HomeMy WebLinkAbout5G Street Overlay (13-005) and Concrete Repair o� p �O�P
� �
U �
4646 Dakota Street SE
'�jNxESO'��' Prior Lake, MN 55372
CITY COUNCIL AGENDA REPORT
MEETING DATE: August 26,2013
AGENDA #: 5G
PREPARED BY: JAKE THEISEN, MAINTENANCE SUPERINTENDENT
PRESENTER: JAKE THEISEN
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION ACCEPTING BIDS AND
AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE
CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE 2013
STREET OVERLAY PROJECT 13-500 AND CONCRETE REPAIRS
DISCUSSION: Introduction
The purpose of this agenda item is to accept the bids and authorize the
Mayor and City Manager to execute the City's Standardized Construction
Contract with Bituminous Roadways for the 2013 street overlays and
concrete repairs as identified in the 2013 Street Department portion of the
General Fund Budget. Streets to be overlaid are in the Woodridge area.
Hi StOry
Staff utilizes a pavement management system for rating the condition of
streets throughout the City. Staff then uses this system as a tool when
identifying areas for maintenance and repair. To be eligible for an overlay
the street must have concrete curb and gutter, storm sewer, and a sound
sub base. The City also includes maintenance resurfacing of existing
streets in the overlay project area that do not have concrete curb and gutter
and will not be reconstructed in the next ten years. These maintenance
activities include patching, concrete repairs, and resurfacing of road
segments necessary to keep the streets usable until they are
reconstructed.
The following street overlays and maintenance resurfacings have been
identified by staff for construction in 2013:
1. Full len th road overla .
Route Descri tion
Toronto Ave Tower St to Mushtown Rd
Pondview Trl Mushtown Rd to Toronto Ave
Overlook Dr Mushtown Rd to Toronto Ave
Overlook Dr Toronto Ave to Horizon Trl
Parkwood Dr Toronto Ave to Rid ewood Ct
Rid ewood Ct Mushtown Rd to End
Horizon Trl Rid ewood Ct to Woodview Ct
Woodview Ct Toronto Ave to End
Oakwood Cir Woodview Ct to End
This is approximately 2.0 linear miles of street. Our average annual target
is 3.4 miles.
2. Concrete Repairs.
Mountable B618 Curb Concrete
Curb Pedestrian
Ram s
1,659 LF 640 LF 22
Current Circumstances
Advertisement for bids were published in both the Prior Lake American and
Minnesota Construction eAdvertising with bids due and opened on August 16,
2013 at 11:OOam for the Street Overlay project. The City received five (5)
bids for the Street Overlay project, which are listed in the chart below.
Com an Address Total
Bituminous Roadways, Inc. Mendota Heights, MN $263,344.45
55120
McNamara Contractin , Inc. Rosemont, MN 55068 $275,055.00
Prior Lake Blackto , Inc. Prior Lake, MN 55372 $298,066.20
Valley Paving, Inc Shakopee, MN 55379 $327,086.08
Chard Tiling & Excavating, Belle Plaine, MN 56011 $361,231.60
I nc.
Conclusion
Staff is recommending awarding the construction contract to the lowest
bidder, Bituminous Roadways, in the amount of $263,344.45. Bituminous
Roadways has previously worked for the City of Prior Lake and have
completed these projects successfully.
ISSUES: Considering the price of petroleum and petroleum based products, we
believe that the low bidders represent a good value to the Prior Lake
taxpayer. The City's estimate was $256,980.67 based on last year's
project.
FINANCIAL Funds for this project will be drawn from the Street Department portion of
IMPACT: the general fund budget, of which $370,000 is identified for the City's street
maintenance programs (overlay, seal coat, crack seal and stripping).
ALTERNATIVES: 1. Approve a resolution accepting the bids and authorizing the Mayor and
City Manager to execute the City's Standardized Construction Contract with
Bituminous Roadways for the 2013 Street Overlay Project 13-500.
2. Table this item for a specific reason and provide staff with direction.
3. Direct staff not to proceed with the project.
RECOMMENDED Alternative # 1
MOTION:
2
O � PRip
� �
U t:y
4646 Dakota Street SE
'�INnrESO'� Prior Lake, MN 55372
RESOLUTION 13-xxx
A RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE MAYOR AND CITY MANAGER TO
EXECUTE THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE 2013 STREET
OVERLAY PROJECT 13-500 AND CONCRETE REPAIRS
Motion By: Second By:
WHEREAS, The following streets have been identified by staff for overlay maintenance in 2013: '
Route Description
Toronto Ave Tower St to Mushtown Rd
Pondview Trl Mushtown Rd to Toronto Ave
Overlook Dr Mushtown Rd to Toronto Ave
Overlook Dr Toronto Ave to Horizon Trl
Parkwood Dr Toronto Ave to Ridgewood Ct
Ridgewood Ct Mushtown Rd to End
Horizon Trl Ridgewood Ct to Woodview Ct
Woodview Ct Toronto Ave to End
Oakwood Cir Woodview Ct to End
;and
WHEREAS, The City of Prior Lake is committed to improving the streets within the City by providing
continued maintenance; and
WHEREAS, Continued maintenance of City streets will reduce the need of costly reconstruction in the
near future; and
WHEREAS, A total of five (5) bids (provided in the chart below) were received for the identified
improvements, with the low bid from Bituminous Roadways, Inc. at a cost of $263,344.45
Com an Address Total
Bituminous Mendota Heights, MN $263,344.45
Roadwa s, Inc. 55120
McNamara Rosemont, MN 55068 $275,055.00
Contractin , Inc.
Prior Lake Blacktop, Prior Lake, MN 55372 $298,066.20
I nc.
Valley Paving,lnc Shakopee, MN 55379 $327,086.08
Chard Tiling & Belle Plaine, MN $361,231.60
Excavatin , Inc. 56011
;and
WHERAS, City staff recommends award of a contract to Bituminous Roadways, inc. as the lowest
responsible bidder for the 2013 Street Overlay Project 13-500.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Manager are hereby authorized to execute the City's Standardized Construction
Contract for the itlentified street overlays with Bituminous Roadways, Inc for a cost not to exceed
$263,344.45
3. Funding for this project shall be drawn from the Street Department portion of the General Fund Account
# 101-43100-412
PASSED AND ADOPTED THIS 26th DAY OF AUGUST 2013.
YES NO
Hedber Hedber
Keene Keene
McGuire McGuire
Morton Morton
Souku Souku
Frank Boyles, City Manager
2