonconforming Work and materials from the site, (b) the cost of correcting all Work of other Contractors
destroyed or damaged by defective or nonconforming Work and materials including the cost of removal of
such damaged Work and materials form the site, and (c) the cost of correcting all damages to Work of other
Contractors caused by the removal of the defective or nonconforming Work or materials.
The Contractor shall post bonds to secure the warranties.
10. Riahts and Remedies. The duties and obligations imposed by the Contract Documents and the rights and
remedies available thereunder shall be in addition to and not a limitation of any duties, obligations, rights
and remedies otherwise imposed or available by law.
No action nor failure to act by the City or the Contractor shall constitute a waiver of any right or duty
afforded any of them under the Contract, nor shall any such action or failure to act constitute an approval of
or acquiescence in any breach thereunder, except as may be specifically agreed in writing.
Page 3 of 7
11. Notice. Required notices to the Contractor shall be in writing, and shall be either hand-delivered to the
Contractor, its employees or agents, or mailed to the Contractor by certified mail at the following address:
Notices to the City shall be in writing and shall be either hand-delivered or mailed to the City by certified
mail at the following address:
Makenzie McCormick
City of Prior Lake
17073 Adelmann Street S.E.
Prior Lake, MN 55372
12. Condition and Inspection. All goods and other materials furnished under this Contract shall be new and in
current manufacture, unless otherwise specified, and all goods and work shall be of hood quality, free from
faults and defects and in conformance with the Contract Documents. All goods and work not conforming to
these requirements shall be considered defective.
Goods shall be subject to inspection and testing by the City. Defective goods or goods not in current
manufacture may be returned to the Contractor at the Contractor's expense.
13. Correction of Work. The Contractor shall promptly correct all Work rejected by the City as defective or as
failing to conform to the Contract Documents whether observed before or after Substantial Completion of
the Project and whether or not fabricated, installed or completed. The Contractor shall bear all costs of
correcting such rejected Work.
If, within one (1) year after the Date of Substantial Completion of the Project or designated portion thereof
or within one (1) year after acceptance by the City of designated equipment, or within such longer period of
time as may be prescribed by law or by the terms of any applicable special warranty required by the
Contract Documents, any of the Work is found to be defective or not in accordance with the Contract
Documents, the Contractor shall correct it promptly after receipt of a written notice from the City to do so
unless the City has previously given the Contractor a written acceptance of such condition. This obligation
shall survive both final payment for the Work or designated portion thereof and termination of the Contract.
The City shall give such notice promptly after discovery of the condition.
14. City's Riaht to Carry Out the Work. If the Contractor defaults or neglects to carry out the Work in
accordance with the Contract Documents or fails to perform any provisions of the Contract, the City may,
after seven (7) days written notice to the Contractor and without prejudice to any other remedy the City may
have, make good such deficiencies. In such case an appropriate Change Order shall be issued deducting
from the payment then or thereafter due the Contractor the cost of correcting such deficiencies. If the
Page 4 of 7
payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall
pay the difference to the City.
15. Chanae Orders. The Contract Sum may be changed only by written Change Order approved by the City
Council. The cost or credit to the City resulting from a Change Order shall be determined in one of the
following manners: (1) by mutual acceptance of a lump sum; or (2) by unit prices stated in the Contract
Documents as subsequently agreed upon. Any request for Change Order must be certified as true, correct
and accurate by the maker to avoid fraudulent requests.
16. Unauthorized Work. Additional Work performed without authorization of a Change Order will not entitle
Contractor to an increase in the Contract Price or an extension of the Contract Time.
17. Termination. If the Contractor persistently or repeatedly refuses or fails, except in cases for which
extension of time is provided, to supply enough properly skilled workers or proper materials, or fails to
make prompt payment to subcontractors or for materials or labor or persistently disregards laws,
ordinances, rules, regulations or orders of any public authority having jurisdiction, or otherwise is guilty of a
substantial violation of a provision of the Contract Documents, and fails within seven (7) days after receipt
of written notice to commence and continue correction of such default, neglect or violation with diligence
and promptness, the City may, without prejudice to any other remedy the City may have, terminate the
employment of the Contractor and take possession of the site and of all materials, equipment, tools,
construction equipment and machinery thereon owned by the Contractors and may finish the Work by
whatever methods the City may deem expedient. In such case, the Contractor shall not be entitled to
receive any further payment until the Work is finished.
18. Prompt Payment to Subcontractors. The Contractor shall pay any subcontractor within ten (10) days of
the Contractor's receipt of payment by the City of undisputed services provided by the subcontractor. If the
Contractor fails within that time to pay the subcontractor any undisputed amount for which the Contractor
has received payment by the City, the Contractor shall pay interest to the subcontractor on the unpaid
amount at the rate of one and one-half percent (1.5%) per month or any part of a month. The minimum
monthly interest penalty payment for an unpaid balance of $100.00 or more is $10.00. For an unpaid
balance of less than $100.00, the Contractor shall pay the actual interest penalty due to the subcontractor.
A subcontractor who prevails in a civil action to collect interest penalties from the Contractor shall be
awarded its costs and disbursements, including attorneys' fees, incurred in bringing the action. The
Contractor shall, by an appropriate agreement with each subcontractor, require each subcontractor to make
payments to his subcontractors in a similar manner.
19. Independent Contractor. At all times and for all purposes hereunder, the Contractor is an independent
contractor, and not an employee of the City.
20. Affirmative Action Policv. All Contractors and subcontractors employed shall comply with all applicable
provisions of all federal, state and municipal laws which prohibit discrimination in employment on the basis
of race, color, religion, sex marital status, national origin, ancestry, age, and physical or mental handicap
and all rules and regulations, promulgated and adopted pursuant thereto. The Contractor will include a
similar provision in all subcontracts entered into for the performance of this contract.
21. Miscellaneous.
Page 5 of 7
a. This Contract shall become effective only upon its execution by both the City and the Contractor.
This Contract shall not be modified, rescinded, waived or terminated without the approval in writing of the
City Council.
b. The City shall be allowed to audit Contractor's books and records during regular business hours
upon five (5) days written notice.
c. The Contractor and City, together with their respective agents and employees, agree to abide by
the provisions of the Minnesota Data Practices Act, Minnesota Statutes Section 13, as amended, and
Minnesota Rules promulgated pursuant to Chapter 13.
d. This Agreement shall be governed by the laws of the State of Minnesota.
e. That with respect to any and all businesses conducted or acts performed pursuant to this
Agreement, the Contractor shall be deemed an employer.
IN WITNESS WHEREOF, the parties have entered into this Agreement as of the date and year hereinabove first
written.
CITY OF PRIOR LAKE
CONTRACTOR
By:
By:
Jack G. Haugen, Mayor
Its:
By:
Frank Boyles, City Manager
STATE OF MINNESOTA )
)ss.
COUNTY OF SCOTT )
The foregoing instrument was acknowledged before me this day of , 2004, by
Jack G. Haugen and Frank Boyles, respectively the Mayor and City Manager of the City of Prior Lake, a Minnesota
municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council.
Notary Public
STATE OF MINNESOTA )
)ss.
COUNTY OF SCOTT )
Page 6 of 7
The foregoing instrument was acknowledged before me this
the
behalf, Contractor.
, a
Page 7 of 7
day of
, 2004, by
of
, on
Notary Public