Loading...
HomeMy WebLinkAbout94-43 RESOLUTION 94-43 RESOLUTION ORDERING PREPARATION OF REPORT ON 1995 IMPROVEMENT PROJECTS MOTION BY: KEDROWSKI SECONDED BY: GREENFIELD WHEREAS, it is proposed to construct improvements within the following generally described project areas: 1. Street overlay project on Martindale Street from Pike Lake Trail to end terminus, Henning Circle from Martindale Street to end terminus, and Hickory Avenue from Martindale Street to end terminus by the construction of bituminous surfacing and appurtenant work; 2. Pike Lake Trail from CSAH 42 to North line of proposed Knob Hill plat by the construction of grading, sanitary sewer, watermain, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sidewalk, landscaping and appurtenant work; 3. Ridgemont Avenue from 300' north of T.H. 13 to Rutledge Street by the construction of sanitary sewer, watermain, storm sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing and appurtenant work; 4. Street paving and Street overlay/reconstruction improvement project on Creekside Circle from T.R. 13 North to end terminus, Candy Cove Trail from T.R. 13 to T.H. 13, Lemley Circle from Candy Cove Trail to end terminus, Manor Road from Candy Cove Trail to Candy Cove Trail, Wood Lawn Circle from Manor Road to end terminus, Hill Circle from Wood Lawn Circle to end terminus, Pixie Point Circle from 150th Street to 150th Street, Oak Ridge Circle from Indian Ridge Circle to Indian Ridge Circle, Indian Ridge Circle from Fairlawn Shore Trail to end terminus, Fulbright Circle from Oak Ridge Circle to end terminus, Flandreau Circle from Oak Ridge Circle to end terminus, Euclid Avenue from Oak Ridge Circle to 150th Street, Centennial Street from Candy Cove Trail to end terminus and Tower Street from CSAH 23 to Duluth Avenue by the construction of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sidewalk, landscaping, and appurtenant work; 5. CSAH 44 from T.H. 13 to east City limit line by the construction of storm sewer, concrete curb and gutter, sidewalk, trail, lighting, landscaping and appurtenant work; 6. County Road 83 from County Road to CSAR 42 by the construction of storm sewer, concrete curb and gutter, trail, landscaping and appurtenant work; 4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER RS9443 PAGE 2 7. Construction of restrooms/storage beneath the grandstand in Memorial Park; 8. Construction of restrooms and shelter at Grainwood Crossing Park; 9. Channel stabilization project in Fish Point Park; 10. CSAH 18 from the City limits to CSAH 42 by the construction of storm sewer, utility crossings, concrete curb and gutter, sidewalk, landscaping and appurtenant work; and to assess the benefitted property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the proposed improvements be referred to the City Engineer for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to whether they should best be made as proposed or in connection with other improvements, and the estimated costs for the improvements as recommended. Passed and adopted this 1st day of August, 1994. YES NO Andren Greenfield Kedrowski Schenck Scott X- X- X- X- X- Andren Greenfield Kedrowski Schenck Scott r:/ / \ (~ { Seal }