RESOLUTION 95-119
~liVNESO~~
RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT
FOR
NORTHWOOD ROAD, CSAH 21, STREET SEALCOATING,
AND LAKE FRONT PARK
MOTION BY:
GREENFIELD
SECONDED BY:
SCHENCK
WHEREAS, it is proposed to construct improvements within the following generally described
project area:
1. Northwood Road from CSAH 12 to Island View Road. The construction will include
sanitary sewer and watermain, storm sewer, grading, aggregate base, concrete curb and
gutter, bituminous surfacing, concrete walk and appurtenant work; and
2. Paving of Lakefront Community Park roads, trails and parking lots by the construction
of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing,
and appurtenant work; and
3. CSAH 21 from CSAH 82 to CSAH 42 by the construction of grading, storm sewer,
utility crossings, concrete curb and gutter, bituminous surfacing, sidewalk, and
appurtenant work; and
4. The sealcoating of bituminous paved streets throughout the City.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that the proposed improvements be referred to the City Engineer for study and
that he is instructed to report to the Council with all convenient speed advising the Council in a
preliminary way as to whether the proposed improvements are feasible and as to whether they
should best be made as proposed or in connection with other improvements, and the estimated
costs for the improvements as recommended.
Passed and adopted this 4th day of December, 1995.
Scott
NO
Andren
Greenfield
Kedrowski
Andren
Greenfield
Kedrowski
Schenck
Scott
{ Seal}
16200 IMgtel~k Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER