Loading...
HomeMy WebLinkAbout94-24 "RS9424" RESOLUTION 94-24 RESOLUTION OF THE PRIOR LAKE CITY COUNCIL SETTING FORTH CONDITIONS TO BE MET PRIOR TO RELEASK OF THE FINAL PLAT OF THE SECOND ADDITION TO RASPBERRY RIDGE. MOTION BY: KEDROWSKI SECONDED BY: GREENFIELD WHEREAS, the City Council has approved the Final Plat of the Second Addition to Raspberry Ridge. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PRIOR LAKE, MINNESOTA, that it should and hereby does require the following conditions to be met, prior to release of, and recording of said plat: 1. A title opinion or commitment of title insurance be submitted acceptable to the City Attorney. 2. Payment of all fees including but not limited to: final plat fee of $ 135.00 dollars; and all other fees associated with the developers agreement. See attached memo from Ralph Teschner dated March 24, 1994 for estimated fees. 3. The developer's agreement, as drafted by the City Engineer, shall be signed and fully executed prior to the release of the final plat. All fees shall be paid prior to release of the final plat. 4. Four mylar sets of the final plat with all required signatures be submitted. 5. A complete set of construction plans and specifications for all public works facilities for subdivision be submitted in accordance with the requirements of the "Public Works Design Manual." 6. Utility and drainage easements along with an erosion control plan and sewer/water plan be revised acceptable to the City Engineer. All easements including those necessary on the plat be granted, acceptable to the City Engineer. 7. A planting plan be submitted in accordance with Section 6-7-1 of the Subdivision Ordinance, and consistent with the approved planting plan for the preliminary plat. See attached memo from Gina Mitchell dated September 28, 1993 for detail changes required on the planting plan. 8. The final plat and all pertinent documents must be filed with Scott County within 60 days from the date of final plat approval. Failure to record the documents by July 16, 1994, will render the final plat null and void. ********* NOTES: ********* a) Payment of park support fees in accordance with City Policy at the time of building permit. b) Building permits shall not be issued until a contract has been awarded for the construction of municipal sewer and water. Occupancy permits will not be issued until sewer, water and storm sewers are accepted by the City Engineer and the base course for this road is installed. c) No building permits shall be issued until the Final Plat is filed and recorded with Scott County with the exception of one permit which may be issued to the underlying legal description for the entire parcel. 4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER d) The "City Copy" hardshell, containing all required signatures be returned to the Prior Lake Planning Office prior to issuance of any building permits for the plat. e) Homes built upon lots within the subdivision will be subject to the 30% impervious surface coverage ratio of the Zoning Ordinance, if located within a S-D, Shoreland District. f) All new construction will be subject to the driveway standards for slope, setback and hard surface, as per Prior Lake Zoning Ordinance 83-6. Passed and adopted this 16th day of May, 1994. Andren Greenfield Kedrowski Schenck Scott Yes X X X ~ X No Andren Greenfield Kedrowski Schenck Scott { Seal} RS9424. WRT