RESOLUTION 94-61
RESOLUTION ACCEPTING FEASIBILITY STUDY AND CALLING FOR A PUBLIC
HEARING ON IMPROVEMENT OF 1995 PROJECTS
MOTION BY:
KEDROWSKI
SECONDED BY:
GREENFIELD
WHEREAS,
pursuant to Resolution 94-43 of the City Council, adopted on August 1,
1994, to include traffic control signal work for CSAH 44 and County
Road 83 improvement projects, a report prepared by the City's
Engineering Department and the City's Engineering Consultant (MSA
Consulting Engineers, Inc.) with reference to the following improvements
and the generally described project areas:
Area 1 - Ridgemont Avenue
Ridgemont Avenue from the existing concrete curb and gutter to Rutledge
Street, including sanitary sewer, watermain, storm sewer, grading,
aggregate base, concrete sidewalk, bituminous surfacing, and appurtenant
work.
Area 2 - Creekside Circle
Street reconstruction of Creekside Circle, including grading, aggregate
base, storm sewer, concrete curb and gutter, bituminous surfacing, and
appurtenant work.
Area 3 - Titus Addition
Bituminous resurfacing of Martindale Street, Henning Circle and Hickory
Lane within the Titus Subdivision. In addition, work includes the
reconstruction of Martindale at Pike Lake Trail, including grading,
aggregate base, bituminous curb, bituminous surfacing, and appurtenant
work.
Area 4 - Construction of Restrooms/Storage in Memorial Park
Construction of restrooms/storage beneath the grandstand in Memorial
Park.
Area 5 - CSAH 18 From City Limits to CSAH 42
CSAH 18 from the City limits to CSAH 42 by the construction of storm
sewer, utility crossings, concrete curb and gutter, sidewalk, landscaping,
and appurtenant work.
4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
Area 6 - CSAH 44 From T.H. 13 to East City Limit Line
CSAH 44 from T.H. 13 to east City limit line by the construction of storm
sewer, concrete curb and gutter, sidewalk, trail, lighting, landscaping,
traffic control signal, and appurtenant work.
Area 7 - County Road 83 From County Road 82 to CSAH 42
County Road 83 from County Road 82 to CSAH 42 by the construction of
storm sewer, concrete curb and gutter, trail, landscaping, traffic control
signal, and appurtenant work.
Area 8 - Construction of Restrooms/Shelter in Grainwood Park
Construction of restrooms and shelter at Grainwood Crossing Park.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that
1. The Council will consider the improvement of such streets and areas in
accordance with the report and the assessment of property as described in the
report for all or a portion of the cost of the improvement pursuant to Minnesota
Statutes Chapter 429 at an estimated total cost of the improvements of
$1,297,968.00.
2. A Public Hearing shall be held on the following such proposed improvements on
February 6, 1995 in the Council Chambers at City Hall and at the following
times:
A.
Ridgemont Avenue
7:45 P.M.
B.
Creekside Circle
8:15 P.M.
C. Titus Addition Street Improvement 8:45 P.M.
'\ ,..A..r/
Passed and adopted this _~~ {;7fJday of }).1 ~ 1994.
YES
NO
Andren
Greenfield
Kedrowski .~.
SChencrk..
acott
.
!/_~
. / ,
Andren
Greenfield
Kedrowski
Schenck
Scott
Frank Bo es
City Man ger
City of Prior Lake
{ Seal}