Loading...
HomeMy WebLinkAbout4C - Prior South ImprovementsSTAFF AGENDA REPORT AGENDA #: PREPARED BY: SUBJECT: DATE: 4 (c) BRUCE LONEY, ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF CHANGE ORDER NO. 1 PROJECT 94-01, PRIOR SOUTH IMPROVEMENTS DECEMBER 5, 1994 INTRODUCTION: BACKGROUND: During the course of construction for Project 94-01, additional work beyond the Contract was done by the Contractor. A Change Order for this additional work has been prepared and enclosed in the Agenda packet for Council approval. The contractor, Valley Paving Inc., and their subcontractors, have performed additional work which was not included in the original contract. The additional work is described and itemized costs are shown on the enclosed Change Order form. A total of ten (10) additional items are described with the total net cost of the Change Order being $11,441.55. Previously a memorandum was given to Council in regards to the Change Order work on September 20, 1994, which listed six (6) items at an estimated cost of $5,360.00. Additional work was required to complete the project beyond what was itemized in the September 20 memorandum. Items #2 and 3 in the September 20, 1994 memorandum were also under estimated due to unforeseen underground conditions. Items #1 and 8 are associated with rework on existing storm sewer pipe in which the pipe was either not needed or the pipe size changed to match existing field conditions. Item #2 is associated with a repair of a sanitary sewer service within the City's right of way. The existing sewer service had a sag in the pipe and the service pipe was relaid and trench bottom stabilized. The trench area had high ground water conditions, thus considerable dewatering was necessary and the use of a trench box to protect the workers. The high ground water made the repair more difficult and more costly than previously estimated. Items #3, 4, 5, 7 and 9 are extra work items associated with the City's existing watermain system. Item #3 was for the repair of a defective valve. Items #4 and 5 were in regards to locating the limits of a shallow watermain and the actual lowering of the watermain under Brunswick Avenue. The watermain was lowered to a minimum depth of four (4) feet and insulated to prevent freezing. Items #7 and 9 are associated with repairs to existing hydrants and repair of a water service. 4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPIfi~)~{TUNITY EMPLOYER ALTERNATIVES: RECOMMENDATION: BUDGET IMPACT: ACTION REQUIRED: AG125.ENG Item #6 is associated with the landscape restoration at the corner of Brunswick Avenue and Dublin Road which did not have a bid item associated with the work. Item #10 is associated with the removal of an additional tree located by the Blind Lake dredging work area and was deemed necessary in order to complete the dredging work. The total amount of this Change Order is $11,441.55 with the original contract amount being $435,577.16. The addition of Change Order No. 1 represents a 2.6% increase in the original contract amount and the contract amount total is now $447,018.71. Although the contract price total will be $447,018.71, the estimated final contract total per MSA Consulting Engineers will be approximately $431,000.00 including the Change Order work. The contractor has signed the Change Order and has performed the work. Additional work was completed as recommended by the City's consultant and City's engineering staff. This Change Order is for all the extra work associated with this year's construction work on this project. The alternatives are as follows: Approve a motion authorizing Change Order No. 1 in the amount of $11,441.55 to Valley Paving Inc. Disapprove the motion for a specific reason. Table this item for a specific reason. The recommendation is to approve Change Order #1 as the contractor has completed the work and City staff feels the additional cost is acceptable. This amount will be paid from the Construction Fund and will be included with this month's construction voucher. Sufficient funds exist to pay for the additional cost from this Change Order. Make a motion to a~prove Change Order #1 for Project 94-01 authorizing the(~~ REVIEW~ / -2- (Instructions on reverse side) CHANGE ORDER NO. PROJECT: Prior South DATE OF ISSUANCE: OWNER: (Name, Address) CONTRACTOR: City of Prior Lake 4629 Dakota Avenue S.E. Prior Lake, Mb; 55372 Valley Paving, Inc. 8800 - 13th Avenue E Shakopee, MN 55379 CONTRACT FOR:Prior South Street and Storm Sewer OWNER'S Project No. 94-01 ENGINEER: MSA, Consulting Engineers 1326 Energy Park Drive St. Paul, MN 55108-5202 ENGINEER's Project No. 102-024-30 You are directed to make the following changes in the Contract Documents. Description: SEE ATTACHED LIST. Purpose of Change Order: SEE ATTACHED LIST. Attachments: (List documents supporting change) SEE ATTACHED LIST. CHANGE IN CONTRACT PRICE: Original Contract Price Previous Change Orders No. -- to No. -- $ 0 - Contract Price prior to this Change Order $ 435,577,16 Net Increase (Dccrcazc) of this Change Order $ 11,441,55 Contract Price with all approved Change Orders $ 447,018,7~ CHANGE IN CONTRACT TIME: Original Contract Time days or date Net change from previous Change Orders days Contract Time Prior to this Change Order days or date Net Increase (Decrease) of this Change Order days Contract Time with all approved Change Orders days or date RECOMMENDED: APPROVED: MSA, Consulting ~n~neers City of Prior Lake EJCDC No. 1910-8-B (1983 Edition) 'V~lley Pavin~ Inc. C0#1-102.024 ~0 DESCRIPTION: Restocking 36" ARCP, sanitary sewer service repair, excavation and backfill of a leaking water valve, lowering the existing 8" watermain under Brunswick that had inadequate cover, and landscape restoration of the property located at the north-east comer of Brunswick Avenue and Dublin Road. PURPOSE OF CHANGE ORDER NO. 1: The purpose of Change Order No. 1 is to perform the work described below that was not included in the Bid. Item No. 1 The restocking of the 30" ARCP that was initially placed, then removed because the pipe was not needed. The lump sum cost for lost crew time, restocking, and Contractor mark- up is $520.17. Item No. 2 The repair of the sanitary sewer service located at the comer of Lyons and Brunswick Avenues. The lump sum cost for materials, labor, sales tax, additional bonding, and Contractor mark-up is $3,453.44. The total lump sum costs includes 13 hours of labor @ $175/hr, trench box rental of $150., materials, sales tax and bonding of $91.25, trench rock for stabilization of $657.69, Contractor mark-up of $254.16 and overhead of $25.34. The exposure of a leaking water valve located at the intersection of Brunswick and Lyons Avenues in order to allow access to the valve by the City maintenance crew. Backfilling of the valve after the valve repair was completed by the City. The total lump stun cost for labor, materials, sales tax, additional bonding, and Contractor mark-up is $1,007.80. Item No. 4 Digging three test holes for the City, in order to determine the depth of the existing watermain under Brunswick Avenue. The total cost for three holes with a unit price of $120/each is $360.00. Item No. 5 The lowering of shallow watermain under Brunswick Avenue. The total lump sum cost for labor, materials, sales tax, additional bonding, and Contractor mark-up is $3,855.92. co#t-102.024 20-A Item No. 6 Landscape restoration of the property located on the northeast comer of Brunswick Avenue and Dublin Road. The total lump sum cost for labor, materials, sales tax, additional bonding, and Contractor mark-up is $825.00. Item No, 7 Two hydrant extensions for hydrants located at the intersections of Brunswick and Lyons Avenues and Brunswick and Dublin Road. The total lump sum cost for materials, sales tax, and Contractor mark-up is $550.61. Item No. 8 Additional material cost and freight for the placement of a 15" CMP in lieu of a 12" CMP. The total lump sum cost for labor, materials, sales tax, additional bonding, and Contractor mark-up is $106.87. Item No. 9 The repair of a water service located on Dublin Road. The total lump sum cost for labor, materials, sales tax, additional bonding, and Contractor mark-up is $311.74. Item No. 10 The clearing and grubbing additional willow trees located on the Blind Lake storm sewer outlet. The total lump sum cost for labor is $450.00. CO#1-102.024 20-B Item No. 1. CHANGE ORDER NO. 1 - PRIOR SOUTH CITY PROJECT NO. 94-01 ~ Unit Qty.. Price Restock/Labor Cost for 30" ARCP LS 1 $ 520.17 Sanitary Sewer Service Repair LS 1 $3,453.44 Excavation & Backfill of Water Valve LS 1 $1,007.80 Watermain Test Holes EA 3 $ 120.00 Lower 8" Watermain on Brunswick Avenue LS 1 $3,855.92 Landscape Restoration LS 1 $ 825.00 Hydrant Extensions LS 1 $ 550.61 (2 each) 15" CMP in lieu of LS 1 $ 106.87 12" CMP Water Service Repair LS 1 $ 311.74 Clear & Grab Trees LS 1 $ 450.00 Total Increase Due to Change Order No. I Extension $ 520.17 $3,453.44 $1,007.80 $ 36O.OO $3,855.92 $ 825.00 $ 550.61 $ 106.87 $ 311.74 $ 450.00 $11,441.55 COg1-102.024 20-C