WHEREAS, it is proposed to construct improvements within the following generally described
project areas:
1. Street overlay project on Martindale Street from Pike Lake Trail to end terminus,
Henning Circle from Martindale Street to end terminus, and Hickory Avenue from
Martindale Street to end terminus by the construction of bituminous surfacing and
appurtenant work;
2. Pike Lake Trail from CSAH 42 to North line of proposed Knob Hill plat by the
construction of grading, sanitary sewer, watermain, storm sewer, aggregate base,
concrete curb and gutter, bituminous surfacing, sidewalk, landscaping and
appurtenant work;
3. Ridgemont Avenue from 300' north of T.H. 13 to Rutledge Street by the
construction of sanitary sewer, watermain, storm sewer, grading, aggregate base,
concrete curb and gutter, bituminous surfacing and appurtenant work;
4. Street paving and Street overlay/reconstruction improvement project on Creekside
Circle from T.R. 13 North to end terminus, Candy Cove Trail from T.R. 13 to
T.H. 13, Lemley Circle from Candy Cove Trail to end terminus, Manor Road
from Candy Cove Trail to Candy Cove Trail, Wood Lawn Circle from Manor
Road to end terminus, Hill Circle from Wood Lawn Circle to end terminus, Pixie
Point Circle from 150th Street to 150th Street, Oak Ridge Circle from Indian
Ridge Circle to Indian Ridge Circle, Indian Ridge Circle from Fairlawn Shore
Trail to end terminus, Fulbright Circle from Oak Ridge Circle to end terminus,
Flandreau Circle from Oak Ridge Circle to end terminus, Euclid Avenue from
Oak Ridge Circle to 150th Street, Centennial Street from Candy Cove Trail to end
terminus and Tower Street from CSAH 23 to Duluth Avenue by the construction
of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous
surfacing, sidewalk, landscaping, and appurtenant work;
5. CSAH 44 from T.H. 13 to east City limit line by the construction of storm sewer,
concrete curb and gutter, sidewalk, trail, lighting, landscaping and appurtenant
work;
6. County Road 83 from County Road to CSAR 42 by the construction of storm
sewer, concrete curb and gutter, trail, landscaping and appurtenant work;
4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
RS9443
PAGE 2
7. Construction of restrooms/storage beneath the grandstand in Memorial Park;
8. Construction of restrooms and shelter at Grainwood Crossing Park;
9. Channel stabilization project in Fish Point Park;
10. CSAH 18 from the City limits to CSAH 42 by the construction of storm sewer,
utility crossings, concrete curb and gutter, sidewalk, landscaping and appurtenant
work;
and to assess the benefitted property for all or a portion of the cost of the improvement, pursuant
to Minnesota Statutes, Chapter 429.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that the proposed improvements be referred to the City Engineer for study and
that he is instructed to report to the Council with all convenient speed advising the Council in a
preliminary way as to whether the proposed improvements are feasible and as to whether they
should best be made as proposed or in connection with other improvements, and the estimated
costs for the improvements as recommended.
Passed and adopted this 1st day of August, 1994.
YES
NO
Andren
Greenfield
Kedrowski
Schenck
Scott
X-
X-
X-
X-
X-
Andren
Greenfield
Kedrowski
Schenck
Scott
r:/
/ \
(~
{ Seal }