HomeMy WebLinkAbout95-65
RESOLUTION 95-65
RESOLUTION ORDERING PREPARATION OF REPORT
FOR
UPGRADING OF MUSHTOWN ROAD IMPROVEMENT PROJECT
MOTION BY:
Kedrowski SECONDED BY:
Scott
WHEREAS, it is proposed to construct improvements within the following generally described
project area:
Mushtown Road from 1000 feet south of Tower Street to the southeast for 2500 feet to
Ridgemont Court. The construction will include sanitary sewer and watermain stubs,
storm sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing and
appurtenant work.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOT A, that the proposed improvements be referred to the City Engineer for study and
that he is instructed to report to the Council with all convenient speed advising the Council in a
preliminary way as to whether the proposed improvements are feasible and as to whether they
should best be made as proposed or in connection with other improvements, and the estimated
costs for the improvements as recommended.
Passed and adopted this 17th day of July, 1995.
YES NO
Andren X Andren
- -
Greenfield X Greenfield
--
Kedrowski X Kedrowski
--
Schenck X Schenck
--
Scott X Scott
{Seal}
RES9565.DOC
16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 1 Ph. (612) 447-4230 1 Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER