Loading...
HomeMy WebLinkAbout4H Northwood Rd EasementSTAFF AGENDA REPORT AGENDA #: PREPARED BY: SUBJECT: DATE: INTRODUCTION: BACKGROUND: DISCUSSION: 4 (h) BRUCE LONEY, ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF AUTHORIZING EASEMENT DESCRIPTION PREPARATION FOR PROJECT 94-02, NORTHWOOD ROAD DECEMBER 19, 1994 The purpose of this Agenda item is to consider approving easement description work for Project 94-02, Northwood Road street improvement by MSA Consulting Engineers. On April 4, 1994, the Council approved Resolution 94-15 which ordered the preparation of plans for the Northwood Road improvement project. The Council also authorized MSA Consulting Engineers, Inc. to prepare the construction plans at a cost not to exceed $52,000.00. The project cost for Northwood Road in the Feasibility Study was $919,950.00. The construction cost for this project using a 30% indirect cost percentage is $707,653.84. The cost given by MSA Consulting Engineers to prepare the plans for Northwood Road did not include easement descriptions, negotiations or appraisals. The total of $52,000.00 was for the design and preparation of plans. MSA Consulting Engineers is estimating a cost of $8,300.00 to describe the easements as per the attached letter. The work consists of preparing easements for 12 parcels of land, preparing exhibits, field locations, meetings with City and the preparation of a right-of-way plan for State Aid reimbursement. The design engineering total would then be $60,300.00 or 8.52% of the construction cost. Typically, State Aid will allow 10% of the construction cost for plan preparation. Staff was working with a potential property owner and potential development along Northwood Road to acquire the necessary easements on the west side of Northwood Road. It appears that the development is not moving forward at this time, thus the proposal to prepare the necessary easement descriptions is on the Council Agenda for consideration. It is staff's intention to have the easements prepared, and at a future Council meeting have appraisals, negotiations and eminent domain proceedings authorized, if necessary. 4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ISSUES: ALTERNATIVES: RECOMMENDATION: FINANCIAL IMPACT: ACTION REQUIRED: A1219.ENG The City needs to have the work authorized in order to complete the design and to start the right-of-way acquisition process for the project to be constructed next year. The project design has proceeded to a point where the right-of-way/easement acquisition can be determined. The alternatives are as follows: Approve a motion authorizing MSA Consulting Engineers to prepare the easement descriptions for Project 94-02, Northwood Road street improvement. Deny approval for a specific reason. Table this item for a specific reason. The recommendation is to approve the easement description work as part of Project 94-02 and design at a cost of not to exceed $8,300.00. The cost of the project will be recovered through Special Assessments, Trunk Reserve and Municipal State Aid Funds. The action required v~ll be to make a motion to approve or deny MSA Consulting, ..E~gineer~/to prepare the easement description for Project REVI EW~,/~ g ~ ONe[ LTING ENG[NEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 December 9, 1994 File: 1024325-53 CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS Mr. Brace Loney, P.E. City of Prior Lake 16200 Eagle Creek Avenue Southeast Prior Lake, MN 55372-1714 RE: EASEMENT PREPARATION FOR THE NORTHWOOD ROAD PROJECT Dear Mr. Loney: We have prepared an estimate for the preparation of the easements for the Northwood Road project. The project will consist of preparing easements for 12 parcels of land. Our services would consist of preparing the easement documents, exhibits, field locations of section lines and lot lines, meetings with the City and the acquisition company, and the preparation of a right-of-way plan. Our proposal is based on our hourly rates with a not-to-exceed cost of $8,300.00. If there are any questions regarding the above proposal, please contact our office. Yours truly, MSA, CONSULTING ENGINEERS Frank S. Kriz, R.L.S. FSK:pd 09-5-0809.de~ OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA