Loading...
HomeMy WebLinkAbout95-119 RESOLUTION 95-119 ~liVNESO~~ RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT FOR NORTHWOOD ROAD, CSAH 21, STREET SEALCOATING, AND LAKE FRONT PARK MOTION BY: GREENFIELD SECONDED BY: SCHENCK WHEREAS, it is proposed to construct improvements within the following generally described project area: 1. Northwood Road from CSAH 12 to Island View Road. The construction will include sanitary sewer and watermain, storm sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing, concrete walk and appurtenant work; and 2. Paving of Lakefront Community Park roads, trails and parking lots by the construction of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work; and 3. CSAH 21 from CSAH 82 to CSAH 42 by the construction of grading, storm sewer, utility crossings, concrete curb and gutter, bituminous surfacing, sidewalk, and appurtenant work; and 4. The sealcoating of bituminous paved streets throughout the City. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the proposed improvements be referred to the City Engineer for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to whether they should best be made as proposed or in connection with other improvements, and the estimated costs for the improvements as recommended. Passed and adopted this 4th day of December, 1995. Scott NO Andren Greenfield Kedrowski Andren Greenfield Kedrowski Schenck Scott { Seal} 16200 IMgtel~k Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER