RESOLUTION ORDERING IMPROVEMENTS AND PREPARATION OF PLANS
ON BUSINESS OFFICE PARK (PROJECT#93-11) AND OTHER 1993
CITY IMPROVEMENT PROJECTS
MOTIONED BY
WHITE
SECONDED BY FITZGERALD
WHEREAS, pursuant to Resolution 93-05 which the
adopted on February 16, 1993 calling
Hearing to be held at 8:00 P.M. on March
the following improvements:
AREA 1 - BUSINESS OFFICE PARK
Proposed Business Office Park located south of CSAH 2l and
within section 1 by the construction of grading, sanitary
sewer, watermain, storm sewer, aggregate base, concrete curb
and gutter, bituminous surfacing and appurtenant work;
City
for
15,
Council
a Public
1993 for
AREA 4 - CSAH 21 IMPROVEMENTS
CSAH 21 from 2000 feet east of Franklin Trail to east City
limit line by the construction of storm sewer, concrete curb
and gutter, lighting, sidewalk, landscaping and appurtenant
work;
AREA 5 - EXISTING INDUSTRIAL PARK STORM SEWER
From the existing Industrial Park and City Maintenance Shop
areas within section 1 to Markley Lake by the construction of
a storm sewer/ponding system and appurtenant work;
AREA 6 - CSAH 42 FROM FERNDALE AVENUE TO BOONE AVENUE
CSAH 42 from Ferndale Avenue to T.H. 13 by the construction
of storm sewer, watermain, sanitary sewer crossing, concrete
curb and gutter, intersection lighting, bikeway, landscaping,
and appurtenant work;
AREA 7 - FISH POINT ROAD EXTENSION IN THE GREENBRIAR PARCEL
Fish Point Road from CSAH 44 south to approximately 1,500
feet within the Greenbriar property by the construction of
grading, aggregate base, storm sewer, concrete curb and
gutter, bituminous surfacing, sidewalk and appurtenant work;
4629 Dakota St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPWYER
AREA 8 - CARRIAGE HILL ROAD
Carriage Hill Road from CSAH 21 to Pike Lake Trail by the
construction of grading, sanitary sewer, watermain, storm
sewer, aggregate base, concrete curb and gutter, bituminous
surfacing, sidewalk, landscaping, and appurtenant work;
AREA 9 - LEMLEY CIRCLE STORM SEWER
From Trunk Highway 13 and Candy Cove Trail to Mitchell Pond
by the construction of a storm sewer system and appurtenant
work;
AREA 10 - TRAFFIC CONTROL SIGNAL AT T.H. 13 & FIVE HAWKS
AVENUE
Trunk Highway 13 and Five Hawks Avenue Intersection by the
construction of a traffic control signal and road
channelization and appurtenant work;
AREA 11 - BITUMINOUS SEAL COAT OF CITY STREETS
The bituminous seal coating of bituminous paved streets
throughout the city;
AREA 12 - THE POND ATHLETIC COMPLEX PARKING LOTS AND ROAD
PAVING
Roadway and Parking lot paving in the Pond Athletic complex
by the construction of gradin9, aggregate base, concrete curb
and gutter, bituminous surfac1ng and appurtenant work;
AREA 13 - CIVIL DEFENSE SIRENS
Five locations within the City limits by the installation of
civil Defense sirens.
WHEREAS, ten days mailed notice and two weeks published notice of
the hearing was given, and the hearing was called to order on the
15th day of March, 1993 at which all persons desiring to be heard
were given an opportunity to be heard thereon; and
NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF
PRIOR LAKE, MINNESOTA, that;
Such improvements are hereby ordered as proposed in
Council Resolution 93-05 adopted the 16th day
February, 1993 contingent upon the acquisition of
Waterfront Passage Business Office Park land
further Council review of the projects.
2. The Citr En9ineer is hereby designated as the Engineer
for th1s 1mprovement. He shall prepare plans and
specifications for the making of this improvement.
1.
the
of
the
and
Passed and adopted this ~th day of
YES
March
, 1993.
NO
Andren
Fitzgerald
Kedrowski
Scott
White
Absent
X
--X
-X
--X