Loading...
HomeMy WebLinkAbout94-61 RESOLUTION 94-61 RESOLUTION ACCEPTING FEASIBILITY STUDY AND CALLING FOR A PUBLIC HEARING ON IMPROVEMENT OF 1995 PROJECTS MOTION BY: KEDROWSKI SECONDED BY: GREENFIELD WHEREAS, pursuant to Resolution 94-43 of the City Council, adopted on August 1, 1994, to include traffic control signal work for CSAH 44 and County Road 83 improvement projects, a report prepared by the City's Engineering Department and the City's Engineering Consultant (MSA Consulting Engineers, Inc.) with reference to the following improvements and the generally described project areas: Area 1 - Ridgemont Avenue Ridgemont Avenue from the existing concrete curb and gutter to Rutledge Street, including sanitary sewer, watermain, storm sewer, grading, aggregate base, concrete sidewalk, bituminous surfacing, and appurtenant work. Area 2 - Creekside Circle Street reconstruction of Creekside Circle, including grading, aggregate base, storm sewer, concrete curb and gutter, bituminous surfacing, and appurtenant work. Area 3 - Titus Addition Bituminous resurfacing of Martindale Street, Henning Circle and Hickory Lane within the Titus Subdivision. In addition, work includes the reconstruction of Martindale at Pike Lake Trail, including grading, aggregate base, bituminous curb, bituminous surfacing, and appurtenant work. Area 4 - Construction of Restrooms/Storage in Memorial Park Construction of restrooms/storage beneath the grandstand in Memorial Park. Area 5 - CSAH 18 From City Limits to CSAH 42 CSAH 18 from the City limits to CSAH 42 by the construction of storm sewer, utility crossings, concrete curb and gutter, sidewalk, landscaping, and appurtenant work. 4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER Area 6 - CSAH 44 From T.H. 13 to East City Limit Line CSAH 44 from T.H. 13 to east City limit line by the construction of storm sewer, concrete curb and gutter, sidewalk, trail, lighting, landscaping, traffic control signal, and appurtenant work. Area 7 - County Road 83 From County Road 82 to CSAH 42 County Road 83 from County Road 82 to CSAH 42 by the construction of storm sewer, concrete curb and gutter, trail, landscaping, traffic control signal, and appurtenant work. Area 8 - Construction of Restrooms/Shelter in Grainwood Park Construction of restrooms and shelter at Grainwood Crossing Park. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that 1. The Council will consider the improvement of such streets and areas in accordance with the report and the assessment of property as described in the report for all or a portion of the cost of the improvement pursuant to Minnesota Statutes Chapter 429 at an estimated total cost of the improvements of $1,297,968.00. 2. A Public Hearing shall be held on the following such proposed improvements on February 6, 1995 in the Council Chambers at City Hall and at the following times: A. Ridgemont Avenue 7:45 P.M. B. Creekside Circle 8:15 P.M. C. Titus Addition Street Improvement 8:45 P.M. '\ ,..A..r/ Passed and adopted this _~~ {;7fJday of }).1 ~ 1994. YES NO Andren Greenfield Kedrowski .~. SChencrk.. acott . !/_~ . / , Andren Greenfield Kedrowski Schenck Scott Frank Bo es City Man ger City of Prior Lake { Seal}